Jail Boiler Replacement - Technical Drawings Summary
This is a technical drawing package prepared by Chatham Engineering Company, LLC for the Effingham County Board of Commissioners in Georgia, documenting the domestic boiler replacement project at the Effingham County Jail located at 130 W. 1st Street Ext., Springfield, GA 31329. The project scope encompasses the replacement of two existing domestic water boilers with two new water heaters (WH-1 and WH-2), two storage tanks (ST-1 and ST-2 at 257 gallons each), circulation pumps (HWC-1, HWC-2, and HWC-3), and associated piping and trim. The work includes removal and disposal of existing equipment, installation of new Lochinvar AWH1500 water heaters with 1,500,000 BTU/HR input capacity and 98% thermal efficiency, installation of gas piping systems, hot water circulation systems rated at 1,750 RPM with 1/6 HP motors, thermal expansion tanks, and complete plumbing modifications. The drawings were released for construction on April 19, 2022, with a bid submission deadline of 11:00 a.m. Eastern Time on Wednesday, June 22, 2022. A mandatory pre-bid conference was scheduled for Wednesday, June 8, 2022 at 11:00 a.m. at the project site, with attendance required for proposal consideration.
The technical specifications detail requirements for Schedule 40 CPVC domestic water piping, natural gas piping with Schedule 40 black steel pipe and threaded malleable iron fittings, hydrostatic pressure testing at 100 PSIG, chlorine disinfection with a minimum 16-hour dwell time, fiberglass-jacketed pipe insulation meeting Georgia Energy Code standards, and compliance with the 2018 International Plumbing Code and International Fuel Gas Code with Georgia amendments. Water heaters must include full modulation capability down to 20% of rated input, ASME "HLW" certification, sidewall mounted venting with combustion air intake, remote communication capability with text/email alerts, electronic display controls, and a 5-year warranty on heat exchangers with 1-year parts warranty. The circulation pumps must be bronze body in-line centrifugal types rated for 125 PSI working pressure with mechanical seals and built-in thermal overload protection. Contractors are responsible for all labor, materials, equipment, permits, mobilization, cleanup, Georgia Boiler certification and inspection, insurance, bonds, and coordination with existing facility operations to minimize disruption.
Text of this file
EFFINGHAM COUNTY JAIL
DRAWING LIST:
T0.1
TITLE SHEET
JPG
JPG
P2.1 PLUMBING DETAILS
P1.1 FLOOR PLANS - PLUMBING AND ELECTRICAL
P0.1 SCHEDULES & SPECIFICATIONS PLUMBING
T0.1 TITLE SHEET
DOMESTIC BOILER REPLACEMENT
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
19-APR-2022
E:\Effingham Co Jail Boiler - 22032.00\CADD\T0_1.dgn
CADD PLOT
19-APR-2022
09:45 mpeavler
1 INCH
c1 P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
Stamp
1 INCH
22032.00
R E L E
A S
D
F O
C
N S T R
U C
T
IO
N
E F F
IN
G H
A M C
O U
N T
Y G
E O
R G
IA
D O
M E S
T
IC
B
O
IL
E R R
E P
L A
C E
M E
N T
E F F
IN
G H
A M C
O U
N T
Y J
A
IL
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
19-APR-2022
E:\Effingham Co Jail Boiler - 22032.00\CADD\P0.1.dgn
CADD PLOT
19-APR-2022
09:46 mpeavler
1 INCH
c1 P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
Stamp
1 INCH
L E
A S
N S T R
U C
T
IO
N
E F F
IN
G H
A M C
O U
N T
Y G
E O
R G
IA
D O
M E S
T
IC
B
O
IL
E R R
E P
L A
C E
M E
N T
E F F
IN
G H
A M C
O U
N T
Y J
A
IL
JPG
P0.1
JPG
PUMPS
PUMP NUMBER
SPEC. TYPE
SERVICE
LOCATION
CAPACITY, GPM
DISCHARGE HEAD, FT.
SUCTION PRESS., FT.
RPM
HP
CONTROLLER
ELECTRICAL
CHARACTERISTICS
REMARKS
SEE ELEC. DWGS. SEE ELEC. DWGS.
HWC-1
DOMESTIC WATER
SEE DWGS
HWC-2
DOMESTIC WATER
SEE DWGS
FLUID TEMP., °F.
CITY PRESSURE WATER
AQUASTAT/TIMER
WATER HEATERS - GAS
HEATER NUMBER
SPEC. TYPE
LOCATION
STORAGE, GALLONS
ENTERING WATER
TEMPERATURE, °F.
LEAVING WATER
TEMPERATURE, °F.
INPUT, BTU/HR.
GAS HEATING VALUE,
BTU/FT.
ELECTRICAL
CHARACTERISTICS
REMARKS
WH-1
SEE ELEC DWGS. SEE ELEC DWGS.
PLUMBING SPECIFICATIONS
CODES
A. THE PLUMBING INSTALLATION AND EQUIPMENT SHALL CONFORM TO THE FOLLOWING:
TESTING PIPE SYSTEMS
A. GENERAL, CONCEALED PIPING AND INSULATED PIPING SHALL BE TESTED IN PLACE
BEFORE CONCEALING OR COVERING. TEST SHALL BE CONDUCTED IN THE PRESENCE
OF THE ARCHITECT OR HIS DESIGNATED REPRESENTATIVE. PIPING LOCATED
UNDERGROUND SHALL BE TESTED BEFORE BACKFILLING. EQUIPMENT, MATERIALS
AND INSTRUMENTS FOR TESTING SHALL BE FURNISHED BY THE CONTRACTOR
WITHOUT ADDITIONAL COST TO THE OWNER.
B. PLUMBING SYSTEMS
FIXTURES, THE ENTIRE DOMESTIC COLD WATER, HOT WATER, AND HOT WATER
CIRCULATION PIPING SYSTEMS SHALL BE TESTED AT HYDROSTATIC PRESSURE
OF 100 PSIG AND PROVED TIGHT AT THIS PRESSURE FOR A PERIOD OF NOT
LESS THAN 2 HOURS IN ORDER TO PERMIT INSPECTION OF ALL JOINTS.
WHERE A PORTION OF THE WATER PIPING SYSTEM IS TO BE CONCEALED
BEFORE COMPLETION, THIS PORTION SHALL BE TESTED SEPARATELY IN A
MANNER DESCRIBED FOR THE ENTIRE SYSTEM.
DOMESTIC WATER SYSTEM
A. PROVIDE COMPLETE SYSTEMS OF COLD AND HOT WATER PIPING AND ACCESSORIES
SO THAT EVERY FIXTURE AND PIECE OF WATER USING EQUIPMENT IN THIS AREA
OF THE BUILDING WILL BE FURNISHED WITH A WATER SUPPLY.
C. PIPING FITTINGS AND JOINTS
1. PIPE AND FITTINGS SHALL BE AS LISTED HEREIN AND SHALL BE USED ON
THE SERVICES INDICATED.
D. DISINFECTION
1. ALL DOMESTIC WATER SERVICE AND SUPPLY PIPING INSTALLED UNDER THIS
DIVISION SHALL BE DISINFECTED WITH CHLORINE BEFORE IT IS PLACED
INTO OPERATION. THE CHLORINATING MATERIAL SHALL BE LIQUID
CHLORINE CONFORMING TO FEDERAL SPECIFICATION BB-C-120 AND SHALL BE
INTRODUCED TO THE SYSTEM BY EXPERIENCED OPERATORS ONLY. THE
CHLORINE SOLUTION APPLIED TO THE PIPING SECTIONS OR SYSTEM SHALL
CONTAIN AT LEAST FIFTY PARTS PER MILLION OF AVAILABLE CHLORINE AND
SHALL REMAIN IN THE SECTIONS OR SYSTEM FOR A PERIOD OF NOT LESS
THAN SIXTEEN (16) HOURS. DURING THE DISINFECTION PERIOD ALL
VALVES SHALL BE OPENED AND CLOSED AT LEAST FOUR TIMES. AFTER THE
DISINFECTION PERIOD THE CHLORINATED WATER SHALL BE FLUSHED FROM
THE SYSTEM WITH CLEAR WATER UNTIL THE RESIDUAL CHLORINE CONTENT IS
NOT GREATER THAN TWO-TENTHS - (0.2) - PARTS PER MILLION. THE
CONTRACTOR SHALL SUBMIT TO THE ARCHITECT CERTIFICATION THAT THE
SYSTEM WAS DISINFECTED.
INSULATION
1. INSULATION SHALL BE FIBERGLASS JACKETED PIPE INSULATION.
2. INSTALLATION SHALL COMPLY TO THE MANUFACTURERS REQUIREMENTS.
3. INSTALLATION THICKNESS SHALL COMPLY TO THE GEORGIA ENERGY CODE.
HANGERS
A. HANGERS SHALL BE CLEVIS TYPE HANGERS. HANGERS SHALL BE COATED
AS REQUIRED FOR PIPING SYSTEMS AS INSTALLATION.
B. HANGER SPACING SHALL COMPLY TO THE INTERNATIONAL PLUMBING CODE
CONNECT, AS SHOWN ON THE DRAWINGS.
B. EXTEND THE DOMESTIC COLD AND HOT WATER AND FILTERED WATER PIPING AND
1. WATER PIPING. UPON COMPLETION OF THE ROUGH-IN AND BEFORE SETTING
WATER HEATER
B. THE HEATER SHALL BE CONSTRUCTED OF A STEEL JACKET ASSEMBLY, PRIMED AND
PAINTED. THE COMBUSTION CHAMBER SHALL BE SEALED AND COMPLETELY ENCLOSED.
A BURNER/FLAME OBSERVATION PORT SHALL BE PROVIDED. THE BURNER SHALL BE
STAINLESS STEEL. THE HEATER SHALL BE SUPPLIED WITH A GAS VALVE DESIGNED
C. THE HEAT SHALL UTILIZE A 24 VOLT CONTROL CIRCUIT. THE CONTROL SYSTEM SHALL
HAVE AN ELECTRONIC DISPLAY FOR SETUP, STATUS AND DIAGNOSTICS. THE HEATER
WITH NEGATIVE PRESSURE REGULATION AND SUPPLED WITH A VARIBLE SPEED BLOWER.
SHALL HAVE THE MANUFACTURER'S STANDARD CONTROLS AND INTERFACE FOR THE
SYSTEM. VENTING MATERIAL SHALL BE AS APPROVED BY THE HEATER MANUFACTURER.
H. THE HEATER SHALL BE APPROVED FOR 180°F OPERATION.
I. THE HEATERS SHALL HAVE A 5 YEAR WARRANTY ON THE HEAT EXCHANGERS
AND 1 YEAR PARTS WARRANTY. SEE DRAWINGS FOR HEATER SIZING.
AT START UP.
K. THE HEATER SHALL HAVE MANUFACTURER'S START UP AND 8 HOURS OWNER TRAINING
A. DOMESTIC HOT WATER CIRCULATION PUMP SHALL BE THE IN-LINE CENTRIFUGAL TYPE
DESIGNED FOR 125 PSI (860 KPA) WORKING PRESSURE WITH BRONZE BODY AND IMPELLER,
MECHANICAL SEALS AND STAINLESS STEEL IMPELLER SHAFT. THE PUMP MOTOR SHALL BE
THE OPEN DRIP-PROOF DESIGN WITH SLEEVE BEARINGS, BUILT-IN THERMAL OVER-LOAD
PROTECTORS, AND SHALL OPERATE AT 1750 RPM. PUMP SHALL HAVE THE CAPACITIES AS
SHOWN ON THE DRAWINGS. PUMPS SHALL BE:
BOOSTER SERIES BELL & GOSSETT
CIRCULATION SERIES TACO
CIRCULATOR SERIES THRUSH
CP
PP
CP
PP PUMP PRESSURE WATER
WH-2
SEE DWGS SEE DWGS
RECOVERY 1
1/6
SEE ELEC. DWGS.
DOMESTIC WATER
SEE DWGS
HWC-3
PLUMBING
SPECIFICATIONS
SCHEDULES &
1. INTERNATIONAL PLUMBING CODE, 2018 EDITION WITH GEORGIA AMENDMENTS.
2. INTERNATIONAL FUEL GAS CODE, 2018 EDITION WITH GEORGIA AMENDMENTS.
GG GAS PIPING
WH WATER HEATER
ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION
ABOVE CEILING
VENT - SANITARY
DOMESTIC COLD WATER
BELOW FLOOR
DOMESTIC HOT WATER RETURN
GATE VALVE
BALL VALVE
CHECK VALVE
WATER HAMMER ARRESTOR 'SIZE'
CLEANOUT
FLOOR CLEANOUT
SOIL OR WASTE STACK DESIGNATION
STACK NUMBER
W, S, D
V
CW
HW
HWR
GV
BV
CV
WHA
CO
FCO
FD
A/C
B/F
SANITARY WASTE, SOIL & DRAIN S
FLOOR DRAIN 'TYPE'
S
LEGEND & ABBREVIATIONS
CONNECT(ION) CONN
CONTINUATION CONT
DOWN DN
DRAWINGS DWGS
ELECTRICAL ELEC
EXISTING EXIST
HEATING, VENTILATION & AIR CONDITIONING HVAC
HOSE BIBB HB
SANITARY SAN
SOIL S
TYPICAL
VENT THRU ROOF
WASTE
VTR
W
TYP
CA
HW
CA
140 ETR
CTE
EXISTING TO REMAIN
CONNECT TO EXISTING
COMPRESSED AIR
DOMESTIC HOT WATER (140)
SOFT SOFT WATER
DOMESTIC HOT WATER (110)
HWC HOT WATER CIRC PUMP
TV TEMPERATURE MIXING VALVE
GENERAL NOTES:
COORDINATE ALL WORK WITH OTHER TRADES.3.
UNLESS NOTED OTHERWISE.
HOSE BIBBS SHALL BE MOUNTED 1'-6" ABOVE FINISHED FLOOR,2.
IN FIELD BEFORE BEGINNING WORK.
ONLY. VERIFY EXACT LOCATION AND INVERT ELEVATION
ALL UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS1.
(PLUMBING)
2. DOMESTIC WATER PIPING SHALL BE SCHEDULE 40 CPVC PIPE WITH SOLVENT
GLUED JOINTS TO MATCH THE EXISTING.
A. THE HEATER SHALL BE A FULL MODULATION FIRING DOWN TO 20% OF THE RATED
INPUT WITH A TURN DOWN RATION OF 5:1. THE HEATER SHALL HAVE THE ASME
"HLW" STAMP AND BE LISTED. THE STAINLESS STEEL COMBINATION SHALL DRAIN
CONDENSATE TO THE BOTTOM OF THE HEAT EXCHANGER ASSEMBLY. THE HEATER SHALL
90.1 STANDARD FOR EFFICIENCY AND BE 98% THERMAL EFFICIENCY.
BE ANSI Z21.10.3 CERTIFIED. THE HEATER SHALL COMPLY WITH THE LATEST ASHRAE
CONTROLS ON SITE.
OPERATION OF MULTIPLE HEATERS. CONTROLS SHALL INTERFACE WITH THE EXISTING
D. THE WATER HEATER SHALL HAVE A SIDEWALL MOUNTED VENT AND COMBUSTION AIR INTAKE
E. THE WATER HEATER SHALL BE CAPABLE OF REMOTE COMMUNICATION AND CAPABLE OF
SENDING TEXT MESSAGE OR EMAIL ALERTS.
F. MODULATION LOGIC SHALL BE PROVIDED AND CAPABLE OF ROTATION OF THE HEATER.
G. THE WATER HEATER SHALL HAVE 2 TERMINAL STRIPS FOR ELECTICAL CONNECTION.
A LOW VOLTAGE CONNECTION BOARD FOR SAFETY AND OPERATION CONTROLS.
J. THE HEATER SHALL BE SUPPLIED WITH THE MANUFACTURER'S CICULATING PUMP.
SEE SCHEDULE FOR FLOW, HEAD AND HORSEPOWER. THE PUMP SHALL BE WIRED TO RUN
WITH INTERMITTENT PUMP CONTROL.
L. THE WATER HEATERS SHALL BE LOCHINVAR AWH1500 OR A PRIOR APPROVED EQUAL.
M. THE HEATER SHALL BE SUPPLIED WITH A CONDENSATE NEUTRALIZATION KIT.
STORAGE TANK
A. STORAGE TANK SHALL BE A VERTICAL TANK HAVING A STORAGE CAPACITY OF 257
GALLONS. THE TANK SHALL BE CONSTRUCTED WITH AN INNER CHAMBER DESIGNED TO
RECEIVE ALL CIRCULATION TO AND FROM THE WATER HEATER TO ELIMINATE TURBULENCE
IN THE TANK. THE BAFFLED TANK SHALL SUPPLY 80% OF TANK CAPACITY WITHOUT A
DROP IN OUTLET TEMPERATURE.
B. THE STORAGE TANK SHALL BE CONSTRUCTED IN ACCORDANCE WITH (STANDARD/ASME)
REQUIREMENTS, IF SAME, STAMPED AND REGISTERED WITH THE NATIONAL BOARD OF
BOILER AND PRESSURE VESSEL INSPECTORS. THE STORAGE TANK SHALL HAVE A WORKING
PRESSURE OF (125/150) PSI. THE STORAGE TANK SHALL BE GLASS LINED AND FIRED
TO 1600°F TO ENSURE A MOLECULAR FUSING OF GLASS AND STEEL, AND CARRY A
FIVE (5) YEAR LIMITED WARRANTY. THE LOCK-TEMP TANK SHALL BE CONSTRUCTED WITH
A HEAVY GAUGE GALVANIZED STEEL JACKET ASSEMBLY, PRIMED AND PRE-PAINTED ON
BOTH SIDES. THE JACKET AND TANK BASE SHALL BE A WATER TIGHT CONSTRUCTION WITH
A BUILT-IN DRAIN PAN, COMPLETE WITH A ƒ" DRAIN CONNECTION TO ASSIST IN
PROTECTING AGAINST DAMAGE IN THE EVENT OF A TANK OR COMPONENT LEAKAGE.
THE STORAGE TANK SHALL BE COMPLETELY ENCASED IN HIGH DENSITY INSULATION OF
SUFFICIENT THICKNESS TO MEET THE ENERGY EFFICIENCY REQUIREMENTS OF THE LATEST
EDITION OF THE ASHRAE 90.1 STANDARD. THE STORAGE TANK SHALL BE LOCHINVAR RGA0257
OR PRIOR APPROVED EQUAL.
CIRCULATION PUMPS (HWC-1)
NATURAL GAS PIPING
A. PROVIDE A COMPLETE SYSTEM OF NATURAL GAS PIPING AS SHOWN ON THE DRAWINGS.
B. ABOVE GROUND NATURAL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE
ASTM120 WITH 150lb THREADED MALLEABLE IRON FITTINGS ASTM A47.
C. INSTALLATION
1. HORIZONTAL PIPING SHALL BE SLOPED „" PER FOOT TOWARD THE VALVED DRIP LEGS.
2. TAKEOFFS FOR EQUIPMENT SHALL BE FROM THE TOP OF THE MAIN.TAKEOFFS TO DRIP
LEGS SHALL BE FROM THE BOTTOM OF THE MAIN.
3. PIPING SHALL BE TESTED AT 200 PSI FOR 1HR. ALL LEAKS SHALL BE REPAIRED.
D. ALL WORK SHALL COMPLY TO CODES.
INSULATION
B. THICKNESS SHALL COMPLY TO THE INTERNATIONAL ENERGY CODE REQUIREMENTS.
MATCH EXISTING.
A. ALL WATER PIPING SHALL BE INSULATED WITH FIBERGLASS JACKETED. INSULATION TO
STORAGE, GALLONS
ST-2
STORAGE TANK
TANK NUMBER
LOCATION
HEIGHT (INCHES)
DIAMETER (INCHES)
ST-1
SEE DWGS
SEE DWGS
WATER HEATER IS SUPPLIED WITH A REMOTE TANK.
GALLONS PER HOUR AT 100° RISE.1
2 2
1,782 1,782
1,500,000 1,500,000
15 115
ONE PUMP IS AT EACH BOILER.
PUMP IS SUPPLIED WITH THE WATER HEATER/BOILER.
1 1
CELL
CELL
A106
CELL
A105
CELL
A104
CELL
CELL
A106
CELL
A105
CELL
A104
CELL
CELL
A106
CELL
A105
CELL
A104
CELL
CELL
A106
CELL
A105
CELL
A104
WATER BOOSTER PUMP
EXISTING DOMESTIC
MIXING VALVE TO REMAIN
EXISTING TEMPERATURE
TYPICAL
EXISTING PIPING
TO REMAIN
REGULATOR
GAS PRESSURE
EXISTING
TYPICAL
EXISTING PIPES
EXPANSION TANK
RELOCATED THERMAL
TYPICAL
EXISTING PIPING
ƒ"
ST-1
HWC-1
1"
2•"
HWC-2
2•"
2•
EXPANSION TANK
RELOCATED THERMAL
3"
HWC-3 2•"
ST-2
PAD
KEEPING
HOUSE
EXISTING
HEATERS
NEW WATER
NOTES E1 & E2
NOTE E1
NOTE E2
EQD-13
120 VOLT CIRCUIT
CONNECT TO EXISTING
NEW CO MONITOR.
KEEPING PAD
EXISTING HOUSE
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
19-APR-2022
E:\Effingham Co Jail Boiler - 22032.00\CADD\P1.1.dgn
CADD PLOT
19-APR-2022
09:48 mpeavler
1 INCH
c1 P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
Stamp
1 INCH
L E
A S
N S T R
U C
T
IO
N
E F F
IN
G H
A M C
O U
N T
Y G
E O
R G
IA
D O
M E S
T
IC
B
O
IL
E R R
E P
L A
C E
M E
N T
E F F
IN
G H
A M C
O U
N T
Y J
A
IL
G
G
G
G
G
G
NOTES:
D1
D2
D3
D4
D5
(REFERENCE 1/P1.1)
TO PREVENT ANY PROLONGED SHUTDOWNS.
SHALL BE COORDINATED WITH THE OWNER
ALL WORK AND WORK SCHEDULES
SCALE: 1 / 4 " = 1' - 0"P1.1
FLOOR PLAN - PLUMBING DEMOLITION
HEATER AND DISPOSED OF.
FLUES AND 6" AIR INTAKES TO BE REMOVED TO WATEREXISTING 6"
EXISTING FLOOR DRAINS TO REMAIN.
REQUIRED FOR NEW PIPING. SEE WATER HEATER DETAIL.
EXISTING THERMAL MIXING VALVE TO REMAIN. MODIFY PIPING AS
REPLACEMENT.
EXISTING PUMP TO BE REMOVED AND DISPOSED OF. SEE NEW WORK FOR
THE EXISTING THERMAL EXPANSION TANK SHALL BE RELOCATED.
EXISTING WATER HEATER AND TRIM TO BE REMOVED AND DISPOSED OF.
POINTS OF RECONENCTION.
REMOVED AND PROPERLY DISPOSED OF. COORDINATE WITH NEW WORK
EXISTING CW, HW (140) HW, HWR AND GAS PIPING SHOWN HATCHED
D6
D6
D4
D3
D1
D2
D1
D5
D1
D2
NOTES:(REFERENCE 2/P1.1 & 3/P1.1)
SCALE: 1 / 4 " = 1' - 0"P1.1
FLOOR PLAN - PLUMBING VENTING
SCALE: 1 / 4 " = 1' - 0"P1.1
FLOOR PLAN - PLUMBING PIPING 4
SCALE: 1 / 4 " = 1' - 0"P1.1
FLOOR PLAN - ELECTRICAL
TO PREVENT ANY PROLONGED SHUTDOWNS.
SHALL BE COORDINATED WITH THE OWNER
ALL WORK AND WORK SCHEDULES
ST-1
ST-2
WH-1
WH-2
TO PREVENT ANY PROLONGED SHUTDOWNS.
SHALL BE COORDINATED WITH THE OWNER
ALL WORK AND WORK SCHEDULES
WH-1
WH-2
JPG
SMP
P1.1
ELECTRICAL
PLUMBING AND
FLOOR PLANS -
NOTES:(REFERENCE 4/P1.1) - ELECTRICAL
NOTE E3
EQD-15
NOTE E3
EQD-13
NOTE E3
EQD-15
EXISTING 120 VOLT CIRCUIT. MAINTAIN TO SERVE NEW EQUIPMENT.E3.
CONDUCTOR IN ALL CONDUITS.
USE FLEXIBLE CONDUIT. PROVIDE GREEN EQUIPMENT GROUNDING
CONNECTIONS TO BE COORDINATED WITH EQUIPMENT PROVIDED AND
IN EXISTING MOTOR SWITCHES TO MATCH NEW LOADS. ALL
HP, 120V. PROVIDE NEW OVERLOAD HEATERS6
1 AND HWC-1 IS RATED
CIRCUITS SHOWN. WATER HEATERS DESIGN RATED 1HP, 7A, 120V
CONNECT NEW HEATERS AND NEW CIRC PUMP HWC-1 TO EXISTINGE2.
ACCESSIBLE.
NEW JUNCTION BOX AND RELOCATE SWITCHES SO THEY ARE
CIRC PUMP FROM EXISTING CIRCUITS. INTERCEPT CIRCUITS WITH
REMOVE CONNECTIONS TO EXISTING WATER HEATERS (2) AND HWC-1E1.
16 17
RELOCATE PUMP TO PROVIDE SERVICE ACCESS.
POWER TO THE DETECTOR.
THE CO SENSOR SHALL ALSO DISABLE THE BURNERS UPON LOSS OF
BURNERS WHEN THE MEASURED LEVEL OF CO RISES ABOVE 200 PPM.
ALARM AT 50 PPM AND BOILERS SHALL BE INTERLOCKED TO DISABLE
PROVIDE AND INSTALL A CARBON MONOXIDE SENSOR. SENSOR SHALL
ENERGIZED.
FIRED BOILERS. IF MISSING PROVIDE TO STOP ALL BOILERS WHEN
VERIFY IF SPACE HAS EMERGENCY STOP SWITCH AT EXIT FOR GAS
FOR ADDITIONAL PIPING, PIPE SIZES, VALVES TRIM ETC. SEE 1/P2.1.
EXTEND 1" HWR AND CONNECT TO THE CW PIPING AS SHOWN ON 1/P2.1.
SHOWN ON 1/P2.1.
EXTEND ƒ" HWR AND CONNECT TO THE EXISTING TEMPERING VALVE AS
CONNECT TO THE EXISTING 1" HWR.
CONNECT TO THE EXISTING 2•" CW AT VALVE.
ETC.
2•" (140) HW DOWN TO STORAGE TANKS. SEE 1/P2.1 FOR VALVES,
CONNECT TO THE EXISTING 2•" (140) HW.
THE CONNECTION.
2•" GAS DN TO HEATER. INSTALL VALVE, UNION AND DRIP LEG AT
REGULATOR.
CONNECT TO THE EXISTING GAS AT OUTLET OF THE PRESSURE
8" DOWN TO CONNECTION AT HEATER.
8" EXHAUST FLUE WITH BIRD SCREEN. SEE 2/P2.1 FOR SCHEMATIC.
SCHEMATIC.
8" AIR INTAKE TURN DOWN WITH BIRD SCREEN. SEE 2/P2.1 FOR
FOR INCREASED PIPE SIZE. OPENINGS SHALL BE CORE DRILLED.
MODIFY THE EXISTING OPENINGS IN CONCRETE WALL AS REQUIRED
8" AIR INTAKE OVERHEAD. COORDINATE WITH EXISTING CONDITIONS.
8" EXHAUST FLUE OVERHEAD. COORDINATE WITH EXISTING CONDITIONS.
WH-1 WH-2
INTAKES
FOR AIR
SEE PLANS
TANK
EXPANSION
RELOCATED
HWC-2
2•" 2•"
2•"
2•"
2•"
TANK
STORAGE
MIXING VALVE
EXISTING
AND PUT BACK IN SERVICE
AND TRIM. MODIFY PIPING
EXISTING MIXING VALVE
1"
2•"
2•" ƒ"
HEATER
FLUE FROM
TO HEATER
AIR INTAKE
FROM OPENING
DISTANCE MIN.
MAINTAIN 36" VERTICAL
SCREEN. MUST
DOWN WITH BIRD
8" ELBOW TURNED
OUT WITH BIRDSCREEN
8" ELBOW TURNED
PLATE
TERMINATION
8" ELBOW
HWC-1
HWC-3
1"
Sheet No.Date
Checked
Drawn
Job No.
Sheet Title
Revisions
No. Date Description By
19-APR-2022
E:\Effingham Co Jail Boiler - 22032.00\CADD\P2.1.dgn
CADD PLOT
19-APR-2022
09:49 mpeavler
1 INCH
c1 P a rk o f
C o m m e rc e D ri v e S u it e
S a v a n n a h
G e o rg ia
T h is d ra w in g a n d a ll p ri n ts o f it a re t h e p ro p e rt y o f fo r w h ic h t h e y w e re i s s u e d
R e p ro d u c ti o n s o f th is d ra w in g w it h o u t th e
P H
O N
E -2
F
A X -2
C h a th a m E n g in e e ri n g C o m p a n y L L C
P ri n ts a re t o b e r e tu rn e d t o C h a th a m E n g in e e ri n g C o m p a n y L L C u p o n c o m p le ti o n o f u s e w ri tt e n c o n s e n t o f
C h a th a m E n g in e e ri n g C o m p a n y L L C i s n o t p e rm it te d
Stamp
1 INCH
L E
A S
N S T R
U C
T
IO
N
E F F
IN
G H
A M C
O U
N T
Y G
E O
R G
IA
D O
M E S
T
IC
B
O
IL
E R R
E P
L A
C E
M E
N T
E F F
IN
G H
A M C
O U
N T
Y J
A
IL
FIN. FLOOR
TEMP GAUGE
BALANCE VALVE
ROOF
CW CW
CW SUPPLY
CW
MANUFACTURERS INSTRUCTIONS.
VALVES & EQUIPMENT MUST BE INSTALLED PER
DRAWINGS FOR SCHEMATIC PURPOSES ONLY. ALL
AND LOCAL CODES
VENTING PER MANUFACTURERS RECOMMENDATIONS
NOTES:
AQUASTAT
1 WATER HEATER PIPING DETAIL
P2.1 SCALE: SCHEMATIC
NOTES:
ST-1 ST-2
VENT
VENT
REQUIRED OTHERWISE BY MANUFACTURER
AND TANK SHALL BE 2•" UNLESS
ALL LOOP PIPING BETWEEN HEATERS
1 1
2 SIDEWALL DIRECT VENTING
P2.1 SCALE: SCHEMATIC
HOLES IN THE WALL TO MATCH THE EXISTING.
REQUIREMENTS. THE CONTRACTOR SHALL PATCH ADDITIONAL
THE INSTALLATION, SHALL COMPLY TO THE MANUFACTURER'S
IF PROVIDED BY THE HEATER MANUFACTURER IS AN OPTION.
THE OPTION TO INSTALL A CONCENTRIC SIDEWALL VENT KIT,2.
FLUE SHALL COMPLY TO THE HEATER MANUFACTURERS REQUIREMENTS.
ALL WORK FOR THE INSTALLATION OF THE AIR INTAKE AND EXHAUST1.
36" MIN
P2.1
PLUMBING DETAILS
JPG
SMP
LOCATION.
LOCATE VALVE AND CONNECTION IN AN ACCESSIBLE
2-1/2" HE VALVED AND CAPPED FOR FUTURE CONNECTION.
LOCATION.
LOCATE VALVE AND CONNECTION IN AN ACCESSIBLE
1" HWR VALVED AND CAPPED FOR FUTURE CONNECTION.
VACUUM BREAKER
TEMPERATURE GUAGE (TYP)
UNION (TYP)
CHECK VALVE (TYP)
BALL VALVE (TYP)
| T0_1 |
| T0_1 |
| References |
| bdr, CHATHAM 24X36.dgn |
| P0.1 |
| P0.1 |
| References |
| bdr, CHATHAM 24X36.dgn |
| P1.1 |
| P1.1 |
| References |
| BDR, CHATHAM 24X36.dgn |
| SCRBGND DEMO, floorplan.dgn, Model |
| SCRBGND PIPING, floorplan.dgn, Model |
| DEMO, P1.1.dgn |
| SCRBGND VENTING, floorplan.dgn, Model |
| SCRBGND ELECTRICAL, floorplan.dgn, Model |
| P2.1 |
| P2.1 |
| References |
| bdr, CHATHAM 24X36.dgn |
Other files
| File | Type | Posted |
|---|---|---|
| ITB for Jail Boiler | — | |
| Award Information | — | |
| Invitation and Instructions | — | |
| Addendum 1 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .