JBLE Paint IDIQ Price List.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- JBLE Painting IDIQ - Sources Sought Federal contract opportunity
- Solicitation number
- FA480023B0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EMP 4.4.6.16 Contracting Environmental Special Conditions - JBLE-Eustis 14 Jun 21.docx | DOCX document | |
| Tab 1 - 01 12 00 Enviro Special Conditions 2022.pdf | ||
| Paint IDIQ Specifications.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE OPTION YEAR
| JBLE PAINT IDIQ | |||||
| UNIT PRICE LIST | |||||
| CONTRACT LINE ITEM No. | ITEM NO., DESCRIPTION, | EST. QTY | UNIT MEAS. | UNIT PRICE | TOTAL COST |
| GENERAL REQUIREMENTS, EQUIPMENT RENTALS | |||||
| Lift Rental, Up To 30 Feet Heights | |||||
| 0001 | Daily Rental | DY | $ - 0 | ||
| 0002 | Weekly Rental | WK | $ - 0 | ||
| 0003 | Monthly Rental | MO | $ - 0 | ||
| Lift Rental, 30 - 60 Feet Heights | $ - 0 | ||||
| 0004 | Daily Rental | DY | $ - 0 | ||
| 0005 | Weekly Rental | WK | $ - 0 | ||
| 0006 | Monthly Rental | MO | $ - 0 | ||
| Lift Rental 60 - 80 Feet Heights | |||||
| 0007 | Daily Rental | DY | $ - 0 | ||
| 0008 | Weekly Rental | WK | $ - 0 | ||
| 0009 | Monthly Rental | MO | $ - 0 | ||
| Lift Rental Over 80 Feet Heights | |||||
| 0010 | Daily Rental | DY | $ - 0 | ||
| 0011 | Weekly Rental | WK | $ - 0 | ||
| 0012 | Monthly Rental | MO | $ - 0 | ||
| 0013 | Lift Delivery/Pickup | JB | $ - 0 | ||
| Labor Rate Multiplier (Percentage of Equipment Total) | Labor % | Equipment Total | |||
| 0014 | Labor Rate Multiplier Over 30 FT 25%) | 25% | $ - 0 | ||
| 0015 | Labor Rate Multiplier Over 60 FT 50% | 50% | $ - 0 | ||
| 0016 | Labor Rate Multiplier Over 80 FT 75% | 75% | $ - 0 | ||
| 0017 | Labor Rate Multiplier Evening/Weekend Requirement | TBD | $ - 0 | $ - 0 | |
| SITE WORK | |||||
| DEMOLITION | |||||
| 0018 | Remove Ridge board 1" X 4" | LF | $ - 0 | ||
| 0019 | Remove Ridge board 1" X 6" | LF | $ - 0 | ||
| 0020 | Remove Blocking, 2 x (8" to 10") | LF | $ - 0 | ||
| 0021 | Remove Fascia Boards 1" X 6" | LF | $ - 0 | ||
| 0022 | Remove Fascia Boards 1" X 8" | LF | $ - 0 | ||
| 0023 | Remove Fascia Boards 1" X 10" | LF | $ - 0 | ||
| 0024 | Remove Trim, Baseboard to 6" wide | LF | $ - 0 | ||
| 0025 | Remove Trim, Baseboard to >6" wide and up to 12" wide | LF | $ - 0 | ||
| 0026 | Remove Vinyl or rubber cove base | LF | $ - 0 | ||
| 0027 | Remove Vinyl or rubber cove base molded corner | EA | $ - 0 | ||
| 0028 | Remove Chair Rails | LF | $ - 0 | ||
| 0029 | Remove Wood Trim to include door and window trim | LF | $ - 0 | ||
| 0030 | Remove Interior Base, cove, carpet, rubber or vinyl | LF | $ - 0 | ||
| 0031 | Remove fascia and rakes | SF | $ - 0 | ||
| 0032 | Remove GWB/Fiberboard up to 1/2" | SF | $ - 0 | ||
| 0033 | Remove Sheathing from walls up to 1/2" | SF | $ - 0 | ||
| 0034 | Remove Sealant and Backer Rod | LF | $ - 0 | ||
| 0035 | Remove Vines and Ivy | LF | $ - 0 | ||
| 0036 | Remove and Dispose of Gutters, Down Spouts and Hangers | LF | $ - 0 | ||
| 0037 | Remove vinyl wallcovering/ wallpaper with release agent | SF | $ - 0 | ||
| 0038 | Remove corner guards (metal, plastic, vinyl and wood) | LF | $ - 0 | ||
| 0039 | Remove Bonded Carpet including surface scraping | SF | $ - 0 | ||
| 0040 | Remove Carpet tile, releasable adhesive | SF | $ - 0 | ||
| 0041 | Remove Carpet tile, permanent adhesive | SF | $ - 0 | ||
| 0042 | Remove Bonded LVT including surface scraping | SF | $ - 0 | ||
| FLOORING | |||||
| 0043 | Install carpet tile tufted hard back (2' X 2' 26 Oz. nylon) | SY | $ - 0 | ||
| 0044 | Install LVT planks (6" X 36")? | SF | $ - 0 | ||
| 0045 | Prepare & Paint Concrete Floor, Epoxy Coating, Standard Colors (up to 1/8" thick (2 base coats) plus top coat rolled | SF | $ - 0 | ||
| 0046 | Prepare & Apply Fuel Resistant Epoxy/Urethane Coating | SF | $ - 0 | ||
| LEAD BASED PAINT/MOLD - REMOVAL, ABATEMENT, DISPOSAL AND ENCAPSULATION | |||||
| 0047 | Piping Up To 12" Diameter | LF | $ - 0 | ||
| 0048 | Piping 12" To 16" Diameter | LF | $ - 0 | ||
| 0049 | Surface Prep Doors | SF | $ - 0 | ||
| 0050 | Surface Prep Walls | SF | $ - 0 | ||
| 0051 | Surface Prep Beams & Trusses | SF | $ - 0 | ||
| 0052 | All Others-To be Negotiated (Per Height, Accessibility, Sub star, etc.) | TBN | $ - 0 | $ - 0 | |
| 0055 | Lead Dust Wipe Sampling by IH | HRS | $ - 0 | ||
| 0056 | Lead Dust Wipe Sampling Read by CIH | EA | $ - 0 | ||
| 0057 | Soil Sampling by IH | HRS | $ - 0 | ||
| 0058 | Soil Sampling Read by CIH | EA | $ - 0 | ||
| 0059 | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | Drums | $ - 0 | ||
| 0060 | If reduction of mat'ls is required (i.e. Paint Chips) | Drums | $ - 0 | $ - 0 | |
| 0062 | Disposal of Non-hazardous Material in Dumpster | CF | $ - 0 | ||
| 0063 | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | Drums | $ - 0 | $ - 0 | |
| 0064 | Lead Paint Testing, AAS Analysis | EA | $ - 0 | ||
| 0065 | Encapsulation of Lead Paint, beams, trusses, steel flat surfaces | SF | $ - 0 | ||
| 0066 | Remove Mold/Mildew on Walls Ceilings etc.. | SF | $ - 0 | ||
| WOOD & PLASTIC | |||||
| 0067 | Install New Wood Exterior /Interior Trims | LF | $ - 0 | ||
| 0068 | Install New Fascia, Size 1" x 6" and Paint Surface | LF | $ - 0 | ||
| 0069 | Install New Fascia, Size 1" x 8" and Paint Surface | LF | $ - 0 | ||
| 0070 | Install New Fascia, Size 1" x 10" and Paint Surface | LF | $ - 0 | ||
| 0071 | Install Ridge board 1" X 4" | LF | $ - 0 | ||
| 0072 | Install Ridge board 1" X 6" | LF | $ - 0 | ||
| 0073 | Install New Chair Railing and Seal Surface | LF | $ - 0 | ||
| 0074 | Install New Wood Blocking, 2" x (8" to 10") and Paint Surface | LF | $ - 0 | ||
| 0075 | Install New Base Molding, Hard Wood 1" x 6" (Prime, Paint or Seal) | LF | $ - 0 | ||
| 0076 | Install New Base Molding, Softwood, 1" x 6" (Prime, Paint or Seal) | LF | $ - 0 | ||
| 0077 | Install New Baseboard Wood Trim to 6" Wide | LF | $ - 0 | ||
| 0078 | Install GWB, Walls and Ceilings up to 1/2" Thick, Taped Lvl 4 Finish | LF | $ - 0 | ||
| 0079 | Install Sheathing up to 1/2" | SF | $ - 0 | ||
| THERMAL AND MOISTURE PROTECTION | |||||
| GENERAL SHEET METAL WORK | |||||
| 0080 | Replace Metal Fascia (0.032" thick) | LF | $ - 0 | ||
| 0081 | Replace Gutters and Downspout (3-1/2" to 4" Diameter) | LF | $ - 0 | ||
| 0082 | Install Gutters/ Downspouts 5" Diameter | EA | $ - 0 | ||
| FINISHES | |||||
| INTERIOR/EXTERIOR PAINTING AND COVERINGS | |||||
| 0083 | Paint Stucco/EIFS/Plaster Surfaces | SF | $ - 0 | ||
| 0084 | Seal concrete masonry unit (CMU) surfaces | SF | $ - 0 | ||
| 0085 | Seal Concrete Surfaces | SF | $ - 0 | ||
| 0086 | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | SF | $ - 0 | ||
| 0087 | Clean existing brick and provide water repellent | SF | $ - 0 | ||
| 0088 | Stucco/Fiberglass repair | SF | $ - 0 | ||
| 0089 | Seal Ferrous Metal/Galvanized/Alum. Surfaces | SF | $ - 0 | ||
| 0090 | Pressure Wash (Not part of prep work, no painting associated with this line item) | SF | $ - 0 | ||
| 0091 | Install corner guards (metal, plastic, vinyl and wood) | LF | $ - 0 | ||
| 0092 | Install Wallpaper, basic matching pattern | SF | $ - 0 | ||
| 0093 | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | LF | $ - 0 | ||
| 0094 | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | EA | $ - 0 | ||
| 0095 | Prepare & Paint Concrete Block or Masonry Surfaces, Primer/ Sealer , 2 Coats | SF | $ - 0 | ||
| 0096 | Prepare & Paint Concrete Block or Masonry Surfaces, Block Fillers , 1 or 2 Coats | SF | $ - 0 | ||
| 0097 | Prepare & Paint Concrete Surfaces | SF | $ - 0 | ||
| 0098 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (125 mils) | SF | $ - 0 | ||
| 0099 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (250 mils) | SF | $ - 0 | ||
| 0100 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Primer, 2 Coats | SF | $ - 0 | ||
| 0101 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Texture Surfaces | SF | $ - 0 | ||
| 0102 | Prepare & Paint Exterior Doors and Windows, ( frames and trims only), Primer and 2 Coats | LF | $ - 0 | ||
| 0103 | Prepare & Paint flush Doors (excluding frame and trim) | EA | $ - 0 | ||
| 0104 | Prepare & Paint Panel Doors (excluding frame and trim) | EA | $ - 0 | ||
| Prepare & Paint Roll Up Doors (frame & trim only) | |||||
| Prepare & Paint Roll Up Doors (excluding frame & trim) | |||||
| Prepare & Paint Roll Up Doors (including frame & trim) | |||||
| 0105 | Prepare & Paint Metal Doors (including frame & trim) | EA | $ - 0 | ||
| 0106 | Prepare & Paint Wood Doors (including frame & trim) | EA | $ - 0 | ||
| 0107 | Prepare & Paint Wood Doors, Varnish, 3 Coats (including frame & trim) | EA | $ - 0 | ||
| 0108 | Prepare & Paint Wood Surfaces, include sealing | SF | $ - 0 | ||
| 0109 | Prepare & Paint 1-8 lite windows | EA | $ - 0 | ||
| 0110 | Prepare & Paint 7-10 lite windows | EA | $ - 0 | ||
| 0111 | Prepare & Paint 12 lite windows | EA | $ - 0 | ||
| 0112 | Prepare & Paint Wood Trim | SF | $ - 0 | ||
| 0113 | Prepare & Paint Ladders | LF | $ - 0 | ||
| 0114 | Prepare & Paint Railings and Balustrades | SF | $ - 0 | ||
| 0115 | Prepare & Paint Stucco/EIFS/Plaster Surfaces | SF | $ - 0 | ||
| 0116 | Prepare & Paint Ferrous Metal Surfaces | SF | $ - 0 | ||
| 0117 | Prepare & Paint Aluminum Surfaces | SF | $ - 0 | ||
| 0118 | Prepare & Paint New/Old Gutters & Downspouts | SF | $ - 0 | ||
| 0119 | Prepare & Paint Pipes Up To 4" Diameter | LF | $ - 0 | ||
| 0120 | Prepare & Paint Pipes Over 4" Diameter | LF | $ - 0 | ||
| 0121 | Spray Texture on Walls (Knock Down or Orange Peel) | SF | $ - 0 | ||
| 0122 | Replace Drywall | SF | $ - 0 | ||
| MISCELLANIOUS | |||||
| 0123 | White Metal Blast Cleaning (SSPC-SP5/NACE No. 1 and UFGS33) | LF | $ - 0 | ||
| 0124 | Hand-cleaning Historic Surfaces by "Gentlest Means Possible" | SF | $ - 0 | ||
| 0125 | Remove/Reinstall Wall Items | EA | $ - 0 | ||
| 0126 | Reseal/Caulk windows | LF | $ - 0 | ||
| 0127 | Apply Window Tint | SF | $ - 0 | ||
| Reserved For Custom Item | TBD | $ - 0 | $ - 0 | ||
| ROAD AND AIRFIELD MARKINGS | |||||
| 0128 | Paint Road Markings "Thermoplastic Striping With Glass Beads" (Centerlines, Stop Bars, Parking Spaces, etc..) | LF | $ - 0 | ||
| 0129 | Paint Airfield Taxiway Markings | SF | $ - 0 | ||
| 0130 | Paint Airfield Runway Markings | SF | $ - 0 | ||
| 0131 | Remove Pavement Markings with High Pressure Water | SF | $ - 0 | ||
| 0132 | Replace sealant and backer rod | LF | $ - 0 | ||
| 0133 | Replace backer rod with the appropriate sizes, apply self-leveling sealant | LF | $ - 0 | ||
| STATIC DISPLAY | |||||
| 0134 | Aircraft Painting 2 coats | SF | $ - 0 | ||
| 0135 | Strip Non-adhering coating | SF | $ - 0 | ||
| 0136 | Sand/Scuff Surfaces | SF | $ - 0 | ||
| 0137 | Provide and Apply Vinyl Stencil/Decal | SF | $ - 0 | ||
| 0138 | Decal Removal | Ea. | $ - 0 | ||
| 0139 | Build Enclosure | CF | $ - 0 | ||
| 0140 | Install Temporary Fencing | LF | $ - 0 | ||
| 0141 | Install Bird Deterrent Wire | LF | $ - 0 | ||
| $ - 0 |
1st OPTION YEAR
| JBLE PAINT IDIQ | |||||
| UNIT PRICE LIST | |||||
| CONTRACT LINE ITEM No. | ITEM NO., DESCRIPTION, | EST. QTY | UNIT MEAS. | UNIT PRICE | TOTAL COST |
| GENRAL REQUIREMENTS, EQUIPMENT RENTALS | |||||
| Lift Rental, Up To 30 Feet Heights | |||||
| 0001 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0002 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0003 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental, 30 - 60 Feet Heights | |||||
| 0004 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0005 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0006 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental 60 - 80 Feet Heights | |||||
| 0007 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0008 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0009 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental Over 80 Feet Heights | |||||
| 0010 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0011 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0012 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| 0013 | Lift Delivery/Pickup | 1 | JB | $ - 0 | $ - 0 |
| Labor Rate Multiplier (Percentage of Equipment Total) | Labor % | ||||
| 0014 | Labor Rate Multiplier Over 30 FT 25%) | 25% | $ - 0 | $ - 0 | |
| 0015 | Labor Rate Multiplier Over 60 FT 50% | 50% | $ - 0 | $ - 0 | |
| 0016 | Labor Rate Multiplier Over 80 FT 75% | 75% | $ - 0 | $ - 0 | |
| 0017 | Labor Rate Multiplier Evening/Weekend Requirement | TBD | |||
| SITE WORK | |||||
| DEMOLITION | |||||
| 0018 | Remove Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0019 | Remove Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0020 | Remove Blocking, 2 x (8" to 10") | 1 | LF | $ - 0 | $ - 0 |
| 0021 | Remove Fascia Boards 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0022 | Remove Fascia Boards 1" X 8" | 1 | LF | $ - 0 | $ - 0 |
| 0023 | Remove Fascia Boards 1" X 10" | 1 | LF | $ - 0 | $ - 0 |
| 0024 | Remove Trim, Baseboard to 6" wide | 1 | LF | $ - 0 | $ - 0 |
| 0025 | Remove Trim, Baseboard to >6" wide and up to 12" wide | 1 | LF | $ - 0 | $ - 0 |
| 0026 | Remove Vinyl or rubber cove base | 1 | LF | $ - 0 | $ - 0 |
| 0027 | Remove Vinyl or rubber cove base molded corner | 1 | EA | $ - 0 | $ - 0 |
| 0028 | Remove Chair Rails | 1 | LF | $ - 0 | $ - 0 |
| 0029 | Remove Wood Trim to include door and window trim | 1 | LF | $ - 0 | $ - 0 |
| 0030 | Remove Interior Base, cove, carpet, rubber or vinyl | 1 | LF | $ - 0 | $ - 0 |
| 0031 | Remove fascia and rakes | 1 | SF | $ - 0 | $ - 0 |
| 0032 | Remove GWB/Fiberboard up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0033 | Remove Sheathing from walls up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0034 | Remove Sealant and Backer Rod | 1 | LF | $ - 0 | $ - 0 |
| 0035 | Remove Vines and Ivy | 1 | LF | $ - 0 | $ - 0 |
| 0036 | Remove and Dispose of Gutters, Down Spouts and Hangers | 1 | LF | $ - 0 | $ - 0 |
| 0037 | Remove vinyl wallcovering/ wallpaper with release agent | 1 | SF | $ - 0 | $ - 0 |
| 0038 | Remove corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0039 | Remove Bonded Carpet including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| 0040 | Remove Carpet tile, releasable adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0041 | Remove Carpet tile, permanent adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0042 | Remove Bonded LVT including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| FLOORING | |||||
| 0043 | Install carpet tile tufted hard back (2' X 2' 26 Oz. nylon) | 1 | SY | $ - 0 | $ - 0 |
| 0044 | Install LVT planks (6" X 36")? | 1 | SF | $ - 0 | $ - 0 |
| 0045 | Prepare & Paint Concrete Floor, Epoxy Coating, Standard Colors (up to 1/8" thick (2 base coats) plus top coat rolled | 1 | SF | $ - 0 | $ - 0 |
| 0046 | Prepare & Apply Fuel Resistant Epoxy/Urethane Coating | 1 | SF | $ - 0 | $ - 0 |
| LEAD BASED PAINT/ASBESTOS/MOLD - REMOVAL, ABATEMENT, DISPOSAL AND ENCAPSULATION | |||||
| 0047 | Piping Up To 12" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0048 | Piping 12" To 16" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0049 | Surface Prep Doors | 1 | SF | $ - 0 | $ - 0 |
| 0050 | Surface Prep Walls | 1 | SF | $ - 0 | $ - 0 |
| 0051 | Surface Prep Beams & Trusses | 1 | SF | $ - 0 | $ - 0 |
| 0052 | All Others-To be Negotiated (Per Height, Accessibility, Sub star, etc.) | 1 | TBN | $ - 0 | $ - 0 |
| 0053 | Remove & dispose of asbestos containing sealant | 1 | LF | ERROR:#REF! | ERROR:#REF! |
| 0054 | Air filtration device for asbestos contain area , 2000CFM | 1 | EA | ERROR:#REF! | ERROR:#REF! |
| 0055 | Lead Dust Wipe Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0056 | Lead Dust Wipe Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0057 | Soil Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0058 | Soil Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0059 | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0060 | If reduction of mat'ls is required (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0061 | Disposal of Non-hazardous Asbestos Material | 1 | Drums | ERROR:#REF! | ERROR:#REF! |
| 0062 | Disposal of Non-hazardous Material in Dumpster | 1 | CF | $ - 0 | $ - 0 |
| 0063 | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | 1 | Drums | $ - 0 | $ - 0 |
| 0064 | Lead Paint Testing, AAS Analysis | 1 | EA | $ - 0 | $ - 0 |
| 0065 | Encapsulation of Lead Paint, beams, trusses, steel flat surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0066 | Remove Mold/Mildew on Walls Ceilings etc.. | 1 | SF | $ - 0 | $ - 0 |
| WOOD & PLASTIC | |||||
| 0067 | Install New Wood Exterior /Interior Trims | 1 | LF | $ - 0 | $ - 0 |
| 0068 | Install New Fascia, Size 1" x 6" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0069 | Install New Fascia, Size 1" x 8" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0070 | Install New Fascia, Size 1" x 10" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0071 | Install Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0072 | Install Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0073 | Install New Chair Railing and Seal Surface | 1 | LF | $ - 0 | $ - 0 |
| 0074 | Install New Wood Blocking, 2" x (8" to 10") and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0075 | Install New Base Molding, Hard Wood 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0076 | Install New Base Molding, Softwood, 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0077 | Install New Baseboard Wood Trim to 6" Wide | 1 | LF | $ - 0 | $ - 0 |
| 0078 | Install GWB, Walls and Ceilings up to 1/2" Thick, Taped Lvl 4 Finish | 1 | LF | $ - 0 | $ - 0 |
| 0079 | Install Sheathing up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| THERMAL AND MOISTURE PROTECTION | |||||
| GENERAL SHEET METAL WORK | |||||
| 0080 | Replace Metal Fascia (0.032" thick) | 1 | LF | $ - 0 | $ - 0 |
| 0081 | Replace Gutters and Downspout (3-1/2" to 4" Diameter) | 1 | LF | $ - 0 | $ - 0 |
| 0082 | Install Gutters/ Downspouts 5" Diameter | 1 | EA | $ - 0 | $ - 0 |
| FINISHES | |||||
| INTERIOR/EXTERIOR PAINTING AND COVERINGS | $ - 0 | ||||
| 0083 | Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0084 | Seal concrete masonry unit (CMU) surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0085 | Seal Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0086 | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1 | SF | $ - 0 | $ - 0 |
| 0087 | Clean existing brick and provide water repellent | 1 | SF | $ - 0 | $ - 0 |
| 0088 | Stucco/Fiberglass repair | 1 | SF | $ - 0 | $ - 0 |
| 0089 | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0090 | Pressure Wash (Not part of prep work, no painting associated with this line item) | 1 | SF | $ - 0 | $ - 0 |
| 0091 | Install corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0092 | Install Wallpaper, basic matching pattern | 1 | SF | $ - 0 | $ - 0 |
| 0093 | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 1 | LF | $ - 0 | $ - 0 |
| 0094 | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 1 | EA | $ - 0 | $ - 0 |
| 0095 | Prepare & Paint Concrete Block or Masonry Surfaces, Primer/ Sealer , 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0096 | Prepare & Paint Concrete Block or Masonry Surfaces, Block Fillers , 1 or 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0097 | Prepare & Paint Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0098 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (125 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0099 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (250 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0100 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Primer, 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0101 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Texture Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0102 | Prepare & Paint Exterior Doors and Windows, ( frames and trims only), Primer and 2 Coats | 1 | LF | $ - 0 | $ - 0 |
| 0103 | Prepare & Paint flush Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0104 | Prepare & Paint Panel Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0105 | Prepare & Paint Metal Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0106 | Prepare & Paint Wood Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0107 | Prepare & Paint Wood Doors, Varnish, 3 Coats (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0108 | Prepare & Paint Wood Surfaces, include sealing | 1 | SF | $ - 0 | $ - 0 |
| 0109 | Prepare & Paint 1-8 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0110 | Prepare & Paint 7-10 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0111 | Prepare & Paint 12 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0112 | Prepare & Paint Wood Trim | 1 | SF | $ - 0 | $ - 0 |
| 0113 | Prepare & Paint Ladders | 1 | LF | $ - 0 | $ - 0 |
| 0114 | Prepare & Paint Railings and Balustrades | 1 | SF | $ - 0 | $ - 0 |
| 0115 | Prepare & Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0116 | Prepare & Paint Ferrous Metal Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0117 | Prepare & Paint Aluminum Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0118 | Prepare & Paint New/Old Gutters & Downspouts | 1 | SF | $ - 0 | $ - 0 |
| 0119 | Prepare & Paint Pipes Up To 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0120 | Prepare & Paint Pipes Over 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0121 | Spray Texture on Walls (Knock Down or Orange Peel) | 1 | SF | $ - 0 | $ - 0 |
| 0122 | Replace Drywall | 1 | SF | $ - 0 | $ - 0 |
| MISCELLANIOUS | |||||
| 0123 | White Metal Blast Cleaning (SSPC-SP5/NACE No. 1 and UFGS33) | 1 | LF | $ - 0 | $ - 0 |
| 0124 | Hand-cleaning Historic Surfaces by "Gentlest Means Possible" | 1 | SF | $ - 0 | $ - 0 |
| 0125 | Remove/Reinstall Wall Items | 1 | EA | $ - 0 | $ - 0 |
| 0126 | Reseal/Caulk windows | 1 | LF | $ - 0 | $ - 0 |
| 0127 | Apply Window Tint | 1 | SF | $ - 0 | $ - 0 |
| Reserved For Custom Item | 1 | TBD | $ - 0 | $ - 0 | |
| ROAD AND AIRFIELD MARKINGS | |||||
| 0128 | Paint Road Markings "Thermoplastic Striping With Glass Beads" (Centerlines, Stop Bars, Parking Spaces, etc..) | 1 | LF | $ - 0 | $ - 0 |
| 0129 | Paint Airfield Taxiway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0130 | Paint Airfield Runway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0131 | Remove Pavement Markings with High Pressure Water | 1 | SF | $ - 0 | $ - 0 |
| 0132 | Replace sealant and backer rod | 1 | LF | $ - 0 | $ - 0 |
| 0133 | Replace backer rod with the appropriate sizes, apply self-leveling sealant | 1 | LF | $ - 0 | $ - 0 |
| STATIC DISPLAY | |||||
| 0134 | Aircraft Painting 2 coats | 1 | SF | $ - 0 | $ - 0 |
| 0135 | Strip Non-adhering coating | 1 | SF | $ - 0 | $ - 0 |
| 0136 | Sand/Scuff Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0137 | Provide and Apply Vinyl Stencil/Decal | 1 | SF | $ - 0 | $ - 0 |
| 0138 | Decal Removal | 1 | Ea. | $ - 0 | $ - 0 |
| 0139 | Build Enclosure | 1 | CF | $ - 0 | $ - 0 |
| 0140 | Install Temporary Fencing | 1 | LF | $ - 0 | $ - 0 |
| 0141 | Install Bird Deterrent Wire | 1 | LF | $ - 0 | $ - 0 |
| TOTAL APPROVAL COST | ERROR:#REF! |
2nd OPTION YEAR
| JBLE PAINT IDIQ | |||||
| UNIT PRICE LIST | |||||
| CONTRACT LINE ITEM No. | ITEM NO., DESCRIPTION, | EST. QTY | UNIT MEAS. | UNIT PRICE | TOTAL COST |
| GENRAL REQUIREMENTS, EQUIPMENT RENTALS | |||||
| Lift Rental, Up To 30 Feet Heights | |||||
| 0001 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0002 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0003 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental, 30 - 60 Feet Heights | |||||
| 0004 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0005 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0006 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental 60 - 80 Feet Heights | |||||
| 0007 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0008 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0009 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental Over 80 Feet Heights | |||||
| 0010 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0011 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0012 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| 0013 | Lift Delivery/Pickup | 1 | JB | $ - 0 | $ - 0 |
| Labor Rate Multiplier (Percentage of Equipment Total) | Labor % | ||||
| 0014 | Labor Rate Multiplier Over 30 FT 25%) | 25% | $ - 0 | $ - 0 | |
| 0015 | Labor Rate Multiplier Over 60 FT 50% | 50% | $ - 0 | $ - 0 | |
| 0016 | Labor Rate Multiplier Over 80 FT 75% | 75% | $ - 0 | $ - 0 | |
| 0017 | Labor Rate Multiplier Evening/Weekend Requirement | TBD | $ - 0 | $ - 0 | |
| SITE WORK | |||||
| DEMOLITION | |||||
| 0018 | Remove Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0019 | Remove Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0020 | Remove Blocking, 2 x (8" to 10") | 1 | LF | $ - 0 | $ - 0 |
| 0021 | Remove Fascia Boards 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0022 | Remove Fascia Boards 1" X 8" | 1 | LF | $ - 0 | $ - 0 |
| 0023 | Remove Fascia Boards 1" X 10" | 1 | LF | $ - 0 | $ - 0 |
| 0024 | Remove Trim, Baseboard to 6" wide | 1 | LF | $ - 0 | $ - 0 |
| 0025 | Remove Trim, Baseboard to >6" wide and up to 12" wide | 1 | LF | $ - 0 | $ - 0 |
| 0026 | Remove Vinyl or rubber cove base | 1 | LF | $ - 0 | $ - 0 |
| 0027 | Remove Vinyl or rubber cove base molded corner | 1 | EA | $ - 0 | $ - 0 |
| 0028 | Remove Chair Rails | 1 | LF | $ - 0 | $ - 0 |
| 0029 | Remove Wood Trim to include door and window trim | 1 | LF | $ - 0 | $ - 0 |
| 0030 | Remove Interior Base, cove, carpet, rubber or vinyl | 1 | LF | $ - 0 | $ - 0 |
| 0031 | Remove fascia and rakes | 1 | SF | $ - 0 | $ - 0 |
| 0032 | Remove GWB/Fiberboard up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0033 | Remove Sheathing from walls up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0034 | Remove Sealant and Backer Rod | 1 | LF | $ - 0 | $ - 0 |
| 0035 | Remove Vines and Ivy | 1 | LF | $ - 0 | $ - 0 |
| 0036 | Remove and Dispose of Gutters, Down Spouts and Hangers | 1 | LF | $ - 0 | $ - 0 |
| 0037 | Remove vinyl wallcovering/ wallpaper with release agent | 1 | SF | $ - 0 | $ - 0 |
| 0038 | Remove corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0039 | Remove Bonded Carpet including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| 0040 | Remove Carpet tile, releasable adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0041 | Remove Carpet tile, permanent adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0042 | Remove Bonded LVT including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| FLOORING | |||||
| 0043 | Install carpet tile tufted hard back (2' X 2' 26 Oz. nylon) | 1 | SY | $ - 0 | $ - 0 |
| 0044 | Install LVT planks (6" X 36")? | 1 | SF | $ - 0 | $ - 0 |
| 0045 | Prepare & Paint Concrete Floor, Epoxy Coating, Standard Colors (up to 1/8" thick (2 base coats) plus top coat rolled | 1 | SF | $ - 0 | $ - 0 |
| 0046 | Prepare & Apply Fuel Resistant Epoxy/Urethane Coating | 1 | SF | $ - 0 | $ - 0 |
| LEAD BASED PAINT/ASBESTOS/MOLD - REMOVAL, ABATEMENT, DISPOSAL AND ENCAPSULATION | |||||
| 0047 | Piping Up To 12" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0048 | Piping 12" To 16" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0049 | Surface Prep Doors | 1 | SF | $ - 0 | $ - 0 |
| 0050 | Surface Prep Walls | 1 | SF | $ - 0 | $ - 0 |
| 0051 | Surface Prep Beams & Trusses | 1 | SF | $ - 0 | $ - 0 |
| 0052 | All Others-To be Negotiated (Per Height, Accessibility, Sub star, etc.) | 1 | TBN | $ - 0 | $ - 0 |
| 0053 | Remove & dispose of asbestos containing sealant | 1 | LF | ERROR:#REF! | ERROR:#REF! |
| 0054 | Air filtration device for asbestos contain area , 2000CFM | 1 | EA | ERROR:#REF! | ERROR:#REF! |
| 0055 | Lead Dust Wipe Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0056 | Lead Dust Wipe Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0057 | Soil Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0058 | Soil Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0059 | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0060 | If reduction of mat'ls is required (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0061 | Disposal of Non-hazardous Asbestos Material | 1 | Drums | ERROR:#REF! | ERROR:#REF! |
| 0062 | Disposal of Non-hazardous Material in Dumpster | 1 | CF | $ - 0 | $ - 0 |
| 0063 | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | 1 | Drums | $ - 0 | $ - 0 |
| 0064 | Lead Paint Testing, AAS Analysis | 1 | EA | $ - 0 | $ - 0 |
| 0065 | Encapsulation of Lead Paint, beams, trusses, steel flat surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0066 | Remove Mold/Mildew on Walls Ceilings etc.. | 1 | SF | $ - 0 | $ - 0 |
| WOOD & PLASTIC | |||||
| 0067 | Install New Wood Exterior /Interior Trims | 1 | LF | $ - 0 | $ - 0 |
| 0068 | Install New Fascia, Size 1" x 6" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0069 | Install New Fascia, Size 1" x 8" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0070 | Install New Fascia, Size 1" x 10" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0071 | Install Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0072 | Install Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0073 | Install New Chair Railing and Seal Surface | 1 | LF | $ - 0 | $ - 0 |
| 0074 | Install New Wood Blocking, 2" x (8" to 10") and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0075 | Install New Base Molding, Hard Wood 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0076 | Install New Base Molding, Softwood, 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0077 | Install New Baseboard Wood Trim to 6" Wide | 1 | LF | $ - 0 | $ - 0 |
| 0078 | Install GWB, Walls and Ceilings up to 1/2" Thick, Taped Lvl 4 Finish | 1 | LF | $ - 0 | $ - 0 |
| 0079 | Install Sheathing up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| THERMAL AND MOISTURE PROTECTION | |||||
| GENERAL SHEET METAL WORK | |||||
| 0080 | Replace Metal Fascia (0.032" thick) | 1 | LF | $ - 0 | $ - 0 |
| 0081 | Replace Gutters and Downspout (3-1/2" to 4" Diameter) | 1 | LF | $ - 0 | $ - 0 |
| 0082 | Install Gutters/ Downspouts 5" Diameter | 1 | EA | $ - 0 | $ - 0 |
| FINISHES | |||||
| INTERIOR/EXTERIOR PAINTING AND COVERINGS | |||||
| 0083 | Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0084 | Seal concrete masonry unit (CMU) surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0085 | Seal Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0086 | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1 | SF | $ - 0 | $ - 0 |
| 0087 | Clean existing brick and provide water repellent | 1 | SF | $ - 0 | $ - 0 |
| 0088 | Stucco/Fiberglass repair | 1 | SF | $ - 0 | $ - 0 |
| 0089 | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0090 | Pressure Wash (Not part of prep work, no painting associated with this line item) | 1 | SF | $ - 0 | $ - 0 |
| 0091 | Install corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0092 | Install Wallpaper, basic matching pattern | 1 | SF | $ - 0 | $ - 0 |
| 0093 | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 1 | LF | $ - 0 | $ - 0 |
| 0094 | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 1 | EA | $ - 0 | $ - 0 |
| 0095 | Prepare & Paint Concrete Block or Masonry Surfaces, Primer/ Sealer , 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0096 | Prepare & Paint Concrete Block or Masonry Surfaces, Block Fillers , 1 or 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0097 | Prepare & Paint Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0098 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (125 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0099 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (250 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0100 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Primer, 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0101 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Texture Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0102 | Prepare & Paint Exterior Doors and Windows, ( frames and trims only), Primer and 2 Coats | 1 | LF | $ - 0 | $ - 0 |
| 0103 | Prepare & Paint flush Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0104 | Prepare & Paint Panel Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0105 | Prepare & Paint Metal Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0106 | Prepare & Paint Wood Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0107 | Prepare & Paint Wood Doors, Varnish, 3 Coats (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0108 | Prepare & Paint Wood Surfaces, include sealing | 1 | SF | $ - 0 | $ - 0 |
| 0109 | Prepare & Paint 1-8 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0110 | Prepare & Paint 7-10 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0111 | Prepare & Paint 12 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0112 | Prepare & Paint Wood Trim | 1 | SF | $ - 0 | $ - 0 |
| 0113 | Prepare & Paint Ladders | 1 | LF | $ - 0 | $ - 0 |
| 0114 | Prepare & Paint Railings and Balustrades | 1 | SF | $ - 0 | $ - 0 |
| 0115 | Prepare & Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0116 | Prepare & Paint Ferrous Metal Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0117 | Prepare & Paint Aluminum Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0118 | Prepare & Paint New/Old Gutters & Downspouts | 1 | SF | $ - 0 | $ - 0 |
| 0119 | Prepare & Paint Pipes Up To 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0120 | Prepare & Paint Pipes Over 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0121 | Spray Texture on Walls (Knock Down or Orange Peel) | 1 | SF | $ - 0 | $ - 0 |
| 0122 | Replace Drywall | 1 | SF | $ - 0 | $ - 0 |
| MISCELLANIOUS | |||||
| 0123 | White Metal Blast Cleaning (SSPC-SP5/NACE No. 1 and UFGS33) | 1 | LF | $ - 0 | $ - 0 |
| 0124 | Hand-cleaning Historic Surfaces by "Gentlest Means Possible" | 1 | SF | $ - 0 | $ - 0 |
| 0125 | Remove/Reinstall Wall Items | 1 | EA | $ - 0 | $ - 0 |
| 0126 | Reseal/Caulk windows | 1 | LF | $ - 0 | $ - 0 |
| 0127 | Apply Window Tint | 1 | SF | $ - 0 | $ - 0 |
| Reserved For Custom Item | 1 | TBD | $ - 0 | $ - 0 | |
| ROAD AND AIRFIELD MARKINGS | |||||
| 0128 | Paint Road Markings "Thermoplastic Striping With Glass Beads" (Centerlines, Stop Bars, Parking Spaces, etc..) | 1 | LF | $ - 0 | $ - 0 |
| 0129 | Paint Airfield Taxiway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0130 | Paint Airfield Runway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0131 | Remove Pavement Markings with High Pressure Water | 1 | SF | $ - 0 | $ - 0 |
| 0132 | Replace sealant and backer rod | 1 | LF | $ - 0 | $ - 0 |
| 0133 | Replace backer rod with the appropriate sizes, apply self-leveling sealant | 1 | LF | $ - 0 | $ - 0 |
| STATIC DISPLAY | |||||
| 0134 | Aircraft Painting 2 coats | 1 | SF | $ - 0 | $ - 0 |
| 0135 | Strip Non-adhering coating | 1 | SF | $ - 0 | $ - 0 |
| 0136 | Sand/Scuff Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0137 | Provide and Apply Vinyl Stencil/Decal | 1 | SF | $ - 0 | $ - 0 |
| 0138 | Decal Removal | 1 | Ea. | $ - 0 | $ - 0 |
| 0139 | Build Enclosure | 1 | CF | $ - 0 | $ - 0 |
| 0140 | Install Temporary Fencing | 1 | LF | $ - 0 | $ - 0 |
| 0141 | Install Bird Deterrent Wire | 1 | LF | $ - 0 | $ - 0 |
| TOTAL APPROVAL COST | ERROR:#REF! |
3rd OPTION YEAR
| JBLE PAINT IDIQ | |||||
| UNIT PRICE LIST | |||||
| CONTRACT LINE ITEM No. | ITEM NO., DESCRIPTION, | EST. QTY | UNIT MEAS. | UNIT PRICE | TOTAL COST |
| GENRAL REQUIREMENTS, EQUIPMENT RENTALS | |||||
| Lift Rental, Up To 30 Feet Heights | |||||
| 0001 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0002 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0003 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental, 30 - 60 Feet Heights | |||||
| 0004 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0005 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0006 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental 60 - 80 Feet Heights | |||||
| 0007 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0008 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0009 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental Over 80 Feet Heights | |||||
| 0010 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0011 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0012 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| 0013 | Lift Delivery/Pickup | 1 | JB | $ - 0 | $ - 0 |
| Labor Rate Multiplier (Percentage of Equipment Total) | Labor % | ||||
| 0014 | Labor Rate Multiplier Over 30 FT 25%) | 25% | $ - 0 | $ - 0 | |
| 0015 | Labor Rate Multiplier Over 60 FT 50% | 50% | $ - 0 | $ - 0 | |
| 0016 | Labor Rate Multiplier Over 80 FT 75% | 75% | $ - 0 | $ - 0 | |
| 0017 | Labor Rate Multiplier Evening/Weekend Requirement | TBD | $ - 0 | $ - 0 | |
| SITE WORK | |||||
| DEMOLITION | |||||
| 0018 | Remove Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0019 | Remove Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0020 | Remove Blocking, 2 x (8" to 10") | 1 | LF | $ - 0 | $ - 0 |
| 0021 | Remove Fascia Boards 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0022 | Remove Fascia Boards 1" X 8" | 1 | LF | $ - 0 | $ - 0 |
| 0023 | Remove Fascia Boards 1" X 10" | 1 | LF | $ - 0 | $ - 0 |
| 0024 | Remove Trim, Baseboard to 6" wide | 1 | LF | $ - 0 | $ - 0 |
| 0025 | Remove Trim, Baseboard to >6" wide and up to 12" wide | 1 | LF | $ - 0 | $ - 0 |
| 0026 | Remove Vinyl or rubber cove base | 1 | LF | $ - 0 | $ - 0 |
| 0027 | Remove Vinyl or rubber cove base molded corner | 1 | EA | $ - 0 | $ - 0 |
| 0028 | Remove Chair Rails | 1 | LF | $ - 0 | $ - 0 |
| 0029 | Remove Wood Trim to include door and window trim | 1 | LF | $ - 0 | $ - 0 |
| 0030 | Remove Interior Base, cove, carpet, rubber or vinyl | 1 | LF | $ - 0 | $ - 0 |
| 0031 | Remove fascia and rakes | 1 | SF | $ - 0 | $ - 0 |
| 0032 | Remove GWB/Fiberboard up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0033 | Remove Sheathing from walls up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0034 | Remove Sealant and Backer Rod | 1 | LF | $ - 0 | $ - 0 |
| 0035 | Remove Vines and Ivy | 1 | LF | $ - 0 | $ - 0 |
| 0036 | Remove and Dispose of Gutters, Down Spouts and Hangers | 1 | LF | $ - 0 | $ - 0 |
| 0037 | Remove vinyl wallcovering/ wallpaper with release agent | 1 | SF | $ - 0 | $ - 0 |
| 0038 | Remove corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0039 | Remove Bonded Carpet including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| 0040 | Remove Carpet tile, releasable adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0041 | Remove Carpet tile, permanent adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0042 | Remove Bonded LVT including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| FLOORING | |||||
| 0043 | Install carpet tile tufted hard back (2' X 2' 26 Oz. nylon) | 1 | SY | $ - 0 | $ - 0 |
| 0044 | Install LVT planks (6" X 36")? | 1 | SF | $ - 0 | $ - 0 |
| 0045 | Prepare & Paint Concrete Floor, Epoxy Coating, Standard Colors (up to 1/8" thick (2 base coats) plus top coat rolled | 1 | SF | $ - 0 | $ - 0 |
| 0046 | Prepare & Apply Fuel Resistant Epoxy/Urethane Coating | 1 | SF | $ - 0 | $ - 0 |
| LEAD BASED PAINT/ASBESTOS/MOLD - REMOVAL, ABATEMENT, DISPOSAL AND ENCAPSULATION | |||||
| 0047 | Piping Up To 12" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0048 | Piping 12" To 16" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0049 | Surface Prep Doors | 1 | SF | $ - 0 | $ - 0 |
| 0050 | Surface Prep Walls | 1 | SF | $ - 0 | $ - 0 |
| 0051 | Surface Prep Beams & Trusses | 1 | SF | $ - 0 | $ - 0 |
| 0052 | All Others-To be Negotiated (Per Height, Accessibility, Sub star, etc.) | 1 | TBN | $ - 0 | $ - 0 |
| 0053 | Remove & dispose of asbestos containing sealant | 1 | LF | ERROR:#REF! | ERROR:#REF! |
| 0054 | Air filtration device for asbestos contain area , 2000CFM | 1 | EA | ERROR:#REF! | ERROR:#REF! |
| 0055 | Lead Dust Wipe Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0056 | Lead Dust Wipe Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0057 | Soil Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0058 | Soil Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0059 | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0060 | If reduction of mat'ls is required (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0061 | Disposal of Non-hazardous Asbestos Material | 1 | Drums | ERROR:#REF! | ERROR:#REF! |
| 0062 | Disposal of Non-hazardous Material in Dumpster | 1 | CF | $ - 0 | $ - 0 |
| 0063 | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | 1 | Drums | $ - 0 | $ - 0 |
| 0064 | Lead Paint Testing, AAS Analysis | 1 | EA | $ - 0 | $ - 0 |
| 0065 | Encapsulation of Lead Paint, beams, trusses, steel flat surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0066 | Remove Mold/Mildew on Walls Ceilings etc.. | 1 | SF | $ - 0 | $ - 0 |
| WOOD & PLASTIC | |||||
| 0067 | Install New Wood Exterior /Interior Trims | 1 | LF | $ - 0 | $ - 0 |
| 0068 | Install New Fascia, Size 1" x 6" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0069 | Install New Fascia, Size 1" x 8" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0070 | Install New Fascia, Size 1" x 10" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0071 | Install Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0072 | Install Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0073 | Install New Chair Railing and Seal Surface | 1 | LF | $ - 0 | $ - 0 |
| 0074 | Install New Wood Blocking, 2" x (8" to 10") and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0075 | Install New Base Molding, Hard Wood 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0076 | Install New Base Molding, Softwood, 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0077 | Install New Baseboard Wood Trim to 6" Wide | 1 | LF | $ - 0 | $ - 0 |
| 0078 | Install GWB, Walls and Ceilings up to 1/2" Thick, Taped Lvl 4 Finish | 1 | LF | $ - 0 | $ - 0 |
| 0079 | Install Sheathing up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| THERMAL AND MOISTURE PROTECTION | |||||
| GENERAL SHEET METAL WORK | |||||
| 0080 | Replace Metal Fascia (0.032" thick) | 1 | LF | $ - 0 | $ - 0 |
| 0081 | Replace Gutters and Downspout (3-1/2" to 4" Diameter) | 1 | LF | $ - 0 | $ - 0 |
| 0082 | Install Gutters/ Downspouts 5" Diameter | 1 | EA | $ - 0 | $ - 0 |
| FINISHES | |||||
| INTERIOR/EXTERIOR PAINTING AND COVERINGS | |||||
| 0083 | Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0084 | Seal concrete masonry unit (CMU) surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0085 | Seal Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0086 | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1 | SF | $ - 0 | $ - 0 |
| 0087 | Clean existing brick and provide water repellent | 1 | SF | $ - 0 | $ - 0 |
| 0088 | Stucco/Fiberglass repair | 1 | SF | $ - 0 | $ - 0 |
| 0089 | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0090 | Pressure Wash (Not part of prep work, no painting associated with this line item) | 1 | SF | $ - 0 | $ - 0 |
| 0091 | Install corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0092 | Install Wallpaper, basic matching pattern | 1 | SF | $ - 0 | $ - 0 |
| 0093 | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 1 | LF | $ - 0 | $ - 0 |
| 0094 | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 1 | EA | $ - 0 | $ - 0 |
| 0095 | Prepare & Paint Concrete Block or Masonry Surfaces, Primer/ Sealer , 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0096 | Prepare & Paint Concrete Block or Masonry Surfaces, Block Fillers , 1 or 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0097 | Prepare & Paint Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0098 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (125 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0099 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (250 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0100 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Primer, 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0101 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Texture Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0102 | Prepare & Paint Exterior Doors and Windows, ( frames and trims only), Primer and 2 Coats | 1 | LF | $ - 0 | $ - 0 |
| 0103 | Prepare & Paint flush Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0104 | Prepare & Paint Panel Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0105 | Prepare & Paint Metal Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0106 | Prepare & Paint Wood Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0107 | Prepare & Paint Wood Doors, Varnish, 3 Coats (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0108 | Prepare & Paint Wood Surfaces, include sealing | 1 | SF | $ - 0 | $ - 0 |
| 0109 | Prepare & Paint 1-8 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0110 | Prepare & Paint 7-10 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0111 | Prepare & Paint 12 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0112 | Prepare & Paint Wood Trim | 1 | SF | $ - 0 | $ - 0 |
| 0113 | Prepare & Paint Ladders | 1 | LF | $ - 0 | $ - 0 |
| 0114 | Prepare & Paint Railings and Balustrades | 1 | SF | $ - 0 | $ - 0 |
| 0115 | Prepare & Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0116 | Prepare & Paint Ferrous Metal Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0117 | Prepare & Paint Aluminum Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0118 | Prepare & Paint New/Old Gutters & Downspouts | 1 | SF | $ - 0 | $ - 0 |
| 0119 | Prepare & Paint Pipes Up To 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0120 | Prepare & Paint Pipes Over 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0121 | Spray Texture on Walls (Knock Down or Orange Peel) | 1 | SF | $ - 0 | $ - 0 |
| 0122 | Replace Drywall | 1 | SF | $ - 0 | $ - 0 |
| MISCELLANIOUS | |||||
| 0123 | White Metal Blast Cleaning (SSPC-SP5/NACE No. 1 and UFGS33) | 1 | LF | $ - 0 | $ - 0 |
| 0124 | Hand-cleaning Historic Surfaces by "Gentlest Means Possible" | 1 | SF | $ - 0 | $ - 0 |
| 0125 | Remove/Reinstall Wall Items | 1 | EA | $ - 0 | $ - 0 |
| 0126 | Reseal/Caulk windows | 1 | LF | $ - 0 | $ - 0 |
| 0127 | Apply Window Tint | 1 | SF | $ - 0 | $ - 0 |
| Reserved For Custom Item | 1 | TBD | $ - 0 | $ - 0 | |
| ROAD AND AIRFIELD MARKINGS | |||||
| 0128 | Paint Road Markings "Thermoplastic Striping With Glass Beads" (Centerlines, Stop Bars, Parking Spaces, etc..) | 1 | LF | $ - 0 | $ - 0 |
| 0129 | Paint Airfield Taxiway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0130 | Paint Airfield Runway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0131 | Remove Pavement Markings with High Pressure Water | 1 | SF | $ - 0 | $ - 0 |
| 0132 | Replace sealant and backer rod | 1 | LF | $ - 0 | $ - 0 |
| 0133 | Replace backer rod with the appropriate sizes, apply self-leveling sealant | 1 | LF | $ - 0 | $ - 0 |
| STATIC DISPLAY | |||||
| 0134 | Aircraft Painting 2 coats | 1 | SF | $ - 0 | $ - 0 |
| 0135 | Strip Non-adhering coating | 1 | SF | $ - 0 | $ - 0 |
| 0136 | Sand/Scuff Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0137 | Provide and Apply Vinyl Stencil/Decal | 1 | SF | $ - 0 | $ - 0 |
| 0138 | Decal Removal | 1 | Ea. | $ - 0 | $ - 0 |
| 0139 | Build Enclosure | 1 | CF | $ - 0 | $ - 0 |
| 0140 | Install Temporary Fencing | 1 | LF | $ - 0 | $ - 0 |
| 0141 | Install Bird Deterrent Wire | 1 | LF | $ - 0 | $ - 0 |
| TOTAL APPROVAL COST | ERROR:#REF! |
4th OPTION YEAR
| JBLE PAINT IDIQ | |||||
| UNIT PRICE LIST | |||||
| CONTRACT LINE ITEM No. | ITEM NO., DESCRIPTION, | EST. QTY | UNIT MEAS. | UNIT PRICE | TOTAL COST |
| GENRAL REQUIREMENTS, EQUIPMENT RENTALS | |||||
| Lift Rental, Up To 30 Feet Heights | |||||
| 0001 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0002 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0003 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental, 30 - 60 Feet Heights | |||||
| 0004 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0005 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0006 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental 60 - 80 Feet Heights | |||||
| 0007 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0008 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0009 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| Lift Rental Over 80 Feet Heights | |||||
| 0010 | Daily Rental | 1 | DY | $ - 0 | $ - 0 |
| 0011 | Weekly Rental | 1 | WK | $ - 0 | $ - 0 |
| 0012 | Monthly Rental | 1 | MO | $ - 0 | $ - 0 |
| 0013 | Lift Delivery/Pickup | 1 | JB | $ - 0 | $ - 0 |
| Labor Rate Multiplier (Percentage of Equipment Total) | Labor % | ||||
| 0014 | Labor Rate Multiplier Over 30 FT 25%) | 25% | $ - 0 | $ - 0 | |
| 0015 | Labor Rate Multiplier Over 60 FT 50% | 50% | $ - 0 | $ - 0 | |
| 0016 | Labor Rate Multiplier Over 80 FT 75% | 75% | $ - 0 | $ - 0 | |
| 0017 | Labor Rate Multiplier Evening/Weekend Requirement | TBD | $ - 0 | $ - 0 | |
| SITE WORK | |||||
| DEMOLITION | |||||
| 0018 | Remove Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0019 | Remove Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0020 | Remove Blocking, 2 x (8" to 10") | 1 | LF | $ - 0 | $ - 0 |
| 0021 | Remove Fascia Boards 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0022 | Remove Fascia Boards 1" X 8" | 1 | LF | $ - 0 | $ - 0 |
| 0023 | Remove Fascia Boards 1" X 10" | 1 | LF | $ - 0 | $ - 0 |
| 0024 | Remove Trim, Baseboard to 6" wide | 1 | LF | $ - 0 | $ - 0 |
| 0025 | Remove Trim, Baseboard to >6" wide and up to 12" wide | 1 | LF | $ - 0 | $ - 0 |
| 0026 | Remove Vinyl or rubber cove base | 1 | LF | $ - 0 | $ - 0 |
| 0027 | Remove Vinyl or rubber cove base molded corner | 1 | EA | $ - 0 | $ - 0 |
| 0028 | Remove Chair Rails | 1 | LF | $ - 0 | $ - 0 |
| 0029 | Remove Wood Trim to include door and window trim | 1 | LF | $ - 0 | $ - 0 |
| 0030 | Remove Interior Base, cove, carpet, rubber or vinyl | 1 | LF | $ - 0 | $ - 0 |
| 0031 | Remove fascia and rakes | 1 | SF | $ - 0 | $ - 0 |
| 0032 | Remove GWB/Fiberboard up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0033 | Remove Sheathing from walls up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| 0034 | Remove Sealant and Backer Rod | 1 | LF | $ - 0 | $ - 0 |
| 0035 | Remove Vines and Ivy | 1 | LF | $ - 0 | $ - 0 |
| 0036 | Remove and Dispose of Gutters, Down Spouts and Hangers | 1 | LF | $ - 0 | $ - 0 |
| 0037 | Remove vinyl wallcovering/ wallpaper with release agent | 1 | SF | $ - 0 | $ - 0 |
| 0038 | Remove corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0039 | Remove Bonded Carpet including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| 0040 | Remove Carpet tile, releasable adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0041 | Remove Carpet tile, permanent adhesive | 1 | SF | $ - 0 | $ - 0 |
| 0042 | Remove Bonded LVT including surface scraping | 1 | SF | $ - 0 | $ - 0 |
| FLOORING | |||||
| 0043 | Install carpet tile tufted hard back (2' X 2' 26 Oz. nylon) | 1 | SY | $ - 0 | $ - 0 |
| 0044 | Install LVT planks (6" X 36")? | 1 | SF | $ - 0 | $ - 0 |
| 0045 | Prepare & Paint Concrete Floor, Epoxy Coating, Standard Colors (up to 1/8" thick (2 base coats) plus top coat rolled | 1 | SF | $ - 0 | $ - 0 |
| 0046 | Prepare & Apply Fuel Resistant Epoxy/Urethane Coating | 1 | SF | $ - 0 | $ - 0 |
| LEAD BASED PAINT/ASBESTOS/MOLD - REMOVAL, ABATEMENT, DISPOSAL AND ENCAPSULATION | |||||
| 0047 | Piping Up To 12" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0048 | Piping 12" To 16" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0049 | Surface Prep Doors | 1 | SF | $ - 0 | $ - 0 |
| 0050 | Surface Prep Walls | 1 | SF | $ - 0 | $ - 0 |
| 0051 | Surface Prep Beams & Trusses | 1 | SF | $ - 0 | $ - 0 |
| 0052 | All Others-To be Negotiated (Per Height, Accessibility, Sub star, etc.) | 1 | TBN | $ - 0 | $ - 0 |
| 0053 | Remove & dispose of asbestos containing sealant | 1 | LF | ERROR:#REF! | ERROR:#REF! |
| 0054 | Air filtration device for asbestos contain area , 2000CFM | 1 | EA | ERROR:#REF! | ERROR:#REF! |
| 0055 | Lead Dust Wipe Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0056 | Lead Dust Wipe Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0057 | Soil Sampling by IH | 1 | HRS | $ - 0 | $ - 0 |
| 0058 | Soil Sampling Read by CIH | 1 | EA | $ - 0 | $ - 0 |
| 0059 | Disposal of Hazardous Lead-Containing Mat'ls If No Reduction Is Req'd (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0060 | If reduction of mat'ls is required (i.e. Paint Chips) | 1 | Drums | $ - 0 | $ - 0 |
| 0061 | Disposal of Non-hazardous Asbestos Material | 1 | Drums | ERROR:#REF! | ERROR:#REF! |
| 0062 | Disposal of Non-hazardous Material in Dumpster | 1 | CF | $ - 0 | $ - 0 |
| 0063 | If reduction of mat'ls if required (i.e., cutting up fence to fit into drums) | 1 | Drums | $ - 0 | $ - 0 |
| 0064 | Lead Paint Testing, AAS Analysis | 1 | EA | $ - 0 | $ - 0 |
| 0065 | Encapsulation of Lead Paint, beams, trusses, steel flat surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0066 | Remove Mold/Mildew on Walls Ceilings etc.. | 1 | SF | $ - 0 | $ - 0 |
| WOOD & PLASTIC | |||||
| 0067 | Install New Wood Exterior /Interior Trims | 1 | LF | $ - 0 | $ - 0 |
| 0068 | Install New Fascia, Size 1" x 6" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0069 | Install New Fascia, Size 1" x 8" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0070 | Install New Fascia, Size 1" x 10" and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0071 | Install Ridge board 1" X 4" | 1 | LF | $ - 0 | $ - 0 |
| 0072 | Install Ridge board 1" X 6" | 1 | LF | $ - 0 | $ - 0 |
| 0073 | Install New Chair Railing and Seal Surface | 1 | LF | $ - 0 | $ - 0 |
| 0074 | Install New Wood Blocking, 2" x (8" to 10") and Paint Surface | 1 | LF | $ - 0 | $ - 0 |
| 0075 | Install New Base Molding, Hard Wood 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0076 | Install New Base Molding, Softwood, 1" x 6" (Prime, Paint or Seal) | 1 | LF | $ - 0 | $ - 0 |
| 0077 | Install New Baseboard Wood Trim to 6" Wide | 1 | LF | $ - 0 | $ - 0 |
| 0078 | Install GWB, Walls and Ceilings up to 1/2" Thick, Taped Lvl 4 Finish | 1 | LF | $ - 0 | $ - 0 |
| 0079 | Install Sheathing up to 1/2" | 1 | SF | $ - 0 | $ - 0 |
| THERMAL AND MOISTURE PROTECTION | |||||
| GENERAL SHEET METAL WORK | |||||
| 0080 | Replace Metal Fascia (0.032" thick) | 1 | LF | $ - 0 | $ - 0 |
| 0081 | Replace Gutters and Downspout (3-1/2" to 4" Diameter) | 1 | LF | $ - 0 | $ - 0 |
| 0082 | Install Gutters/ Downspouts 5" Diameter | 1 | EA | $ - 0 | $ - 0 |
| FINISHES | |||||
| INTERIOR/EXTERIOR PAINTING AND COVERINGS | |||||
| 0083 | Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0084 | Seal concrete masonry unit (CMU) surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0085 | Seal Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0086 | Patch Concrete, CMU Surfaces (Patch Holes 1/2" or Skim Coat) | 1 | SF | $ - 0 | $ - 0 |
| 0087 | Clean existing brick and provide water repellent | 1 | SF | $ - 0 | $ - 0 |
| 0088 | Stucco/Fiberglass repair | 1 | SF | $ - 0 | $ - 0 |
| 0089 | Seal Ferrous Metal/Galvanized/Alum. Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0090 | Pressure Wash (Not part of prep work, no painting associated with this line item) | 1 | SF | $ - 0 | $ - 0 |
| 0091 | Install corner guards (metal, plastic, vinyl and wood) | 1 | LF | $ - 0 | $ - 0 |
| 0092 | Install Wallpaper, basic matching pattern | 1 | SF | $ - 0 | $ - 0 |
| 0093 | Install Base Cove, rubber or vinyl, Standard Colors, 4-6" high | 1 | LF | $ - 0 | $ - 0 |
| 0094 | Install Base Cove Corners, rubber or vinyl, Standard Colors, 4-6" high | 1 | EA | $ - 0 | $ - 0 |
| 0095 | Prepare & Paint Concrete Block or Masonry Surfaces, Primer/ Sealer , 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0096 | Prepare & Paint Concrete Block or Masonry Surfaces, Block Fillers , 1 or 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0097 | Prepare & Paint Concrete Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0098 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (125 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0099 | Prepare & Paint Concrete Surface, with Blast Resistant Paint (250 mils) | 1 | SF | $ - 0 | $ - 0 |
| 0100 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Primer, 2 Coats | 1 | SF | $ - 0 | $ - 0 |
| 0101 | Prepare & Paint Walls and Ceilings, Concrete, Drywall or Plaster, Texture Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0102 | Prepare & Paint Exterior Doors and Windows, ( frames and trims only), Primer and 2 Coats | 1 | LF | $ - 0 | $ - 0 |
| 0103 | Prepare & Paint flush Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0104 | Prepare & Paint Panel Doors (excluding frame and trim) | 1 | EA | $ - 0 | $ - 0 |
| 0105 | Prepare & Paint Metal Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0106 | Prepare & Paint Wood Doors (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0107 | Prepare & Paint Wood Doors, Varnish, 3 Coats (including frame & trim) | 1 | EA | $ - 0 | $ - 0 |
| 0108 | Prepare & Paint Wood Surfaces, include sealing | 1 | SF | $ - 0 | $ - 0 |
| 0109 | Prepare & Paint 1-8 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0110 | Prepare & Paint 7-10 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0111 | Prepare & Paint 12 lite windows | 1 | EA | $ - 0 | $ - 0 |
| 0112 | Prepare & Paint Wood Trim | 1 | SF | $ - 0 | $ - 0 |
| 0113 | Prepare & Paint Ladders | 1 | LF | $ - 0 | $ - 0 |
| 0114 | Prepare & Paint Railings and Balustrades | 1 | SF | $ - 0 | $ - 0 |
| 0115 | Prepare & Paint Stucco/EIFS/Plaster Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0116 | Prepare & Paint Ferrous Metal Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0117 | Prepare & Paint Aluminum Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0118 | Prepare & Paint New/Old Gutters & Downspouts | 1 | SF | $ - 0 | $ - 0 |
| 0119 | Prepare & Paint Pipes Up To 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0120 | Prepare & Paint Pipes Over 4" Diameter | 1 | LF | $ - 0 | $ - 0 |
| 0121 | Spray Texture on Walls (Knock Down or Orange Peel) | 1 | SF | $ - 0 | $ - 0 |
| 0122 | Replace Drywall | 1 | SF | $ - 0 | $ - 0 |
| MISCELLANIOUS | |||||
| 0123 | White Metal Blast Cleaning (SSPC-SP5/NACE No. 1 and UFGS33) | 1 | LF | $ - 0 | $ - 0 |
| 0124 | Hand-cleaning Historic Surfaces by "Gentlest Means Possible" | 1 | SF | $ - 0 | $ - 0 |
| 0125 | Remove/Reinstall Wall Items | 1 | EA | $ - 0 | $ - 0 |
| 0126 | Reseal/Caulk windows | 1 | LF | $ - 0 | $ - 0 |
| 0127 | Apply Window Tint | 1 | SF | $ - 0 | $ - 0 |
| Reserved For Custom Item | 1 | TBD | $ - 0 | $ - 0 | |
| ROAD AND AIRFIELD MARKINGS | |||||
| 0128 | Paint Road Markings "Thermoplastic Striping With Glass Beads" (Centerlines, Stop Bars, Parking Spaces, etc..) | 1 | LF | $ - 0 | $ - 0 |
| 0129 | Paint Airfield Taxiway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0130 | Paint Airfield Runway Markings | 1 | SF | $ - 0 | $ - 0 |
| 0131 | Remove Pavement Markings with High Pressure Water | 1 | SF | $ - 0 | $ - 0 |
| 0132 | Replace sealant and backer rod | 1 | LF | $ - 0 | $ - 0 |
| 0133 | Replace backer rod with the appropriate sizes, apply self-leveling sealant | 1 | LF | $ - 0 | $ - 0 |
| STATIC DISPLAY | |||||
| 0134 | Aircraft Painting 2 coats | 1 | SF | $ - 0 | $ - 0 |
| 0135 | Strip Non-adhering coating | 1 | SF | $ - 0 | $ - 0 |
| 0136 | Sand/Scuff Surfaces | 1 | SF | $ - 0 | $ - 0 |
| 0137 | Provide and Apply Vinyl Stencil/Decal | 1 | SF | $ - 0 | $ - 0 |
| 0138 | Decal Removal | 1 | Ea. | $ - 0 | $ - 0 |
| 0139 | Build Enclosure | 1 | CF | $ - 0 | $ - 0 |
| 0140 | Install Temporary Fencing | 1 | LF | $ - 0 | $ - 0 |
| 0141 | Install Bird Deterrent Wire | 1 | LF | $ - 0 | $ - 0 |
| TOTAL APPROVAL COST | ERROR:#REF! |
File details come from the government source that posted it. Updated .