JCI_Onsite_Protocol_Revised.pdf

PDF 139 KB Posted

Attached to
North South Building Food Service and Food Courts Renovations
Solicitation number
Y27-706
Issued by
Orange County, Orlando City, Florida

About this file

This document is a Johnson Controls Fire Protection onsite protocol for work performed at the Orange County Convention Center in Orange County, Florida. The protocol establishes standardized procedures for four types of fire protection system work: installation, program downloading, pretesting, and final testing with the Authority Having Jurisdiction (AHJ). Each procedure requires Johnson Controls to obtain approval from the OCCC Project Management Team prior to commencing work and mandates coordination with the prime contract holder, OCCC Capital Planning, and OCCC Security/Life Safety personnel. For program downloads, pretesting, and final testing procedures, Johnson Controls must deploy at least two technicians, with one positioned at the main control panel (TSW) and additional technicians performing work at specific nodes or devices. All procedures require Johnson Controls to document the fire alarm system's status at the beginning and end of work, including counts of alarms, troubles, supervisory signals, and bypasses, with work considered complete only when the system is returned to the same or better condition than when work commenced.

The protocol mandates that Johnson Controls notify OCCC Security to place the system in test mode for the duration of work activities and requires the security team to remove the system from test mode prior to the technician's departure. Johnson Controls must disable and subsequently reenable any system points affected by work, and must turn on and off any necessary bypasses in accordance with the specific procedure being performed. Upon completion of all work, Johnson Controls must submit a signed debrief report to the prime contract holder that documents the project authorization, specific work performed, initial and final system conditions, and any explanation for variances in system status. The debrief report must include the CIP onsite point of contact name, identify any nodes or TSWs affected by work, and confirm that affected nodes have been reinitialized to restore the system to its original condition. The prime contract holder assumes responsibility for notifying OCCC Capital Planning that work is complete.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated 8/27/26

Johnson Controls Fire Protection 6830 Shadowridge Drive Suite 215 Orlando, FL 32812-9013

P: 407-235-1100 F: 407-235-1150 www.johnsoncontrols.com

5/15/2024

Johnson Controls Fire Protection LP System Protocol with Capital Planning

Location: Orange County Convention Center

Procedure for installing:

1. After approval from OCCC Project Management Team, Johnson Controls Fire Protection LP technicians arrive onsite.

2. JCI technician checks in with prime contract holder.

3. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital Planning staff will inform OCCC Security/Life safety.

4. JCI technician arrives at the TSW in command and confirms number of existing alarms, troubles, supervisory, and bypasses on the system and documents in a debrief report.

5. JCI technician notifies OCCC Security to put the system in test until X:XX as needed.

6. JCI technician disables any points needed and document disabled points.

7. JCI technician starts installation of scope.

8. JCI technician will reenable any disabled points disabled by JCI.

9. Once the scope of work is complete JCI technician will verify the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report (see Debrief Requirements at the bottom of second page).

10. JCI technician notifies OCCC Security to take the system off test prior to leaving site.

11. A debrief report (see Debrief Requirements at the bottom of second page) will be signed and a copy left with the prime contract holder to be submitted to OCCC Capital Planning.

12. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.

Procedure for downloading a program:

1. After approval from OCCC Project Management Team, Johnson Controls Fire Protection LP technicians arrive onsite.

2. JCI must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the download at the specific node(s).

3. JCI technician checks in with prime contract holder.

4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed.

Capital Planning staff will inform OCCC Security/Life safety.

5. JCI technician arrives at the TSW in command and confirms number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.

6. JCI technician also confirms all panels being downloaded are communicating with the network and no known troubles are found that will hinder the ability to download.

7. JCI technician notifies OCCC Security to put the system in test until X:XX as needed.

8. JCI technician turns on any bypasses as needed.

9. JCI technician completes the download at each panel and does not move on to the next until the panel is completely back up on the network.

10. Once the scope of work is complete JCI technician will check the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report (see Debrief Requirements at the bottom of second page).

11. JCI technician will turn off any bypasses.

12. JCI technician notifies OCCC Security to take the system off test prior to leaving site.

13. A debrief report (see Debrief Requirements at the bottom of second page) will be signed and a copy

14. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.

Procedure for JCI pretesting:

1. After approval from OCCC Project Management Team, Johnson Controls Fire Protection LP technicians arrive onsite.

2. JCI must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the testing of the device(s).

3. JCI technician checks in with prime contract holder.

4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital

Planning staff will inform OCCC Security/Life safety.

5. JCI technicians arrive at the TSW in command and confirm the number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.

6. JCI technician notifies OCCC Security to put the system in test until X:XX as needed.

7. JCI technician turns on any bypasses as needed.

8. JCI technician starts required testing.

9. When testing JCI technician confirms points triggered are received at the TSW in command center.

10. Once the scope of work is complete JCI technician will check the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report (see Debrief Requirements bottom of second page).JCI technician will turn off any bypasses.

11. JCI technician notifies OCCC Security to take the system off test prior to leaving site.

12. A debrief report (see Debrief Requirements at the bottom of second page). will be signed and a copy left with the prime contract holder to be submitted to OCCC Capital Planning.

13. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.

Procedure for final testing with the AHJ:

1. After approval from OCCC Project Management Team, Johnson Controls Fire Protection LP technicians arrive onsite.

2. JCI must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the testing of the device(s).

3. JCI technician checks in with prime contract holder.

4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital

Planning staff will inform OCCC Security/Life safety.

5. JCI technicians arrive at the TSW in command and confirm the number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.

6. JCI technician notifies OCCC Security to put the system in test until X:XX as needed.

7. JCI technician turns on any bypasses as needed.

8. JCI technician starts required testing with AHJ.

9. When testing JCI technician confirms points triggered are received at the TSW in command center.

10. Once the scope of work is complete JCI technician will check the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report.

11. JCI technician will turn off any bypasses.

12. JCI technician notifies OCCC Security to take the system off test prior to leaving site.

13. A debrief report (see Debrief Requirements at the bottom of second page) will be signed and a copy

14. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.

Debrief Requirements:

A. What project are they doing. Who authorized the work. CIP onsite point of contact name.

B. What work are they doing? Downloading – If yes what nodes / TSW’s. If installing where be specific.

C. Note the “current” Fire alarms, Supervisory and Troubles on the command center TSW.

D. Provide the ending condition of the TSW (Alarms, Supervisory and Troubles) counts.

E. Return the system to the “Same Condition” as when arrived. If different than initial counts, explain why.

F. Must re-start (initialize) any nodes affected by work again to put the system in same condition as when started