About this file

This document contains additional information and specifications for the Jacksonville Correctional Center Dietary A/C Replacement project (B-35281 23RM097) issued by the Illinois Department of Corrections. The project involves the removal and installation of a new air conditioning unit for the dietary building at the Jacksonville Correctional Center. The key details include the approximate 5,500 square foot area to be cooled, the facility providing electrical 460 volt hookup and assistance with removing the return fan to facilitate the evaporator coil installation, and the facility removing fencing around the existing condensing unit to allow placement of the new unit.

The related state and local contract opportunity involves the service and parts for the replacement of the dietary A/C unit at the Jacksonville Correctional Center. The contract is being issued by the Illinois Department of Corrections. No additional details regarding pricing terms, set asides, incumbents, funding requirements, or other salient information are provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF ILLINOIS

DEPARTMENT OF CORRECTIONS

Additional Information and Specifications

JACKSONVILLE CORRECTIONAL CENTER

DIETARY A/C REPLACEMENT

B-35281 23RM097 03/15/23

1. What is the square footage of the area in dietary that will be cooled with the new A/C system?

Answer: Approximately 5500 sq ft of area being cooled

2. How cooling loops are contained within the evaporator assembly?

Answer: Please see attached photos

3. What is the physical size of evaporator assembly?

Answer: Please see attached photos

4. Will the facility be in charge of the electrical 460 volt hookup?

Answer: Yes the facility electrician will hookup the 460 volt connections and the contractor will supply necessary material.

5. Will the facility assist in removing the return fan located in the mechanical room to facilitate the installation of the evaporator coil?

Answer: Yes, the facility staff will move the return air fan as needed to assist in installing the evaporator coil located in the mechanical room.

6. Will the facility remove fencing around the condensing unit to allow the new unit to be placed in the existing location?

Answer: Yes, facility staff will remove fencing around the existing unit and reinstall after the new unit has been set.

Current Unit image4.jpeg image1.png image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .