John Jakubowski Park Addendum 1.pdf
PDF 405 KB Posted
- Solicitation number
- RFQ 171 240000000523 4
- Issued by
- Wayne County, Riverview City, Michigan
About this file
This is Addendum No. 1 issued by the State of Michigan Department of Technology, Management & Budget, in coordination with the Department of Environmental, Great Lakes, and Energy (EGLE) Design and Construction Division, for the John Jakubowski Park project located at 3111 W St. Joseph Street in Lansing, Michigan (with work occurring at Goodell Street in River Rouge, Michigan). The addendum was issued on July 1, 2024, with a bid opening date of July 17, 2024, at 2 PM local time. The primary purpose of this addendum is to distribute the pre-bid meeting attendee list (Attachment 1) and to revise the project manual by adding critical specifications regarding lead-based paint hazards identified on the project site. The addendum notes that both the swing set and pavilion at the park contain lead-based paint, and contractors must acknowledge this hazard in the modified "Bid Summary" form. All addenda will be distributed online through the sigma.michigan.gov website, and bidders are responsible for ensuring subcontractors and suppliers are informed of addendum contents.
The addendum includes detailed lead abatement project procedures that establish mandatory contractor obligations for worker protection and lead hazard mitigation. Contractors must comply with Michigan Department of Licensing and Regulatory Affairs Occupational Health Standards Part 603 and the Michigan Lead Abatement Act, ensuring employee exposure does not exceed Permissible Exposure Limits. All lead removal, transportation, and disposal must be performed at no additional cost to the Owner, with contractors required to provide minimum 10 working days' notice prior to initiating lead abatement activities. Lead abatement work must be completed by a qualified Lead Abatement Contractor in accordance with state regulations, with clearance testing performed by a Certified Inspector or Risk Assessor. Contractors are prohibited from using sanding, cutting, grinding, or heat-gun stripping methods on lead-based paint and must comply with federal OSHA standards including proper respirator use, worker rotation, and comprehensive employee training requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement 24247.pdf | ||
| John Jakubowski Park Addendum 3.pdf | ||
| John Jakubowski Park Addendum 2.pdf | ||
| Specifications 24247.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN Date Issued: July 1, 2024 Department of Technology, Management & Budget DMB File #: 761/24247.IND State Facilities Administration Department: EGLE Design and Construction Division Project Name: John Jakubowski Park 3111 W St. Joseph Street Lansing, Michigan 48917
Subject: Addendum No. 1
Bid Opening Date:
July 17, 2024 at 2 PM local time
ADDENDUM NO. 1
To: All Bidders
SUBJECT: Amendments to the John Jakubowski Park project, Goodell Street, River Rouge, Michigan.
INTENT: This addendum is issued to distribute the Bidder’s list (Attachment 1) and to revise the project manual. This addendum and all future addenda will be distributed online at the sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService website. It is the eligible Bidders’ responsibility to ensure that any potential subcontractors or suppliers that have the original version of the Contract Documents are aware of the contents of all addenda.
REVISIONS
1. Add Attachment 2 to Appendix 3 of the Specifications. The swing set and pavilion are known to contain lead-based paint.
Acknowledgement of this Addendum shall be made in the space provided on the modified “Bid Summary” form. The changes and information in this Addendum shall become part of the Contract Documents.
WSP Michigan, Inc.
Anita Emery-DeVisser Site Manager
John Jakubowski Park Addendum #1 July 1, 2024
Attachment 1
Pre-Bid Meeting Attendance List
John Jakubowski Park Addendum #1 July 1, 2024
Attachment 2
Appendix III, Special Project Procedures, Lead Abatement Project Procedures
LEAD ABATEMENT PROJECT PROCEDURES
Should this Work require the renovation or demolition of a building or structure, the workers are assumed to be exposed to lead or materials containing lead above acceptable levels until proven otherwise through personal air sampling and analysis. The Contractor shall take all steps necessary to assure that his/her employees, are not exposed to lead at concentrations greater than the Permissible Exposure Limit as per the State of Michigan Department of Licensing and Regulatory Affairs Occupational Health Standards Part 603 “Lead Exposure in Construction”. In addition, the Contractor shall convey this same requirement to all subcontractors that may be under his/her control.
The employer shall comply with the Michigan Lead Abatement Act, as amended, and the Lead Hazard Control rules and must communicate information concerning lead hazards according to the requirements of Michigan Occupational Safety and Health Administration (MIOSHA) Part 603 and the Occupational Safety and Health Administration’s (OSHA's) Hazard Communication Standard for the construction industry, 29 CFR 1926.59, including but not limited to safety equipment (e.g. personal fit-tested and approved respirators and protective clothing), worker rotation (on a short-cycle and regular basis), working practices (e.g. sanding, cutting, grinding, abraded, burning and heat-gun stripping of lead based paint are not allowed), the requirements concerning warning signs and labels, Safety Data Sheets (SDS), and employee information and training. Employers shall comply with the requirements of 29 CFR 1926.62(l) - Employee Information and Training.
If lead or materials containing lead will be disturbed as a part of the work to be performed, the Contractor must remove, transport, and dispose of these materials at no additional cost to the Owner and prior to any other work taking place within the immediate vicinity of said material. The Contractor must provide the Owner a minimum 10 working day notification prior to the start of any lead abatement activities with abatement in occupied buildings being completed even if they will be conducted during off hours (nights, weekends, and state holidays). Abatement is defined as an activity specifically designed to permanently remove lead paint, lead-contaminated dust or other lead containing materials, the installation of a permanent enclosure or encapsulation of lead paint or other lead containing materials, the replacement of lead-painted surfaces or fixtures, the removal or covering of lead-contaminated soil, and any preparation, cleanup, disposal, and post-abatement clearance testing associated with these activities. Renovation, remodeling, landscaping, or other activity, that is not designed to permanently eliminate lead paint hazards, but is instead designed to repair, restore, or remodel a structure, or housing unit even though the activity may incidentally result in a reduction or elimination of a lead paint hazard is not considered abatement.
If abatement of lead or materials containing lead is required, abatement must be completed by a qualified Lead Abatement Contractor. In addition, Specifications for the Lead Abatement should be based upon a Lead Inspection/Risk Assessment report. The Lead Inspection/Risk Assessment report and clearance testing upon completion should be performed by a Certified Inspector or Risk Assessor. Lead abatement including clearance testing shall be performed in accordance with the State of Michigan, Lead Abatement Act, Part 54A Lead Abatement and with all other federal, state, and local Laws and Regulations that may apply.
For additional information about certifications, guidance, and regulations for lead hazard control activities, visit www.michigan.gov/lead.
http://www.michigan.gov/leadsafe
| ADDENDUM NO. 1 |
| JAKUBOWSKI_SIGN_IN |
| Att2 LEAD ABATEMENT PROJECT PROCEDURES |
File details come from the government source that posted it. Updated .