Jefferson_Ave_60%_Structure_Plans.pdf
PDF 6 MB Posted
- Solicitation number
- PD 25-26.054
- Issued by
- Escambia County, Florida
About this file
This is a 60% Design submittal document for structural plans prepared by Mott MacDonald for Escambia County, Florida, specifically detailing the rehabilitation of the Jefferson Avenue bridge structure over an unnamed branch pipe culvert in the Town of Century. The project aims to repair damage caused by flooding and erosion affecting dual 96-inch corrugated metal pipe (CMP) culverts. The scope of work includes cleaning and removing vegetation and loose debris from eroded areas, placing filter fabric and rubble riprap, installing sand-cement riprap pinned with reinforcement bars, placing flowable fill to eliminate voids underneath existing concrete slope protection, and applying bituminous pipe coating to all interior surfaces of the pipes using three coats. The project is governed by FDOT Standard Specifications for Road and Bridge Construction (FY 2025-26), AASHTO Load and Resistance Factor Design specifications, and the Alabama Department of Transportation 2022 Standard Specifications for Precast Bridge Components. A mandatory pre-construction meeting with Escambia County staff must occur before work begins, and the contractor is responsible for maintaining traffic control in accordance with MUTCD standards and county guidelines, with lane closures requiring approval from the county and Engineer of Record prior to implementation.
Work is anticipated during low-water conditions with potential de-watering operations using temporary sheet piles or bladder systems to divert water flow between pipes as needed. The contractor must protect all existing structures, roadway, right-of-way, and utilities from damage; prevent erosion and sediment transport through installation of turbidity barriers; and properly dispose of construction debris at approved sites. All materials, labor, and equipment for riprap installation and flowable fill placement are included in bid pricing. The document specifies that flowable fill must be designed for placement under water with a particular mix design (150 LB Portland Cement, 500 LB Flyash, 1,870 LB Sand, 870 LB Pea Gravel, 40 Gallons Water, 1 Gallon Sikament 100, 0.5 Gallons Sikament 610), and riprap shall comply with Alabama Department of Transportation Section 814 Class II requirements with filter fabric meeting FDOT Section 985 specifications. The project is federally funded under the Community Development Block Grant-Disaster Recovery (CDBG-DR) program with funding source HS019.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
Miles
0 0.5 11 reproduction.
Note: The scale of these plans may have changed due to CONSULTANT PROJECT NO. 502101595
Registry #155
Vendor No. 591294824004
(850)484-6011
Pensacola, Florida 32502
Suite 700
220 West Garden Street
Mott MacDonald
PLANS PREPARED BY:
PENSACOLA
NAVAL AIR
STATION
SHERMAN
FIELD
STATION
CORRY
NTTC
FIELD
SAUFLEY
PENSACOLA
REGIONAL
AIRPORT
McDAVID
ISLAND
ONO PERDIDO
KEY
TO
MOBILE
A
L
A
A
FLOWER
A
B
M
HillWalnut
L
ATMORE
A A B
SANTA
ROSA
CANTONMENT
PENSACOLA
TALLAHASSEE
BASE LINE
TO MILTON
QUINTETTE
INOMOL
CENTURY
A M
FLOMATON
TO
Pensacola Beach
SANTA
ROSA
COUNTY
ISLAND
TO MILTON
d
B a y d i o
Per
TRACOASTAL
NI
WATERWAY
INTRACOASTAL
WATERWAY
B A L D
W
IN
C
O U
N T Y
R i v e r
P e r d i d o
B a y
E s c a m b i a
O F
P e n s a c o l a
G U
L F
M E
X I C
O
E a s t
B a y
E s c a m b i a
R i v e r
B a y
ESCAMBIA COUNTY
A
C O
U N
T Y
S A
N T
A
R O
S A
10 9
27 28
29 31
2 1
3 2
14 13
11 12
18 16
11 12
5 4
29 28
31 9
53 2
3 5
36 31
15 14
22 23
18 17
3 2
1 6
13 18
4 3
20 21
16 15
13 18
2 1
8 9
1814 13
34 35
2119 20
31 32
24 19
27 26 25
14 13
4 3
8 9
20 21
6 5
31 32
8 9
3 2
20 22
23 24
30 29
19 20
18 17
19 20
31 32
3534 3136 32 33 34
31 32 3433 36
33 34
T R
A N S
C S
X
C S
X
S S
S Y S
T E
M
S E
A B
O A
R D
ST. L.S.F. RY.
RY.LST SF
R O
A D
I L
R A
R Y
.S F
L S
T
R R
R R
R A I L
W A
Y F
R A
N C I S
C O
S A
N A
N D
S T
L O
U I S
4A
4A
4A
99A
99A
97A
97A
97A
297A
297A
Power
I psco
Eagle
Goulding dgeE
Big
Power
I psco
Eagle
Goulding dgeE
Big
SHEET DESCRIPTIONSHEET NO.
INDEX OF STRUCTURE PLANS
PROJECT SITE
ENGINEERING DEPARTMENT
ESCAMBIA COUNTY, FLORIDA
THE TOWN OF CENTURY
PLANS PROPOSED FOR
STRUCTURE PLANS
This drawing is the property of Mott MacDonald Florida, LLC., and may not be reproduced without written permission. This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Mott MacDonald was commissioned. Mott MacDonald accepts no responsibility for this document to any party other than the person or entity by whom it was commissioned.
N O
T I C
E
T H
E O
F F
I C
I A
L R
E C
O R
D O
F T
H I S
S H
E E
T I
S T
H E
E L
E C
T R
O N
I C
F I L
E D
I G
I T
A L
L Y
S I G
N E
D A
N D
S E
A L
E D
U N
D E
R R
U L
E
G
.0
F
.A .C
PROJECT MANAGER:
REG. FL ENG. NO:
SECTION/TOWNSHIP/RANGE:DISTRICT:
PROJECT ENGINEER:
SIGNATURE: DATE:
51391BART F. HENDRICKS, P.E.
SHEET NUMBER:
5 / 5N / 30W
R U
S
/1
/2
:1
:2
P
M Z
S
T R
U C
T \5
C
D B
G \J e f f e r s o n \D r a w in g s \S tr u c t\
B
K e y s h e e t.
d g n
30.972 N, 87.251 W
Bridge Location
R
R
B-01
T o M cD a vi d
To Jay
T o
F lo m a to n
REHABILITATION
JEFFERSON AVE OVER UNNAMED BRANCH
FEBRUARY 2026
60% SUBMITTAL
BORING LOGS (2 OF 2)B1-04
BORING LOGS (1 OF 2)B1-03
SECTIONS AND DETAILSB1-02
PLAN VIEWB1-01
GENERAL NOTESB-02
KEYSHEET & INDEX OF DRAWINGSB-01
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K E
D
B Y
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T
IO
N e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R P
(R e d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q o rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A S
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q
(B lu e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
60% Submittal B-02 expensive of the contract documents options.
to bid. Conflicts which are not identified prior to bid shall be controlled and constructed according to the most
Report conflicts between plans, specifications, and other contract documents in writing to the engineer of record prior 5.
provide no less quality than a comparable APL product.
be accepted if they meet all the requirements of the Specifications and Specifications. Substitute products will only
e. Approved material refers to a product on the FDOT Approved Products List (APL) or as referenced in the
d. Testing requirements that exceed the requirements of the County are not applicable.
c. FDOT Submittal requirements are not applicable.
b. Methods of payment and Pay Item Numbers are not applicable.
a. Division I General Requirements & Covenants shall be excluded and not applicable.
Construction (latest edition) with the following exceptions:
All work, unless otherwise indicated, shall conform to the FDOT Standard Specifications for Road and Bridge 4.
PublicWorks/Engineering.html
Escambia County General Paving and Drainage Technical Specifications. http://co.escambia.fl.us/Bureaus/ 3.
Components
Alabama Department of Transportation 2022 Standard Specifications for Highway Construction - For Precast Bridge 2.
http://www.dot.state.fl.us/programmanagement/ Implemented/SpecBooks/default.shtm
FY 2025-26 Standard Specifications for Road and Bridge Construction, as amended by Contract Documents.
Florida Department of Transportation, FY 2025-26 Standard Plans and revised Index Drawings as appended herein, and 1.
GOVERNING STANDARDS AND CONSTRUCTION SPECIFICATIONS:
FDOT Design Manual dated January 2025.3.
Bridge Design Specifications, [9th] Edition and all subsequent interims.
American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor (LRFD) 2.
FDOT Structures Manual dated January 2025.1.
DESIGN SPECIFICATIONS
GENERAL NOTES
provide all facilities required for a thorough inspection of workmanship.
The site is open to inspection for Escambia County Engineering Department or EOR personnel. The contractor shall11.
the Escambia County Engineering Department and EOR prior to submission of bid.
No substitutions or modifications are allowed to the Specifications or specified materials unless authorized by10.
the plans shall be used. Follow all manufacturer's installation instructions.
Means and methods are the responsibility of the contractor, but the specified materials and specific directions shown in 9.
guarantee a safe work zone shall be the responsibility of the contractor.
The contractor is responsible for maintaining a safe work zone. Any additional barriers, barricades and signage needed to 8.
approved traffic control plan.
Contractor shall limit work area to the available roadway shoulder and the roadway lane closure corresponding to the 7.
damaged by construction operations are to be replaced or repaired as directed by the Escambia County engineer.
Vegetation on R/W and easements shall be restored to original condition unless otherwise noted on plan sheets. All items adjacent property and the public. Each contractor is solely responsible for damage or injury due to his act or neglect.
Protect existing bridge structure, roadway, R/W, and utilities from all damage. Each contractor shall protect his work, 6.
flerosioncontrolmanuald730f0544e0547c9898d375364f2a5f7.pdf?sfvrsn=ae35b76a_2) source/programmanagement/implemented/urlinspecs/files/ by the EOR. Install turbidity barrier as shown on plan view. (https://fdotwww.blob.core.windows.net/sitefinity/docs/default-remain in place until associated distrurbed areas are stabilized as to reduce sediment runoff, unless otherwise directed
Designer and Reviewer Manual, including but not limited to items indicated on the plans. All erosion control measures shall providing silt fence, staked hay bales, or other measures as required by the Florida Erosion and Sediment Control
Take steps to prevent erosion and any off site sediment transport resulting from increased runoff during construction by 5.
Dispose of construction debris and debris in channel properly in approved disposal sites.4.
The contractor shall not bring any hazardous materials as identified by State law on to the project.3.
engineer.
Comply with all conditions and stipulations of the construction permits and the approvals issued by the Escambia County 2.
instructions from the EOR.
any discrepancies in writing to the EOR. Do not change size or dimensions of structural members without written
Review all contract documents, dimensions and site conditions and coordinate with field dimensions prior to bidding. Report 1.
SITE CONDITIONS:
Front Face of Backwall-FFBW
Engineer of Record-EOR
Existing-Exist.
Corrugated Metal Pipe-CMP
Approximate-Approx.
ABBREVIATIONS:
QUANTITIES: For quantities, see Bid Tab.
Comply with FEMA Exhibit K contract provisions under separate cover.3.
Phone: (850)595-2413, E-mail: dfox@myescambia.com
3363 West Park Place, Pensacola, FL 32505
Escambia County Public Works Department, Engineering Division
Derek Fox, Bridge Program Manager
Escambia County Contact:2.
A pre-construction meeting with Escambia County staff is mandatory before starting any work.1.
BID NOTES:
directly above the riprap.
Flowable fill placed over riprap shall be deposited through tremies or discharged directly from the pump hose 5.
line as the voids are filled.
Place flowable fill in eroded areas by placing the line at the deep/back point of the areas and withdrawing the 4.
Pump flowable fill with sufficient pressure to displace water and completely fill voids.3.
Remove debris and vegetation from areas to receive flowable fill.2.
b. Verify mix design and pumpability with concrete supplier and submit final mix design for approval.
SC, 0.5 Gallons Sikament 610.
LB Portland Cement, 500 LB Flyash, 1,870 LB Sand, 870 LB Pea Gravel, 40 Gallons Water, 1 Gallon Sikament 100
a. The flowable fill mix shall be designed for placement under water with the following mix characteristics: 150 changes:
Flowable fill shall meet the requirements of Section 121 of the FDOT Specifications with the following noted 1.
FLOWABLE FILL:
Perforate riprap bags and thorougly wet following placment.4.
Drive a #4 reinforcement bar through each stack of riprap bags and extend a minimum of 2'-0" into the ground.3.
Stagger the placement of successive riprap layers to offset the joint approximately 9".2.
Sand-Cement riprap shall be Sakrete or Quikrete Rip Rap - Scrim in 60 LB or 80 LB bags.1.
SAND-CEMENT RIPRAP:
the riprap is included in the cost of flowable fill.
Following placement, riprap shall be grouted to fill voids between rocks with flowable fill. The cost of grouting 6.
Do not place riprap in a position which will block flow into the pipe culverts.5.
All materials, labor, and equipment required to install riprap shall be included in the cost of the riprap.4.
shall be in accordance with Section 514.
Install riprap over Type D-2 filter fabric. Filter fabric shall meet FDOT Section 985 requirements. Splice length 3.
Install riprap to the minimum blanket thickness specified in the plans by section.2.
Riprap shall meet ALDOT Specifications Section 814 Class II requirements.1.
RUBBLE RIPRAP:
flaggers on a Monday.
required in accordance with the county specifications. Do not begin a lane closure or operations requiring and the Escambia County Guidelines for Maintenance of Traffic, latest edition. Lane closures and MOT approval are
Maintenance of traffic shall conform to the Manual for Uniform Traffic Control Devices (MUTCD), latest edition, 2.
approved traffic control procedures including flaggers. Contruction notification signage is required.
is required, but partial lane closures required to deliver equipment or materials shall be performed using
The roadway is open and will remain open for the duration of this rehabilitation project. No traffic control plan 1.
TRAFFIC CONTROL:
Water may be diverted to one side or the other as desired at no additional project cost.3.
Riprap and flowable fill may be placed in flowing water. 2.
Work is anticipated to take place during a dry period with low-water conditions. 1.
DE-WATERING:
prior to starting construction.
Contractor shall verify all dimensions, elevations and angles shown for existing items that affect construction3.
Do not scale drawings; Use dimensions. Drawing scales may have been changed by reproduction.2.
All dimensions in these plans are measured in feet either horizontally or vertically unless otherwise noted.1.
PLAN DIMENSIONS:
e. Maintenance of traffic.
d. Clearing and removing vegetation.
c. Placing flowable fill to fill the voids underneath the concrete slope protection along the east and west sides.
b. Placing filter fabric, rubble riprap, and sand-cement riprap in areas to receive flowable fill.
a. Cleaning loose soil and debris from areas to receive riprap and flowable fill.
the damage caused by flooding and erosion. The scope of work includes:
The purpose of this project is to perform activities on the Jefferson Avenue over Unnamed Branch Pipe Culverts to repair 1.
GENERAL:
59 58
55 54
2025.084/.085
170001-021
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
60% Submittal
Plan View
Min.
10'-0"
Min.
25'-0"
B
B
A
A
Min.
7'-0"
± Sand Cement Riprap
B
M in
Min.
10'-0" Sand Cement Riprap
M in
- Water Flow Direction
- Riprap
- Direction of Traffic
- Flowable Fill
- Sand Cement Riprap
8'-0"8'-0"
Legend
B1-01
Barrier
Floating Turbidity
B
M in
¡ Jefferson Ave.
Pavement
Edge of under & in front of pipes
Flowable Fill, 6" thick under concrete
Flowable Fill, 48" thick 4'-0"x4'-0"x2'-6"
Flowable Fill
6'-0"x1'-0"x6"
Flowable Fill
Grouted Riprap
4'-0"x4'-0"x1'-2"
Place Flowable Fill slope protection
Exist Concrete
9'-9" Crack
41'-4"
3'-0"x1'-6"x8"
Flowable Fill
8'-0"x8'-0"x6"
Flowable Fill
6'-3"x1'-8"x8"
Flowable Fill
8'-0"x8'-0"x6"
Flowable Fill
3'-0"x1'-9"x8"
Flowable Fill slope protection
Exist. concrete pavement
Edge of along � Rdwy
1"x1" Crack
" Crack8 111'-6"x
Crack
"8 111'-6"x
1'-0"x4'-0"x1'-0"
Flowable Fill
1'-0"x8'-0"x2'-0"
Flowable Fill coating with Bituminous
Coat inside of CMP Paint guardrail
Paint guardrail
Crack
"8 111'-6"x
Crack
"8 118'-0"x
Crack
" 8 117'-0"x
Notes:
1. Pipe culverts and slope protection are drawn from approximate field measurements. No existing plans are available.
2. See Sheet B1-02 for Sections A-A and B-B.
3. Perform cleaning and clearing operations to remove the loose debris that has filled in eroded and scoured areas to ensure proper riprap and flowable fill placement. Cut vegetation as needed but do not remove roots which are providing slope stabilization.
4. Place filter fabric and riprap on the west side in front of the voids between and beside pipe culverts.
5. Place sand cement riprap in all locations shown and pin to the ground with a #4 bar driven through the center of each riprap bag with 2'-0" minimum embedment into the soil below the riprap. For most cases use a 2'-6" long bar for a single layer of sand cement riprap and 3'-0" long bar for a double layer.
6. Install a flowable fill form on top of the riprap on the west side as shown in Section B-B.
Brace with timber as required to withstand the flowable fill pressure.
7. Place flowable fill in a manner which will fill all voids without creating air pockets. Fill voids below the existing concrete slope protection.
8. Place flowable fill over the riprap on the west side to fill voids between the rocks. The flowable fill does not need to be placed above the top of the riprap surface.
9. Use temporary sheet piles or a bladder system along with de-watering to divert the water to one pipe while working on the other pipe and channel areas as needed.
10.Clean the pipes according to the coating manufacturer's written instructions prior to applying the coating. Coat all interior surfaces of the pipes using 3 coats of a bituminous pipe coating material.
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
60% Submittal B1-02
4'-0"
M in
6"2'-0"2'-6"
2'-0"
C
M P
V a r ie s t o
2'-0"
1'-2"End of Pipe
Filter Fabric
Timber Form
CMP
CMP
Concrete Slope Protection
Concrete Slope Protection
Flowable Fill
1'-8"±
3"±
Riprap
#4x3'-0"
SECTION A-A
in other areas.
Use 1 or 2 layers as needed
Sand-Cement Riprap
Corrugated Metal Pipe (CMP)
Sand-Cement Riprap
Flowable Fill
#4x2'-6"
2'-0"
SECTION B-B
Notes:
1. Work this sheet with Sheet B1-01.
2. Filter fabric shall be Type D-2 in accordance with Specifiations Section 985.
Splice length shall be in accordance with Specifications Section 514.
3. Place flowable fill to completely fill voids without creating air pockets. Use a timber form or sand-cement riprap to create a grout dam to hold the flowable fill in place.
4. Sand-cement riprap shown in Section A-A is typical for placing flowable fill in other locations under the existing concrete slope protection. Timber forms may be substituted for the sand-cement riprap in these locations with no change in price.
The sand-cement riprap shown in Section B-B cannot be changed.
5. Pin all sand-cement bags with a #4 bar driven through the middle of the bags to a depth of 2'-0" minimum embedment in the soil below the bags.
6. Grout all riprap to place flowable fill in gaps between rocks.
Flowable Fill
6'-4" 3'-10"
EL: 50.60'
Observed High Water
1.5
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
60% Submittal B1-03
NUMBER
SURVEY
NUMBER
PROJECT
F B
-1
-0
P
P -7
-7
-5
N -3
W
NUMBER
DRAWING
N U
M B
E R
R E
V
IS
IO
N
S
W E
R
D R
A W
N B
Y
D A
T E
A P
P R
O V
E D
B Y
F E
B R
U A
R Y
D A
T E
F
IE
L D
B O
O K
P
A G
E S
B F
H
D A
T E
R
E G
F
L A
E
N G
N
O
D E
S
IG
N E
D B
Y
R H
B
S
IG
N A
T U
R E
C H
E C
K
S E
C T
IO
N
T
O W
N S
H
IP
R
A N
G E
P R
O J E
C T
M A
N A
G E
R
T
IM
O T
H Y
C A
R D
E N
D
IS
T R
IC
T
SHEET
D
E D
-5
-4
B
-B -F
C
C F
A
G F
C E
N T
U R
Y B
R
ID
G E
R E
P L
A C
E M
E N
T
H S
O
C D
B G
-D R
C H
A N
G E
I N
C O
R P
O R
A T e ll o w
H ig h L ig h te r)
C H
E C
K E
R
R d
P e n
X -O u t to D is a g rr e e o r R e m a rk
O R
IG
IN
A T
O R
Q rr e c t
(G re e n
H ig h li g h te r)
C h a n g e
R e d
P e n
P R
O D
U C
T
IO
N C
H E
C K
IN
G
C O
M P
L E
T E
R
E A
D Y
F O
R S
U B
M
IT
T A
L R
E V
IE
W
R
P
O R
IG
IN
A T
O R
R
P
P H
A
V
IE
W
S
IG
N A
T U
R E
D A
T E
D A
T E
D A
T E
D A
T E
R E
M A
R K
I N
C O
R P
O R
A T lu e H ig h li g h te r)
V E
R
IF
IC
A
T
IO
N
C H
E C
K E
R
Q e H ig h li g h te r)
O R
IG
IN
A T
O R
V E
R
IF
IC
A
T rr e c t
(P in k H ig h li g h te r)
D A
T E
D A
T E
D A
T E
D A
L E
E
L O
N G
P
.E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d
N a v a rr e
F lo ri d a p
(8
-5
C E
R T
IF
IC
A T
E O
F A
U T
H O
R
IZ
A T
IO
N
C
A -3
60% Submittal B1-04
| B1Keysheet |
| B1GeneralNts |
| B1PlanElev01 |
| B1BridgeHydro01 |
| B1TypSect01 |
| B1PlanElev01 |
| B1PileDetails01 |
| B1PileDetails01 |
| B1EndBent01 |
| B1EndBent01 |
| B1BeamDetails |
| B1BeamDetails |
| B1BeamDetails |
| B1BeamDetails |
| B1BeamDetails |
| B1BeamDetails |
| B1BeamDetails |
| B1Geotech01 |
| B1Geotech01 |
File details come from the government source that posted it. Updated .