Alger_Road_60%_Plans_02-06-2026.pdf
PDF 20 MB Posted
- Solicitation number
- PD 25-26.054
- Issued by
- Escambia County, Florida
About this file
This is a 60% design submittal document prepared by Dale E. Long, P.E. for Escambia County, Florida, pertaining to the CDBG-DR Century Drainage & Road Improvements project (HSO19) dated February 2026. The project involves the replacement of an existing bridge structure on Alger Road in the Town of Century, Florida, located in Section 25-2N-31W, District 5. The proposed bridge will be approximately 27 feet 1 inch in length and 23 feet in width, spanning an unnamed creek. The project includes demolition of the existing structure, relocation and installation of utilities (6-inch water lines, 8-inch sanitary sewer, 2-inch gas main), roadway improvements consisting of approximately 163 linear feet of asphalt paving from station 0+16 to 1+79, approach slabs on both sides of the bridge, and installation of road striping and signage. The design incorporates erosion and sediment control measures including silt fencing, turbidity curtains, and stabilization requirements. The project encompasses survey and staking activities, conflicts resolution with existing utilities, and compliance with local, state, and federal environmental and construction standards.
The design documents establish comprehensive technical specifications and construction requirements aligned with Escambia County Technical Specifications and applicable Florida Department of Transportation standards, excluding FDOT Division 1 General Requirements and Covenants. The contractor is responsible for acquiring FDEP/NPDES permits for stormwater pollution prevention, managing all utility relocations and coordinated tie-ins with the Town of Century and utility providers (water, sewer, gas, electric, telephone, fiber optic, and cable), conducting geotechnical compliance per recommendations from Larry M. Jacobs and Associates, Inc., and performing all erosion control and environmental compliance activities. Record drawing requirements include as-built documentation for all utilities, drainage structures, and site conditions. The project requires contractor responsibility for hazardous materials testing and disposal, safety compliance with OSHA requirements, tree protection measures, and site restoration. All work must comply with local, state, and federal building codes, permit conditions, and environmental regulations, with the owner maintaining authority for final inspection and certification upon completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
SCALE: 1"= 2000'
MES
INC
N
HWY 4
HW
Y 2
E. HECKER RD
AL
GE
R
RD
JEF
FER
SO
N AV
E
PROJECT
LOCATION
PROJECT
LOCATION
E. HECKER RD
HWY 4
OL
D
FL
OM
AT
ON
R D
HW
Y
AL
GE
R
RD
CX
S
RA
IL
RO
AD
AutoCAD SHX Text 00 01 02 03 04 05 06 07 08 09 10 11-14
AutoCAD SHX Text COVER SHEET, SHEET INDEX & LOCATION MAP GENERAL NOTES GENERAL NOTES & LEGEND EROSION & SEDIMENT CONTROL GENERAL NOTES & DETAILS ALGER BID ITEMS AND CONFLICT MATRIX ALGER ROAD BRIDGE - EXISTING CONDITIONS ALGER ROAD BRIDGE - DEMOLITION & EROSION CONTROL PLAN ALGER ROAD BRIDGE - SITE UTILITY PLAN ALGER ROAD BRIDGE - PLAN AND PROFILE ALGER ROAD BRIDGE - CROSS SECTIONS ALGER ROAD BRIDGE - STRIPING & SIGNAGE PLAN PROJECT DETAILS
AutoCAD SHX Text
ESCAMBIA COUNTY, FLORIDA
AutoCAD SHX Text
PLANS PROPOSED FOR
AutoCAD SHX Text %%uINDEX OF PLANS
AutoCAD SHX Text
60% DESIGN SUBMITTAL DESIGN SUBMITTAL FEBRUARY 2026
AutoCAD SHX Text
ENGINEERING / INFRASTRUCTURE DIVISION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
SHEET DESCRIPTION
AutoCAD SHX Text CDBG-DR CENTURY DRAINAGE & ROAD IMPROVEMENTS (HSO19) 6DED4-5296-489B-B550-F49CC34F3AGF
AutoCAD SHX Text
BOARD OF COUNTY COMMISSIONERS
AutoCAD SHX Text
DISTRICT TWO
AutoCAD SHX Text
DISTRICT ONE
AutoCAD SHX Text
DISTRICT FIVE
AutoCAD SHX Text
DISTRICT FOUR
AutoCAD SHX Text
DISTRICT THREE
AutoCAD SHX Text
COMMISSIONERS
AutoCAD SHX Text
MIKE KOHLER, CHAIRMAN
AutoCAD SHX Text
STEVE STROBERGER, VICE CHAIR
AutoCAD SHX Text
STEVEN BARRY
AutoCAD SHX Text
LUMON MAY
AutoCAD SHX Text
PROJECT MANAGER:
AutoCAD SHX Text
PROJECT ENGINEER:
AutoCAD SHX Text
DALE E. LONG, PE
AutoCAD SHX Text
SECTION / TOWNSHIP / RANGE:
AutoCAD SHX Text
SIGNATURE:
AutoCAD SHX Text
DISTRICT:
AutoCAD SHX Text
REG FLA ENG NO:
AutoCAD SHX Text 55393
AutoCAD SHX Text 25-2N-31W
AutoCAD SHX Text
AutoCAD SHX Text
DATE:
AutoCAD SHX Text THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE LATEST ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS. ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND COVENANTS, SHALL BE EXCLUDED AND NOT APPLICAPABLE TO ANY SPECIFICATION REFERED HEREIN OR OTHERWISE LISTED IN THESE PLANS OR RELATED DOCUMENTS OR THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.
AutoCAD SHX Text
PUBLIC WORKS DEPARTMENT
AutoCAD SHX Text
FEBRUARY 2026
AutoCAD SHX Text
TIMOTHY CARDEN
AutoCAD SHX Text
ASHLEE HOFBERGER, CHAIR
2025.084/.085 170001-021
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
FE
B
R U
A R
Y
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
O N
Ye llo w
H ig hL ig ht er
C H
EC
K
ER
R P) ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q
C or re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
AS
E
RE
VI
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
B lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q
(B lu e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
GENERAL NOTES:
1. THE OWNER INTENDS THAT THE CONTRACT DOCUMENTS WILL PROVIDE A COMPLETE AND
FULLY FUNCTIONAL PROJECT. WHERE LABOR AND MATERIAL MAY BE REQUIRED TO PROVIDE A
COMPLETE AND FULLY FUNCTIONAL PROJECT BUT IS NOT FULLY SPECIFIED, DETAILED, OR
SHOWN AS A CONSTRUCTION ITEM, THE CONTRACTOR SHALL PROVIDE THE REQUIRED
MATERIAL OR LABOR TO MEET THE INTENT OF THE CONTRACT DOCUMENTS. THIS
REQUIREMENT MAY ONLY BE CONSTRUED AS A REQUIREMENT TO COMPLETE OR MAKE
FUNCTIONAL CONSTRUCTION ITEMS SHOWN IN OR ON THE CONTRACT DOCUMENTS.
2. PRIOR TO COMMENCING CONSTRUCTION WITHIN THE PROJECT AREA(S), THE CONTRACTOR
SHALL VIDEO THE EXISTING CONDITIONS AND AREAS ADJACENT TO THE PROJECT THAT MAY
BE IMPACTED BY THE CONSTRUCTION. THE CONTRACTOR SHALL KEEP ONE COPY AND
PROVIDE ONE COPY EACH TO THE OWNER AND OWNER'S CONSTRUCTION
INSPECTION/ADMINISTRATION REPRESENTATIVE.
3. ALL FINAL CONSTRUCTION AND CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH ALL
LOCAL, STATE AND FEDERAL BUILDING AND/OR CONSTRUCTION CODES, RULES OR
REQUIREMENTS AS APPLICABLE.
4. ABOVE GROUND FEATURES SHOWN WHICH MAY AFFECT CONSTRUCTION WERE TAKEN FROM
THE BEST AVAILABLE INFORMATION AND FIELD SURVEYS. THE OWNER DOES NOT GUARANTEE
THAT ALL PHYSICAL FEATURES OR ABOVE GROUND OBSTRUCTIONS AFFECTING
CONSTRUCTION ARE SHOWN. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF/HERSELF WITH
THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS/HER BID. THERE SHALL BE NO
ADJUSTMENT OF THE CONTRACT PRICE FOR VISIBLE FEATURES AFFECTING CONSTRUCTION.
5. THE CONTRACT DOCUMENTS, SPECIFICATIONS, AND GEOTECHNICAL INVESTIGATION REPORT
FOR THIS PROJECT ARE AN INTEGRAL PART OF THE CONSTRUCTION. THE CONTRACTOR SHALL
FULLY REVIEW AND FOLLOW ALL REQUIREMENTS OF THESE DOCUMENTS IN THE COMPLETION
OF THE WORK. ALL CONSTRUCTION SHALL BE IN STRICT COMPLIANCE WITH THE CONTRACT
DOCUMENTS UNLESS OTHERWISE APPROVED IN WRITING BY THE OWNER OR OWNER'S
AUTHORIZED REPRESENTATIVE.
6. ALL EXISTING FENCES, STORM DRAINS, PROPERTY CORNERS, SURVEY MONUMENTS,
PAVEMENT, ROADS, SIDEWALKS, SIGNS OR ANY OTHER EXISTING OBJECTS OR STRUCTURES
WHICH ARE NOT DESIGNATED FOR REMOVAL, BUT ARE DAMAGED OR DESTROYED BY THE
CONTRACTOR OR BY ANYONE FOR WHOM THE CONTRACTOR IS RESPONSIBLE ARE TO BE
REPLACED BY THE CONTRACTOR AT HIS EXPENSE. THE CONTRACTOR IS RESPONSIBLE FOR
REPLACING IN KIND OR REPAIRING TO ORIGINAL CONDITION; MAILBOXES, DRIVEWAY
CULVERTS, RETAINING WALLS, LANDSCAPING, ETC. THAT ARE DISTURBED, DAMAGED OR
DESTROYED BY CONSTRUCTION ACTIVITIES.
7. THE LEGEND IS TYPICAL FOR ALL SHEETS. SOME ITEMS MAY NOT APPLY TO EACH SHEET.
8. CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THE LIMITS OF CONSTRUCTION,
RIGHT-OF-WAYS AND/OR EASEMENTS SHOWN. CONTRACTOR SHALL BE LIABLE FOR ALL
DAMAGE TO AND RESTORATION OF ALL AREAS OUTSIDE OF RIGHT-OF-WAYS AND EASEMENTS,
AT HIS EXPENSE.
9. IN THE EVENT THAT ANY STANDARDS OR SPECIFICATIONS AS DESCRIBED HEREIN OR SHOWN
ON THE PLANS, ARE IN CONFLICT WITH EACH OTHER, THE MORE STRINGENT CRITERIA WILL
APPLY. CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD IMMEDIATELY AND IN
WRITING. SHOULD THE MORE STRINGENT CRITERIA BE UNCLEAR, THE ENGINEER WILL
PROVIDE AN INTERPRETATION AND DETERMINE WHICH CRITERIA IS TO BE USED.
10. THESE PLANS WERE BASED ON THE GEOTECHNICAL REPORT BY LARRY M. JACOBS AND
ASSOCIATES, INC., PHONE: (850) 434-0846. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ACQUIRE A COPY OF THE REPORT(S) FROM THE GEOTECHNICAL ENGINEER, FAMILIARIZE
THEMSELVES WITH THE CONDITIONS AS DESCRIBED IN THE REPORT(S), AND COMPLY WITH
ALL RECOMMENDATIONS MADE IN THE REPORT(S) SPECIFICALLY FOR SOIL PREPARATION ON
THE SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COPY OF ALL
SUPPLEMENTAL REPORTS FOR THIS PROJECT FROM THE OWNER AND TO FOLLOW THE
SUPPLEMENTAL REPORTS' RECOMMENDATIONS.
11. THE OWNER, OWNER'S REPRESENTATIVES, AND INSPECTORS OF APPLICABLE GOVERNMENT
AGENCIES HAVING JURISDICTION, SHALL AT ALL TIMES HAVE ACCESS TO THE WORK SITE.
THE CONTRACTOR SHALL PROVIDE PROPER FACILITIES FOR SUCH ACCESS AND INSPECTIONS.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE ALL REASONABLE AND PRUDENT
PRECAUTIONS TO ENSURE THAT ALL COMPLETED WORK, MATERIALS AND EQUIPMENT STORED
ON SITE ARE SAFE AND SECURE FROM UNAUTHORIZED ACCESS OR USE. SUCH PRECAUTIONS
MAY INCLUDE INSTALLATION OF SIGNS, FENCES, OR POSTING OF SECURITY GUARDS.
13. THE CONTRACTOR SHALL COMPLY FULLY WITH ALL PERMIT REQUIREMENTS IMPOSED BY THE
REGULATORY AGENCIES.
14. THE ENGINEER SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF ALL TESTING
RELATED TO CIVIL WORK.
15. ALL DISCHARGE FROM ANY REQUIRED DEWATERING OPERATIONS SHALL BE RESTRICTED AND
MAINTAINED ON SITE. PERCOLATION THROUGH TEMPORARY PONDS OR EVAPORATION ARE
THE ONLY ALLOWABLE NON-PERMITTED MEANS OF DISPOSAL OF GROUNDWATER. THE
CONTRACTOR AT HIS EXPENSE, MAY PROVIDE TESTING OF GROUNDWATER PER F.D.E.P.
GUIDELINES INCLUDING FAC CHAPTER 62-621.300(2). THE CONTRACTOR WILL BE REQUIRED
TO OBTAIN A “GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUNDWATER FROM
ANY NON-CONTAMINATED SITE ACTIVITY” FROM F.D.E.P. IF REQUIRED AT HIS EXPENSE.
16. NO DEVIATIONS OR REVISIONS FROM THESE PLANS BY THE CONTRACTOR SHALL BE ALLOWED
WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD, THE TOWN OF CENTURY, AND
THE OWNER.
HAZARDOUS MATERIALS NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH LOCAL STATE AND
FEDERAL REGULATIONS REGARDING TESTING FOR AND DISPOSAL OF HAZARDOUS MATERIALS
DURING DEMOLITION.
2. HAZARDOUS MATERIAL MEANS ANY SUBSTANCE: (A) THE PRESENCE OF WHICH REQUIRES
INVESTIGATION OR REMEDIATION UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE,
REGULATION, ORDINANCE, RULE, CODE, ACTION, POLICY OR COMMON LAW, OR (B) WHICH IS
OR BECOMES DEFINED AS A “HAZARDOUS WASTE”, “HAZARDOUS SUBSTANCE” POLLUTANT OR
CONTAMINANT UNDER ANY PRESENT FEDERAL, STATE OR LOCAL STATUTE, REGULATION, RULE
OR ORDINANCE OR AMENDMENTS THERETO INCLUDING, WITHOUT LIMITATION, THE
COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT (42 USC
SECTIONS 9601 ET SEQ.) AND/OR THE RESOURCE CONSERVATION AND RECOVERY ACT (42
USC SECTIONS 6901 ET SEQ.), OR (C) WHICH IS TOXIC, EXPLOSIVE, CORROSIVE, FLAMMABLE, INFECTIOUS, RADIOACTIVE, CARCINOGENIC, MUTAGENIC, OR OTHERWISE HAZARDOUS AND
IS REGULATED BY ANY GOVERNMENTAL AUTHORITY, AGENCY, DEPARTMENT, COMMISSION,
BOARD, AGENCY OR INSTRUMENTALITY OF THE UNITED STATES, THE STATE IN WHICH THE
PREMISES ARE LOCATED OR ANY POLITICAL SUBDIVISION THEREOF, OR (D) THE PRESENCE
OF WHICH ON THE PREMISES CAUSES OR THREATENS TO CAUSE A NUISANCE UPON THE
PREMISES OR TO ADJACENT PROPERTIES OR POSES OR THREATENS TO POSE A HAZARD TO
THE HEALTH OR SAFETY OF PERSONS ON OR ABOUT THE PREMISES, OR (E) WHICH CONTAINS
GASOLINE, DIESEL FUEL, OR OTHER PETROLEUM HYDROCARBONS, OR (F) WHICH CONTAINS
POLYCHLORINATED BIPHENYL (PCB'S), ASBESTOS, LEAD OR UREA FORMALDEHYDE FOAM
INSULATION.
3. CONTRACTOR AND ITS SUBCONTRACTORS SHALL USE, HANDLE, TEST TRANSPORT, AND
DISPOSE OF ALL HAZARDOUS MATERIALS (AS DEFINED HEREIN) IN COMPLIANCE WITH ALL
CURRENT FEDERAL, STATE AND LOCAL ENVIRONMENTAL, HEALTH OR SAFETY LAW,
INCLUDING, BUT NOT LIMITED TO, ALL SUCH STATUTES, REGULATIONS, RULES, ORDINANCES, CODES, AND RULES OF COMMON LAW.
4. CONTRACTOR FURTHER AGREES THAT CONTRACTOR AND ITS SUBCONTRACTORS SHALL NOT
CAUSE THE DISCHARGE, RELEASE, OR DISPOSAL OF ANY HAZARDOUS MATERIAL CREATED BY
ITS WORK ON OR ABOUT THE JOB SITE. IN THE EVENT OF ANY SPILL, RELEASE, OR ANY
OTHER REPORTABLE OCCURRENCE, CONTRACTOR SHALL NOTIFY THE APPROPRIATE
GOVERNMENTAL AGENCY AND SHALL TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE
THE DELETERIOUS EFFECT OF SUCH A SPILL ON PERSONS OR PROPERTY.
PROJECT SAFETY NOTES:
1. THE CONTRACTOR SHALL BE SOLELY LIABLE FOR THE SAFETY OF THE WORK AND ANY AND ALL
DAMAGES ARISING FROM THE CONSTRUCTION SHOWN ON THE PLANS. THE CONTRACTOR
SHALL BE SOLELY RESPONSIBLE FOR ASSURING THAT THE CONSTRUCTION MATERIALS AND
METHODS ARE COMPLIANT WITH ALL APPLICABLE LOCAL, STATE OR FEDERAL SAFETY CODES,
RULES, OR REQUIREMENTS.
2. THE CONTRACTOR SHALL COMPLY IN EVERY RESPECT WITH THE FEDERAL OCCUPATIONAL
SAFETY AND HEALTH ACT OF 1970 (OSHA) AND ALL RULES AND REGULATIONS NOW OR
HEREAFTER IN EFFECT UNDER THIS ACT. THE CONTRACTOR FURTHER AGREES TO COMPLY
WITH ANY AND ALL APPLICABLE STATE LAWS AND REGULATIONS PERTAINING TO JOB SAFETY
AND HEALTH.
3. THE CONTRACTOR SHALL PROTECT AND KEEP THE OWNER (INCLUDING THEIR AGENTS,
CONSULTANTS, AND EMPLOYEES) FREE AND HARMLESS FROM ANY AND ALL LIABILITY, PUBLIC
OR PRIVATE, PENALTIES, CONTRACTUAL OR OTHERWISE, LOSSES, DAMAGES, COSTS,
ATTORNEY'S FEES, EXPENSES, CAUSES OF ACTION, ETC. RESULTING FROM THE FEDERAL
OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AS AMENDED.
DEMOLITION AND CLEARING NOTES
1. THE TREES SHOWN FOR REMOVAL AND PROTECTION ON THIS SHEET ARE INTENDED TO BE
GENERAL IN NATURE. THE CONTRACTOR IS TO REMOVE ANY AND ALL TREES AS REQUIRED TO
COMPLETE THE CONSTRUCTION ACTIVITIES.
2. TREES SLATED FOR PROTECTION SHALL BE MARKED AND TREE PROTECTION BARRICADES
SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES.
NO PROTECTED TREES SHALL BE REMOVED, DESTRUCTIVELY DAMAGED, MUTILATED,
RELOCATED, DISFIGURED, DESTROYED, CUT DOWN OR EXCESSIVELY PRUNED DURING
CONSTRUCTION ACTIVITIES.
3. NO GRADING OR CLEARING BY, OR STORAGE OF HEAVY EQUIPMENT SHALL OCCUR WITHIN
THE DRIP LINE OF PROTECTED TREES OR WITHIN ENVIRONMENTALLY SENSITIVE AREAS.
4. TREE PROTECTION BARRICADES OR EQUIVALENT PROTECTIVE MEASURES WILL BE
CONSTRUCTED ACCORDING TO THE LOCAL JURISDICTION'S CRITERIA FOR TREES TO REMAIN
WITHIN THE LIMITS OF CONSTRUCTION.
5. CONTRACTOR SHALL TAKE EXTREME CARE TO REMOVE ONLY TREES AND VEGETATION
ABSOLUTELY NECESSARY FOR THE CONSTRUCTION OF THIS WORK.
6. ALL TREE PROTECTION MEASURES AND BARRICADES SHALL BE INSTALLED AROUND EACH
PROTECTED TREE SHOWN TO REMAIN ON SITE AND PRIOR TO ANY SITE DISTURBANCE. TREE
PROTECTION MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER UNTIL PROJECT IS
COMPLETE AND THE SITE IS STABILIZED.
7. THE CONTRACTOR SHALL BE EXTREMELY CAUTIOUS WHEN WORKING NEAR TREES THAT ARE
TO BE SAVED, WHETHER SHOWN ON THE PLANS OR DESIGNATED IN THE FIELD
8. ALL PRACTICAL AND NECESSARY EFFORT SHALL BE TAKEN DURING CONSTRUCTION TO
PREVENT UNNECESSARY TREE REMOVAL.
9. TRENCHING FOR PROPOSED UTILITY IMPROVEMENTS WITHIN THE DRIP LINE OF SPECIMEN
TREES TO REMAIN, WILL REQUIRE THE ADVANCED PRE-TREATMENT OF EACH IMPACTED TREE
BY A QUALIFIED ARBORIST OR THE LANDSCAPE ARCHITECT TO MINIMIZE THE POTENTIALLY
ADVERSE IMPACTS OF CONSTRUCTION. HAND DIGGING MAY BE REQUIRED WITHIN THE DRIP
LINE OF PROTECTED TREES.
10. TO PROTECT TREES STABILIZING ROOTS, TRENCHING OR ANY TOPSOIL DISTURBANCE
SHOULD BE NO CLOSER THAN 10 FEET FROM TRUNK OF THE TREE THAT IS TO REMAIN.
11. OUTSIDE OF THE STRUCTURAL ROOT PLATE, PROTECTED TREE ROOTS OF 2" DIAMETER OR
GREATER SHALL BE CUT CLEANLY WITH APPROPRIATE EQUIPMENT. DO NOT USE EQUIPMENT
THAT PULLS AND SHATTER ROOTS. (E.G. BACKHOE). ROOTS SHALL BE PRUNED TO A DEPTH
OF 18 INCHES BELOW THE EXISTING GRADE OR TO THE DEPTH OF DISTURBANCE IF LESS
THAN 18" FROM THE EXISTING GRADE. CUT TO A LATERAL ROOT WHEN POSSIBLE. EXPOSED
ROOTS SHOULD BE COVERED WITH A LAYER OF MULCH OR SOIL TO HELP PREVENT STRESS
FROM WATER LOSS.
12. SUPPLEMENTAL IRRIGATION MAY BE SUPPLIED TO TREES TO COMPENSATE FOR ROOT LOSS
AND DETER WATER STRESS. IRRIGATION SHOULD WET/SATURATE THE SOIL WITHIN THE
TREE PROTECTION ZONE.
13. IN AREAS REQUIRING FILL MATERIAL, THE CONTRACTOR SHALL STRIP OR OTHERWISE
REMOVE ALL VEGETATION SUCH AS BRUSH, HEAVY SOD, HEAVY GROWTH OF GRASS,
DECAYED VEGETATION MATTER, RUBBISH AND ANY OTHER DELETERIOUS MATERIAL BEFORE
EMBANKMENT IS PLACED. IMMEDIATELY PRIOR TO THE PLACING OF FILL MATERIAL, THE
ENTIRE AREA UPON WHICH FILL IS TO BE PLACED, SHALL BE SCARIFIED IN A DIRECTION
APPROXIMATELY PARALLEL TO THE AXIS OF FILL. THE GEOTECHNICAL ENGINEER SHALL
APPROVE THE AREA PRIOR TO THE PLACEMENT OF FILL.
14. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL CLEARLY DESIGNATE THE LIMITS OF
CONSTRUCTION ON-SITE. THE CONTRACTOR SHALL NOT PERFORM ANY WORK OUTSIDE THE
LIMITS OF CONSTRUCTION. IN AREAS WHERE NO WORK IS PROPOSED THE CONTRACTOR
SHALL PROTECT THE TOPOGRAPHY, THE SOIL, AND THE VEGETATION.
15. WHERE DEMOLITION REQUIREMENTS LEAVE OPEN TRENCHES, PITS OR OTHER VOIDS,
PROVIDE CLEAN FILL AND COMPACTION PER THE SPECIFICATIONS, THE GEOTECHNICAL
REPORT OR OTHER REQUIREMENTS.
16. REMOVAL OF EXISTING PAVED SURFACES INCLUDES REMOVAL OF EXISTING BASE OR SOIL
MATERIALS SUFFICIENTLY TO CONSTRUCT THE NEW SURFACE IN ACCORDANCE WITH THE
CONSTRUCTION PLANS.
17. ALL DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE SITE AT THE CONTRACTOR'S
EXPENSE. DEBRIS SHALL BE DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE AND
FEDERAL REGULATIONS.
18. ALL ASPHALT AND CONCRETE SHALL BE SAW CUT AT EDGES TO REMAIN. REMAINING EDGES
SHALL BE PROTECTED AT THE CONTRACTOR'S EXPENSE.
19. CONTRACTOR SHALL MAINTAIN EXISTING DRAINAGE PATTERNS WHILE REMOVING OR
REPAIRING ANY EXISTING STORM DRAINS OR SWALES.
20. EXCAVATED MATERIALS (SPOILS) SHALL BE DISPOSED OF AS REQUIRED IN UPLAND AREAS IN
ACCORDANCE WITH LOCAL, STATE AND FEDERAL LAWS. IF SPOILS ARE TO BE STORED ON
SITE EITHER TEMPORARILY OR PERMANENTLY, THE STORAGE LOCATION SHALL BE AN UPLAND
AREA APPROVED BY THE OWNER AND ENGINEER. THE SPOILS SHALL BE PREVENTED FROM
ERODING WITH THE USE OF SILT FENCING AND GRASSING AS APPROPRIATE.
PAVING GRADING AND DEMOLITION NOTES:
1. ALL DRAINAGE STRUCTURES ARE TO BE TRAFFIC RATED UNLESS SPECIFICALLY NOTED
OTHERWISE.
2. AFTER THE ROADWAY HAS BEEN CONSTRUCTED TO SUBGRADE, IT SHALL BE PROOF-ROLLED
TO ASSURE THAT PROPER COMPACTION HAS BEEN ATTAINED. THE PROOF-ROLLING AND
COMPACTION OPERATIONS SHALL BE INSPECTED AND TESTED BY A FLORIDA LICENSED
GEOTECHNICAL ENGINEER TO ASSURE THAT THE SPECIFIED COMPACTION IS MAINTAINED
AND ALL DELETERIOUS MATERIALS HAVE BEEN REMOVED.
3. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE A MINIMUM CLASS III, UNLESS OTHERWISE
APPROVED OR NOTED ON THE PLANS OR SPECIFICATIONS.
4. THE CONTRACTOR IS RESPONSIBLE FOR GRADING/PAVING ALL ROADWAYS TO DRAIN
POSITIVELY IN THE DIRECTION SHOWN BY THE PROPOSED GRADES AND FLOW ARROWS ON
THE PLANS. INTERSECTIONS SHALL BE TRANSITIONED TO PROVIDE A SMOOTH DRIVING
SURFACE WHILE MAINTAINING POSITIVE DRAINAGE. IF AN AREA OF POOR DRAINAGE IS
OBSERVED DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR
TO PAVING SO THAT A SOLUTION OR RECOMMENDATION FOR CORRECTION CAN BE MADE.
5. ALL STORMWATER PIPE JOINTS SHALL BE WRAPPED WITH FILTER FABRIC.
6. CONTRACTOR SHALL SCREED ALL SIDEWALKS ¼” PER FOOT AWAY FROM THE BUILDING.
7. ALL HANDICAP ACCESSIBLE SIDEWALKS/ROUTES SHALL BE CONSTRUCTED TO LIMIT CROSS
SLOPES TO 2.0% MAXIMUM.
8. AS A CONDITION OF THE ENVIRONMENTAL RESOURCE PERMIT, THE CONTRACTOR SHALL:
a. KEEP A COPY OF THE PERMIT ON SITE.
b. REVIEW THE PERMIT PRIOR TO CONSTRUCTION COMMENCEMENT.
c. PROVIDE AN 8-1/2” X 11” WEATHER-PROOF ENCLOSURE INCLUDING THE
PERMIT NUMBER FACING THE ROAD ON SITE.
9. THE OWNER WILL BE RESPONSIBLE FOR MONITORING CONSTRUCTION AND SUBMITTING A
NOTICE OF CONSTRUCTION COMMENCEMENT AND AN AS-BUILT CERTIFICATION FOR THE
PROJECT UPON COMPLETION.
10. CONTRACTOR SHALL VERIFY THE SIZE, TYPE, END ELEVATIONS AND SLOPE OF ALL CULVERTS
THAT ARE DAMAGED OR WILL BE REPLACED DURING THE COURSE OF CONSTRUCTION.
CULVERTS AND MITERED END SECTIONS, OR HEADWALLS SHALL BE REPLACED WITH
EQUIVALENT MATERIALS AND CONSTRUCTION AS REQUIRED BY THE OWNER. THE
CONTRACTOR SHALL PROVIDE PRE AND POST CULVERT ELEVATIONS, MATERIAL AND SIZE ON
THE AS-BUILTS TO ENSURE COMPLIANCE.
RECORD DRAWING NOTES:
1. PRIOR TO CONSTRUCTION, THE CONTRACTOR WILL OBTAIN A COPY OF THE MINIMUM
REQUIREMENTS FOR AS-BUILT RECORD DRAWING ACCEPTANCE FOR THE AGENCY HAVING
JURISDICTION (AHJ) SUCH AS A COUNTY OR CITY, AND/OR A UTILITY SERVICE PROVIDER.
THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THESE REQUIREMENTS AND
PRODUCE AS-BUILT RECORD DRAWINGS THAT SUBSTANTIALLY COMPLY WITH OR EXCEED
THESE REQUIREMENTS.
2. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER OF RECORD REDLINE DRAWINGS
DEPICTING THE AS-BUILT CONDITION AT LEAST TWO (2) WEEKS PRIOR TO REQUESTING A
FINAL INSPECTION OF THE WORK TO BE CERTIFIED.
3. THE CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH
SHOW THE AS-BUILT CONDITIONS OF ALL WORK INCLUDING PIPING, FITTINGS, DRAINAGE
STRUCTURES, POND TOPOGRAPHY, OUTLET STRUCTURE DIMENSIONS, GRADING, ELEVATIONS,
ETC. RECORD DRAWINGS SHALL BE PROVIDED TO THE ENGINEER OF RECORD PRIOR TO
REQUESTING A FINAL INSPECTION.
4. THE CONTRACTOR SHALL KEEP A DAILY SET OF AS-BUILT DRAWINGS WHILE THE WORK IS
BEING DONE AND IS VISIBLE AND EXPOSED ACCORDING TO THE CRITERIA CONTAINED
HEREIN.
5. THE OWNER RESERVES THE RIGHT TO REQUIRE THAT THE CONTRACTOR UNCOVER, RE-TEST,
AND/OR PERFORM ANY ACTION NECESSARY TO ENSURE THAT THE IMPROVEMENTS HAVE BEEN
CONSTRUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
6. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING SUFFICIENT AS-BUILT
INFORMATION TO CONVEY THAT THE CONSTRUCTION HAS BEEN COMPLETED WITHIN
ACCEPTABLE TOLERANCES. AS-BUILT INFORMATION SHALL INCLUDE BUT IS NOT LIMITED TO
THE FOLLOWING:
A.SANITARY SEWER:
1)TOP ELEVATION OF ALL MANHOLE FRAME AND COVERS.
2)INVERT OF EACH LINE ENTERING AND EXITING EACH MANHOLE STRUCTURE.
3)LENGTH OF EACH RUN OF MAIN BETWEEN MANHOLES (MEASURED FROM CENTER
TO CENTER OF MANHOLE)
4)PIPE SLOPE (GRADE) BETWEEN MANHOLES.
5)LOCATE ALL SERVICE WYES FROM THE DOWNSTREAM MANHOLE. PROVIDE A
LATERAL DEPTH AT THE LOT LINE AS WELL AS AN OFFSET DISTANCE FROM THE
MAIN.
6)LOCATE WITH MEASUREMENTS (MINIMUM TWO-POINT TIES) FROM PERMANENT
VISIBLE OBJECTS ALL FITTINGS, STUB-OUTS, ACCESSORIES, ETC. NOT VISIBLE
FROM THE SURFACE.
B.STORM DRAINAGE:
1)TOP ELEVATION OF EACH STRUCTURE FRAME AND COVER AS WELL AS THE TOP
ELEVATION OF ALL HEADWALLS, CONTROL STRUCTURES, ETC.
2)INVERT OF EACH LINE ENTERING AND EXITING EACH STRUCTURE.
3)INVERTS OF ALL PIPE OUTFALLS.
4)PIPE SLOPE (GRADE) BETWEEN STRUCTURES.
5)LENGTH OF RUN OF MAIN BETWEEN STORMWATER STRUCTURES (MEASURED FROM
CENTER TO CENTER OF STRUCTURE)
6)PROVIDE DIMENSIONS AND INVERTS FOR ALL UNDERDRAINS INCLUDING
FITTINGS AND CLEANOUTS.
7)POND TOPOGRAPHY:
i. CROSS-SECTIONS
ii. SAND CHIMNEY DIMENSIONS
iii. OVERFLOW STRUCTURE INFORMATION
8)LOCATE WITH MEASUREMENTS (MINIMUM TWO-POINT TIES) FROM PERMANENT
VISIBLE OBJECTS ALL FITTINGS, STUB-OUT, ACCESSORIES, ETC. NOT VISIBLE
FROM THE SURFACE.
C.PRESSURE MAINS (WATER AND SEWER):
1)ACTUAL LENGTH OF PIPE BETWEEN EACH BRANCH OR VALVE IN RUN.
2)LOCATE ALL FITTINGS WITH MEASUREMENTS (MINIMUM TWO-POINT TIES) FROM
PERMANENT VISIBLE OBJECTS ALL FITTINGS, STUB-OUT, ACCESSORIES, ETC. NOT
VISIBLE FROM THE SURFACE.
3)LIST THE DEPTH OF LINES AT ALL VALVES, FITTINGS, AND FIRE HYDRANTS.
4)DIMENSIONS WHICH CLEARLY DEMONSTRATE COMPLIANCE WITH MINIMUM
SEPARATION DISTANCES OR REQUIRED PIPE UPGRADES (ENCASEMENT).
D.OTHER IMPROVEMENTS:
1)LOCATE BUILDINGS, BRIDGES, SIDEWALKS, PAVEMENT, CURB AND GUTTER, ETC.
AS APPLICABLE.
G
EN
ER
A
L N
O
TE
S
C-001
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\
G en er al
N ot es .d w g, /6
/2
1:
:1
PM
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
FE
B
R U
A R
Y
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
llo w
H ig hL ig ht er
C H
EC
K
ER
ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
UTILITY NOTES:
1. ALL UTILITY CONSTRUCTION SHALL CONFORM TO THE TOWN OF CENTURY STANDARD
GUIDELINES AND SPECIFICATIONS, LATEST EDITION, AND STANDARD DETAILS.
2. THE EXISTING UTILITIES SHOWN ON THESE PLANS ARE APPROXIMATE. THE CONTRACTOR
SHALL FIELD LOCATE ALL EXISTING UTILITIES AS TO SIZE, LOCATION, AND ELEVATION. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY AND ALL CONFLICTS PRIOR TO
BEGINNING CONSTRUCTION.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND VERIFYING SIZE, TYPE,
LOCATION, AND ELEVATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND
NOTIFYING THE INVOLVED UTILITY PROVIDERS TO MAKE ANY NECESSARY ARRANGEMENTS
FOR RELOCATION, DISRUPTION OF SERVICE OR CLARIFICATION OF ACTIVITY REGARDING
SAID UTILITY. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN CROSSING AN
UNDERGROUND UTILITY, WHETHER SHOWN ON THESE PLANS OR FIELD LOCATED. THE
RESPECTIVE UTILITY PROVIDERS SHALL RELOCATE UTILITIES THAT INTERFERE WITH THE
PROPOSED CONSTRUCTION AND THE CONTRACTOR SHALL COOPERATE WITH THE UTILITY
PROVIDERS DURING RELOCATION OPERATIONS. ANY DELAY OR INCONVENIENCE CAUSED BY
THE INVOLVED UTILITIES SHALL BE INCIDENTAL TO THE CONTRACT.
4. THE CONTRACTOR SHALL ADHERE TO FLORIDA STATUTE CHAPTER 556 AND THE SUNSHINE
811 OF FLORIDA. CONTRACTOR SHALL NOTIFY ALL UTILITY OWNERS AND THE SUNSHINE
UNDERGROUND NOTIFICATION CENTER AT 811 AT LEAST 48 HOURS PRIOR TO START OF
WORK. CONTRACTOR IS RESPONSIBLE FOR CONTINUAL MAINTENANCE OF ALL UTILITY
LOCATES, FLAGS, MARKINGS, ET CETERA THROUGH THE ENTIRE DURATION OF
CONSTRUCTION.
5. ALL VALVE BOXES SHALL BE SET FLUSH IN A CONCRETE COLLAR TO FINISH GRADE. ALL
CONCRETE VALVE COLLARS SHALL BE CIRCULAR PRECAST MEMBER WITH A MINIMUM
ANNULAR COVERAGE OF 6-INCHES.
6. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES, RULES AND
REGULATIONS REGARDING UTILITY LOCATIONS. THE CONTRACTOR IS COMPLETELY AND
SOLELY RESPONSIBLE FOR ALL DAMAGES TO ANY UTILITIES CAUSED AS A RESULT OF, OR BY, THE CONSTRUCTION. THE LOCATION OF EXISTING UTILITIES ON THESE PLANS IS SHOWN IN
AN APPROXIMATE WAY ONLY AND WAS TAKEN FROM LIMITED FIELD LOCATES AND THE BEST
INFORMATION AVAILABLE. THE CONTRACTOR SHALL CONTACT FLORIDA POWER AND LIGHT
AND/OR AT&T TO SUPPORT OR RELOCATE EXISTING POLES DURING CONSTRUCTION IF
NECESSARY. THE CONTRACTOR SHALL PAY THE RESPECTIVE COMPANY FOR THIS WORK. THE
CONTRACTOR SHALL COORDINATE ALL OTHER UTILITY WORK OR CONNECTIONS WITH THE
APPROPRIATE UTILITY COMPANIES. UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT
SHOWN.
7. ALL NEW UTILITY MAINS (POTABLE WATER, RECLAIMED WATER, OR SANITARY FORCEMAINS)
SHALL HAVE A MINIMUM COVER OF 30-INCHES AND A MAXIMUM COVER OF 36-INCHES,
UNLESS OTHERWISE NOTED.
8. AT TIMES WHEN PIPE INSTALLATION IS NOT IN PROGRESS, THE OPEN ENDS OF THE PIPE
SHALL BE CLOSED BY AN APPROVED MEANS AND SHALL REMAIN CLOSED UNTIL
CONSTRUCTION OF THAT PARTICULAR SECTION IS RESUMED. NO OPEN TRENCHES WILL BE
ALLOWED WHEN PIPE INSTALLATION IS NOT IN PROGRESS. THE TERMINAL JOINT MAY BE
LEFT EXPOSED IN AN OPEN TRENCH, PROVIDED ADEQUATE SAFETY BARRICADES ARE
INSTALLED BY THE CONTRACTOR.
9. CONNECTIONS TO EXISTING WATER AND SEWER FACILITIES SHALL BE COORDINATED WITH
THE TOWN OF CENTURY AT (850)256-3208, PRIOR TO MAKING CONNECTIONS. A
REPRESENTATIVE OF THE TOWN OF CENTURY SHALL WITNESS ALL CONNECTIONS AND
OPERATE ALL VALVES.
10. PRESSURE PIPES SHALL BE ADJUSTED VERTICALLY GRADUALLY WITHOUT THE USE OF
FITTINGS AS REQUIRED TO ACCOMMODATE EXISTING UTILITIES. IF GRADUAL LOWERING IS
NOT POSSIBLE, APPROPRIATE FITTINGS AND JOINT RESTRAINT SHALL BE PROVIDED TO
AVOID THE EXISTING CONFLICT. NO FITTINGS GREATER THAN 45° WILL BE ALLOWED.
SEPARATION SHALL BE A MINIMUM OF 18” UNLESS OTHERWISE NOTED ON THE PLANS.
CONTRACTOR SHALL REFERENCE PLAN NOTES AND CONFLICT DETAILS FOR ADDITIONAL
GUIDANCE.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS
WITH GOVERNMENTAL DEPARTMENTS, PUBLIC UTILITIES, PUBLIC CARRIERS, SERVICE
COMPANIES, AND CORPORATIONS OWNING OR CONTROLLING ROADWAYS, RAILWAYS, WATER,
SEWER, GAS, ELECTRICAL, TELEPHONE, AND TELEGRAPH FACILITIES, SUCH AS PAVEMENTS,
TRACKS, PIPING, WIRES, CABLES, CONDUITS, POLES, GUYS, OR OTHER SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES CONNECTED THEREWITH THAT ARE ENCOUNTERED IN
THE WORK IN ORDER THAT SUCH ITEMS MAY BE PROPERLY SUPPORTED, PROTECTED OR
LOCATED.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF PRIVATELY
(HOMEOWNER/HOA) OWNED UNDERGROUND UTILITIES SUCH AS SPRINKLER SYSTEMS,
SEPTIC DRAIN LINES, UNDERDRAINS, ETC. THAT ARE DAMAGED OR DESTROYED DURING
CONSTRUCTION.
13. IN LOCATIONS WHERE CONSTRUCTION IS SHOWN CROSSING EXISTING UTILITIES, THE
CONTRACTOR SHALL POTHOLE THE EXISTING UTILITIES TO CONFIRM LOCATION, SIZE AND
DEPTH IN ADVANCE OF CONSTRUCTION. CONTRACTOR SHALL USE THE POTHOLE
INFORMATION TO PROVIDE THE REQUIRED CLEARANCE BETWEEN THE PROPOSED UTILITY
LINE ABOVE OR BELOW THE EXISTING UTILITIES.
14. CONTRACTOR SHALL COORDINATE SERVICE OUTAGES RELATED TO UTILITY TIE-INS WITH
TOWN OF CENTURY STAFF. CONTRACTOR IS ADVISED THAT TIE-INS MAY NEED TO BE MADE
OVERNIGHT DURING OFF-PEAK HOURS.
15. GRAVITY SANITARY SEWER PIPE LENGTHS SHOWN ON THE PLANS ARE FROM CENTER OF
MANHOLE TO CENTER OF MANHOLE.
16. MANHOLE LOCATIONS ARE TO BE STAKED/PAINTED (IN ROADWAY) BY THE CONTRACTOR IN
THE FIELD FOR THE ENGINEER'S REVIEW PRIOR TO PLACING MANHOLES.
17. MANHOLE TOP ELEVATIONS SHOWN ARE APPROXIMATE ONLY. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE TOP ELEVATIONS ARE SET FLUSH
WITH THE FINAL GRADE, UNLESS SPECIFICALLY NOTED OTHERWISE ON THE CONSTRUCTION
PLANS.
18. FOR CONNECTION OF PROPOSED SEWER TO EXISTING MANHOLES, THE CONTRACTOR SHALL
CORE EXISTING MANHOLE AND CONNECT THE PROPOSED SEWER LINE TO THE EXISTING
MANHOLE WITH A FLEXIBLE BOOT OR ENGINEER APPROVED CONNECTION IN ACCORDANCE
WITH THE SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE A WATERTIGHT CONNECTION
AND RE-SHAPE THE MANHOLE INVERT TO ACCOMMODATE THE NEW PIPE AND FLOW.
CONTRACTOR SHALL PREVENT ANY DEBRIS FROM EXITING THE MANHOLE DURING THE
CORING OPERATION AND ALL CORING DEBRIS SHALL BE REMOVED FROM THE MANHOLE AND
SEWER LINES ONCE THE CONNECTION IS MADE.
19. UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION SO
THAT THE UTILITY OWNER CAN SPOT VERIFY AND/OR EXPOSE THEIR UTILITIES. KNOWN
UTILITIES OWNERS INCLUDE:
WATER/SEWER - TOWN OF CENTURY
MR. KEVIN MERCHANT
PH: (850) 256-3208
WATER/SEWER - TOWN OF CENTURY
MR. GARY SMALL
PH: (850) 256-3208
TELEPHONE -AT&T FLORIDA
MR. MIKE SMITH
PH: (251) 591-6630
ELECTRIC - FLORIDA POWER & LIGHT
MR. STEPHEN HARRIS
PH: (850) 444-6895
ELECTRIC - ESCAMBIA RIVER ELECTRIC CO-OP
MR. ALAN MITCHEM
PH: (850) 791-1687
FIBER OPTIC - UNITI FIBER
MR. KYLE HILL
PH: (850) 544-1400
CABLE - SPECTRUM
MR. JOEY PRIDGEN
PH: (205) 209-2028
20. AT&T FLORIDA WILL COMPLETE ALL WORK DURING THE HOURS OF 7:30 AM -4:30 PM,
MONDAY THRU FRIDAY. NO NIGHT OR WEEKEND WORK.
21. ALL CABLE DAMAGE MUST BE REPORTED TO THE ATT FLORIDA REPAIR SERVICE DEPARTMENT
AT 611 FROM A LAND LINE OR 877-737-2478 IF USING A CELL PHONE.
22. CONTRACTOR SHALL USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD
TRANSMISSION LINES AND UNDERGROUND UTILITIES.
23. UTILITIES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. NECESSARY REPAIRS
SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS AND SHALL BE TO THE
SATISFACTION OF UTILITY OWNERS.
24. ALL WATER SYSTEM COMPONENTS THAT COME INTO CONTACT WITH DRINKING WATER SHALL
CONFORM TO NSF-61.
25. CCTV INSPECTION IS REQUIRED ON ALL NEWLY INSTALLED SANITARY SEWER MAINS AND
LATERALS.
26. ALL BENDS, FITTINGS, AND COUPLINGS SHALL BE SUITABLY RESTRAINED AGAINST THRUST ON ALL NEW OR MOIDIFIED PRESSURE PIPE. ALL FITTINGS ON PRESSURE PIPE SHALL UTILIZE
FLANGED OR APPROVED EQUAL RESTRAINT DEVICES (SEE DETAILS).
27. PLANS AND SPECIFICATIONS REQUIRE THAT BACKFILL BE PLACED ALONG SIDE AND OVER ALL
NEWLY INSTALLED UTILITIES. COMPACTION TESTS SHALL BE TAKEN TO VERIFY BACKFILL IN
ACCORDANCE WITH THE SPECIFICATIONS.
28. ALL PIPE INSTALLATION SHALL BE DIRECT BURY UNLESS SPECIFICALLY NOTED OTHERWISE.
G
EN
ER
A
L N
O
TE
S
L
EG
EN
D
LEGEND:
SET BENCHMARK
SET 1/2" DIA RED CAPPED IRON ROD (No. 7916) FOUND 1/2" DIA CAPPED IRON ROD (No. 0155)
FOUND 1/2" DIA CAPPED IRON ROD (ILLEGIBLE)
FOUND 1/2" DIA IRON ROD (UNNUMBERED)
FOUND 1" DIA IRON PIPE (UNNUMBERED)
DENOTES LINE SHOWN NOT TO SCALE
DENOTES WOOD UTILITY POLE
DENOTES GUY WIRE ANCHOR
DENOTES SINGLE SUPPORT SIGN
DENOTES MULTIPLE SUPPORT SIGN
DENOTES MAILBOX
DENOTES BORE
DENOTES TREE (SIZE AND TYPE)
DENOTES WETLAND FLAG (MARKED BY OTHERS)
DENOTES COMMUNICATIONS VAULT
DENOTES BURIED FIBER OPTIC CABLE MARKER
DENOTES FIRE HYDRANT
DENOTES SANITARY SEWER MANHOLE
DENOTES TEMPORARY BENCHMARK
DENOTES TELEPHONE PEDESTAL
DENOTES WATER METER
DENOTES WATER VALVE
DENOTES SPOT ELEVATION
DENOTES ELEVATION CONTOUR LINE
AT ONE FOOT INTERVALS
DENOTES BURIED TELEPHONE LINE
DENOTES FORCE MAIN
DENOTES GAS LINE
DENOTES OVERHEAD UTILITIES
DENOTES WATER LINE
DENOTES RECLAIMED WATER LINE
DENOTES GUARDRAIL
DENOTES TREE LINE
DENOTES WETLAND LINE
BFE DENOTES BASE FLOOD ELEVATION
BM DENOTES BENCHMARK
CMP DENOTES CORRUGATED METAL PIPE
DIA DENOTES DIAMETER
EL DENOTES ELEVATION
EOP DENOTES EDGE OF PAVEMENT
(F) DENOTES FIELD INFORMATION
(MFH) DENOTES MINIMAL FLOOD HAZARD
No. DENOTES NUMBER
RCP DENOTES REINFORCED CONCRETE PIPE
R/W DENOTES RIGHT-OF-WAY
DENOTES ASPHALT
DENOTES WETLANDS
DENOTES WATER BODY
CONCRETE
+ 6.00
WV
WM
HYD
TP
CVCV
A1
6''W (PVC)
S
A-4
FOC
10''RW(PVC)
OHU
6''FM (PVC)
4''G (PE)
PROPOSED LEGEND:
VALVE
PIGGING STATION
DOUBLE ROW OF SILT FENCING w/HAYBALES
HAY BALE
SANDBAG
FLOATING TURBIDITY CURTAIN
SOLID SLEEVE CONNECTION
FLUSH HYDRANT
EXISTING TREE REMOVAL
ASPHALT
CONCRETE
RIP-RAP/GRAVEL
BT
F
C-002
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\
G en er al
N ot es .d w g, /6
/2
1:
:2
PM
AutoCAD SHX Text
HB
AutoCAD SHX Text
SB
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
FE
B
R U
A R
Y
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
llo w
H ig hL ig ht er
C H
EC
K
ER
ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
ER
O
S
IO
N
S
ED
IM
EN
T C
O N
TR
O
L D
ET
A
IL
S
G
EN
ER
A L
N O
TE
S
EROSION AND SEDIMENT CONTROL NOTES:
1. FOR ALL PROJECTS WHICH DISTURB MORE THAN ONE ACRE OF AREA, THE CONTRACTOR IS WHOLLY RESPONSIBLE FOR PREPARING, SUBMITTING, AND ACQUIRING THE FDEP/NPDES PERMIT, INCLUDING THE REQUIRED STORMWATER POLLUTION PREVENTION PLAN (SWPPP). THE CONTRACTOR SHALL SUBMIT A NOTICE OF INTENT TO FDEP NO LESS THAN 48 HOURS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ENSURING THAT THE PROJECT COMPLIES WITH THE PERMIT CONDITIONS (INCLUDING THE REQUIRED NPDES INSPECTIONS AND DOCUMENTATION) AND APPLICABLE LOCAL, STATE, AND FEDERAL WATER QUALITY STANDARDS DURING CONSTRUCTION. THE CONSTRUCTION DOCUMENTS CONTAIN ONLY THE MINIMUM REQUIREMENTS FOR EROSION AND SEDIMENT CONTROL. ANY AND ALL COSTS ASSOCIATED WITH OBTAINING THE NPDES PERMIT OR COMPLYING WITH
THE PERMIT REQUIREMENTS SHALL BE BORNE BY THE CONTRACTOR.
2. WHEN REQUIRED, THE CONTRACTOR SHALL DEVELOP AND IMPLEMENT A SWPPP ACCORDING TO EPA/FDEP CRITERIA TO MINIMIZE EROSION AND ENSURE PROPER FUNCTIONING OF THE STORMWATER MANAGEMENT SYSTEM UPON COMPLETION OF CONSTRUCTION. IN ADDITION TO MEETING EPA/FDEP NPDES CRITERIA, THE SWPPP SHALL BE SUBMITTED TO AND COMPLY WITH ANY REQUIREMENTS OF THE LOCAL AGENCY HAVING JURISDICTION. A COPY OF THE APPROVED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE KEPT
ON SITE AT ALL TIMES FOR REVIEW AS MAY BE REQUIRED.
3. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS AND ALL REGULATIONS CONTROLLING POLLUTION OF
THE ENVIRONMENT.
4. CONTRACTOR SHALL EXECUTE ALL MEASURES AND IMPLEMENT ALL BEST MANAGEMENT PRACTICES NECESSARY TO LIMIT THE TRANSPORTATION OF SEDIMENTS OUTSIDE THE LIMITS OF THE PROJECT. THE EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO THE START OF CONSTRUCTION AND MUST REMAIN IN SATISFACTORY OPERATION UNTIL THE PROJECT IS FULLY COMPLETED AND ACCEPTED AND UNTIL THE PERMANENT EROSION CONTROL MEASURES ARE ESTABLISHED AND CAPABLE OF PROVIDING EROSION AND SILTATION CONTROL. CONTRACTOR SHALL PROVIDE ROUTINE MAINTENANCE ON TEMPORARY EROSION CONTROL MEASURES AT HIS EXPENSE. CONTRACTOR SHALL CONTINUALLY MONITOR WEATHER AND SITE CONDITIONS AND SHALL PROVIDE CONTINUOUS MONITORING OF EROSION AND SEDIMENT CONTROLS AND SHALL DOCUMENT ALL CORRECTIVE MEASURES.
5. INLETS AND CATCH BASINS SHALL BE PROTECTED FROM SEDIMENTATION RESULTING FROM SURFACE RUNOFF UNTIL COMPLETION OF ALL CONSTRUCTION OPERATIONS THAT MAY CAUSE SEDIMENT TO RUN OFF. FILTER FABRIC SHALL BE PLACED AND MAINTAINED UNDER THE GRATE AND FILTER SOCKS SHALL BE PLACED IN FRONT OF THE THROAT OF CURB INLETS DURING CONSTRUCTION AND SHALL BE
MAINTAINED FOR THE DURATION OF THE PROJECT CONSTRUCTION.
6. ALL DISTURBED AREAS WHICH ARE NOT PAVED SHALL BE SEEDED, FERTILIZED AND MULCHED, HYDROSEEDED, OR SODDED AS REQUIRED, UNLESS NOTED OTHERWISE. SOD PINS SHALL BE USED FOR ALL SOD PLACED ON SLOPES STEEPER THAN 3:1. AREAS OF ESTABLISHED SOD OR GROUND COVER SHALL BE REPLACED IN KIND TO MATCH THE EXISTING CONDITIONS PRIOR TO CONSTRUCTION
COMMENCEMENT.
7. PERMANENT GRASSING SHALL BE INSTALLED AND MAINTAINED ON ALL EXPOSED SLOPES AND DISTURBED AREAS WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION, OR TURBID DISCHARGES. A VEGETATIVE COVER THAT STABILIZES AND PREVENTS EROSION SHALL BE ESTABLISHED WITHIN 60 DAYS OF PERMANENT GRASSING INSTALLATION. UPON ESTABLISHMENT OF A SUBSTANTIAL VEGETATIVE COVER, ALL TURBIDITY BARRIERS AND
EROSION CONTROL MEASURES SHALL BE REMOVED.
8. ALL EROSION AND SEDIMENT CONTROLS SHALL BE CONSISTENT WITH PERFORMANCE STANDARDS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER TREATMENT SET FORTH IN SECTION 62-40.432, OF THE FLORIDA ADMINISTRATIVE CODE, AS WELL AS THE APPLICABLE STORMWATER OR ENVIRONMENTAL RESOURCE PERMITTING REQUIREMENTS OF FDEP, THE APPLICABLE WATER MANAGEMENT DISTRICT, THE US ENVIRONMENTAL PROTECTION AGENCY AND THE GUIDELINES CONTAINED IN THE STATE OF FLORIDA EROSION AND
SEDIMENT CONTROL DESIGNER AND REVIEWER MANUAL (LATEST VERSION).
9. TEMPORARY SEDIMENT CONTROL MEASURES INCLUDE, BUT ARE NOT LIMITED TO: SILT FENCING; CONSTRUCTION OF SEDIMENT CHECK DAMS; CONSTRUCTION EXITS, FLOATING TURBIDITY CURTAINS, FILTER SOCKS; SEEDING AND MULCHING, ETC. PERMANENT SEDIMENT CONTROL MEASURES INCLUDE BUT ARE NOT LIMITED TO: PERMANENT GRASSING; EROSION BLANKETS; RIP RAP, ETC. MINIMUM STABILIZATION MEASURES ARE DETAILED ON THE CONSTRUCTION PLANS. THE CONTRACTOR SHALL INCLUDE ANY AND ALL MEASURES NECESSARY TO STABILIZE THE SITE, CONTROL EROSION, AND PREVENT SEDIMENT FROM ESCAPING THE SITE. THE CONTROL OF EROSION ON THE SITE COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
10. CONSTRUCTION OPERATIONS SHALL BE SCHEDULED AND PERFORMED SO THAT PREVENTATIVE EROSION CONTROL MEASURES ARE IN PLACE PRIOR TO EXCAVATION. TEMPORARY STABILIZATION MEASURES SHALL BE IN PLACE IMMEDIATELY FOLLOWING CLEARING, BACKFILLING AND/OR GRADING OPERATIONS.
11. SPECIAL PRECAUTIONS WILL BE TAKEN IN THE USE OF CONSTRUCTION EQUIPMENT TO PREVENT SITUATIONS THAT PROMOTE EROSION.
12. CLEANUP WILL BE DONE IN A MANNER TO INSURE THAT EROSION CONTROL MEASURES ARE NOT DISTURBED.
13. THE PROJECT WILL BE CONTINUALLY INSPECTED FOR SOIL EROSION AND SEDIMENT CONTROL COMPLIANCE. DEFICIENCIES WILL BE
CORRECTED BY THE CONTRACTOR WITHIN 24 HOURS.
14. TEMPORARY EROSION CONTROL MEASURES SHALL BE COMPLETELY REMOVED BY THE CONTRACTOR UPON ESTABLISHMENT OF
PERMANENT CONTROL MEASURES OR WHEN DIRECTED BY THE OWNER.
15. THE CONTRACTOR SHALL RESTORE ALL DISTURBED RIGHTS-OF-WAY IN ACCORDANCE WITH THE LATEST EDITION OF THE FLORIDA
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, OR THE REQUIREMENTS OF THE LOCAL AGENCY HAVING JURISDICTION
(AHJ).
16. THE CONTRACTOR SHALL COMPLETE SITE RESTORATION AS THE PROJECT PROGRESSES.
17. THE CONTRACTOR SHALL INSTALL PRIOR TO THE START OF CONSTRUCTION AND MAINTAIN DURING CONSTRUCTION ALL SEDIMENT
CONTROL MEASURES AS REQUIRED TO RETAIN ALL SEDIMENTS ON SITE. IMPROPER SEDIMENT CONTROL MEASURES MAY RESULT IN A
CODE ENFORCEMENT VIOLATION.
18. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING TRACKING OF SOIL FROM THE SITE ONTO ADJACENT ROADWAYS. IN ADDITION TO THE INSTALLATION OF A CONSTRUCTION EXIT THE CONTRACTOR WILL BE RESPONSIBLE FOR SWEEPING ROADWAYS AS REQUIRED.
19. CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO CONTROL TURBIDITY IN SURROUNDING WATERS INCLUDING, BUT NOT LIMITED TO, THE INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING BODY OF WATER EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST BE MAINTAINED AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVING THE BARRIERS AND ANY ACCUMULATED SILT AT THE COMPLETION OF CONSTRUCTION AND PERMANENT STABILIZATION. AT NO TIME SHALL THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS OF THE
FLORIDA ADMINISTRATIVE CODE.
20. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF DUST AND OTHER AIRBORNE POLLUTANTS DURING CONSTRUCTION. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHODS AT THE CONTRACTOR'S DISCRETION.
21. AT ALL TIMES DURING AND AFTER DEVELOPMENT, CLEARED AREAS SHALL BE STABILIZED. FINAL STABILIZATION MEASURES SHALL BE IN
PLACE WITHIN FOURTEEN (14) DAYS OF FINAL GRADING.
22. ALL CONTROL MEASURES SHALL COMPLY WITH THE MANAGEMENT PRACTICES CONTAINED IN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S “EROSION & SEDIMENT CONTROL DESIGNER AND REVIEWER'S MANUAL” LATEST EDITION.
23. ANY SEDIMENT OR DEBRIS THAT LEAVES THE DEVELOPMENT SITE SHALL BE PROPERLY RECOVERED BY THE BUILDING PERMIT HOLDER.
24. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MANAGE ALL SEDIMENT AND EROSION CONTROL MEASURES AS REQUIRED BY REGULATORY AGENCIES.
25. NO CLEARING, GRADING, EXCAVATING, FILLING, OR OTHER DISTURBANCE OF THE NATURAL TERRAIN SHALL OCCUR UNTIL EROSION AND
SEDIMENTATION CONTROL MEASURES HAVE BEEN INSTALLED, EXCEPT THOSE OPERATIONS NEEDED TO IMPLEMENT THESE MEASURES.
PINNING STAKE
NOT TO SCALE
SILT FENCE DETAIL
(M
IN
NATURAL GRADE
COMPACTED FILL
6"
6"
(M
IN
HAY BALE
WOODEN OR METAL
(TYPE "B" ONLY)
MESH
POLYETHYLENE
*6"x6" WIRE MESH
FENCE STAKE
DIRECTION OF RUNOFF WATERS
BUTTING SILT FENCE DETAIL
FIRST FENCE
NOT TO SCALE
GROUND AND BURY FLAP.
DRIVE BOTH POSTS ABOUT 12" INTO THE
TIGHT SEAL WITH THE FABRIC MATERIAL.
CLOCKWISE DIRECTION TO CREATE A
ROTATE BOTH POSTS AT LEAST 180° IN A
FENCE INSIDE THE END POST OF THE
PLACE THE END POST OF THE SECOND
FIRST POST.
SECOND FENCE
SILT FENCE DROP INLET
SEDIMENT BARRIER DETAIL
NOT TO SCALE
PLAN VIEW
A
A
FLOW
LESS THAN
5% SLOPE
DRAIN
GRATE
TE
M
PO
R A R Y
D
IK
E
IF
N
EE
D
ED
SECTION A-A
36" MAX.
18" MAX.
12" MIN.
DROP
INLET
PONDING HT.
2x4 WOOD FRAME
4 SIDES OF D.I.
TOP FRAME NECESSARY
FOR STABILITY
ATTACH FILTER FABRIC
SECURILY TO 2x4 WOOD
FRAME, OVERLAPPING
FABRIC TO NEXT STAKE
* ALL SILT FENCING THAT PROTECTS JURISDICTIONAL
WETLANDS MUST BE TYPE "B" SILT FENCING. ALL OTHER
AREAS MAY USE POLYETHYLENE MESH SILT FENCING.
NOT TO SCALE
DOUBLE ROW STAKED SILT FENCE DETAIL
(M
IN
4" TYP.
4" TYP.
(M
IN
STAKED AND TRENCHED
SILT FENCE
NATURAL GRADE
PINNING STAKE
HAY BALE
* ALL SILT FENCING THAT PROTECTS JURISDICTIONAL
WETLANDS MUST BE TYPE "B" SILT FENCING. ALL
OTHER AREAS MUST USE POLYETHELENE MESH SILT
FENCING.
WIRE REINFORCED
STAKED AND TRENCHED
SILT FENCE
SURFACE RUNOFF
3' MIN.
NOTES:
1. DROP INLET SEDIMENT BARRIERS ARE TO BE
USED FOR SMALL, NEARLY LEVEL DRAINAGE
AREAS. (LESS THAN 5%)
2. USE 2x4 WOOD OR EQUIVALENT METAL
STAKES, (3 FT. MIN. LENGTH)
3. INSTALL 2x4 WOOD TOP FRAME TO INSURE
STABILITY.
4. THE TOP OF THE FRAME (PONDING HEIGHT)
MUST BE WELL BELOW THE GROUND ELEVATION
DOWNSLOPE TO PREVENT RUNOFF FROM BY-
PASSING THE INLET. A TEMPORARY DIKE MAY
BE NECESSARY ON THE DOWNSLOPE SIDE OF
THE STRUCTURE.
5. FILTER FABRIC SHALL BE PLACED AND
MAINTAINED UNDER THE GRATE.
STONE CHECK DAM DETAIL
NOT TO SCALE
NOTE:
KEY STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND
THE ABUTMENTS A MINIMUM OF 18" TO PREVENT OVER FLOW
AROUND DAM. CENTER OF STONE SHALL BE LOWER THAN ENDS.
VIEW LOOKING UPSTREAM
SECTION A-A
FLOW
STONE SHALL BE F.D.O.T.
No.1 COARSE AGGREGATE
(1.5" - 3" STONE)
A
A
6"
18"
C-003
TYPE 2
D
EP
TH
S
EE
N O
TE
5/16-INCH GALVANIZED WIRE ROPE
LOAD LINES WITH HEAVY VINYL COATING
SUPPORTING FLOTATION
(8-INCH EQUIVALENT)
WATER SURFACE ELEVATION (WSL)
5/16-INCH BALLAST CHAIN
(GALVANIZED)(TYP.)
NYLON REINFORCED VINYL
SLOTTED CONNECTOR PIPE
OR POLYPROPYLENE ROPE
OR GROMMET CONNECTION
PLAN VIEW - INSTALLATION FOR SHORELINE WORK
LAND ANCHORING
SEE NOTE 6
CONSTRUCTION AREA
EXISTING SHORELINE (TYP.)
STAKE (TYP.)
SEE NOTE 4
TURBIDITY CURTAIN
SECTION (TYP.)
ANCHOR (TYP.)
SEE NOTES 4 & 5
MOORING LINE WITH SUPPORTING
FLOTATION (TYP.)
SEE NOTE 7
TURBID WATER
CLEAR WATER
NOTES:
1. SELECT A FLOATING TURBIDITY CURTAIN TYPE TO SUIT THE SITE
CONDITIONS AND MEET EROSION CONTROL AND WATER QUALITY
REQUIREMENTS. SUBMIT DETAILS AND SPECIFICATIONS OF THE
SELECTED CURTAIN TYPE FOR APPROVAL PRIOR TO INSTALLATION.
2. INSTALL FLOATING TURBIDITY CURTAINS BEFORE THE START OF ANY
CONSTRUCTION ACTIVITIES THAT COULD IMPACT THE AREA OF
CONCERN.
3. INSTALL FLOATING TURBIDITY CURTAINS AS SHOWN ON THE PLANS.
DO NOT INSTALL CURTAINS ACROSS THE MAIN FLOW OF A
SIGNIFICANT MOVING WATER BODY. DO NOT INSTALL CURTAINS
WHERE THE FLOW OF WATER WILL REMOVE ACCUMULATED SEDIMENT
OR SIGNIFICANTLY MOVE THE CURTAIN.
4. INSTALL FLOATING TURBIDITY CURTAIN STAKES IN A VERTICAL
POSITION UNLESS OTHERWISE DIRECTED. INSTALL ANCHORS AND
STAKES AT N0 MORE THAN 100-FOOT SPACING.
5. FOR TYPE 1 FLOATING TURBIDITY CURTAINS, INSTALL ANCHORS MADE
OF WOODEN STAKES (2-INCH BY 4-INCH RECTANGULAR OR 21
2-INCH
MINIMUM DIAMETER) OR METAL STAKES (11
3 POUNDS PER LINEAR
FOOT). FOR TYPE 2 AND 3 CURTAINS, INSTALL ANCHORS THAT ARE
EITHER WEIGHTED OR THAT DIG INTO THE CHANNEL BOTTOM.
6. EXTEND THE ENDS OF FLOATING TURBIDITY CURTAINS WELL UP INTO
THE SHORELINE AS APPROVED, ESPECIALLY IF HIGH WATER
CONDITIONS ARE EXPECTED. SECURE THE ENDS FIRMLY TO THE
SHORELINE (PREFERABLY TO RIGID BODIES SUCH AS TREES OR PILES)
TO FULLY ENCLOSE THE AREA WHERE SEDIMENT MAY ENTER INTO THE
WATER BODY.
7. PROVIDE MINIMUM 12-INCH NYLON ROPE FOR ADJUSTMENT LINE FOR
MOORING SYSTEM. ENSURE THE MOORING LINE IS SECURELY
ATTACHED AND IS SUFFICIENTLY BUOYANT TO REMAIN AFLOAT UNDER
NORMAL LOAD CONDITIONS.
8. FOR TYPE 1 AND 2 FLOATING TURBIDITY CURTAINS, EXTEND THE NYLON
REINFORCED VINYL FABRIC THROUGH THE ENTIRE DEPTH OF THE
WATER (TOP THE CHANNEL BOTTOM) UNLESS TIDAL ACTIONS ARE
PRESENT.
9. REMOVE CAPTURED SEDIMENT BEHIND FLOATING TURBIDITY CURTAINS
PRIOR TO REMOVING CURTAINS. DO NOT DISPERSE SEDIMENT INTO
ADJACENT WATER BODY.
FLOATING TURBIDITY CURTAINS
6" MIN.
SYNTHETIC BALE BARRIER CONSTRUCTION
4"
4" MIN. COMPACTED SOIL
STAKED AND ENTRENCHED SYNTHETIC BALE
SLOPESLOPE
BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE, WITH ENDS OF ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER. ALL BALES SHALL BE SECURELY ANCHORED BY AT LEAST TWO STAKES OR REBARS DRIVEN THROUGH THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE TO FORCE THE BALES TOGETHER. CONTRACTOR SHALL WEDGE OR CHINK LOOSE STRAW BETWEEN BALES.
INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE AS PROMPTLY AS NEEDED.
SYNTHETIC BALE BARRIERS SHALL BE REMOVED AFTER THEY HAVE SERVED THEIR USEFULNESS, BUT NOT BEFORE THE UPSLOPE AREAS HAVE BEEN PERMANENTLY STABILIZED. SYNTHETIC BALE BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED BALES, END RUNS AND UNDERCUTTING BENEATH BALES.
BUILDING WIRE
OR TWINE
2-2"x2" WOODEN STAKE OR 2-#5 REBARS
(WITH SAFETY CAPS)
HAY BALE DETAIL
NOT TO SCALE
TURBIDITY CURTAIN DETAIL
NOT TO SCALE
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\
G en er al
N ot es .d w g, /6
/2
1:
:4
SURVEY
NUMBER
PROJECT
NUMBER
FB
3-
, 2 5-
P
P.
2-
, 6 9-
-5 N
-3 0W
DRAWING
NUMBER
N U
M B
ER
R
EV
IS
IO
N
S
EM
D
D R
A W
N B
Y
D A
TE
A
PP
R
O V
ED
B
Y
FE
B
R U
A R
Y
D A
TE
FI
EL
D B
O O
K
PA
G
ES
D
EL
D A
TE
R
EG
. F
LA
. E N
G . N
O
D
ES
IG
N
ED
B
Y
W V
P, II
SI
G
N A
TU
R
E:
C H
EC
K
ED
B
Y
SE
C
TI
O
N
TO
W
N
SH
IP
R A
N G
E
PR
O
JE
C T
M A
N A
G
ER
TI
M
O
TH
Y C
A R
D
EN
D
IS
TR
IC
T:
SHEET OF
C D
B G
-D R
CE
NT
UR
Y
DR
AI
NA
GE
RO
AD
IM
PR
OV
EM
EN
TS
(H
SO
6D
ED
4-
-4
B- B5
-F
CC
F3
AG
F
C H
A N
G E
IN
C O
R
PO
R A
TI
llo w
H ig hL ig ht er
C H
EC
K
ER
ed
P en
X -O ut t o D is ag rr ee o r
R em ar k)
O R
IG
IN
A
TO
R
Q re ct
G re en H ig hl ig ht er
C ha ng e
(R ed
P en
PR
O
D U
C
TI
O N
C H
EC
K
IN
G C
O M
PL
ET
E, R
EA
D
Y
FO
R S
U B M
IT
TA
L R
EV
IE
W
R P)
O R
IG
IN
A
TO
R
R P)
PH
EW
SI
GN
AT
UR
E:
D A
TE
D A
TE
D A
TE
D A
TE
R
EM
A R K I
N C O
R
PO
R A
TI
lu e H ig hl ig ht er
V
ER
IF
IC
A
TI
O N
C H
EC
K
ER
Q e H ig hl ig ht er
O R
IG
IN
A
TO
R V
ER
IF
IC
A
TI
re ct
Pi nk H ig hl ig ht er
D A
TE
D A
TE
D A
TE
D A
LE
E
. L O
N G
, P .E
E X
C E
L L
E N
C E
I N
E N
G
IN
E E
R
IN
G S
E R
V
IC
E
T u rk e y
B lu ff R o a d N a v a rr e
F lo ri d a p
(8
-5
C
E R
T
IF
IC
A
T E
O F
A U
T H
O R
IZ
A
T
IO
N
C A
-3
AL
GE
R
BI
D
IT
EM
S A
ND
C
ON
FL
IC
T M
AT
RI
X
C-004
R
M
ES
I\
\1
1-
C D
B G
-D R C en tu ry D ra in ag e
D es ig n\
D W
G \S he et s\
A lg er B id I te m s C on fli ct
M at ri x.
dw g, /6
/2
1:
:5
8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC) 8''SS (PVC)
2''G(STL) 2''G(STL)
2''G(STL) 2''G(STL) 2''G(STL) 2''G(STL)
GUARD RAIL ON
TOP OF CONCRETE
BLOCK HEADWALL
OHU
OHU
OHU OHU OHU OHU OHU OHU OHU
O H
U
O H
U
O H
U
OHU
OHU OHU
OHU
OHU
OHU
OHU
EM
S
A4
C4
C3
A5
A7
A8
B2
E5
E4
E3
F2
F3
F1
W 6''PVC
W 6''PVC 6''W (CI) 6''W (CI) 6''W (CI) 6''W (CI) 6''W (CI)
GUARD RAIL ON
TOP ON CONCRETE
BLOCK HEADWALL
BROKEN
CONCRETE
HEADWALL
EDGE OF W
ATER
EDGE OF WATER
EDGE OF WATER
SANITARY SEWER MANHOLE
TOP ELEVATION=75.56'
NORTH INVERT(HIGHER)=69.03'
NORTH INVERT(LOWER)=66.65'
SOUTH INVERT=66.75'
S 08°49'14" W 544.74'(F)
RIP RAP
RIP RAP
BM 25-06-17A
NAIL & DISK (No. 7916)
ELEVATION=75.19'
ALGER ROAD
(50' PUBLIC
RIGHT-OF-WAY)
BM 25-06-17B
NAIL & DISK (No. 7916)
ELEVATION=75.64'
EOP
EOP
EOP
EOP
EOP
EOP
UNNAMED CREEK
05-5N-30-2421-000-005
LEWIS DONNA F & HAMMAC
ALTON D & HAMMAC KENNETH E
8300 BLK N CENTURY BLVD
CENTURY, FL 32535
USE: VACANT RESIDENTIAL
05-5N-30-2423-000-002
STOKES GRACE
GRAHAM CRYSTAL DAWN
8221 CENTURY BLVD
CENTURY, FL 32535
USE: STORE, 1 STORY
05-5N-30-2406-000-001
SALAZAR ROLANDO R
8011 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
05-5N-30-2423-000-000
CARTER RONALD L & CARTER ROSA MITCHELL
8021 ALGER RD
CENTURY, FL 32535
USE: SINGLE FAMILY RESID
EAST RIGHT-OF-WAY
WEST RIGHT-OF-WAY
SPEED LIMIT
(25MPH)
DITCH
X
6" WOOD
PRIVACY FENCE
CONCRETE BLOCK
FOUNDATION
DIRT
DRIVEWAY
BROKEN ASPHALT AND
CONCRETE RIP-RAP
6"W (PVC) INSIDE
STEEL CASING
62"x 31" CMP (LINED)
INV IN (W) = 68.90
INV OUT (E) = 67.19
18" CMP (LINED)
INV IN…