About this file
The document provided is a Charrette Report for Repair Base Operations B528, which is related to the federal contract opportunity JFSD201907 Repair (SUS) Base Operations B528.
The Charrette Report outlines the services required from an Architect-Engineer (A-E) to prepare complete construction documents, including contract drawings, technical specifications, design analysis, cost estimate breakdown, and construction schedule, for the repair of Base Operations Building 528. The specifications must comply with the Federal Affirmative Procurement Program Guide. The contracting agency is the Department of the Air Force Air Mobility Command. The document does not provide specific details on response dates, award dates, pricing terms, set asides, incumbents, or other salient information related to the contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRAND FORKS AIR FORCE BASE
PROJECT NO. JFSD201961
REPAIR BASE OPERATIONS B528
CHARRETTE REPORT
810 1st Avenue North, Fargo, North Dakota 58102 - 701-282-5505 fossarch.com
July 28, 2021
Greg Sturdevant Architecture/Project Management
319 CES/CENM
525 Tuskegee Airmen Blvd Grand Forks AFB ND 58205-6434
Contract: FA4659-15-D-A001
Project: JFSD201961
Subject: Repair Base Operations B528
Mr. Sturdevant, Attached is our Charrette Report for the Repair of Base Operations B528.
Three options were explored, each providing varying levels of renovation to B528. The report appendix includes existing plans, concept plans, building assessment report, cost estimating worksheets, charrette meeting minutes, hazardous materials report, and list of additional questions, which have been answered.
Please contact me with any questions or concerns.
Sincerely, Robert Ames, AIA, LEED AP Principal/Project Manager
TABLE OF CONTENTS
FACILITY SUSTAINMENT, RESTORATION, AND MODERNIZATION (FSRM)
CHARRETTE REPORT (CR) Standard form provided by Grand Forks AFB
1.0 - Introduction
2.0 - Project Description
2.1 - General Description
2.2 - Current Situation
2.3 - Impact if Not Provided
2.5 - Cost Estimate
2.6 - Concept Sketches
3.0 - Scope Analysis
3.1 - Cost & Scope Thresholds
3.2 - User and Facility Requirements
3.3 - User Equipment
3.4 - Hazardous Substances
3.5 - Approvals/Exemptions/Waivers
Appendicies
A - Existing Site Plans
B - Existing Floor Plans
C – Facility Assessment Report
D - Concept Plans
E – DA Forms 7307-R – Cost Estimating Worksheet – Facility Alteration
F - Simplified Analysis of Alternatives (SAoA)
G - Charrette Meeting Minutes and Space Program
H - Asbestos & Lead-Based Paint Survey and Report
I - List of unresolved items and answers needed from Government
FACILITY SUSTAINMENT, RESTORATION, AND MODERNIZATION (FSRM)
CHARRETTE REPORT (CR)
Repair Base Operations B528
Grand Forks AFB, ND
JFSD201961
July 28, 2021
319 CES/CENM
Point of Contact:
Greg Sturdevant, Project Manager
701-747-4575
Gregory.sturdevant@us.af.mil
1.0 Introduction
This document provides the Facility Sustainment, Restoration, and Modernization (FSRM) Conceptual Charrette Report (CCR) for the Repair of Base Operations B528 at Grand Forks
AFB, ND.
The primary purpose of the CCR is to validate the project scope, site, and costs and to refine the programming documentation in preparation for possible submission for project approval; DD
Form 1391. It also provides the designer a basis for understanding the project requirements and establishes a framework for project execution.
The CCR development was accomplished by Foss Architecture + Interiors, Fargo, ND. Key users included in developing this document included:
Major Casey Phipps 319 OSS
Doug Starkweather Airfield Management
Capt Matthew Dehr Weather Element
Lt Trever Bruce Airfield Management
Gregory Sturdevant 319 CES/CENM
The project scope and costs are described below and in the Appendix. Form 1391 will be provided by the GFAFB. Any items in this report that are left blank are to be verified and completed by the GFAFB.
The following is a summary of the basic project information:
Project Name: Repair Base Operations B528
Project Number: JFSD201961
Installation: Grand Forks Airforce Base, ND
Requiring Command:
Host Command:
Fiscal Year (FY) Planned:
Category Code(s):
Proposed Acquisition Method: (DB or DBB)
Status of Design: (A&E acquisition or XX% complete)
Design Agent: (Base or AFCEC or Other)
Construction Agent: (Base or AFCEC or Other)
2.0 Project Description
2.1 General Description
Scope
This project involves repair and modernization to B528 which houses 319th Operations Support
Squadron Airfield Management and Weather Element. The last significant renovation/addition occurred in 2000, and all major building systems are in need of significant repair or replacement.
Foss Architecture + Interiors performed both a facility assessment and space planning study to evaluate existing building systems conditions and utilization, the results of which are contained in this report.
Function
Airfield Management and Weather Element both provide direct support to airfield activities and aircraft arriving to, and exiting from, the Base. Airfield Management requires direct visual, pedestrian, and vehicular airfield access for maintenance and management. Weather Element provides both visual and electronic monitoring of weather conditions as related to the Base, airfield, and surrounding region. Electronic connection to monitoring equipment located at airfield and face-to-face support for aircraft personnel is required.
Airfield Management is programmed for 11 total personnel housed largely in open office workstations, along with support facilities for flight planning, training, and aircrew lounge. A
Distinguished Visitor (DV) lounge under Wing Protocol management is required to be located in
B528 for direct airfield access.
Weather Element is programmed for nine personnel in a combination of private office and open office workstations. Some personnel provide direct support to aircraft personnel. A training room and a secured communications/storage environment are required.
Airfield Management and Weather Element are 24-hour operations. At times, inclement weather and travel conditions prevent personnel from leaving Base and facilities to accommodate overnight stays are desired.
Site
B528 is located on the western edge of the Base along Eielson Street, and between Steen Blvd.
and Road 16. The location is adjacent to the airfield and is on the flight-line security perimeter.
Criteria in AFI 31-101 Integrated Defense will apply.
A large parking lot is located east of, and directly adjacent to, the building has been maintained in good condition and sized adequately to serve B528. A porte cochere on the south end of B528, adjacent to the DV lounge provides covered vehicular access for pick-up and drop-off.
See Appendix Figure A-1, Vicinity Map, for location of the project site. See Appendix Figure
A-2, Project Site Map, which illustrates the project site location and surrounding area.
2.2 Current Situation
The existing facility functions largely as required and desired by Airfield Management and
Weather Element. Minor functional improvements have been identified, including creation of and Aircrew lounge separate from other AM functions, creation of a toilet/shower and cot space for overnight accommodations, and right-sizing of Weather SIPR functions. Increase in
Mechanical space will allow for improved and centralized mechanical systems.
General Construction Existing Conditions:
B528 is one of the original Base structures remaining, originally constructed in 1955 and has been subject to numerous repair/renovation projects, the most significant occurring in 2000 which included substantial interior renovation, a small addition and exterior wall finish repair.
B529 is the original OSS tower structure connected to B528 which has been decommissioned and the cab removed.
Foss Architecture + Interiors, along with civil, mechanical, and electrical consultants performed a facility assessment in 2020 to evaluate building systems conditions along with space utilization. Report is included in Appendix C.
Exterior cladding consists of thin-brick and exterior insulation and finish system (EIFS) installed in the 2000 renovation. In many areas the thin-brick is failing and delaminating from the substructure. Falling bricks potentially create a hazard for personnel at the building entrances, and roof panels have been damaged at higher elevations.
The metal standing seam roof system was added as part of the 2000 renovation, and its condition was evaluated in 2017. Roof appears to be in good condition.
Aluminum-clad wood windows installed in 1988 are in poor conditions and in need of replacement. Exterior hollow metal and aluminum entrances are in fair-to-good condition and in need of minor maintenance. Glazing does not meet current minimum anti-terrorism standards.
Interior doors are a mix of ages including those replaced in 2000 (north end) and other original to the building (1958 & 1963).
Interior finishes are in fair-to-good condition, though dated in many areas. Flooring tile, paint and vinyl wall finishes, suspended ACT ceiling tile and wood casework are all in need of refresh or replacement to repair worn finishes, update interiors and provide consistent appearance throughout.
B528 meets most ABA accessibility requirements, with some deficiencies noted including:
• Most doors have knob-style hardware in lieu of levers.
• DV Lounge is not wheelchair accessible and kitchenette lacks recommended clearances.
Toilet room lacks grab bars.
• Current reception desk does not have an accessible transaction counter.
Mechanical Existing Conditions:
The heating system for the building is split in half and is served by two separate boiler plants.
Each consists of a Gas Fired Fulton Pulse Combustion Boilers, 500 MBH. Multiple inline pumps are used to serve different piping loops in the building. There is no redundancy built into the system so if one boiler or pump fails there is no heat for the area of the building that it serves. It was also reported that the boilers are undersized and cannot match the heating demand of the building. Exterior rooms have fin tube radiation, vestibules and mechanical/electrical spaces have hot water unit heaters, and hot water reheats are installed in VAVs in ductwork to provide primary zone level heating.
Indoor air handling units provide the ventilation and air distribution for the building. The unit serving the north portion of the building (AHU-2) and associated condensing unit are past their service life and should be replaced. Outside air and relief air is handled through roof hoods and wall louvers. The newer air handling unit (AHU-1) does not have a heating coil and the mixed air temperature gets bellow design temperature during extreme low outside air temperatures. It is believed that the outside air being brought into the building is limited to keep air temperatures
up. No airflow measuring stations installed to verify ventilation airflow.
The controls in the building are a mix of analog and digital thermostats. The system is approaching the end of its service life for all components. Controllers, thermostats, and programming need to be updated per staff as they do not function properly.
Domestic hot water for the building is broken up between the north and south half similar to other systems. Hot water is generated through electric water heaters with the North side water heater being in good condition, but the South side water heater is at the end of its service life and should be replaced. Plumbing fixtures are in good condition.
No fire protection sprinkler system currently installed in building. Would need to be reviewed if fire sprinkler is required to be added if new work occurs in building.
Electrical Existing Conditions:
The building electrical systems are mostly original and approaching end of expected life expectancy. Electrical panels in the main electrical room are newer, likely replaced in the last 5 years, and one panel in the corridor is older (20+ years) and should be replaced. Electrical outlets appear to be in good condition, although replacement of outlets and covers should be considered for aesthetics.
Lighting fixtures are fluorescent tube fixtures, ballasts are reaching end of expected life and bulb replacement or LED retrofit is not cost effective. Lighting controls are switched: automatic lighting controls are recommended, which will reduce energy consumption. Emergency egress signage and illuminate should be replaced.
Specific data requirements need to be evaluated, although it appears deficiencies exist in present condition. Significant upgrades to the existing infrastructure may be more expensive than a new system based on owner specifications.
Fire alarm detection and annunciation is older, portions of the building is alarmed with metal percussion bells. A new fire alarm system is recommended. Building access and camera systems should be updated concurrently with other building upgrades.
2.3 Impact if Not Provided
Not replacing exterior thin-brick cladding will result in continued deterioration and delamination creating hazards for personnel and other surfaces due to falling debris, along with exposure of building elements to weather and compromising weather-tightness and energy performance. Not replacing windows will result in continued deterioration, energy performance and weather infiltration.
Not replacing interior finishes will result in deterioration and wear of floor, wall and ceiling finishes and continued outdated appearance. Not rectifying ABA accessibility issues could result in claims filed against the Base for lacking accommodations.
Not replacing the noted electrical and mechanical systems will result in higher operational and ongoing maintenance costs. Leaving the existing boiler plants as is without redundancy creates the risk of losing heat in half the building if one component in the plant fails. Ongoing maintenance of fluorescent lighting fixtures will result in ongoing costs for bulb/ballast replacements. Ruptured fluorescent bulbs present a potential health and safety hazard.
2.5 Cost Estimate
The following cost estimate analysis is based on UFC 3-730-01 Programming Cost Estimates for
Military Construction and UFC 3-701-01 Data Tables updated February 2021.
Square Foot Costs
Facility Unit Cost – Aircraft Operations w/o Tower, 47,000 SF $306.00
Size Adjustment Factor “S” – 9,750/47,000 = .21 1.20
Location “ACF” – Grand Forks AFB, ND 1.05
Cost Escalation “CE” – Mid-point of Construction 2024 1.0612
Technological Updating Adjustment “TU” 1.00
Design Contingency Adjustment “DC” 1.05
Adjusted Guidance Cost Unit (per SF) $430.00
Alteration Project Estimates (using DA Form 7307-R)
Minor Renovation - $430.00 x .3636 x 9,740 SF = $1,523,000
Moderate Renovation - $430 x .5939 x 9,740 SF = $2,487,000
Major Renovation - $430 x .8409 x 9,750 SF = $3,525,000
See Appendix E for DA Forms 7307-R Cost Estimating Worksheet – Facility Alteration associated with each option.
2.6 Concept Sketches
Proposal for programmatic improvements to B528 are limited to one option providing minor reconfiguration of space to:
• Create an Aircrew Lounge separate from other Aircraft Management functions.
• Create toilet/shower room, cot room, galley kitchenette for overnight stays of personnel during inclement weather and lactation space.
• Right-size and improve Weather Element SIPR compartment for open storage.
• Expand mechanical room space to accommodate new centralized and redundant equipment.
• Right-size existing exercise room.
Therefore, three options provided for renovation are differentiated primarily on levels of restoration/renovation of building systems.
Minor Renovation
General Construction:
• Repair of minor sidewalk and landscaping deficiencies
• Localized repair of thin-brick veneer at problem areas
• Replacement of exterior windows
• NO roof work
• Reconfiguration of interior space as required to satisfy programmatic concerns outlined above.
• Replace/refresh interior finishing including flooring, wall finishes and ceilings.
• Replace older doors and hardware
• Replace casework
• Correct ABA accessibility deficiencies.
• Install new equipment and furnishings
Mechanical Construction – Component Replacement:
Under this option, existing boilers and heating pumps would be replaced with new in their existing locations. The existing heating piping would be tied into and re-used. AHU-2 serving the north half of the building and the associated condensing unit would be replaced with a new
VAV air handling unit. New AHU would tie into and re-use existing distribution ductwork.
Heating coil would be installed in the existing AHU-1. The south side water heater and recirculation pump would be replaced with new. Water heater would be tied into existing domestic water piping. New temperature controls would be provided for any new equipment.
Electrical Construction:
This option will consist of replacement of existing fluorescent lighting with new LED lighting.
Lighting controls will be replaced with motion sensor/infra-red occupancy sensors on the wall switches only. Existing service panels will remain, one of which is older. Additional data jacks will be installed as needed based on occupant needs. Fire alarm devices will be replaced and added as needed to meet minimum requirements of electrical code. Emergency egress signage and illumination should be replaced.
Moderate Renovation
General Construction:
• All work included in “Minor Renovation”
Mechanical Construction – Heating Plant Replacement:
Under this option, existing boilers and heating pumps would be disconnected and removed. All heating water throughout the building would be disconnected and removed. Two (2) new redundant boilers (each sized to handle 75% or the overall building load) would be installed in the north mechanical room. New fully redundant boiler would be provided to circulate water through the building. New heating water piping would be run through the building. Both existing air handling units and the associated condensing units would be replaced with a single new VAV air handling unit to serve the entire building located in the central mechanical room. New AHU would tie into and re-use existing distribution ductwork. VAV boxes and reheat coils would be replaced with new in their existing locations and tied into existing ductwork. Existing finned tube and unit heaters would be replaced with new. The south side water heater and recirculation pump would be replaced with new. Water heater would be tied into existing domestic water piping. New temperature controls would be provided for all new and existing equipment throughout the building.
Electrical Construction:
This option will consist of replacement existing fluorescent lighting with new LED lighting and associated new lighting controls, implementing motion sensor/infra-red occupancy sensors and daylight harvesting. The existing electrical panel in the hallway is approaching expected end of life and will be replaced with new. New outlets and wiring will be included in the scope.
Updated fire detection and notifications will be installed and will include voice notification and a new Fire Alarm panel. New data and communications systems will be replaced in a central, consolidated location. Building access and camera systems will be updated. Emergency egress signage and illumination will be replaced.
Major Renovation
General Construction:
• All work included in “Moderate Renovation,” plus
• Replacement of standing seam roof panels. Existing underlying structure to remain.
Government to consider and evaluate removal of the existing tower structure during pre-design investigation (not within this charrette scope).
• Complete replacement of thin-brick veneer with combination of full-thickness brick and cavity wall system and/or Exterior Insulation and Finish System (EIFS)
Mechanical Construction – Total mechanical system replacement:
• All work included in “Moderate Renovation,” plus
• Installation of a wet system fire suppression system.
Electrical Construction:
• Same as “Moderate Renovation” plus
• New backup generator, day tank and new main building electrical service entrance panel.
3.0 Scope Analysis
3.1 Cost and Scope Thresholds
Item Value Remarks
Project Program Amount
(PA)
$3.525M Option “Major Renovation”
Maintenance EEIC 521xx
$0 (Regularly scheduled adjustments and inspections, preventative maintenance – Not construction-related)
Repair (Sustainment) EEIC 524xx
$3.525M (Major repairs, such as roof replacement, refinishing of wall surfaces, replacing heating and cooling systems, replacing interior finishes, etc.)
Repair (Restoration & Modernization) EEIC 522xx
$0 (Modernization = alteration of facility to meet codes or other higher standards)
Minor Construction EEIC 529xx
$0 (Work to modify function of building, additions)
Plant Replacement Value
(PRV)
$4,288,054 Provided by GFAFB
PA / PRV ratio 82%
Estimated Replacement Cost (ERC)
$6,003,276 Provided by GFAFB
PA / ERC ratio 59%
Existing Building Area, Gross
9,750 SF
Size of Addition, Gross 0 SF
Addition/Existing Ratio 0%
3.2 User and Facility Requirements
Requirements Remarks
GENERAL
As-Built Drawings As-built drawings of the existing building exist and are comprised of:
528-000-015 1955 North addition 529-000-015 1955 Control Tower 529-001-002 1959 Modification Base Weather Station (Tower) 529-002-001 1960 Electrical Modifications 528-000-017 1961 South addition 529-003-002 1961 Modification Tower Crew Alert Room 528-002-005 1965 Weather Facilities Remodeling 528-003-002 1972 Exhaust Hood Remodeling 528-004-003 1973 Relocate Weather Observation 529-004-003 1984 Install Insulated Glass (Tower) 528-006-021 1988 Passenger Terminal Remodeling 528-007-004 1989 Environmental Control System 528-008-041 1999 Repair Exterior/Add to Base Operations 528-009-001 1994 Air Conditioning 528-011-002 2001 Drainage Repairs 528-012-002 2002 Install Marquee JFSD2001020 2002 Partial Heat Plant Decentralization 528-013-003 2003 Construct Dumpster Screens JFSD200152 2010 Air Conditioning
Site Accessibility Concerns B528 is located on the west edge of the Base campus, at the east edge of the airfield. Access is convenient through Base traffic roadways. B528 serves as a structural element of airfield security, and temporary measures will be required during construction to maintain airfield security while providing access to the building for construction.
Construction Security Temporary airfield security fencing will be required to bypass B528 while maintaining airfield security and allowing unrestricted access to the building for construction.
Temporary user space Complete vacation of B528 is recommended during repairs/renovation.
Assumed that OSS will identify space in existing facilities for temporary relocation of Airfield Management and Weather Element. In addition to standard communication systems, Weather Element will require temporary relocation and/or connection to airfield weather monitoring equipment.
Facility Addition No additions to the facility are anticipated as part of this repair/renovation.
Allied Support Requirements
GFAFB to Verify
SITE, CIVIL, AND
GEOTECHNICAL
Existing Site Conditions Current site is developed with sidewalks, parking and landscaping installed as part of the 2000 renovation. Minor repairs of sidewalk and landscape edging is required. Existing landscaping may be modified to meet current anti-terrorism standards.
Facility Siting No change in facility siting is anticipated.
Removals/Demolition No existing site or civil demolition is anticipated.
Geotechnical Report Required
No geotechnical testing or report requirements are anticipated
Special soil conditions NA
Roads and Drives No changes to roads and drives are anticipated.
Vehicle Parking No changes to vehicle parking are anticipated.
Site Work Minor repair to pedestrian sidewalks to eliminate tripping hazards is required. Repair of landscaping edging and/or retaining walls is required. Repair and maintenance of landscape materials and planting is required due to life-cycle deterioration and to meet current anti-terrorism requirements.
Grading & Storm Water No known issues associated with grading and storm water management have been identified.
UTILITIES No site utilities are anticipated to be impacted by B528 renovation.
Water Distribution No changes anticipated.
Sanitary Sewer No changes anticipated.
Natural Gas No changes anticipated.
Exterior Electrical No changes anticipated.
Exterior Communications No changes anticipated.
Cathodic Protection No changes anticipated.
ARCHITECTURAL
REQUIREMENTS
Air Force Corporate Facility Standards
(AFCFS)
Applicable Unified Facilities Criteria (UFC) are to be used.
Air Force Standard Designs AFMAN 32-1084 Facility Requirements AFI 31-101 Integrated Defense UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
Installation Facilities Standards (IFS)
Grand Forks AFB Installation Facilities Standards are currently in draft status. Direction will be provided from the draft by 319 CED as required.
Space Requirement Analysis
Compliance with AFMAN 32-1084, Facility Requirements, applies.
Finishes (exterior walls, interior walls, ceilings)
The interior finishes are outdated and showing signs of wear. The following finishes should be replaced and modernized:
a. Repair or replace exterior thin-brick veneer.
b. Remove VWC on walls and replace with paint, refresh painted walls.
c. New flooring and base, including carpeting and tile.
d. New acoustic ceiling tile and grid
e. New toilet compartments and accessories
f. New doors (at older locations) and ABA compliant hardware
g. New cabinets and casework.
SCIF/VAULT Weather Element requires Classified Open Storage vault for SIPR.
Sound Attenuation Provide acoustically rated walls at the following locations: demising walls of all offices, training room walls, toilet room walls, corridor walls, cot room and lactation room walls, and mechanical rooms.
Acoustically rated walls shall meet a minimum (STC) sound transmittance coefficient rating of 45.
Elevators NA
Correction of Architectural Barriers Act (ABA) Deficiencies
ABA deficiencies identified in the Facility Assessment and requiring correction include:
• Most doors have knob-style hardware in lieu of levers.
• DV Lounge is not wheelchair accessible and kitchenette lacks recommended clearances. Toilet room lacks grab-bars.
• Current reception desk does not have an accessible transaction counter.
State Historical Preservation Office Review
NA
STRUCTURAL
REQUIREMENTS
Analysis by a Structural Engineer was not completed at this phase.
Foundation No foundation issues observed.
Roof A pitched, metal roof structure was added over existing flat roof structure during previous renovation.
No new roofing is included in minor or moderate renovation options.
Major renovation option includes replacement of metal standing-seam roof panels.
Structure See below
- Modification/increase in loads
No changes required.
- Structural Repairs No distress or deterioration observed.
- Seismic Evaluation Required
Not Required.
MECHANICAL &
PLUMBING SYSTEMS
Currently, many of the building components are at the end of their useful life including pumps, heating coils, boilers, controls, one air handling unit, and one water heater. The building is currently split in half from a heating standpoint with a single boiler serving each half of the building.
The existing boilers are undersized and there is no redundancy in the system.
A central boiler plant with redundancy should be installed to heat the entire building. During a boiler system upgrade, associated pumps should also be upgraded. South side water heater should be replaced.
A heating coil should be provided for the newer (AHU-1) air handling unit. The older (AHU-2) air handling unit should be replaced.
As part or any remodeling, finned tube radiation and air terminal units will need to be replaced.
Controllers, thermostats, and programming need to be updated to a newer digital control system tied into the base wide system. Some control components such as actuators are in good condition but are connected to aging equipment. These will be replaced along with the associated equipment.
HVAC system or component modifications
Existing boiler plants will be replaced with new central boiler plant consisting of two boilers to provide redundancy. During the boiler system upgrade, redundant building pumps will be provided. Heating water piping throughout the building will be removed and replaced to tie into new central boiler plant. Heating coils are integral to air side equipment and should be replaced at time of air handler or terminal replacement. The newer air handling unit (AHU-1) will have a heating coil installed so it can supply the required discharge air temperature.
AHU-2 (north end) will be replaced with a new variable air volume (VAV) air handling unit. Associated condensing unit will be replaced with new.
Automatic temperature controls system will be replaced with a new DDC system tied into the base wide system.
- Unusual ventilation NA
- Special heating/cooling loads
Standard design per Design Standards with typical office heating/cooling loads. IT/Data rooms will be addressed independently for cooling.
- Temp/humidity control Standard design per Design Standards with temperature ranges and humidity’s specified.
Plumbing system or component modifications
South side water heater will be replaced. Plumbing throughout the building will be modified as part of any remodel work.
FIRE PROTECTION
REQUIREMENTS
No fire protection sprinkler system currently installed in building. Under any significant building modification project, a fire suppression system should be added. Code analysis to be done to determine if required.
Category of Work The building is categorized as a renovation.
NFPA 101 and UFC 3-600-01 requirements shall apply.
Fire Safety Deficiencies (FSDs)
And Corrective Action Plans (CAPs)
None identified.
Changes to facility egress No changes anticipated.
Changes to occupant density
No changes anticipated.
Facility houses Mission- Support or Mission- Essential Equipment
Not Required.
Hangar NA
ELECTRICAL
SYSTEMS
Electrical system appears to be mostly original. A new panel is in the mechanical building towards the main entrance, remainder of systems appear to be approaching end of expected life.
Primary Power Services Primary Power Services appear to be adequate, no deficiencies identified.
Interior Electrical Interior electrical systems appear adequate. One panel in the corridor is older and should be replaced.
Lighting Existing lighting is fluorescent and should be replaced. LED retrofit kits using the existing fixtures is not recommended. New lighting control using motion sensor/infra-red occupancy sensors and daylight harvesting is recommended. Emergency egress signage and illumination should be replaced.
Lightning Protection Lightning protection system was not evaluated. Lighting protection study should be completed.
RPIE Generators Existing generator is 60 Kw, 120/208 3-phase, manufactured in 2005.
Used generator and new transfer panel installed in 2015. Above ground fuel tank installed in 2016 to replace underground tank. Day tank (2005) inside the building needs to be raised and changed out.
Generator, day tank and riser should be replaced.
Special user requirements
ANTITERRORISM /
FORCE PROTECTION
Current number of occupants: 23 Current occupancy level: Inhabited Planned number of occupants: 23 Planned occupancy level: Inhabited
UFC 4-010-01
Antiterrorism Minimum Standards; project scope requires full mandatory compliance
The estimated cost of renovation and addition exceeds 50% of the Plant Replacement Value, therefore creating a trigger for compliance.
- Unique Occupancy Factors
None
- Standoff Distances Current UFC 4-010-01 Standards exempt existing buildings within an installation perimeter from standoff distance requirements.
- Window or Glazed Door Replacement
Section 3-11.1 of UFC 4-010-01 shall apply. Glazing of windows and exterior doors shall provide no less than ¼” nominal polycarbonate or laminated glass. Frame bite shall be no less than 1.5 times the polycarbonate thickness.
For estimating purposes, we are assuming that all windows and doors need to be replaced until determined otherwise.
- HVAC replacement or upgrade
If AT/FP standards apply, the new building intakes will adhere to the UFC, and a building wide AT shutdown switch will be required for the new HVAC system.
- Mass Notification System (MNS)
NA
Antiterrorism or Force Protection Requirements beyond Minimum AT Standards
None identified. GFAFB to confirm.
SUSTAINABILTY
UFC 1-200-02, HPSB
Requirements
Whereas B528 is less than 10,000 SF, Tracking, Reporting, and Third Party Certification is not required.
Compliance with UFC 1-200-02 Chapter 2 and other standards applicable to renovation of existing buildings under 10,000 SF shall apply.
Compliance with AF SDD Implementing Guidance Memorandum
The AF SDD Implementing Guidance Memorandum is dated 7/2/2011 which precedes the 2020 UFC 1-200-02. GFAFB to verify if LEED is indeed required, or if this memorandum is outdated.
Third-Party Certification Whereas B528 is less than 10,000 SF, Tracking, Reporting, and Third Party Certification is not required.
ENVIRONMENTAL
REQUIREMENTS AND
HAZARDOUS
SUBSTANCES
Environmental Permitting Required
GFAFB to verify standard.
Hazardous Materials Remediation
No hazardous material survey was completed as part of this charrette.
A hazardous material survey was complete as part of the 2000 renovation project and is documented in Appendix I. According to Base Engineering, only those materials required to be removed to accommodate renovation work were abated. Other materials may remain, subject to abatement as part of this proposed renovation.
Survey and verification should be completed as part of the design phase.
Environmental Impact Analysis Process (EIAP)
GFAFB to verify.
DESIGN AND
ACQUISITION OF
UNFUNDED
Furniture Fixtures and Equipment (FF&E) Acquisition
FF&E was not included in the construction cost estimate and was not included in the facility assessment. GFAFB to verify extent of reuse and new acquisition requirements.
Existing FF&E Reuse FF&E was not included in the construction cost estimate and was not included in the facility assessment. GFAFB to verify extent of reuse and new acquisition requirements.
Non-RPIE Communications Acquisition
Summarize scope and budget anticipated for all non-RPIE communications equipment (including cabling and termination devices).
Non-RPIE Generators/UPS/other backup power storage or capability
Generator is existing.
Raised Access Flooring NA
TEMPEST / HEMP / RF
Shielding
If yes, indicate if existing or new.
Intrusion Detection Systems (IDS)
Indicate whether the IDS is funded (RPIE, transmits only within the building) or unfunded
Closed Circuit TV If yes, indicate if existing or new.
Other User Equipment, Including Special Computer Systems or Support
Include this statement only if equipment is applicable. Reference Section 3.1.
AIRFIELDS
Existing Structure NA
Repair Alternatives NA
Evaluation of Excess Pavement Facilities
NA
Course of Action Analysis NA
Lighting and NAVAIDS NA.
Airfield Waivers NA
Phasing and Mission Work- Arounds
NA
Staging/Laydown NA
Base Access NA
Design Traffic; Structural and Geometric
NA.
Tiedowns and Grounding NA
Problem Soils NA
Frost NA
Inlets, Manholes, and Other Utility Structures
NA
Storm Water NA
Aircraft Arresting Systems
NA
3.3 User Equipment
Description Quantity Remarks (including supporting utilities, supply source, and acquisition/installation method, i.e. GF/GI, CF/CI, GF/CI, etc.)
Office Furniture (desks, file cabinets, chairs, etc.)
Verify GF/GI
Work Area Equipment (large printer, file cabinets, paper shredder, etc.)
Verify GF/GI
Kitchen Equipment (Refrigerator, microwave, stove, etc.)
Verify CF/CI
Communications and Data Equipment Verify GF/GI
Exercise/Fitness Equipment Verify GF/GI
3.4 Hazardous Substances
Hazardous Substances Y / N /
Unknown
Remarks (date of last survey)
Asbestos Yes Surveyed May 1999
Lead Based Paint Yes Surveyed May 1999
PCB Unknown
Radon Unknown
IRP Sites Unknown
Toxic industrial waste Unknown
Radiological Unknown
Heavy Metals Unknown
Ozone Depleting Substances (refrigerants)
Unknown
Medical gases Unknown
Known Abatement Considerations Y / N /
Unknown
Remarks
Asbestos Yes Verify remaining quantities and locations
Lead Based Paint Yes Verify remaining quantities and locations
PCB Unknown
Radon Unknown
Hazardous Waste (RCRA) Unknown
Heavy Metals Unknown
3.5 Approvals/Exemptions/Waivers
None identified at this time.
APPENDIX A – EXISTING SITE PLANS
Figure A-1: Vicinity Map
GRAND FORKS
AIR FORCE BASE
PROJECT SITE1
N O
R T
H
MAIN GATE
COMMERCIAL GATE
HIGHWAY 2
Figure A-2: Project Site Map
OSS BUILDING 528
PORTE COCHERE
PARKING LOT
N O
R T
H
STEEN BLVD.
ROAD 16
FLIGHT-LINE SECURITY
APPENDIX B – EXISTING FLOOR PLANS
Repair Base Operations B528 Grand Forks AFB, ND
Existing Plan
FLIGHT
PLANNING
WEATHER
(2 CREW)
COMM
MUNITIONS/
LOUNGE
BREAK ROOM
MECHANICAL
AIRFIELD
MANAGER.
GENERATOR
WEATHER
(2 CREW) FLT CHIEF TRAINING
WEATHER
(3 CREW)
UNASSIGNED
EXERCISE
MECHANICAL
164 SF
CUST.
68 SF
VESTIBULE
345 SF
VESTIBULE
TOILET
165 SF
WOMEN'S
TOILET
180 SF
MEN'S
180 SF
230 SF
135 SF
385 SF
530 SF
D.V. LOUNGE
500 SF
340 SF 155 SF 330 SF
WEATHER
(2 CREW)
360 SF
270 SF
350 SF
290 SF
205 SF
AIRFIELD
VEST.
220 SF
TOWER
ACCESS
EQUIP.
125 SF
DEPUTY
SUPV.
210 SF
Repair Base Operations B528 Grand Forks AFB, ND 0 8 16 32 FT
Existing Utilization
265 SF
MGMT
AIRCREW
LOUNGE
250 SF
(2 CREW)
535 SF
AIRFIELD
MANAGEMENT
(3 CREW)
WEATHER WEATHER
EQUIP. STOR.
100 SF
APPENDIX C – FACILITY ASSESSMENT REPORT
TABLE OF CONTENTS
PART 1 – OVERVIEW
1.1 Overview
PART 2 - FACILITY ASSESSMENT FOR BUILDING B528
2.1 – ARCHITECTURAL
2.1.1 Exterior Walls
2.1.2 Roofs
2.1.3 Windows & Exterior Doors
2.1.4 Site & Exterior Accessibility
2.1.5 Interior Accessibility
2.1.6 Interior Doors & Hardware
2.1.7 Casework
2.1.8 Ceilings
2.1.9 Floors
2.1.10 Interior Walls
2.2 – MECHANICAL
2.2.1 Heating System
2.2.2 Ventilation & Air Handling
2.2.3 AC & Cooling
2.2.4 Temperature Control
2.2.5 Plumbing
2.2.6 Sprinkler/Fire Protection
2.3 – ELECTRICAL
2.3.1 Switchgear & Distribution
2.3.2 Lighting
2.3.3 Life Safety
PART 3 - FACILITY ASSESSMENT FOR BUILDING B607 - DELETED
PART 4 - FACILITY ASSESSMENT FOR BUILDING B631 - DELETED
PART 5 – SPACE PLANNING STUDY - DELETED
PART 1 - OVERVIEW
1.1 OVERVIEW
1.1 –OVERVIEW
Background:
Personnel for the 319th Operations Support Squadron (OSS) are currently located in multiple facilities.
Leadership has directed that OSS functions be relocated and consolidated to allow more direct and efficient management. Three buildings are under consideration:
• Building 528 houses several OSS functions. Originally built in 1958, the last significant renovation/addition was in 2000, and all major building systems need significant repair or replacement.
• Building 631 is currently unoccupied and is identified as a potential location to consolidate OSS functions. Construction of Building 631 was completed in 1998 and the building has had no significant work since.
• Building 607 currently houses several OSS functions. Building 607 was originally built in 1960 with several renovations and additions over the years. The last major remodel occurred in 2006.
OSS functions may be added or removed from Building 607, but no significant renovation/repair is intended in this building. Area A in green below is the current OSS area, and Area B in red below is being considered for OSS expansion.
Space Planning Study:
Part 5 of this report includes the Space Planning Study with options for relocating OSS into these three buildings.
Facility Assessment:
Prior to creating the Space Planning Study, a facility assessment was performed for the entirety of
Buildings 528 & 631. Since work is limited to the interior of Building 607, site and exterior envelope assessment was not performed on this building.
Foss Architecture + Interiors reviewed the Architectural categories, while consultant Obernel Engineers reviewed Mechanical and Electrical categories. The following items were considered in this assessment:
ARCHITECTURAL
• Exterior Walls
• Roofs
• Windows & Exterior Doors
• Site & Exterior Accessibility
• Interior Accessibility
• Interior Doors & Hardware
• Casework
• Ceilings
• Floors
• Interior Walls
MECHANICAL
• Heating System
• Ventilation & Air Handling
• AC & Cooling
• Temperature Control
• Plumbing
• Sprinkler/Fire Protection
ELECTRICAL
• Switchgear
• Lighting
• Life Safety
The following ratings are used in this facility assessment for the various building systems. Each building element is given a rating as shown below.
BUILDING ELEMENT: Exterior Walls BUILDING: 631 RATING: 4
Assessment Ratings:
1 – Poor
Urgent deficiencies need to be completed within one or two years, if possible, to correct safety problem, eliminate damaging deterioration, or to be in code compliance.
2 – Fair
Potentially urgent deficiencies which, if not corrected in 2-5 years, will become urgent need.
3 – Average
Demonstrates wear or aging consistent with life expectancy. Near-term repair or replacement should be considered, but not critical.
4 – Good
Meeting expectations. Some action may be required to maintain performance. No significant repair or replacement in near future.
5 – Very Good
New or nearly new condition meeting all expectations and performance criteria.
Assessment Summary:
The following chart summarizes and illustrates the ratings for each building category. See Parts 2, 3 & 4 of this report for detailed assessments with photos.
PART 2 - FACILITY ASSESSMENT FOR BUILDING B528
2.1.1 EXTERIOR WALLS
2.1.1 – EXTERIOR WALLS
BUILDING ELEMENT: Exterior Walls BUILDING: 528 RATING: 1
Material: Thin Brick, Glass Block, EIFS at Tower, Aluminum Storefront & Wood Windows (See window section)
Age: Original Building was built in 1958; South Addition was built in 1963; Building was re-clad in 1999
Condition: Poor - Thin brick is falling off the rigid insulation substrate.
Average Life Expectancy: Brick & Masonry 100 Years; Thin Brick – Varies; EIFS 50 Years
Life Remaining Based on Current Condition: 0 years for thin brick; 40 years for CMU backup wall
Notes:
Original 1958 walls were primarily concrete block furred out with 2x2s and ½” GWB on the interior with batt insulation in the furring cavity.
1963 addition exterior walls were cavity wall construction with 4” exterior CMU, 2” cavity with 1” rigid insulation, and 8” concrete block structure.
1999 remodel removed the upper portion of the air traffic control tower and clad the building in thin brick, rigid insulation, and EIFS.
The thin brick is improperly installed and expected to continue falling off the building until it is replaced. It has been reported that the thin brick sometimes falls off the tower and damages the metal roof below. The thin brick is particularly damaged at entries where users kick off their boots prior to entering the building.
The EIFS on the tower is in good condition.
Sealants are in fair condition.
Glass block at entry is in good condition.
Photos:
2.1.1 EXTERIOR WALLS
2.1.2 ROOFS
2.1.2 – ROOFS
BUILDING ELEMENT: Roofs BUILDING: 528 RATING: 4
Material: Standing Seam Metal
Age: The building was converted from a flat roof to a pitched roof in 1999
Condition: Good – Other than fading of the paint, the standing seam metal appears to be in good condition.
Average Life Expectancy: 25-50 years
Life Remaining Based on Current Condition: 10-15 years
See Grand Forks AFB Roof Inspections Report dated Sept. 27, 2017 for detailed report and photos.
2.1.3 WINDOWS & EXTERIOR DOORS
2.1.3 – WINDOWS & EXTERIOR DOORS
BUILDING ELEMENT: Windows & Ext. Doors BUILDING: 528 RATING: 2
Material: Aluminum-clad Operable Wood Windows; Aluminum Storefront Doors & Windows; Hollow Metal
Door & Frames
Age: Building was re-windowed in 1988 with alum-clad wood windows. The 1999 remodel has aluminum storefront windows installed at the north end of the building.
Condition: Wood windows are in poor condition; aluminum storefront is in good condition. Exterior hollow metal doors and frames are in fair condition.
Average Life Expectancy: Alum-Clad Wood Windows 15-25 years; Aluminum Storefront 15-25 years
Life Remaining Based on Current Condition: 0 years for wood windows – should be replaced soon;
10-15 years for Aluminum Storefront
The air or argon gas in the 1988 wood window’s glass appears to have leaked out, causing condensation and staining on the interior.
The exterior hollow metal doors need painting.
2.1.3 WINDOWS & EXTERIOR DOORS
2.1.4 SITE & EXTERIOR ACCESSIBILITY
2.1.4 – SITE & EXTERIOR ACCESSIBILITY
BUILDING ELEMENT: Site & Ext. Accessibility BUILDING: 528 RATING: 4
Site:
Asphalt parking lot appears to be in good condition.
There is cracking in the concrete sidewalk near the main entry.
Sidewalks are edged in brick pavers which need repair in some locations.
The south entrance has reportedly had drainage issues. A trench drain and inlets to the storm sewer were added in 2001; however, heavy rain has seeped into the southeast lounge during heavy rain events.
Accessibility:
Main entrance is accessible via ramp; entrances appear to meet accessibility requirements.
2.1.4 SITE & EXTERIOR ACCESSIBILITY
2.1.5 INTERIOR ACCESSIBILITY
2.1.5 – INTERIOR ACCESSIBILITY
BUILDING ELEMENT: Interior Accessibility BUILDING: 528 RATING: 4
Accessibility:
Most doors have door knobs which don’t meet current accessibility standards. Levers are recommended in lieu of knobs.
Southeast lounge is not accessible for persons in a wheelchair. Kitchenette does not have recommended clearances. Lounge toilet room does not have grab bars.
The main Men’s and Women’s restrooms appear to be accessible and have proper grab bars.
The reception desk is not ADA accessible. The transaction counter should have a lowered portion 34” tall for use by those in a wheelchair.
2.1.5 INTERIOR ACCESSIBILITY
2.1.6 INTERIOR DOORS & HARDWARE
2.1.6 – INTERIOR DOORS & HARDWARE
BUILDING ELEMENT: Interior Doors & Hardware BUILDING: 528 RATING: 3
Material: Solid-core Wood Doors in Hollow Metal Frames
Age: The doors at the north end of the building are from the 1999 remodel. The remaining are original from 1958 & 1963.
Condition: Average
Average Life Expectancy: 50 years
Life Remaining Based on Current Condition: 15-30 years
Doors have some chips and scratches in the wood veneer.
Hardware consists of door knobs which are not ADA accessible.
Hollow metal frames need paint in some locations
There is some staining around the push plates and kick plates on the doors entering the main restrooms.
2.1.6 INTERIOR DOORS & HARDWARE
2.1.7 CASEWORK
2.1.7 – CASEWORK
BUILDING ELEMENT: Casework BUILDING: 528 RATING: 3
Material: Wood; laminate
Age: Original Building was built in 1958; South Addition was built in 1963; Building was remodeled in
Average Life Expectancy: 50 years
Reception desk is not ADA accessible and should have 34” tall transaction surface for persons in a wheelchair.
Casework does not coordinate.
2.1.7 CASEWORK
2.1.8 CEILINGS
2.1.8 – CEILINGS
BUILDING ELEMENT: Ceilings BUILDING: 528 RATING: 3
Material: Acoustic ceiling tile, gypsum wall board barrel vault at entry
Age: Original Building was built in 1958; South Addition was built in 1963; North end of building was remodeled in 1999.
Average Life Expectancy: 40 years
Ceiling tile types vary and do not coordinate.
Water-stained ceiling tile was observed in Room 115, north of tower.
Ceiling tile in original south area of building looks aged.
2.1.8 CEILINGS
2.1.9 FLOORS
2.1.9 – FLOORS
BUILDING ELEMENT: Floors BUILDING: 528 RATING: 4
Material: Floor tile, carpet tile
Age: Original Building was built in 1958; South Addition was built in 1963; North end of building was remodeled in 1999.
Condition: Good
Average Life Expectancy: Floor tile 75 years; Carpet 5 years
Life Remaining Based on Current Condition: 15 years for Tile; 5 years for Carpet
Other than being outdated, the floor tile is in good shape.
Carpet appears to have been replaced recently and is in good condition.
Rubber mat flooring was installed in the Exercise Room without proper floor transitions at doorway.
2.1.9 FLOORS
2.1.10 INTERIOR WALLS
2.1.10 – INTERIOR WALLS
BUILDING ELEMENT: Interior Walls BUILDING: 528 RATING: 3
Material: 1/2” gypsum board on 2x4 wood framing; Glass block and steel studs were introduced in 1999.
Some walls have vinyl wallcovering. Restroom walls have tile.
Age: Original Building was built in 1958; South Addition was built in 1963; North area of building was remodeled in 1999
Average Life Expectancy: Interior Wall Structure – Life of Building; Paint on walls – 5 years; Vinyl
Wallcovering – 10 years; Wood base – 15 years; Wall tile – 75 years.
Life Remaining Based on Current Condition: 5 years for paint; 5 years for vinyl wallcovering; 5 years for wood base; 15 years for wall tile
Walls appear in good overall condition with some expected wear at certain locations.
Wood wall base is installed in most areas, with wood chair rail added at corridors. Base is in good condition except where there is minor staining on the wood due to mopping tile floors.
There are CMU block walls in storage areas and a curved glass block wall at the lobby/lounge area.
The restrooms have tiled walls. The tile behind the wall-hung toilets is breaking off.
2.1.10 INTERIOR WALLS
2.2.1 HEATING SYSTEM
2.2.1 – HEATING SYSTEM
BUILDING ELEMENT: Heating System BUILDING: 528 RATING: 2
Material: Gas Fired Hot Water Boilers. Inline pipe mounted circulation pumps for each boiler. Inline pipe mounted circulation pumps for building.
Age: 19 years, system updated in 2001.
Condition: Fair – Heating plant approaching end of service life.
Average Life Expectancy: Boilers 25 years; Pumps 10 years, Heating Coils 20 years
Life Remaining Based on Current Condition: 5 years for boilers; 0 years for pumps, 1 year for coils
Boiler plant consists of two (2) Gas Fired Fulton Pulse Combustion Boilers, 500 MBH each, with an inline pipe mounted circulation pumps for each boiler. Multiple inline pumps used to serve different piping loops in the building.
Building is split in half with one boiler serving the north half and one boiler serving the south half.
There is no redundancy built into the system so if one boiler or pump fails there is no heat for the area of the building that it serves.
Exterior rooms have fin tube radiation, vestibules and mech/elec spaces have hot water unit heaters, and hot water reheats are installed in VAVs in ductwork to provide primary zone level heating.
The boilers are in good condition but approaching the end of their service life. It was also reported that the boilers are undersized and cannot maintain heating setpoints. A central boiler plant with redundancy should be installed to heat the entire building. Some pumps have been replaced over the years as they have failed. During a boiler system upgrade, associated pumps should also be upgraded. Fin tube radiation and cabinet/suspended unit heaters are in good condition. Heating coils are integral to air side equipment and should be replaced at time of air handler or terminal replacement. The newer air handling unit does not have a heating coil and the mixed air temperature gets bellow design temperature during extreme low outside air temperatures.
2.2.1 HEATING SYSTEM
2.2.2 VENTILATION & AIR HANDLING
2.2.2 – VENTILATION & AIR HANDLING
BUILDING ELEMENT:…