Jail Boiler Replacement - Technical Drawings Summary

This is a technical drawing package prepared by Chatham Engineering Company, LLC for the Effingham County Board of Commissioners in Georgia, documenting the domestic boiler replacement project at the Effingham County Jail located at 130 W. 1st Street Ext., Springfield, GA 31329. The project scope encompasses the replacement of two existing domestic water boilers with two new water heaters (WH-1 and WH-2), two storage tanks (ST-1 and ST-2 at 257 gallons each), circulation pumps (HWC-1, HWC-2, and HWC-3), and associated piping and trim. The work includes removal and disposal of existing equipment, installation of new Lochinvar AWH1500 water heaters with 1,500,000 BTU/HR input capacity and 98% thermal efficiency, installation of gas piping systems, hot water circulation systems rated at 1,750 RPM with 1/6 HP motors, thermal expansion tanks, and complete plumbing modifications. The drawings were released for construction on April 19, 2022, with a bid submission deadline of 11:00 a.m. Eastern Time on Wednesday, June 22, 2022. A mandatory pre-bid conference was scheduled for Wednesday, June 8, 2022 at 11:00 a.m. at the project site, with attendance required for proposal consideration.

The technical specifications detail requirements for Schedule 40 CPVC domestic water piping, natural gas piping with Schedule 40 black steel pipe and threaded malleable iron fittings, hydrostatic pressure testing at 100 PSIG, chlorine disinfection with a minimum 16-hour dwell time, fiberglass-jacketed pipe insulation meeting Georgia Energy Code standards, and compliance with the 2018 International Plumbing Code and International Fuel Gas Code with Georgia amendments. Water heaters must include full modulation capability down to 20% of rated input, ASME "HLW" certification, sidewall mounted venting with combustion air intake, remote communication capability with text/email alerts, electronic display controls, and a 5-year warranty on heat exchangers with 1-year parts warranty. The circulation pumps must be bronze body in-line centrifugal types rated for 125 PSI working pressure with mechanical seals and built-in thermal overload protection. Contractors are responsible for all labor, materials, equipment, permits, mobilization, cleanup, Georgia Boiler certification and inspection, insurance, bonds, and coordination with existing facility operations to minimize disruption.

Text of this file

EFFINGHAM COUNTY JAIL

DRAWING LIST:

T0.1

TITLE SHEET

JPG

JPG

P2.1 PLUMBING DETAILS

P1.1 FLOOR PLANS - PLUMBING AND ELECTRICAL

P0.1 SCHEDULES & SPECIFICATIONS PLUMBING

T0.1 TITLE SHEET

DOMESTIC BOILER REPLACEMENT

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description By

19-APR-2022

E:\Effingham Co Jail Boiler - 22032.00\CADD\T0_1.dgn

CADD PLOT

19-APR-2022

09:45 mpeavler

1 INCH

c1 P a rk o f

C o m m e rc e D ri v e S u it e

S a v a n n a h

G e o rg ia

T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d

R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e

P H

O N

E -2

F

A X -2

C h a th a m E n g in e e ri n g C o m p a n y L L C

P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f

C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d

Stamp

1 INCH

22032.00

R E L E

A S

D

F O

C

N S T R

U C

T

IO

N

E F F

IN

G H

A M C

O U

N T

Y G

E O

R G

IA

D O

M E S

T

IC

B

O

IL

E R R

E P

L A

C E

M E

N T

E F F

IN

G H

A M C

O U

N T

Y J

A

IL

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description By

19-APR-2022

E:\Effingham Co Jail Boiler - 22032.00\CADD\P0.1.dgn

CADD PLOT

19-APR-2022

09:46 mpeavler

1 INCH

c1 P a rk o f

C o m m e rc e D ri v e S u it e

S a v a n n a h

G e o rg ia

T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d

R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e

P H

O N

E -2

F

A X -2

C h a th a m E n g in e e ri n g C o m p a n y L L C

P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f

C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d

Stamp

1 INCH

L E

A S

N S T R

U C

T

IO

N

E F F

IN

G H

A M C

O U

N T

Y G

E O

R G

IA

D O

M E S

T

IC

B

O

IL

E R R

E P

L A

C E

M E

N T

E F F

IN

G H

A M C

O U

N T

Y J

A

IL

JPG

P0.1

JPG

PUMPS

PUMP NUMBER

SPEC. TYPE

SERVICE

LOCATION

CAPACITY, GPM

DISCHARGE HEAD, FT.

SUCTION PRESS., FT.

RPM

HP

CONTROLLER

ELECTRICAL

CHARACTERISTICS

REMARKS

SEE ELEC. DWGS. SEE ELEC. DWGS.

HWC-1

DOMESTIC WATER

SEE DWGS

HWC-2

DOMESTIC WATER

SEE DWGS

FLUID TEMP., °F.

CITY PRESSURE WATER

AQUASTAT/TIMER

WATER HEATERS - GAS

HEATER NUMBER

SPEC. TYPE

LOCATION

STORAGE, GALLONS

ENTERING WATER

TEMPERATURE, °F.

LEAVING WATER

TEMPERATURE, °F.

INPUT, BTU/HR.

GAS HEATING VALUE,

BTU/FT.

ELECTRICAL

CHARACTERISTICS

REMARKS

WH-1

SEE ELEC DWGS. SEE ELEC DWGS.

PLUMBING SPECIFICATIONS

CODES

A. THE PLUMBING INSTALLATION AND EQUIPMENT SHALL CONFORM TO THE FOLLOWING:

TESTING PIPE SYSTEMS

A. GENERAL, CONCEALED PIPING AND INSULATED PIPING SHALL BE TESTED IN PLACE

BEFORE CONCEALING OR COVERING. TEST SHALL BE CONDUCTED IN THE PRESENCE

OF THE ARCHITECT OR HIS DESIGNATED REPRESENTATIVE. PIPING LOCATED

UNDERGROUND SHALL BE TESTED BEFORE BACKFILLING. EQUIPMENT, MATERIALS

AND INSTRUMENTS FOR TESTING SHALL BE FURNISHED BY THE CONTRACTOR

WITHOUT ADDITIONAL COST TO THE OWNER.

B. PLUMBING SYSTEMS

FIXTURES, THE ENTIRE DOMESTIC COLD WATER, HOT WATER, AND HOT WATER

CIRCULATION PIPING SYSTEMS SHALL BE TESTED AT HYDROSTATIC PRESSURE

OF 100 PSIG AND PROVED TIGHT AT THIS PRESSURE FOR A PERIOD OF NOT

LESS THAN 2 HOURS IN ORDER TO PERMIT INSPECTION OF ALL JOINTS.

WHERE A PORTION OF THE WATER PIPING SYSTEM IS TO BE CONCEALED

BEFORE COMPLETION, THIS PORTION SHALL BE TESTED SEPARATELY IN A

MANNER DESCRIBED FOR THE ENTIRE SYSTEM.

DOMESTIC WATER SYSTEM

A. PROVIDE COMPLETE SYSTEMS OF COLD AND HOT WATER PIPING AND ACCESSORIES

SO THAT EVERY FIXTURE AND PIECE OF WATER USING EQUIPMENT IN THIS AREA

OF THE BUILDING WILL BE FURNISHED WITH A WATER SUPPLY.

C. PIPING FITTINGS AND JOINTS

1. PIPE AND FITTINGS SHALL BE AS LISTED HEREIN AND SHALL BE USED ON

THE SERVICES INDICATED.

D. DISINFECTION

1. ALL DOMESTIC WATER SERVICE AND SUPPLY PIPING INSTALLED UNDER THIS

DIVISION SHALL BE DISINFECTED WITH CHLORINE BEFORE IT IS PLACED

INTO OPERATION. THE CHLORINATING MATERIAL SHALL BE LIQUID

CHLORINE CONFORMING TO FEDERAL SPECIFICATION BB-C-120 AND SHALL BE

INTRODUCED TO THE SYSTEM BY EXPERIENCED OPERATORS ONLY. THE

CHLORINE SOLUTION APPLIED TO THE PIPING SECTIONS OR SYSTEM SHALL

CONTAIN AT LEAST FIFTY PARTS PER MILLION OF AVAILABLE CHLORINE AND

SHALL REMAIN IN THE SECTIONS OR SYSTEM FOR A PERIOD OF NOT LESS

THAN SIXTEEN (16) HOURS. DURING THE DISINFECTION PERIOD ALL

VALVES SHALL BE OPENED AND CLOSED AT LEAST FOUR TIMES. AFTER THE

DISINFECTION PERIOD THE CHLORINATED WATER SHALL BE FLUSHED FROM

THE SYSTEM WITH CLEAR WATER UNTIL THE RESIDUAL CHLORINE CONTENT IS

NOT GREATER THAN TWO-TENTHS - (0.2) - PARTS PER MILLION. THE

CONTRACTOR SHALL SUBMIT TO THE ARCHITECT CERTIFICATION THAT THE

SYSTEM WAS DISINFECTED.

INSULATION

1. INSULATION SHALL BE FIBERGLASS JACKETED PIPE INSULATION.

2. INSTALLATION SHALL COMPLY TO THE MANUFACTURERS REQUIREMENTS.

3. INSTALLATION THICKNESS SHALL COMPLY TO THE GEORGIA ENERGY CODE.

HANGERS

A. HANGERS SHALL BE CLEVIS TYPE HANGERS. HANGERS SHALL BE COATED

AS REQUIRED FOR PIPING SYSTEMS AS INSTALLATION.

B. HANGER SPACING SHALL COMPLY TO THE INTERNATIONAL PLUMBING CODE

CONNECT, AS SHOWN ON THE DRAWINGS.

B. EXTEND THE DOMESTIC COLD AND HOT WATER AND FILTERED WATER PIPING AND

1. WATER PIPING. UPON COMPLETION OF THE ROUGH-IN AND BEFORE SETTING

WATER HEATER

B. THE HEATER SHALL BE CONSTRUCTED OF A STEEL JACKET ASSEMBLY, PRIMED AND

PAINTED. THE COMBUSTION CHAMBER SHALL BE SEALED AND COMPLETELY ENCLOSED.

A BURNER/FLAME OBSERVATION PORT SHALL BE PROVIDED. THE BURNER SHALL BE

STAINLESS STEEL. THE HEATER SHALL BE SUPPLIED WITH A GAS VALVE DESIGNED

C. THE HEAT SHALL UTILIZE A 24 VOLT CONTROL CIRCUIT. THE CONTROL SYSTEM SHALL

HAVE AN ELECTRONIC DISPLAY FOR SETUP, STATUS AND DIAGNOSTICS. THE HEATER

WITH NEGATIVE PRESSURE REGULATION AND SUPPLED WITH A VARIBLE SPEED BLOWER.

SHALL HAVE THE MANUFACTURER'S STANDARD CONTROLS AND INTERFACE FOR THE

SYSTEM. VENTING MATERIAL SHALL BE AS APPROVED BY THE HEATER MANUFACTURER.

H. THE HEATER SHALL BE APPROVED FOR 180°F OPERATION.

I. THE HEATERS SHALL HAVE A 5 YEAR WARRANTY ON THE HEAT EXCHANGERS

AND 1 YEAR PARTS WARRANTY. SEE DRAWINGS FOR HEATER SIZING.

AT START UP.

K. THE HEATER SHALL HAVE MANUFACTURER'S START UP AND 8 HOURS OWNER TRAINING

A. DOMESTIC HOT WATER CIRCULATION PUMP SHALL BE THE IN-LINE CENTRIFUGAL TYPE

DESIGNED FOR 125 PSI (860 KPA) WORKING PRESSURE WITH BRONZE BODY AND IMPELLER,

MECHANICAL SEALS AND STAINLESS STEEL IMPELLER SHAFT. THE PUMP MOTOR SHALL BE

THE OPEN DRIP-PROOF DESIGN WITH SLEEVE BEARINGS, BUILT-IN THERMAL OVER-LOAD

PROTECTORS, AND SHALL OPERATE AT 1750 RPM. PUMP SHALL HAVE THE CAPACITIES AS

SHOWN ON THE DRAWINGS. PUMPS SHALL BE:

BOOSTER SERIES BELL & GOSSETT

CIRCULATION SERIES TACO

CIRCULATOR SERIES THRUSH

CP

PP

CP

PP PUMP PRESSURE WATER

WH-2

SEE DWGS SEE DWGS

RECOVERY 1

1/6

SEE ELEC. DWGS.

DOMESTIC WATER

SEE DWGS

HWC-3

PLUMBING

SPECIFICATIONS

SCHEDULES &

1. INTERNATIONAL PLUMBING CODE, 2018 EDITION WITH GEORGIA AMENDMENTS.

2. INTERNATIONAL FUEL GAS CODE, 2018 EDITION WITH GEORGIA AMENDMENTS.

GG GAS PIPING

WH WATER HEATER

ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION

ABOVE CEILING

VENT - SANITARY

DOMESTIC COLD WATER

BELOW FLOOR

DOMESTIC HOT WATER RETURN

GATE VALVE

BALL VALVE

CHECK VALVE

WATER HAMMER ARRESTOR 'SIZE'

CLEANOUT

FLOOR CLEANOUT

SOIL OR WASTE STACK DESIGNATION

STACK NUMBER

W, S, D

V

CW

HW

HWR

GV

BV

CV

WHA

CO

FCO

FD

A/C

B/F

SANITARY WASTE, SOIL & DRAIN S

FLOOR DRAIN 'TYPE'

S

LEGEND & ABBREVIATIONS

CONNECT(ION) CONN

CONTINUATION CONT

DOWN DN

DRAWINGS DWGS

ELECTRICAL ELEC

EXISTING EXIST

HEATING, VENTILATION & AIR CONDITIONING HVAC

HOSE BIBB HB

SANITARY SAN

SOIL S

TYPICAL

VENT THRU ROOF

WASTE

VTR

W

TYP

CA

HW

CA

140 ETR

CTE

EXISTING TO REMAIN

CONNECT TO EXISTING

COMPRESSED AIR

DOMESTIC HOT WATER (140)

SOFT SOFT WATER

DOMESTIC HOT WATER (110)

HWC HOT WATER CIRC PUMP

TV TEMPERATURE MIXING VALVE

GENERAL NOTES:

COORDINATE ALL WORK WITH OTHER TRADES.3.

UNLESS NOTED OTHERWISE.

HOSE BIBBS SHALL BE MOUNTED 1'-6" ABOVE FINISHED FLOOR,2.

IN FIELD BEFORE BEGINNING WORK.

ONLY. VERIFY EXACT LOCATION AND INVERT ELEVATION

ALL UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS1.

(PLUMBING)

2. DOMESTIC WATER PIPING SHALL BE SCHEDULE 40 CPVC PIPE WITH SOLVENT

GLUED JOINTS TO MATCH THE EXISTING.

A. THE HEATER SHALL BE A FULL MODULATION FIRING DOWN TO 20% OF THE RATED

INPUT WITH A TURN DOWN RATION OF 5:1. THE HEATER SHALL HAVE THE ASME

"HLW" STAMP AND BE LISTED. THE STAINLESS STEEL COMBINATION SHALL DRAIN

CONDENSATE TO THE BOTTOM OF THE HEAT EXCHANGER ASSEMBLY. THE HEATER SHALL

90.1 STANDARD FOR EFFICIENCY AND BE 98% THERMAL EFFICIENCY.

BE ANSI Z21.10.3 CERTIFIED. THE HEATER SHALL COMPLY WITH THE LATEST ASHRAE

CONTROLS ON SITE.

OPERATION OF MULTIPLE HEATERS. CONTROLS SHALL INTERFACE WITH THE EXISTING

D. THE WATER HEATER SHALL HAVE A SIDEWALL MOUNTED VENT AND COMBUSTION AIR INTAKE

E. THE WATER HEATER SHALL BE CAPABLE OF REMOTE COMMUNICATION AND CAPABLE OF

SENDING TEXT MESSAGE OR EMAIL ALERTS.

F. MODULATION LOGIC SHALL BE PROVIDED AND CAPABLE OF ROTATION OF THE HEATER.

G. THE WATER HEATER SHALL HAVE 2 TERMINAL STRIPS FOR ELECTICAL CONNECTION.

A LOW VOLTAGE CONNECTION BOARD FOR SAFETY AND OPERATION CONTROLS.

J. THE HEATER SHALL BE SUPPLIED WITH THE MANUFACTURER'S CICULATING PUMP.

SEE SCHEDULE FOR FLOW, HEAD AND HORSEPOWER. THE PUMP SHALL BE WIRED TO RUN

WITH INTERMITTENT PUMP CONTROL.

L. THE WATER HEATERS SHALL BE LOCHINVAR AWH1500 OR A PRIOR APPROVED EQUAL.

M. THE HEATER SHALL BE SUPPLIED WITH A CONDENSATE NEUTRALIZATION KIT.

STORAGE TANK

A. STORAGE TANK SHALL BE A VERTICAL TANK HAVING A STORAGE CAPACITY OF 257

GALLONS. THE TANK SHALL BE CONSTRUCTED WITH AN INNER CHAMBER DESIGNED TO

RECEIVE ALL CIRCULATION TO AND FROM THE WATER HEATER TO ELIMINATE TURBULENCE

IN THE TANK. THE BAFFLED TANK SHALL SUPPLY 80% OF TANK CAPACITY WITHOUT A

DROP IN OUTLET TEMPERATURE.

B. THE STORAGE TANK SHALL BE CONSTRUCTED IN ACCORDANCE WITH (STANDARD/ASME)

REQUIREMENTS, IF SAME, STAMPED AND REGISTERED WITH THE NATIONAL BOARD OF

BOILER AND PRESSURE VESSEL INSPECTORS. THE STORAGE TANK SHALL HAVE A WORKING

PRESSURE OF (125/150) PSI. THE STORAGE TANK SHALL BE GLASS LINED AND FIRED

TO 1600°F TO ENSURE A MOLECULAR FUSING OF GLASS AND STEEL, AND CARRY A

FIVE (5) YEAR LIMITED WARRANTY. THE LOCK-TEMP TANK SHALL BE CONSTRUCTED WITH

A HEAVY GAUGE GALVANIZED STEEL JACKET ASSEMBLY, PRIMED AND PRE-PAINTED ON

BOTH SIDES. THE JACKET AND TANK BASE SHALL BE A WATER TIGHT CONSTRUCTION WITH

A BUILT-IN DRAIN PAN, COMPLETE WITH A ƒ" DRAIN CONNECTION TO ASSIST IN

PROTECTING AGAINST DAMAGE IN THE EVENT OF A TANK OR COMPONENT LEAKAGE.

THE STORAGE TANK SHALL BE COMPLETELY ENCASED IN HIGH DENSITY INSULATION OF

SUFFICIENT THICKNESS TO MEET THE ENERGY EFFICIENCY REQUIREMENTS OF THE LATEST

EDITION OF THE ASHRAE 90.1 STANDARD. THE STORAGE TANK SHALL BE LOCHINVAR RGA0257

OR PRIOR APPROVED EQUAL.

CIRCULATION PUMPS (HWC-1)

NATURAL GAS PIPING

A. PROVIDE A COMPLETE SYSTEM OF NATURAL GAS PIPING AS SHOWN ON THE DRAWINGS.

B. ABOVE GROUND NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE

ASTM120 WITH 150lb THREADED MALLEABLE IRON FITTINGS ASTM A47.

C. INSTALLATION

1. HORIZONTAL PIPING SHALL BE SLOPED „" PER FOOT TOWARD THE VALVED DRIP LEGS.

2. TAKEOFFS FOR EQUIPMENT SHALL BE FROM THE TOP OF THE MAIN.TAKEOFFS TO DRIP

LEGS SHALL BE FROM THE BOTTOM OF THE MAIN.

3. PIPING SHALL BE TESTED AT 200 PSI FOR 1HR. ALL LEAKS SHALL BE REPAIRED.

D. ALL WORK SHALL COMPLY TO CODES.

INSULATION

B. THICKNESS SHALL COMPLY TO THE INTERNATIONAL ENERGY CODE REQUIREMENTS.

MATCH EXISTING.

A. ALL WATER PIPING SHALL BE INSULATED WITH FIBERGLASS JACKETED. INSULATION TO

STORAGE, GALLONS

ST-2

STORAGE TANK

TANK NUMBER

LOCATION

HEIGHT (INCHES)

DIAMETER (INCHES)

ST-1

SEE DWGS

SEE DWGS

WATER HEATER IS SUPPLIED WITH A REMOTE TANK.

GALLONS PER HOUR AT 100° RISE.1

2 2

1,782 1,782

1,500,000 1,500,000

15 115

ONE PUMP IS AT EACH BOILER.

PUMP IS SUPPLIED WITH THE WATER HEATER/BOILER.

1 1

CELL

CELL

A106

CELL

A105

CELL

A104

CELL

CELL

A106

CELL

A105

CELL

A104

CELL

CELL

A106

CELL

A105

CELL

A104

CELL

CELL

A106

CELL

A105

CELL

A104

WATER BOOSTER PUMP

EXISTING DOMESTIC

MIXING VALVE TO REMAIN

EXISTING TEMPERATURE

TYPICAL

EXISTING PIPING

TO REMAIN

REGULATOR

GAS PRESSURE

EXISTING

TYPICAL

EXISTING PIPES

EXPANSION TANK

RELOCATED THERMAL

TYPICAL

EXISTING PIPING

ƒ"

ST-1

HWC-1

1"

2•"

HWC-2

2•"

2•

EXPANSION TANK

RELOCATED THERMAL

3"

HWC-3 2•"

ST-2

PAD

KEEPING

HOUSE

EXISTING

HEATERS

NEW WATER

NOTES E1 & E2

NOTE E1

NOTE E2

EQD-13

120 VOLT CIRCUIT

CONNECT TO EXISTING

NEW CO MONITOR.

KEEPING PAD

EXISTING HOUSE

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description By

19-APR-2022

E:\Effingham Co Jail Boiler - 22032.00\CADD\P1.1.dgn

CADD PLOT

19-APR-2022

09:48 mpeavler

1 INCH

c1 P a rk o f

C o m m e rc e D ri v e S u it e

S a v a n n a h

G e o rg ia

T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d

R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e

P H

O N

E -2

F

A X -2

C h a th a m E n g in e e ri n g C o m p a n y L L C

P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f

C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d

Stamp

1 INCH

L E

A S

N S T R

U C

T

IO

N

E F F

IN

G H

A M C

O U

N T

Y G

E O

R G

IA

D O

M E S

T

IC

B

O

IL

E R R

E P

L A

C E

M E

N T

E F F

IN

G H

A M C

O U

N T

Y J

A

IL

G

G

G

G

G

G

NOTES:

D1

D2

D3

D4

D5

(REFERENCE 1/P1.1)

TO PREVENT ANY PROLONGED SHUTDOWNS.

SHALL BE COORDINATED WITH THE OWNER

ALL WORK AND WORK SCHEDULES

SCALE: 1 / 4 " = 1' - 0"P1.1

FLOOR PLAN - PLUMBING DEMOLITION

HEATER AND DISPOSED OF.

FLUES AND 6" AIR INTAKES TO BE REMOVED TO WATEREXISTING 6"

EXISTING FLOOR DRAINS TO REMAIN.

REQUIRED FOR NEW PIPING. SEE WATER HEATER DETAIL.

EXISTING THERMAL MIXING VALVE TO REMAIN. MODIFY PIPING AS

REPLACEMENT.

EXISTING PUMP TO BE REMOVED AND DISPOSED OF. SEE NEW WORK FOR

THE EXISTING THERMAL EXPANSION TANK SHALL BE RELOCATED.

EXISTING WATER HEATER AND TRIM TO BE REMOVED AND DISPOSED OF.

POINTS OF RECONENCTION.

REMOVED AND PROPERLY DISPOSED OF. COORDINATE WITH NEW WORK

EXISTING CW, HW (140) HW, HWR AND GAS PIPING SHOWN HATCHED

D6

D6

D4

D3

D1

D2

D1

D5

D1

D2

NOTES:(REFERENCE 2/P1.1 & 3/P1.1)

SCALE: 1 / 4 " = 1' - 0"P1.1

FLOOR PLAN - PLUMBING VENTING

SCALE: 1 / 4 " = 1' - 0"P1.1

FLOOR PLAN - PLUMBING PIPING 4

SCALE: 1 / 4 " = 1' - 0"P1.1

FLOOR PLAN - ELECTRICAL

TO PREVENT ANY PROLONGED SHUTDOWNS.

SHALL BE COORDINATED WITH THE OWNER

ALL WORK AND WORK SCHEDULES

ST-1

ST-2

WH-1

WH-2

TO PREVENT ANY PROLONGED SHUTDOWNS.

SHALL BE COORDINATED WITH THE OWNER

ALL WORK AND WORK SCHEDULES

WH-1

WH-2

JPG

SMP

P1.1

ELECTRICAL

PLUMBING AND

FLOOR PLANS -

NOTES:(REFERENCE 4/P1.1) - ELECTRICAL

NOTE E3

EQD-15

NOTE E3

EQD-13

NOTE E3

EQD-15

EXISTING 120 VOLT CIRCUIT. MAINTAIN TO SERVE NEW EQUIPMENT.E3.

CONDUCTOR IN ALL CONDUITS.

USE FLEXIBLE CONDUIT. PROVIDE GREEN EQUIPMENT GROUNDING

CONNECTIONS TO BE COORDINATED WITH EQUIPMENT PROVIDED AND

IN EXISTING MOTOR SWITCHES TO MATCH NEW LOADS. ALL

HP, 120V. PROVIDE NEW OVERLOAD HEATERS6

1 AND HWC-1 IS RATED

CIRCUITS SHOWN. WATER HEATERS DESIGN RATED 1HP, 7A, 120V

CONNECT NEW HEATERS AND NEW CIRC PUMP HWC-1 TO EXISTINGE2.

ACCESSIBLE.

NEW JUNCTION BOX AND RELOCATE SWITCHES SO THEY ARE

CIRC PUMP FROM EXISTING CIRCUITS. INTERCEPT CIRCUITS WITH

REMOVE CONNECTIONS TO EXISTING WATER HEATERS (2) AND HWC-1E1.

16 17

RELOCATE PUMP TO PROVIDE SERVICE ACCESS.

POWER TO THE DETECTOR.

THE CO SENSOR SHALL ALSO DISABLE THE BURNERS UPON LOSS OF

BURNERS WHEN THE MEASURED LEVEL OF CO RISES ABOVE 200 PPM.

ALARM AT 50 PPM AND BOILERS SHALL BE INTERLOCKED TO DISABLE

PROVIDE AND INSTALL A CARBON MONOXIDE SENSOR. SENSOR SHALL

ENERGIZED.

FIRED BOILERS. IF MISSING PROVIDE TO STOP ALL BOILERS WHEN

VERIFY IF SPACE HAS EMERGENCY STOP SWITCH AT EXIT FOR GAS

FOR ADDITIONAL PIPING, PIPE SIZES, VALVES TRIM ETC. SEE 1/P2.1.

EXTEND 1" HWR AND CONNECT TO THE CW PIPING AS SHOWN ON 1/P2.1.

SHOWN ON 1/P2.1.

EXTEND ƒ" HWR AND CONNECT TO THE EXISTING TEMPERING VALVE AS

CONNECT TO THE EXISTING 1" HWR.

CONNECT TO THE EXISTING 2•" CW AT VALVE.

ETC.

2•" (140) HW DOWN TO STORAGE TANKS. SEE 1/P2.1 FOR VALVES,

CONNECT TO THE EXISTING 2•" (140) HW.

THE CONNECTION.

2•" GAS DN TO HEATER. INSTALL VALVE, UNION AND DRIP LEG AT

REGULATOR.

CONNECT TO THE EXISTING GAS AT OUTLET OF THE PRESSURE

8" DOWN TO CONNECTION AT HEATER.

8" EXHAUST FLUE WITH BIRD SCREEN. SEE 2/P2.1 FOR SCHEMATIC.

SCHEMATIC.

8" AIR INTAKE TURN DOWN WITH BIRD SCREEN. SEE 2/P2.1 FOR

FOR INCREASED PIPE SIZE. OPENINGS SHALL BE CORE DRILLED.

MODIFY THE EXISTING OPENINGS IN CONCRETE WALL AS REQUIRED

8" AIR INTAKE OVERHEAD. COORDINATE WITH EXISTING CONDITIONS.

8" EXHAUST FLUE OVERHEAD. COORDINATE WITH EXISTING CONDITIONS.

WH-1 WH-2

INTAKES

FOR AIR

SEE PLANS

TANK

EXPANSION

RELOCATED

HWC-2

2•" 2•"

2•"

2•"

2•"

TANK

STORAGE

MIXING VALVE

EXISTING

AND PUT BACK IN SERVICE

AND TRIM. MODIFY PIPING

EXISTING MIXING VALVE

1"

2•"

2•" ƒ"

HEATER

FLUE FROM

TO HEATER

AIR INTAKE

FROM OPENING

DISTANCE MIN.

MAINTAIN 36" VERTICAL

SCREEN. MUST

DOWN WITH BIRD

8" ELBOW TURNED

OUT WITH BIRDSCREEN

8" ELBOW TURNED

PLATE

TERMINATION

8" ELBOW

HWC-1

HWC-3

1"

Sheet No.Date

Checked

Drawn

Job No.

Sheet Title

Revisions

No. Date Description By

19-APR-2022

E:\Effingham Co Jail Boiler - 22032.00\CADD\P2.1.dgn

CADD PLOT

19-APR-2022

09:49 mpeavler

1 INCH

c1 P a rk o f

C o m m e rc e D ri v e S u it e

S a v a n n a h

G e o rg ia

T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d

R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e

P H

O N

E -2

F

A X -2

C h a th a m E n g in e e ri n g C o m p a n y L L C

P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f

C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d

Stamp

1 INCH

L E

A S

N S T R

U C

T

IO

N

E F F

IN

G H

A M C

O U

N T

Y G

E O

R G

IA

D O

M E S

T

IC

B

O

IL

E R R

E P

L A

C E

M E

N T

E F F

IN

G H

A M C

O U

N T

Y J

A

IL

FIN. FLOOR

TEMP GAUGE

BALANCE VALVE

ROOF

CW CW

CW SUPPLY

CW

MANUFACTURERS INSTRUCTIONS.

VALVES & EQUIPMENT MUST BE INSTALLED PER

DRAWINGS FOR SCHEMATIC PURPOSES ONLY. ALL

AND LOCAL CODES

VENTING PER MANUFACTURERS RECOMMENDATIONS

NOTES:

AQUASTAT

1 WATER HEATER PIPING DETAIL

P2.1 SCALE: SCHEMATIC

NOTES:

ST-1 ST-2

VENT

VENT

REQUIRED OTHERWISE BY MANUFACTURER

AND TANK SHALL BE 2•" UNLESS

ALL LOOP PIPING BETWEEN HEATERS

1 1

2 SIDEWALL DIRECT VENTING

P2.1 SCALE: SCHEMATIC

HOLES IN THE WALL TO MATCH THE EXISTING.

REQUIREMENTS. THE CONTRACTOR SHALL PATCH ADDITIONAL

THE INSTALLATION, SHALL COMPLY TO THE MANUFACTURER'S

IF PROVIDED BY THE HEATER MANUFACTURER IS AN OPTION.

THE OPTION TO INSTALL A CONCENTRIC SIDEWALL VENT KIT,2.

FLUE SHALL COMPLY TO THE HEATER MANUFACTURERS REQUIREMENTS.

ALL WORK FOR THE INSTALLATION OF THE AIR INTAKE AND EXHAUST1.

36" MIN

P2.1

PLUMBING DETAILS

JPG

SMP

LOCATION.

LOCATE VALVE AND CONNECTION IN AN ACCESSIBLE

2-1/2" HE VALVED AND CAPPED FOR FUTURE CONNECTION.

LOCATION.

LOCATE VALVE AND CONNECTION IN AN ACCESSIBLE

1" HWR VALVED AND CAPPED FOR FUTURE CONNECTION.

VACUUM BREAKER

TEMPERATURE GUAGE (TYP)

UNION (TYP)

CHECK VALVE (TYP)

BALL VALVE (TYP)

T0_1
T0_1
References
bdr, CHATHAM 24X36.dgn
P0.1
P0.1
References
bdr, CHATHAM 24X36.dgn
P1.1
P1.1
References
BDR, CHATHAM 24X36.dgn
SCRBGND DEMO, floorplan.dgn, Model
SCRBGND PIPING, floorplan.dgn, Model
DEMO, P1.1.dgn
SCRBGND VENTING, floorplan.dgn, Model
SCRBGND ELECTRICAL, floorplan.dgn, Model
P2.1
P2.1
References
bdr, CHATHAM 24X36.dgn

Other files

File Type Posted
ITB for Jail Boiler —
Award Information —
Invitation and Instructions —
Addendum 1 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .