Jackson Co EMS Station _2_100_ CDS_Complete S.pdf
PDF 38 MB Posted
- Solicitation number
- PE-67800-NONST-2025-000000033
- Issued by
- Jefferson County, Georgia
About this file
This document constitutes the 100% construction documentation for Jackson County EMS Station #2, a state and local construction project located at 519 Panther Drive, Jefferson, Georgia 30549. The project involves comprehensive design and construction specifications prepared by Goodwyn Mills Cawood, LLC (architecture, interiors, and civil engineering), PES Structural (structural engineering), and Delta Engineering (mechanical, plumbing, electrical, and fire protection engineering). The facility consists of a two-level EMS station with a total gross square footage of approximately 14,437 square feet across Level 1 (9,299 SF) and Level 2 (5,138 SF), designed to accommodate residential quarters, administrative offices, training facilities, and operational spaces. The project is classified as Type IIB construction with a seismic design category of C, featuring non-combustible construction techniques, composite steel floor systems, and comprehensive fire-rated partition assemblies. Construction documentation includes detailed floor plans, reflected ceiling plans, roof plans, exterior elevations, building sections, wall sections, and specifications for all building systems including HVAC, plumbing, electrical, fire protection, and landscape improvements. The site encompasses 3.005 acres with provisions for stormwater management, erosion control, utility infrastructure, and landscape plantings including 3 Kousa dogwood trees, 55 shrubs, and 1,616 square feet of Bermuda grass.
The project specifications and construction documents establish strict compliance requirements with the 2018 International Building Code, applicable Georgia amendments, NFPA standards, and local jurisdictional requirements for Jefferson, Georgia. Construction documents establish maximum allowable building area of 48,000 square feet with the actual project utilizing approximately 30% of this allowance, with design dead loads, live loads, and roof loads specified per code standards. The facility design includes 128 total occupants across both levels with specific occupancy classifications including residential (R-2), business (B), assembly (A), and storage (S) uses. Fire protection systems include a wet pipe automatic sprinkler system designed per NFPA 13 standards with static water pressure of 86 PSI and measured flow capacity of 1,300 GPM available from municipal water service. Mechanical systems incorporate ductless split heat pump units, gas-fired equipment heaters, and condensate management systems throughout the facility. All construction materials, methods, and equipment selections are subject to architect approval through detailed submittal processes, with contractor responsibility for multi-trade coordination, temporary bracing, erosion control compliance, and complete project closeout documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00 5200 A101_2017 sample.pdf | ||
| Jackson County EMS Station _2_Specifications .pdf | ||
| Addendum 1 _ 11_6_2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B ro a d S tr e e t, S u it e
T
.3
.3
G M
C N
E T
W O
R K
C
O M
A u g u st a
, G A
G o o d w y n M il ls
C a w o o d
, L L
C
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D R
A W
N B
Y
IS
S
U E
C H
E C
K E
D B
Y
D A
T E
G M
C
/3
1/
:5
:5
P M
T
IT
L E
S H
E E
T
P A
N T
H E
R D
R , J
E F
F E
R S
O N
, G A
T E
M P
L A
T E
V E
R S
IO
N
.1
N O
T F
O R
C O
N
ST
RU
C
T
IO
N
T
K P
W J
P
1/
C O
N S
T R
U C
T
IO
N
D O
C U
M E
N T
A T
IO
N
J A
C K
S O
N C
O U
N T
Y E
M S
S T
A T
IO
N
A
A U
G
519 PANTHER DR, JEFFERSON, GA 30549 100% CONSTRUCTION
DOCUMENTATION
GOODWYN MILLS CAWOOD, LLC ARCHITECTURE, INTERIORS, & CIVIL ENGINEERING
STRUCTURAL ENGINEERING
MECHANICAL, PLUMBING, ELECTRICAL & FIRE PROTECTION ENGINEERING
PES STRUCTURAL
DELTA ENGINEERING
JACKSON COUNTY EMS STATION #2
B ro a d S tr e e t, S u it e
.3
.3
G M
C N
E T
W O
R K
C
O M
A u g u st a
, G A
G o o d w y n M il ls
C a w o o d
, L L
C
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D R
A W
N B
Y
IS
S
U E
C H
E C
K E
D B
Y
D A
T E
G M
C
/3
1/
:5
:5
P M
D R
A W
IN
G
I N
D E
X
P A
N T
H E
R D
R , J
E F
F E
R S
O N
, G A
T E
M P
L A
T E
V E
R S
IO
N
.1
N O
T F
O R
C O
N
ST
RU
C
T
IO
N
G 1.
K P
W J
P
/3
1/
C O
N S
T R
U C
T
IO
N
D O
C U
M E
N T
A T
IO
N
J A
C K
S O
N C
O U
N T
Y E
M S
S T
A T
IO
N
A
A U
G
DRAWING INDEX
DWG.
NO. DRAWING NAME ORIG. DATE
0.0 GENERAL
T1 TITLE SHEET 10/31/25
G1.01 DRAWING INDEX 10/31/25
G1.02 GENERAL NOTES 10/31/25
G1.03 GENERAL INFORMATION 10/31/25
G1.11 ACCESSIBILITY DATA 10/31/25
G1.12 ACCESSIBLE PLUMBING LAYOUTS 10/31/25
G1.21 PARTITION TYPES 10/31/25
G1.22 PARTITION DETAILS 10/31/25
G2.00 LIFE SAFETY - CODE ANALYSIS 10/31/25
G2.01 LIFE SAFETY PLAN - LEVEL 1 + LEVEL 2 10/31/25
1.0 CIVIL
C-001 SITE NOTES 10/31/25
C-002 SURVEY 10/31/25
C-003 EXISTING CONDITION & DEMO PLAN 10/31/25
C-101 SITE PLAN 10/31/25
C-201 GRADING & DRAINAGE PLAN 10/31/25
C-202 STORMWATER PROFILES 10/31/25
C-203 PRE_DRAINAGE 10/31/25
C-204 POST_DRAINAGE 10/31/25
C-301 UTILITY PLAN 10/31/25
C-302 UTILITY PLAN -PROFILE 10/31/25
C-303 SANITARY EASEMENT 10/31/25
C-601 INITIAL EROSION CONTROL PLAN 10/31/25
C-602 INTERMEDIATE EROSION CONTROL PLAN 10/31/25
C-603 FINAL EROSION CONTROL PLAN 10/31/25
C-604 EROSION CONTROL NOTES 10/31/25
C-605 EROSION CONTROL DETAILS 10/31/25
C-606 EROSION CONTROL VEGETATION NOTES & DETAILS 10/31/25
C-607 STORM WATER POLLUTION PREVENTION PLAN 10/31/25
C-901 SEWER DETAILS 10/31/25
C-902 WATER DETAILS 10/31/25
C-903 STORM DETAILS 10/31/25
C-904 CONSTRUCTION DETAILS 10/31/25
2.0 LANDSCAPE
L0.01 LANDSCAPE NOTES 10/31/25
L1.01 LANDSCAPE PLAN 10/31/25
L2.01 LANDSCAPE DETAILS 10/31/25
3.0 STRUCTURAL
S0.01 GENERAL NOTES & SCHEDULES 10/31/25
S0.02 DESIGN CRITERIA 10/31/25
S0.03 CONCRETE GENERAL NOTES & SCHEDULES 10/31/25
S0.04 CONCRETE MASONRY GENERAL NOTES & SCHEDULES 10/31/25
S0.05 STEEL GENERAL NOTES & SCHEDULES 10/31/25
S1.01 FOUNDATION PLAN 10/31/25
S1.02 LEVEL 2 FRAMING PLAN 10/31/25
S1.03 ROOF FRAMING PLAN 10/31/25
S2.10 WALL ELEVATIONS 10/31/25
S3.01 FOUNDATION DETAILS 10/31/25
S3.02 FOUNDATION DETAILS 10/31/25
S3.03 FOUNDATION DETAILS 10/31/25
S4.01 MASONRY DETAILS 10/31/25
S5.01 STEEL FLOOR FRAMING DETAILS 10/31/25
S5.02 STEEL FLOOR FRAMING DETAILS 10/31/25
S5.11 STEEL ROOF FRAMING DETAILS 10/31/25
S5.12 STEEL ROOF FRAMING DETAILS 10/31/25
S5.13 STEEL ROOF FRAMING DETAILS 10/31/25
4.0 ARCHITECTURE
A1.01 FLOOR PLAN - LEVEL 1 & LEVEL 2 10/31/25
A1.21 PLAN DETAILS 10/31/25
A1.22 PLAN DETAILS 10/31/25
A2.01 REFLECTED CEILING PLAN 10/31/25
A3.01 ROOF PLAN 10/31/25
A4.01 EXTERIOR ELEVATIONS 10/31/25
A5.01 BUILDING SECTIONS 10/31/25
A5.11 WALL SECTIONS 10/31/25
A5.12 WALL SECTIONS 10/31/25
A5.13 WALL SECTIONS 10/31/25
A5.14 SECTION DETAILS 10/31/25
A5.15 SECTION DETAILS 10/31/25
A5.16 SECTION DETAILS 10/31/25
A5.21 SECTION & EXT DOOR/WINDOW DETAILS 10/31/25
A5.31 VERTICAL CIRCULATION 10/31/25
A5.32 VERTICAL CIRCULATION 10/31/25
A5.41 RAILING SCHEDULE & DETAILS 10/31/25
A6.01 DOOR SCHEDULE, LEGEND, & NOTES 10/31/25
A6.11 GLAZING & LOUVER SCHEDULES 10/31/25
A7.01 ENLARGED PLANS & INTERIOR ELEVATIONS 10/31/25
A7.02 ENLARGED PLANS & INTERIOR ELEVATIONS 10/31/25
A7.03 ENLARGED PLANS & DETAILS 10/31/25
A8.01 FINISH LEGEND & SCHEDULE 10/31/25
A8.02 FINISH PLAN 10/31/25
A9.01 SIGNAGE PLAN 10/31/25
DRAWING INDEX
DWG.
NO. DRAWING NAME ORIG. DATE
5.0 MECHANICAL
M101 HVAC PLAN - LEVEL 1 10/31/25
M102 HVAC PLAN - LEVEL 2 10/31/25
M103 HVAC NOTES, LEGEND, & SCHEDULES 10/31/25
M104 HVAC DETAILS 10/31/25
M105 HVAC DETAILS 10/31/25
6.0 PLUMBING
P101 WASTE & VENT PIPING PLANS 10/31/25
P201 UTILITY PIPING PLANS 10/31/25
P301 PLUMBING DETAILS 10/31/25
P302 PLUMBING SCHEDULES, NOTES, & LEGEND 10/31/25
6.5 FIRE PROTECTION
FP101 FIRE PROTECTION PLANS 10/31/25
7.0 ELECTRICAL
E101 ELECTRICAL LIGHTING PLANS 10/31/25
E201 ELECTRICAL POWER PLANS 10/31/25
E202 ELECTRICAL LOW VOLTAGE PLANS 10/31/25
E301 ELECTRICAL PANEL SCHEDULES 10/31/25
E302 ELECTRICAL NOTES & DETAILS 10/31/25
1.01. COMPLETE CONTRACT DOCUMENTS: COMPLETE DRAWINGS, SPECIFICATIONS, ADDENDA, AND
CLARIFICATIONS ISSUED BY FIELD ORDER OR SIMILAR INSTRUMENTS CONSTITUTE THE CONTRACT DOCUMENTS AND
SHALL REMAIN INTACT. GENERAL CONTRACTOR IS FULLY RESPONSIBLE FOR COMPLIANCE WITH THE REQUIREMENTS
INCLUDED, OR REASONABLY INFERRED THEREIN. CONSTRUCTION MANAGER OR GENERAL CONTRACTOR (AS
APPLICABLE) MUST NOT ISSUE PARTIAL SETS OR OTHERWISE CAUSE INCOMPLETE CONTRACT INFORMATION TO BE
PROVIDED TO PARTIES TO THE CONTRACT, INCLUDING ASSOCIATED SUB-CONTRACTORS, OR SUB-SUB-CONTRACTORS.
1.02. MULTI-TRADE COORDINATION: ALL WORK SHALL BE COORDINATED WITH THE WORK OF OTHER TRADES TO
AVOID INTERFERENCES AND CONFLICTS. NO ALLOWANCES WILL BE MADE FOR CONTRACTOR'S FAILURE TO
COORDINATE BETWEEN MULTIPLE DISCIPLINES, SYSTEMS OR EQUIPMENT. UNCOORDINATED WORK THAT RESULTS IN
THE INEFFICIENT USE OF AVAILABLE SPACE AND/OR ENCROACHES ON THE WORK OF OTHER TRADES WILL BE SUBJECT
TO REJECTION AND RE-INSTALLATION.
1.03. VERIFICATION: GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, CONSTRUCTION, MATERIALS, METHODS OF CONSTRUCTION, GRADES AND ELEVATIONS. NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
OR CONFLICTS WITHIN THE DOCUMENTS PRIOR TO BID, CONSTRUCTION, AND/OR INSTALLATION OF ASSOCIATED
WORK. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE THAT THE EXISTING CONDITIONS ARE CONSISTENT
WITH THOSE OF THE CONTRACT DOCUMENTS. ANY CHANGE ORDER REQUEST ASSOCIATED WITH AN IDENTIFIABLE
EXISTING CONDITION, WHETHER IN CONFLICT OR COMPLIANCE WITH THE CONTRACT DOCUMENTS, WILL NOT BE
ACCEPTED. THIS PROVISION SHALL NOT APPLY TO WORK PERFORMED UNDER UNIT PRICE OR ALLOWANCE FEE
STRUCTURES.
1.04. DISCREPANCIES: GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT PROMPTLY UPON IDENTIFICATION
OF ANY DISCREPANCIES OR CONFLICTS IN THE CONTRACT DOCUMENTS, WITH THE OBJECTIVE OF RESOLVING THE
CONFLICT OR DISCREPANCY IN A TIMELY MANNER AND PRIOR TO ANY IMPACT TO CONTRACT TIME OR CONTRACT COST.
GENERAL CONTRACTOR SHALL INCLUDE THE MORE EXPENSIVE, COMPLEX, AND TIME CONSUMING COMPONENTS OF ANY
DISCREPANCIES IN THE BASE BID PRICE. FAILURE TO NOTIFY THE ARCHITECT PROMPTLY OF A KNOWN DISCREPANCY
CONSTITUTES ACCEPTANCE OF FULL RESPONSIBILITY FOR THE ASSOCIATED COST AND SCHEDULE IMPACT.
1.05. DRAWING SCALE: REPROGRAPHIC TECHNIQUES MAY RENDER DRAWINGS DIFFERENTLY THAN THE INTENDED
PRINTED SCALE. THEREFORE, DO NOT RELY UPON THE SCALE OF ANY PRINTED DRAWINGS. CONTACT THE ARCHITECT
FOR REQUIRED DIMENSIONS THAT ARE NOT PROVIDED CLEARLY IN NUMERIC FORM HEREIN. FAILURE TO REQUEST
CRITICAL DIMENSIONAL INFORMATION FROM THE ARCHITECT MAY RESULT IN THE REJECTION OF INSTALLED WORK.
1.06. DIMENSIONAL STANDARDS: STANDARD DIMENSION CONVENTIONS UTILIZED HEREIN CALL FOR DIMENSIONS
TO FACE OF STUD (MASONRY) OF FINISHED PARTITION, FACE OF FINISH, OR CENTERLINE OF COLUMN LINE OR OTHER
REFERENCE LINE, UNLESS OTHERWISE NOTED OR GRAPHICALLY ILLUSTRATED. DIMENSIONS NOTED AS “CLEAR”, “MIN”, OR “MAX” SHALL BE STRICTLY ENFORCED.
1.07. {PM SOFTWARE}
1.08. PERMITTING: THE GENERAL CONTRACTOR SHALL SECURE AND PAY FOR ALL NECESSARY AND REQUIRED
PERMITS AND APPROVALS FROM JURISDICTIONAL AUTHORITIES, PRIOR TO COMMENCING THE WORK. THIS
REQUIREMENT SHALL APPLY TO ON-SITE AND OFF-SITE WORK REQUIRED BY THE CONTRACT DOCUMENTS.
1.09. CODE COMPLIANCE: THE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH ALL APPLICABLE LAWS, CODES, AND ORDINANCE. THE GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL PERFORM THEIR WORK IN
COMPLIANCE WITH ALL APPLICABLE BUILDING CODES, LAWS, REGULATIONS, AND ORDINANCES. GENERAL CONTRACTOR
AND ALL SUB-CONTRACTORS SHALL CAREFULLY READ AND FAMILIARIZE THEMSELVES WITH THE CODE COMPLIANCE
DATA INCLUDED IN THE DRAWINGS AND SPECIFICATIONS.
1.10. NON-COMBUSTIBLE CONSTRUCTION TYPES: THE PROPOSED BUILDING STRUCTURE IS NON-COMBUSTIBLE
IN ACCORDANCE WITH APPLICABLE CODES, AND THEREFORE REQUIRES NON-COMBUSTIBLE CONSTRUCTION
TECHNIQUES. ALL NEW CONSTRUCTION SHALL BE IN COMPLIANCE WITH APPLICABLE REQUIREMENTS, INCLUDING WOOD
BLOCKING, FURRING, FRAMING, SHEATHING, BACK-BOARDS, AND RELATED WORK. FIRE RETARDANT TREATED [FRT] IS
PERMITTED WHERE ALLOWED BY CODE. SEE CODE COMPLIANCE DRAWINGS FOR DETAILED INFORMATION AND
REQUIREMENTS.
1.11. TEMPORARY GUARDS: THE GENERAL CONTRACTOR SHALL INSTALL AND MAINTAIN TEMPORARY GUARDS AT
ALL SLAB EDGES, PIT EDGES, ELEVATED PLATFORM EDGES, AND SIMILAR CONDITIONS WHERE REQUIRED BY OSHA, ANY
APPLICABLE CODE OR ORDINANCE, AND AT MINIMUM ALL CHANGES IN ELEVATION IN EXCESS OF THIRTY INCHES (30”)
INCLUDING BOTH SIDES OF STAIRS AND LADDERS. TEMPORARY GUARDS MUST BE MAINTAINED UNTIL THE PERMANENT
GUARDS ARE INSTALLED.
1.12. LIFE-SAFETY MEASURES DURING CONSTRUCTION: THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL
REQUIREMENTS REQUIRED BY OSHA, CODE, AND OTHER APPLICABLE REGULATORY AUTHORITIES.
1.13. MEANS OF EGRESS: THE GENERAL CONTRACTOR SHALL MAINTAIN CLEAR AND UNOBSTRUCTED MEANS OF
EGRESS AT ALL TIMES DURING CONSTRUCTION, WITHOUT EXCEPTION.
1.14. CONSTRUCTION LOADS: THE GENERAL CONTRACTOR SHALL NEVER LOAD NEW OR EXISTING
CONSTRUCTION BEYOND ITS DESIGN CAPACITY WITH STORED MATERIAL, CONSTRUCTION EQUIPMENT, TEMPORARY
LOADS ASSOCIATED WITH MATERIAL MOVEMENT, HOISTING, STORAGE, OR SIMILAR CONDITIONS.
1.15. GENERAL CLEAN-UP: THE GENERAL CONTRACTOR SHALL INCLUDE ONGOING CLEAN-UP OF THE PROPERTY
AND BUILDING, INCLUDING REMOVAL OF TRASH AND WASTE MATERIALS, ON A REGULAR BASIS DURING
CONSTRUCTION. RECYCLING OF CONSTRUCTION WASTE IS ENCOURAGED.
1.16. OWNER FURNISHED EQUIPMENT: LOOSE FURNISHINGS, WORKSTATIONS, OFFICE EQUIPMENT, COPIERS, VENDING MACHINES, KITCHEN EQUIPMENT, AND SIMILAR ITEMS THAT ARE BOTH LABELED “OWNER FURNISHED” OR
“OF/OI”, AND SHOWN DASHED OR IN GRAY-TONE SHALL BE CONSIDERED OWNER-FURNISHED EQUIPMENT. OWNER-
FURNISHED EQUIPMENT IS SHOWN FOR THE GENERAL CONTRACTOR’S KNOWLEDGE AND UNDERSTANDING TO
FACILITATE COORDINATION WITH THE OWNER’S WORK. THE GENERAL CONTRACTOR SHALL CAREFULLY REVIEW THE
SCOPE OF WORK, AND REQUEST CLARIFICATION FROM THE ARCHITECT IN THE EVENT OF ANY UNCERTAINTY ABOUT THE
DEFINITION OF OWNER FURNISHED WORK.
1.17. TEMPORARY BRACING: PRIOR TO REMOVAL OF ANY EXISTING STRUCTURAL ELEMENTS, THE GENERAL
CONTRACTOR SHALL TEMPORARILY SHORE AND/OR BRACE EXISTING CONSTRUCTION TO REMAIN AS REQUIRED TO
SUPPORT EXISTING LOADS AND/OR LOADS IMPOSED DURING CONSTRUCTION. FURTHER, THE GENERAL CONTRACTOR
SHALL DESIGN, INSTALL AND MAINTAIN ANY TEMPORARY BRACING OR SUPPORT FRAMING REQUIRED TO SUPPORT NEW
CONSTRUCTION COMPONENTS WHICH ARE NOT FULLY SECURED IN A COMPLETE STRUCTURAL ASSEMBLY, OR ARE
OTHERWISE SUBJECTED TO LOADS IN EXCESS OF THE POST-CONSTRUCTION LOADS FOR WHICH THE ELEMENT IS
DESIGNED.
2.01. POSITIVE DRAINAGE AT BUILDING: SLOPE EXTERIOR GRADE AWAY FROM THE BUILDING IN ACCORDANCE
WITH THE INTERNATIONAL BUILDING CODE.
2.02. SITE PAVING EXPANSION AND CONTROL JOINTS: WHETHER SPECIFICALLY INDICATED OR NOT, PROVIDE
CONTROL JOINTS IN ALL SITE CONCRETE PAVING FOR PEDESTRIAN TRAFFIC AT AN INTERVAL OF NO MORE THAN FIVE
FEET (5’) EACH WAY. IN ADDITION, PROVIDE CONTROL JOINTS AT NO MORE THAN THIRTY FOOT (30’) INTERVAL, EACH WAY. ALL EXPANSION JOINTS, INCLUDING THOSE BETWEEN HORIZONTAL PAVING AND VERTICAL ABUTMENTS, SHALL RECEIVE SPECIFIED JOINT FILLER, AS SPECIFIED IN SECTION 079000.
9.01. INDOOR ENVIRONMENTAL CONDITIONS: NO INTERIOR SOFT CONSTRUCTION [IE. DRYWALL, CEILINGS, CARPET, MILLWORK, OR SIMILAR WORK THAT IS SUBJECT TO TEMPERATURE AND HUMIDITY INSTABILITY] SHALL
COMMENCE, NOR SHALL MATERIALS BE STORED ON SITE, UNTIL STABLE INTERIOR ENVIRONMENTAL CONDITIONS
ACCEPTABLE TO THE PRODUCT MANUFACTURER ARE PROVIDED AND IN PLACE FOR A DURATION SUFFICIENT TO
ESTABLISH CONSISTENT AND ACCEPTABLE INDOOR TEMPERATURE AND HUMIDITY LEVELS. FAILURE TO PROVIDE AN
INDOOR ENVIRONMENT IN STRICT COMPLIANCE WITH THE PRODUCT MANUFACTURERS PRINTED REQUIREMENTS WILL
SUBJECT THE INSTALLING CONTRACTOR TO FULL RESPONSIBILITY FOR ANY COSTS ASSOCIATED WITH RE-WORK DUE TO
MOLD OR MILDEW GROWTH , WARPING, CUPPING, DE-LAMINATION, OR SIMILAR DETERIORATION OF THE STORED OR
INSTALLED CONSTRUCTION.
9.02. FLOOR & WALL TILE: INSTALL FLOOR AND WALL TILE IN ALL SCHEDULED AREAS IN ACCORDANCE WITH
APPLICABLE TILE COUNCIL OF AMERICA (TCNA) METHOD.
9.03. FLOOR FINISH TRANSITIONS: UNLESS OTHERWISE INDICATED, TRANSITION FLOOR FINISHES AT CENTERLINE
OF DOOR IN CLOSED LOCATION. TRANSITION FLOOR MATERIAL UNDER CENTER OF DOORS & WHERE NOTED. PROVIDE
SCHEDULED TRANSITION MATERIALS AT CHANGES IN FLOOR MATERIAL TYPE.
9.04. PARTITIONS: SEE PARTITION NOTES AND SPECIFICATIONS FOR REQUIREMENTS OF PARTITION
CONSTRUCTION.
9.05. EQUIPMENT ACCESS DOORS: THE GENERAL CONTRACTOR SHALL PROVIDE PROPOSED LOCATION OF
CEILING ACCESS DOORS TO THE ARCHITECT FOR APPROVAL. ACCESS DOORS SHALL BE PAINTED TO MATCH ADJACENT
FINISH.
9.06. CASEWORK AND MILLWORK ANCHORAGE: COORDINATE INSTALLATION OF IN-WALL STEEL ANCHORAGE, GROUNDS, AND REQUIRED BLOCKING WITH OTHER TRADES FOR PRECISE LOCATION.
9.07. PARTITION COORDINATION WITH OTHER TRADES:
(A) COORDINATE BETWEEN TRADES BEFORE FRAMING PARTITIONS. PARTITION FRAMING SHALL BE LAID OUT SO AS TO
PERMIT THE INSTALLATION OF PIPING, CONDUITS, AND DUCTWORK WITH A MINIMUM OF CUTTING BY OTHER TRADES.
(B) EXCEPT FOR PIPING LOCATED IN EQUIPMENT ROOMS, ALL PIPING INSIDE THE BUILDING SHALL BE CONCEALED WITHIN
PARTITIONS AND FURRED SPACES. WHERE IT OCCURS THAT PIPING CANNOT BE EASILY CONCEALED, NOTIFY THE
ARCHITECT IN WRITING FOR CLARIFICATION. IN ANY CASE, SUCH PIPING SHALL BE CONCEALED AT NO ADDITIONAL
COST.
(C) COORDINATE WITH OTHER TRADES AND OWNERS' SCHEDULED EQUIPMENT VENDORS FOR SUPPORT REQUIREMENTS
OF WALL- MOUNTED AND SUSPENDED ITEMS. SIZE STUD GAUGE AND SPACING MUST BE ABLE TO SUPPORT ANY
ADDITIONAL LOADS IMPOSED BY THESE ITEMS. MAX. DEFLECTION L/360 @ 5 PSF HORIZ. LOAD.
(D) PROVIDE AND INSTALL ALL BLOCKING, STIFFENERS, BRACES, BACK-UP PLATES, AND SUPPORTING BRACKETS AS
REQUIRED FOR THE INSTALLATION OF WALL-MOUNTED OR SUSPENDED MECHANICAL ELECTRICAL, CASEWORK, MILLWORK AND ANY OTHER MISCELLANEOUS EQUIPMENT OR WALL-MOUNTED ACCESSORIES.
(E) ANY ADDITIONAL WORK OR, RE-WORK, AS A RESULT OF A FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL NOT
BE GIVEN CONSIDERATION FOR CHANGE ORDER.
9.08 FIRE-RATED PARTITIONS AND FIRE-RATED SMOKE BARRIER IDENTIFICATION
(A) FIRE-RATED PARTITIONS AND FIRE-RATED SMOKE BARRIERS SHALL BE PERMANENTLY LABELED IN RED STENCILED
LETTERING ABOVE FINISHED CEILING AT 1'-0" ABOVE CEILING.
1. EACH NEW FIRE WALL, FIRE BARRIER, FIRE PARTITION, SMOKE BARRIER, SMOKE PARTITION, OR ANY OTHER
NEW WALL REQUIRED TO HAVE PROTECTED OPENINGS SHALL BE PERMANENTLY IDENTIFIED WITH SIGNS OR
STENCILING ABOVE ANY DECORATIVE CEILING AND IN CONCEALED SPACES WITH THE WORDING, "FIRE AND
SMOKE BARRIER - PROTECT ALL OPENINGS", OR SIMILAR LANGUAGE. SUCH SIGNS OR STENCILING SHALL BE IN
4 INCH HIGH LETTERS, I/2 INCH STROKE, AND NOT MORE THAN 15 FEET ON-CENTER.
(B) UNLESS OTHERWISE REQUIRED OTHERWISE BY LOCAL JURISDICTION IDENITIFY RATED PARTITIONS AND WALLS AS
FOLLOWS (G.C. MUST CONFIRM VERBIAGE WITH LOCAL AHJ) :
1-HOUR FIRE BARRIER - PROTECT ALL OPENINGS
1-HOUR FIRE & SMOKE BARRIER - PROTECT ALL OPENINGS
2-HOUR FIRE BARRIER - PROTECT ALL OPENINGS
2-HOUR FIRE & SMOKE BARRIER - PROTECT ALL OPENINGS
3-HOUR FIRE WALL - PROTECT ALL OPENINGS
4-HOUR FIRE WALL - PROTECT ALL OPENINGS
14.01. STRUCTURAL FOUNDATION COORDINATION: COORDINATE EXACT BOTTOM OF ELEVATOR SHAFT WITH PIT
DEPTH REQUIREMENTS OF SELECTED ELEVATOR MANUFACTURER. EXACT LOCATION OF SUMP PUMP AS DICTATED BY
SELECTED ELEVATOR MANUFACTURER. AREA BETWEEN BOTTOM OF SLAB OF ELEVATOR SHAFT & STRUCTURAL
CONCRETE MAT FOOTING TO BE POROUS FILL.
14.02. STRUCTURAL CONCRETE WALL COORDINATION: COORDINATE ALL REQUIRED ELEVATOR SHAFT WALL
PENETRATIONS, EMBED LOCATIONS, SPECIAL HOISTWAY INFILL BRACKETS (IF REQUIRED FOR INSTALLATION IN SHAFT
PROVIDED), WALL MOUNTED LADDERS, ETC. WITH SELECTED ELEVATOR MANUFACTURER.
14.03. STRUCTURAL CMU WALL COORDINATION: COORDINATE ALL REQUIRED ELEVATOR SHAFT WALL
PENETRATIONS, EMBED LOCATIONS, SPECIAL HOISTWAY INFILL BRACKETS (IF REQUIRED FOR INSTALLATION IN SHAFT
PROVIDED), ROUGH OPENINGS FOR DOORS, ETC. WITH SELECTED ELEVATOR MANUFACTURER.
14.04. ELECTRICAL COORDINATION: COORDINATE A MINIMUM QUANTITY (2) PER CAB, ELEVATOR DISCONNECTS
WITH SELECTED ELEVATOR MANUFACTURER
D I V I S I O N 2 - E X I S T I N G C O N D I T I O N SB
D I V I S I O N 3 - C O N C R E T EC
D I V I S I O N 4 - M A S O N R YD
D I V I S I O N 5 - M E T A L SE
D I V I S I O N 6 - W O O D , P L A S T I C S & C O M P O S I T E SF
D I V I S I O N 7 - T H E R M A L & M O I S T U R E P R O T E C T I O NG
D I V I S I O N 8 - O P E N I N G SH
D I V I S I O N 9 - F I N I S H E SI
D I V I S I O N 1 4 - C O N V E Y I N G S Y S T E M SN
D I V I S I O N 2 1 - F I R E S U P P R E S S I O NO
D I V I S I O N 2 2 - P L U M B I N GP
D I V I S I O N 2 3 - H V A CQ
D I V I S I O N 2 6 - E L E C T R I C A LR
D I V I S I O N 1 0 - S P E C I A L T I E SJ
D I V I S I O N 1 2 - F U R N I S H I N G SL
D I V I S I O N 1 1 - E Q U I P M E N TK
D I V I S I O N 1 - G E N E R A L R E Q U I R E M E N T SA
8.01. LABELED FIRE-RATED DOORS AND FRAMES: ALL FIRE DOORS AND FRAMES SHALL BE LABELED BY AN
APPROVED AGENCY PER NFPA 80, AND SHALL BE PERMANENTLY AFFIXED THERETO, AND THE LIFE OF THE LABEL AND
THE ATTACHMENT THEREOF CAN REASONABLY BE EXPECTED TO EQUAL THE LIFE OF THE COMPONENT TO WHICH IT IS
ATTACHED. LABELS MUST BE PROVIDED BY A MANUFACTURER THAT HAS BEEN APPROVED BY A LABORATORY OR
ORGANIZATION TO PROVIDE TESTING AND FOLLOW-UP SERVICES FOR FIRE-RATED OPENING ASSEMBLIES. ALL LABELS
SHALL INCLUDE THE FIRE RESISTANCE RATING IN HOURS AND/OR MINUTES. LABELS ON FRAMES WITH TRANSOMS
AND/OR SIDELIGHTS MUST IDENTIFY THAT THE OPENING ASSEMBLY INCLUDES SAME.
(A) LABELS SHALL BE RAISED OR EMBOSSED ON METAL LABELS.
(B) PLASTIC OR PAPER LABELS ARE UNACCEPTABLE.
(C) LABELS MUST BE VISIBLE AND LEGIBLE AT ALL TIMES AND SHALL NOT BE PAINTED.
1. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL REQUIRE PAINTER TO REIMBURSE OWNER FOR
COSTS OF RE-LABELING RATED DOORS AND FRAMES.
8.02 FIRE-RATED CERAMIC GLAZING: AT FIRE-RATED DOORS, SIDELITES, AND TRANSOMS, PROVIDE FIRE-
RATED CERAMIC GLAZING AT ANY VISION PANEL THAT EXCEEDS THE MAXIMUM ALLOWABLE GLASS SIZE PER IBC TABLE
716.5 (IBC 2015) or 716.1(2) (IBC 2018) AS APPLICABLE. SEE SPECIFICATION SECTION 08 8000 GLAZING FOR
CERAMIC GLAZING.
8.03. TEMPERED GLASS: PROVIDE TEMPERED SAFETY GLASS EVERYWHERE REQUIRED BY APPLICABLE CODE, INCLUDING ANY GLASS IN DOORS, OPERABLE WINDOWS, ADJACENT TO DOORS OR OPERABLE WINDOWS, WITHIN 36”
OF THE ADJACENT FLOOR OR GRADE LEVEL, OR OTHERWISE WHERE REQUIRED BY CODE.
8.04. BLOCKING: FURNISH AND INSTALL BLOCKING IN METAL STUD FRAMED WALLS AND PARTITIONS THAT ARE
SCHEDULED TO RECEIVE DOOR BUMPERS/ STOPS, MAGNETIC LOCK DEVICES, AND SIMILAR DOOR RELATED DEVICES
THAT WILL SUBJECT THE PARTITION TO DOOR MOVEMENT LOADS AND IMPACT.
8.05. HOLLOW METAL FRAMES: COORDINATE THE THROAT DEPTH OF ALL HOLLOW METAL FRAMES WITH THE
DEPTH OF THE PARTITION SCHEDULED TO RECEIVE THE DOOR OR WINDOW FRAME.
8.06 LEAD-LINED DOORS AND HOLLOW METAL FRAMES: THESE DOORS ARE VERY HEAVY AND REQUIRE
ADDITIONAL STRUCTURAL SUPPORT TO PREVENT SAGGING. TYPICALLY THIS WILL REQUIRE HEAVY GUAGE (16 GA.)
BOX-FRAMED AND WELDED STEEL STUD POSTS AT THE HINGE-SIDE JAMB. SEE DRAWING G1.22 AND SPECIFICATION
SECTION 09 2216 "NON-STRUCTURAL METAL FRAMING" FOR FURTHER INFORMATION.
7.01. GENERAL SEALANTS: CONTINUOUSLY SEAL PERIMETER OF ALL DOOR AND WINDOW FRAMES, MILLWORK AND CASEWORK, TRIM, CABINETS, AND SIMILAR FIXED CONSTRUCTION WITH PAINTABLE, SILICONIZED
LATEX SEALANT. ALL VERTICAL SURFACE CONTROL AND EXPANSION JOINTS AT MASONRY WALLS SHALL BE
CONTINUOUSLY SEALED, BOTH SIDES OF JOINT.
7.02. SLOPE TO DRAIN: ALL ROOF SURFACES SHALL BE SLOPED TO DRAIN, WITH MINIMUM PITCH OF ¼”
PER LINEAR FOOT. PROVIDE TAPERED INSULATION, CRICKETS AS NECESSARY TO ASSURE THE MINIMUM SLOPE IS
ACHIEVED.
7.03. WALK-PADS: FURNISH AND INSTALL COMPATIBLE ROOF WALK-PADS AT ALL MEMBRANE ROOF
SURFACES THAT ARE TRAVELED TO ACCESS SERVICEABLE ROOFTOP EQUIPMENT SUCH AS HVAC UNITS, FANS, ELECTRICAL EQUIPMENT, AND SIMILAR EQUIPMENT REQUIRING SERVICE ACCESS.
7.04. EXPANSION JOINTS COVERS: ALL BUILDING EXPANSION JOINTS EXPOSED TO VIEW IN FLOOR, PARTITION, AND/ OR CEILING ASSEMBLIES SHALL RECEIVE COLOR-COORDINATED PRE-FABRICATED EXPANSION
JOINT COVER ASSEMBLY DESIGNED TO ALLOW THE REQUIRED MOVEMENT, AND TO PROVIDE UL APPROVED FIRE
RATED ASSEMBLY WHERE REQUIRED.
6.01. WOOD IN CONTACT WITH CONCRETE/ MASONRY: ALL WOOD IN CONTACT WITH CONCRETE OR
MASONRY CONSTRUCTION SHALL BE PRESSURE TREATED [PT] UNLESS OTHERWISE NOTED TO BE FIRE RETARDANT
TREATED [FRT].
6.02. FIELD VERIFICATION: THE CASEWORK OR MILLWORK CONTRACTOR SHALL OBTAIN AND VERIFY ALL FIELD
MEASUREMENTS AND CONDITIONS AFFECTING HIS WORK AND SHALL BE RESPONSIBLE FOR ALL DETAILS AND
DIMENSIONS ASSURING PRECISION AND PROPER ASSEMBLY OF HIS PRODUCTS.
6.03. MILLWORK BASE: PROVIDE FINISHED BASE TO MATCH MATERIAL AND FINISH OF ADJACENT SCHEDULED
WALL BASE, AT TOE-KICK AT ALL EXPOSED FRONT, SIDE, AND REAR FACES OF MILLWORK OR CASEWORK.
6.04. MILLWORK SPLASH: PROVIDE BACKSPLASH AT ALL COUNTERTOPS UNLESS OTHERWISE INDICATED ON
PLAN. PROVIDE SIDESPLASH OF SAME MATERIAL, DIMENSION, AND FINISH EVERYWHERE A COUNTERTOP
BACKSPLASH ABUTS A VERTICAL WALL SURFACE AT ONE OR MORE OF ITS SIDES UNLESS OTHERWISE INDICATED ON
PLAN.
5.01. EMBEDDED STEEL: ALL MISCELLANEOUS STEEL ITEMS INCLUDING STEEL EDGE ANGLES, EMBEDDED
PLATE, AND SIMILAR WORK SHALL BE HOT-DIPPED GALVANIZED. THIS PROVISION DOES NOT APPLY TO
REINFORCING STEEL, WHICH SHALL COMPLY WITH SPECIFICATION DIVISION 033000.
4.01. SEAL VENEER ANCHORS: ALL EXTERIOR VENEER SYSTEM ANCHORS SHALL BE SET IN FULL, FRESH BED
OF TROWEL GRADE AIR/MOISTURE BARRIER COATING, OR DOW 795 OR EQUIVALENT AT THE PLANE OF THE AIR/
MOISTURE BARRIER.
3.01. SLAB-ON-GRADE: SEE SPECIFICATION SECTION 033000 FOR DETAILED REQUIREMENTS OF SLAB-ON-
GRADE CONSTRUCTION, INCLUDING REQUIREMENTS FOR REINFORCING, CONCRETE ADMIXTURES, VAPOR BARRIER, AND SURFACE TREATMENTS [IF ANY]. ALL SLAB-ON-GRADE CONSTRUCTION SHALL BE INSTALLED OVER MINIMUM
FOUR INCH (4”) THICK COMPACTED POROUS DRAINAGE LAYER UNLESS NOTED OTHERWISE.
3.02. SLAB EXPANSION AND CONTROL JOINTS: SEE STRUCTURAL DRAWINGS FOR REQUIRED SLAB
EXPANSION AND CONTROL JOINTS. ALL EXPANSION JOINTS AND CONTROL JOINTS IN FLOOR SLABS, AND BETWEEN
FLOOR SLABS AND VERTICAL ABUTMENTS SHALL RECEIVE TRAFFIC BEARING SEALANT JOINT MATERIAL.
3.03. CORE DRILLING - FLOOR SLABS: THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING
OF THE LOCATION AND DIMENSION OF ANY PROPOSED CORES THROUGH STRUCTURAL FLOOR SLABS, PRIOR TO
COMMENCING CORING ACTIVITIES. CORE DRILLING IS STRICTLY PROHIBITED (SLEEVES ONLY) IN ANY POST-
TENSIONED STRUCTURED FLOOR SLAB ASSEMBLIES.
3.04. FLOOR LOADING DURING CONSTRUCTION: NO LOADS EXCEEDING THE SPECIFIED FLOOR LIVE LOAD
INCLUDING CONSTRUCTION EQUIPMENT OR LIFTS SHALL BE PLACED ON THE ELEVATED SLABS WITHOUT REVIEW AND
APPROVAL OF THE STRUCTURAL ENGINEER. ANY REQUESTS SHALL BE MADE IN WRITING BY THE GENERAL
CONTRACTOR INCLUDING CUT SHEETS AND PROPOSED LOADING CRITERIA. DO NOT PROCEED UNTIL WRITTEN
AUTHORIZATION FROM THE STRUCTURAL ENGINEER HAS BEEN PROVIDED.
12.01. CASEWORK BASE: PROVIDE FINISHED BASE TO MATCH MATERIAL & FINISH OF ADJACENT WALL BASE, AT TOE
KICK, AT ALL EXPOSED FRONT, SIDE, & REAR FACES OF CASEWORK.
12.02. CASEWORK SPLASH: PROVIDE BACKSPLASH AT ALL COUNTERTOPS UNLESS OTHERWISE INDICATED ON PLAN.
PROVIDE SIDESPLASH OF SAME MATERIAL, DIMENSION, AND FINISH EVERYWHERE A COUNTERTOP BACKSPLASH ABUTS
A VERTICAL WALL SURFACE AT ONE OR MORE OF ITS SIDES UNLESS OTHERWISE INDICATED ON PLAN.
26.01. MEP DEVICE/ FIXTURE COORDINATION: COORDINATE LOCATIONS FOR DIFFUSERS, AND RETURN AIR GRILLES
TO THE GREATEST EXTENT POSSIBLE IN ORDER TO MAINTAIN LIGHTING LAYOUT INDICATED IN THE DRAWINGS. MEP&FP
CONTRACTORS SHALL COORDINATE WORK WITH OTHER DISCIPLINES PRIOR TO INSTALLATION. ALL ELECTRICAL ITEMS
INDICATED IN OR ON CABINETRY OR MILLWORK SHALL BE SUPPLIED, INSTALLED AND COORDINATED BY THE
ELECTRICAL CONTRACTOR, UNLESS OTHERWISE NOTED.
26.02. CENTER CEILING DEVICES: CENTER LIGHTS, SUPPLY DIFFUSERS, RETURN GRILLES, SPRINKLER HEADS, ETC.
IN CEILING PANELS IF NOT OTHERWISE INDICATED.
26.03. ELECTRICAL BOXES IN RATED PARTITIONS: WHERE ELECTRICAL BOXED ARE INSTALLED IN FIRE-RATED METAL
STUD PARTITIONS, INSTALL BOXES NO LARGER THAN SIXTEEN SQUARE INCHES (16 SI) IN AREA, AND DO NOT EXCEED
ONE-HUNDRED SQUARE INCHES (100 SI) OF METALLIC BOX PER ONE-HUNDRED SQUARE FEET (100 SF) OF FIRE-
RATED WALL AREA. WHERE ELECTRICAL REQUIREMENTS DICTATE A HIGHER RATION, TREAT THE ELECTRICAL BOXES
WITH CODE APPROVED METHOD TO ASSURE CONTINUOUS RATING. FURTHER, DO NOT INSTALL ELECTRICAL BOXES
BACK-TO-BACK IN THE SAME STUD CAVITY WITHOUT APPROVED FIRE-RATED TREATMENT.
26.04. ELECTRICAL DEVICES IN OR NEAR MILLWORK: CAREFULLY LOCATE ELECTRICAL BOXES FOR DEVICES IN OR
NEAR MILLWORK AND/OR CASEWORK TO ASSURE COORDINATED INSTALLATION. LOCATE ELECTRICAL DEVICES ABOVE
COUNTERTOP SUCH THAT THE DEVICE COVER PLATE WILL NOT INTERFERE WITH SCHEDULED BACKSPLASH OR
SIDESPLASH.
23.01. MEP DEVICE/ FIXTURE COORDINATION: COORDINATE LOCATIONS FOR DIFFUSERS, AND RETURN AIR GRILLES
TO THE GREATEST EXTENT POSSIBLE IN ORDER TO MAINTAIN LIGHTING LAYOUT INDICATED IN THE DRAWINGS. MEP&FP
CONTRACTORS SHALL COORDINATE WORK WITH OTHER TRADES PRIOR TO INSTALLATION.
22.01. CONCEALED PIPING: ALL PIPING, DUCTWORK, ELECTRICAL RACEWAYS & CONDUITS SHALL BE CONCEALED IN
THE BUILDING CONSTRUCTION. THE GENERAL CONTRACTOR SHALL INCLUDE, IN THE BASE BID, REQUIRED FURRING TO
CONCEAL THESE SYSTEMS WHETHER OR NOT THE FRAMING AND FURRING IS ILLUSTRATED IN THE DRAWINGS.
22.02. SECURE PIPING: TIE ALL PIPING "HARD" TO STRUCTURE.
22.03. GAS PIPING EXPOSED ON ROOF: WHERE GAS PIPING IS EXPOSED ON THE ROOF, PAINT GAS PIPING
"YELLOW".
22.04. PLUMBING FIXTURES: CAREFULLY REVIEW THE DIMENSIONAL STANDARDS FOR INSTALLED PLUMBING
FIXTURES, AND PLAN THE WORK TO ASSURE FULL COMPLIANCE OF CODE REQUIRED FIXTURE CLEARANCES.
21.01. FIRE PROTECTION SYSTEMS: WHERE REQUIRED, INSTALL FIRE PROTECTION SYSTEMS IN STRICT ACCORDANCE
WITH APPLICABLE CODES AND ORDINANCES, INCLUDING NFPA. ALL EQUIPMENT UTILIZED IN THE FIRE PROTECTION
SYSTEM SHALL BE LISTED BY UNDERWRITER'S LABORATORIES [UL].
21.02. FIRE PROTECTION SYSTEM DESIGN: WHERE DESIGN OF THE FIRE PROTECTION SYSTEM IS THE RESPONSIBILITY
OF THE CONTRACTOR AS REQUIRED BY A PERFORMANCE SPECIFICATION, THE SYSTEM DESIGN SHALL BE SUPERVISED
BY AN INDIVIDUAL WHO IS A REGISTERED FIRE PROTECTION ENGINEER AND/OR IS CERTIFIED AT LEVEL III OR HIGHER IN
FIRE PROTECTION ENGINEERING TECHNOLOGY AUTOMATIC SPRINKLER SYSTEM LAYOUT BY THE NATIONAL INSTITUTE
FOR CERTIFICATION IN ENGINEERING TECHNOLOGY (NICET).
21.03. FIRE PROTECTION PIPING: SPRINKLER PIPING SHALL BE UNENCUMBERED BY THE WORK OF ANY OTHER TRADE
THROUGHOUT THE ENTIRE BUILDING. UNDER NO CIRCUMSTANCES SHALL ANYTHING BE SUPPORTED BY, DRAPED
OVER, TIED-OFF TO, OR SUSPENDED BY, SPRINKLER PIPING. GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO
CONTINUOUSLY MONITOR ONGOING WORK IN THE VICINITY OF SPRINKLER PIPING AND SHALL DIRECT ANY OTHER
CONTRACTOR OR TRADESMAN TO IMMEDIATELY REMOVE AND RE-INSTALL ANY ITEM NOT IN COMPLIANCE WITH THIS
REQUIREMENT.
11.01. EQUIPMENT GENERAL: FOR EQUIPMENT OR SYSTEMS INSTALLED UNDER SEPARATE CONTRACT, GENERAL
CONTRACTOR SHALL COOPERATE FULLY WITH SEPARATE CONTRACTORS SO WORK ON THOSE CONTRACTS MAY BE
CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS CONTRACT OR OTHER
CONTRACTS. COORDINATE THE WORK OF THIS CONTRACT WITH WORK PERFORMED UNDER SEPARATE CONTRACTS.
WORK TO BE PERFORMED UNDER SEPARATE CONTRACT IS AS ITEMIZED UNDER SPECIFICATION SECTION 01 1000 -
"SUMMARY"; PARA. "1.07 WORK UNDER SEPARATE CONTRACTS".
11.02. MEDICAL EQUIPMENT, GENERAL: MEDICAL EQUIPMENT PLANNED FOR THIS FACILITY REQUIRING ELECTRICAL, PLUMBING, OR HVAC SERVICES IS AS SCHEDULED ON THE EQUIPMENT PLAN DRAWING AND/OR BOUND EQUIPMENT
MANUAL. GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THESE REQUIREMENTS AND INCLUDE ALL WORK
NECESSARY FOR A COMPLETE INSTALLATION.
11.03. MEDICAL EQUIPMENT VENDOR DRAWINGS: WHEN APPLICABLE, VENDOR'S SITE-SPECIFIC INSTALLATION
DRAWINGS WILL BE PROVIDED TO THE CONTRACTOR FOR INFORMATION (e,g. X-RAY, CT, MRI, OR SIMILAR MAJOR
ITEMS). EQUIPMENT INSTALLATION WILL BE BY THE RESPECTIVE VENDOR/S HOWEVER, THESE DRAWINGS ASSIGN
RESPONSIBILITY TO GENERAL, AND OTHER CONTRACTOR/S, FOR WORK REQUIRED FOR A COMPLETE INSTALLATION THAT
IS NOT PERFORMED BY THE VENDOR. GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THESE
RESPONSIBILITIES AND INCLUDE ALL WORK NECESSARY FOR A COMPLETE INSTALLATION.
10.01. SPECIALTIES GENERAL: WHEN APPLICABLE TO THE PROJECT, OWNER WILL AWARD AND WILL ASSIGN TO THE
GENERAL CONTRACTOR THE CONTRACT FOR CERTAIN SPECIALTY ITEMS. CONTRACTOR SHALL BE RESPONSIBLE FOR
PROCURING, SCHEDULING, AND COORDINATING THE INSTALLATION OF WORK INSTALLED UNDER THESE CONTRACTS. THE
COST OF ASSIGNED CONTRACTS SHALL BE INCLUDED AS PART OF THE WORK OF THIS CONTRACT. SEE SPECIFICATION
SECTION 01 1000 - "SUMMARY""; PARA. "1.07 WORK UNDER SEPARATE CONTRACTS"
10.02. SPECIALTY CONTRACTS: THE FOLLOWING SPECIALTY CONTRACTS WILL BE ASSIGNED TO THE GENERAL
CONTRACTOR:
(A) INTERIOR AND EXTERIOR SIGNAGE PACKAGE.
(B) ROLLER WINDOW SHADE AND CUBICLE CURTAIN PACKAGE.
D I V I S I O N 1 3 - S P E C I A L C O N S T R U C T I O N M
13.01. RF (RADIO-FREQUENCY) SHIELDED ENCLOSURES: WHEN MRI ROOM RF ENCLOSURE/S ARE APPLICABLE TO THE
PROJECT, OWNER WILL AWARD AND WILL ASSIGN TO THE GENERAL CONTRACTOR THE CONTRACT FOR THE RF SHIELDED
ENCLOSURE/S. CONTRACTOR SHALL BE RESPONSIBLE FOR PROCURING, SCHEDULING, AND COORDINATING THE
INSTALLATION OF WORK INSTALLED UNDER THESE CONTRACTS. THE COST OF ASSIGNED CONTRACTS SHALL BE
INCLUDED AS PART OF THE WORK OF THIS CONTRACT.
13.02. LEAD SHIELDING REQUIREMENTS: SEE SPECIFCATION SECTION 134900 "RADIATION PROTECTION" FOR LEAD
SHIELDING REQUIREMENTS AT X-RAY DIAGNOSTIC ROOMS.
(A) ALL RADIATION PROTECTION WORK MUST BE INSTALLED IN STRICT CONFORMANCE WITH PHYSICIST’S REPORTS
PROVIDED BY THE OWNER. IF AT THE TIME OF BIDDING SAID REPORT/S ARE NOT AVAILABLE, CONTRACTOR SHALL
ASSUME THAT ALL LEAD SHIELDING WILL BE THE EQUIVALENT OF 1/16” (15MM) THICK FOR BIDDING PURPOSES.
(B) UPON COMPLETION OF RADIATION PROTECTION WORK, ALL X-RAY DIAGNOSTIC ROOMS WILL BE SUBJECT TO AN
OWNER-COMMISSIONED SHIELDING INTEGRITY SURVEY TO CONFIRM THAT THE SHIELDING WAS INSTALLED ACCORDING
TO PLAN AND THAT X-RAYS ARE BEING CONTAINED WITHIN THE ROOM BY THE SHIELDING.
(C) SHOULD SHIELDING FAILURES OCCUR DURING THE INTEGRITY SURVEY, CONTRACTOR SHALL BE RESPONSIBLE FOR
REPAIRING ANY BREACHES IN THE LEAD SHIELDING SYSTEM. ANY REPAIRS TO WALL, FLOOR , OR CEILING FINISHES AS
MAY BE REQUIRED BY THIS REMEDIAL WORK SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST.
G E N E R A L N O T E S THE GENERAL NOTES BELOW ARE INTENDED TO COMPLEMENT, RATHER THAN REPLACE, REQUIREMENTS PUT FORTH
BY THE PROJECT SPECIFICATIONS. SHOULD A DISCREPANCY BE FOUND BETWEEN THESE GENERAL NOTES AND THE
PROJECT SPECIFICATIONS THE GC SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING.
B ro a d S tr e e t, S u it e
.3
.3
G M
C N
E T
W O
R K
C
O M
A u g u st a
, G A
G o o d w y n M il ls
C a w o o d
, L L
C
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D R
A W
N B
Y
IS
S
U E
C H
E C
K E
D B
Y
D A
T E
G M
C
/3
1/
:5
:5
P M
G E
N E
R A
L N
O T
E S
P A
N T
H E
R D
R , J
E F
F E
R S
O N
, G A
T E
M P
L A
T E
V E
R S
IO
N
.1
N O
T F
O R
C O
N
ST
RU
C
T
IO
N
G 1.
K P
W J
P
/3
1/
C O
N S
T R
U C
T
IO
N
D O
C U
M E
N T
A T
IO
N
J A
C K
S O
N C
O U
N T
Y E
M S
S T
A T
IO
N
A
A U
G
B/B
BC
BD
BLDG
BLKG
BM
BOT
BRG
BSMT
BUR
BOW
B/W
CAB
CB
C/C
CD
CF
CFCI
CI
CIP
CJ
CLG
CLO
CLR
CMP
CMU
CO
COL
CONC
CONN
CONST
CONT
COORD
CPT
CSMU
CT
CW
D
DBL
DEM
DET
DH
DIA
DIAG
DIM
DL
DS
DWG
DF
FACE OF
FACE OF BRICK
FACE OF CONCRETE
FACE OF FINISH
FACE OF MASONRY
FACE OF STUD
FRAME (ED), (ING)
FIRE RETARDANT TREATED
FOOT/FEET
FOOTING
GAUGE
GALVANIZED
GRAB BAR
GALVANIZED HOLLOW METAL
GALVANIZED IRON
GYPSUM WALL BOARD
GYPSUM
HEIGHT
HANDICAP
HOLLOW METAL
HIGHEST OPERABLE DEVICE
HORIZONTAL
HIGH POINT/HORSE POWER
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING / VENTILATION / AIR
CONDITIONING
HARDWARE
ID
IE
IJ
IN
INSUL
JAN
JG
JT
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
OVERHEAD
ON CENTER (S)
OCCUPANT (S)
OUTSIDE DIAMETER
OWNER FURNISHED,
CONTRACTOR INSTALLED
OPPOSITE HAND
OPENING
OPPOSITE
PRECAST JOINT
PROPERTY LINE, PLATE
PLASTIC LAMINATE
PAINT (ED)
PREFABRICATED
PREFINISHED
PREMANUFACTURED
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT / PRESSURE TREATED /
POINT OF TANGENCY
POLYVINYL CHLORIDE
PAVEMENT
PLYWOOD
QUARRY TILE
FBO
FD
FEC
FFE
FFW
FHC
F/F
FL
FLG
FND
W
WB
WC
WD
WH
WIN
WP
WT
W/W
WWF
W/
W/O
TELE
TERM
T&G
TH
THK
TO
TOC
TOGB
TOF
TOJ
TOS
TOW
TYP
TZ
UNO
VB
VCT
VERT
VWC
REQUIRED
RETAINING
REVISION (S), REVISED
RIGHT HAND
RECESSED JOINT
ROOM
ROUGH OPENING
RIGHT OF WAY
ROOF TOP UNIT
SEALED CONCRETE
SCHEDULED
STORM DRAIN
SECTION
STOREFRONT
SIMILAR
SPECIFICATION (S)
SQUARE
SOLID SURFACE
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURAL
SQUARE YARD
BACK-TO-BACK
BASE OF CURB
BOARD
BUILDING
BLOCKING
BENCHMARK
BOTTOM
BEARING
BASEMENT
BUILT-UP ROOF
BOTTOM OF WALL
BETWEEN
ACC
ACI
ACT
ADD
AFF
ALT
ALUM
APPROX
ARCH
ADJ
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ADDENDUM
ABOVE FINISH FLOOR
ALTERNATE
ALUMINUM
APPROXIMATE
ARCHITECT (URAL)
ADJACENT
CABINET
CATCH BASIN
CENTER TO CENTER
CORE DECK
CUBIC FOOT
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CAST IRON
CAST IRON PIPE
CONSTRUCTION OR CONTROL JOINT
CEILING
CLOSET
CLEAR (ANCE)
CORRUGATED METAL PIPE
CONCRETE MASONRY UNIT
CLEAN OUT
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS OR CONTINUE
COORDINATE
CARPET (ED)
CALCIUM SILICATE MASONRY UNIT
CERAMIC TILE
CURTAIN WALL
DRYER
DOUBLE
DEMOLISH OR DEMOLITION
DETAIL
DOUBLE HUNG
DIAMETER
DIAGONAL
DIMENSION
DEAD LOAD
DOWNSPOUT
DRAWING
DRINKING FOUNTAIN
FURNISHED BY OTHERS
FLOOR DRAIN
FIRE EXTINGUISHER & CABINET
FINISH FLOOR ELEVATION
FINISH FACE OF WALL
FIRE HOSE & CABINET
FACE TO FACE
FLOOR
FLANGE
FOUNDATION
FO
FOB
FOC
FOF
FOM
FOS
FR
FRT
FT
FTG
GA
GALV
GB
GHM
GI
GWB
GYP
H
HC
HM
HOD
HORIZ
HP
HSS
HT
HVAC
HW
INSIDE DIAMETER
INVERT ELEVATION
ISOLATION JOINT
INCH / INCHES
INSULATION
JANITOR'S CLOSET
JOIST GIRDER
JOINT
NIC
NO
NOM
NTS
O/H
OC
OCC
OD
OFCI
OH
OPG
OPP
PJ
PL
PLAM
PNT
PREFAB
PREFIN
PREMANUF
PSF
PSI
PT
PVC
PVMT
PWD
QT
REQ'D
RET
REV
RH
RJ
RM
RO
ROW
RTU
SC
SCHED
SD
SECT
SF
SIM
SPEC
SQ
SS
SST
STD
STL
STOR
STRUCT
SY
TELEPHONE
TERMINATION
TONGUE AND GROOVE
THICK (NESS)
THICK (NESS)
TOP OF
TOP OF CURB
TOP OF GRAB BAR
TOP OF FOOTING
TOP OF JOIST
TOP OF SLAB / TOP OF STEEL
TOP OF WALL
TYPICAL
TERRAZZO
UNLESS NOTED OTHERWISE
VINYL BASE
VINYL COMPOSITION TILE
VERTICAL
VINYL WALL COVERING
WASHER / WIDTH / WIDE FLANGE
WOOD BASE
WATER CLOSET
WOOD
WATER HEATER
WINDOW
WORK POINT / WATERPROOFING
WEIGHT
WALL TO WALL
WELDED WIRE FABRIC
WITH
WITHOUT
MATERIAL
MAXIMUM
MISCELLANEOUS CHANNEL
MECHANICAL
MEZZANINE
MANUFACTURE (R)
MANHOLE
MINIMUM
MASONRY OPENING
MULLION
MATL
MAX
MC
MECH
MEZZ
MANUF
MH
MIN
MO
MULL
LAMINATE (D)
LINEAR FOOT
LENGTH, ANGLE
LABORATORY
LAVATORY
LEFT HAND
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOW POINT
LIGHT GAUGE
LIGHT
LAM
LF
L
LAB
LAV
LH
LL
LLH
LLV
LP
LT GA
LT
K
KIP
KJ
KSI
THOUSAND
1000 #
KEY JOINT
1000 # PER SQ IN
RETURN AIR
RADIUS
RUBBER BASE
REFLECTED CEILING PLAN
ROOF DRAIN
REINFORCEMENT BAR
REFRIGERATOR / REFERENCE
REINFORCE (D), (ING)
RA
RAD
RB
RCP
RD
REBAR
REF
REINF
EA
EF
EIFS
EJ
ELEV
ELEC
ENGR
EOP
EOS
EQ
EW
EWC
EXH
EXIST
EXP
EXPN
EXT
EACH
EACH FACE
EXTERIOR INSULATION FINISH SYSTEM
EXPANSION JOINT
ELEVATION / ELEVATOR
ELECTRIC (ALL)
ENGINEER
EDGE OF PAVEMENT
EDGE OF SLAB
EQUAL
EACH WAY
ELECTRIC WATER COOLER
EXHAUST
EXISTING
EXPOSED
EXPANSION
EXTERIOR
ROOM REFERENCE TAG
COLUMN LINES:
CONSECUTIVE NUMBERS ARE
USED FOR COLUMN LINES
RUNNING NORTH & SOUTH
677.52 ELEVATION TAG:
677.52 - ELEVATION (FT)
W-1
0G
L-1
ROOM NAME
DOOR TAG:
DOOR NUMBER 101
WINDOW TAG:
WINDOW TYPE 1
LOUVER TAG:
LOUVER TYPE L1
WALL TAG:
INTERIOR WALL TYPE 0G
REVISION CLOUD AND TAG:
USED TO INDICATE SCOPE OF
CURRENT REVISION
A1.013
TRUE
NORTH
A1.01
INTERIOR ELEVATION TAG:
INTERIOR ELEVATION 3
ON SHEET A101
NORTH ARROW:
ARCHITECTURAL PLAN ORIENTATION
FF&E:
BY OTHERS
EXTERIOR ELEVATION TAG:
ELEVATION 1 ON SHEET A101
PLAN
NORTH
TA01
G1
A1.01
A1.01
SPECIALTY EQUIPMENT TAG:
SEE SPECIALTY EQUIPMENT
SCHEDULE
PLAN KEYNOTE TAG:
KEYNOTE NUMBER
SEE PLAN KEYNOTE SCHEDULE
BUILDING SECTION TAG:
SECTION 1 ON SHEET A101
WALL SECTION TAG:
SECTION 1 ON SHEET A101
ENLARGED DETAIL TAG:
DETAIL 1 ON SHEET A101
A1.01
HEIGHT #
WIDTH #
DEPTH #
CDS#
CASEWORK TAG
A CONSECUTIVE LETTERS ARE
USED FOR COLUMN LINES
RUNNING EAST & WEST
FACE OF MASONRY
OR FACE OF GIRDER
NORTH ARROW:
CIVIL ORIENTATION
(SEE FLOOR PLANS AND
DOOR SCHEDULE)
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
(SEE LOUVER SCHEDULE)
(SEE PARTITION LEGEND)
INTERIOR FINISH TAG
PNT-1
RB-1
LVT-1
PL-3 SS-1
PRIMARY / ACCENT
WALL FINISH
BASE FINISH
FLOOR FINISH
CASEWORK /
COUNTERTOP FINISH
PNT-5
C-1
CURTAINWALL TAG:
CURTAINWALL TYPE 1
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
S-1
STOREFRONT TAG:
STOREFRONT TYPE 1
(SEE EXTERIOR ELEVATIONS
AND GLAZING SCHEDULE)
B ro a d S tr e e t, S u it e
.3
.3
G M
C N
E T
W O
R K
C
O M
A u g u st a
, G A
G o o d w y n M il ls
C a w o o d
, L L
C
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D R
A W
N B
Y
IS
S
U E
C H
E C
K E
D B
Y
D A
T E
G M
C
/3
1/
:5
:5
P M
G E
N E
R A
L I
N F
O R
M A
T
IO
N
P A
N T
H E
R D
R , J
E F
F E
R S
O N
, G A
T E
M P
L A
T E
V E
R S
IO
N
.1
N O
T F
O R
C O
N
ST
RU
C
T
IO
N
G 1.
K P
W J
P
/3
1/
C O
N S
T R
U C
T
IO
N
D O
C U
M E
N T
A T
IO
N
J A
C K
S O
N C
O U
N T
Y E
M S
S T
A T
IO
N
A
A U
G
A B B R E V I A T I O N S
A N N O T A T I O N S Y M B O L S & T A G S
V I C I N I T Y M A P
TRUE
NORTH
L O C A T I O N M A P
TRUE
NORTH
T Y P I C A L R E A C H R A N G E S
WALL MOUNTED DEVICE WALL MOUNTED DEVICE
COUNTER TOP
WALL MOUNTED DEVICE WALL MOUNTED
DEVICE
WALL MOUNTED DEVICE
FIXED OBJECT
WALL MOUNTED DEVICE
FIXED OBJECT
F.F.E.
COUNTER TOP
M
IN
H O
D
M
A X
S
EE
E
LE
V
H O
D
M
A X
S
EE
E
LE
V
H O
D
M
A X
10" MAX
M
A X
M
A X
H O
D
M
A X
H O
D
M
A X
H O
D
M
A X
M
IN
>20" - 25" MAX
MAX
20" 10" MAX >10" - 24" MAX
U N O B S T R U C T E D F O R W A R D R E A C H O B S T R U C T E D H I G H F O R W A R D R E A C H U N O B S T R U C T E D S I D E R E A C H O B S T R U C T E D H I G H S I D E R E A C H
F.F.E. F.F.E. F.F.E.
36" MIN BAR
17" FFW
W A T E R C L O S E T
TO
G
B
A
FF
TO
S
EA
T
A
FF
GB
42" MIN
54" MIN
12" MAX
A
FF
M
IN
'-6
"FFW
±40"
12" MIN
24" MIN
59" MIN CLR
CLR FLOOR SPACE
60" MIN
C
LR
M
IN
TO
G
B
A
FF
A
FF
M
A X
PARTITION
PARTITION
C
LR
M
IN
CLR
6" MIN
FFW
24" MIN
URINAL SCREEN
(WHERE OCCURS)
FFW
13 1/2" MIN
A
FF
M
IN
M A X
A
FF
T O
H O
D
M
A X
6" MIN CLR
15" MIN CLR
TO ANY
OBSTRUCTION
48" MIN CLR
TO
H
O D
U R I N A L
MIN
1'-3" COUNTER
WHERE
OCCURS
OFFSET WASTE
ACCESSIBLE SINK
BOWL 6 -1/2" DEEP
INSULATE
EXPOSED PIPING
M A X
A
FF
K N
EE
C
LR
M
IN
TO
E
C
LR
"M
IN
FFW
17" MIN
8"MIN CLR
11"MIN CLRTOE CLR
6"MIN
L A V A T O R Y O R V A N I T Y S I N K
F.F.E.
F.F.E.
NOTE: PROVIDE TA90,
UNDERLAVATORY GUARD
AT ALL EXPOSED LAVATORY
OR SINK PIPING
01. ACCESSIBILITY STANDARDS: CONTRACTOR MUST BE FAMILIAR WITH AND,
SHALL MAINTAIN ON THE JOB SITE, A COPY OF THE CURRENT ADAAG
STANDARDS AND IBC CHAPTER 11 ACCESSIBILITY REQUIREMENTS (OR
FLORIDA BUILDING CODE ACCESSIBLILITY) AS APPLICABLE. DURING
CONSTRUCTION THE GENERAL CONTRACTOR SHALL BE MINDFUL OF THESE
ACCESSIBILITY REQUIREMENTS INCLUDING MOUNTING HEIGHTS AND FLOOR
MANEUVERING CLEARANCES AND, IN THE EVENT THAT FIELD CONDITIONS
WILL NOT ALLOW FOR ACCESSIBILITY REQUIREMENTS TO BE MAINTAINED IN
A PARTICULAR CONDITION OR INSTALLATION, CONTRACTOR SHALL NOTIFY
THE ARCHITECT FOR FURTHER DIRECTION PRIOR TO PROCEEDING.
02. ADA DEVICES: ALL DEVICES AND FIXTURES DEPICTED HEREIN AND WHERE
NOTED AS “ADA” OR “ACCESSIBLE” SHALL AT MINIMUM BE INSTALLED IN
STRICT ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT AND
APPLICABLE BUILDING CODES. WHERE ACCESSIBILITY REQUIREMENTS MAY
VARY BY JURISDICTION, FOLLOW THE MOST STRINGENT REQUIREMENTS.
03. ADA MOUNTING HEIGHTS: ALL MOUNTING HEIGHTS SHOWN ON THIS PAGE
ARE TO BE MEASURED FROM THE TOP OF FLOOR FINISH (i.e. NOT FROM
SUBFLOOR). THE CONTRACTOR SHALL ACCOUNT FOR THE THICKNESS OF
THE SPECIFIED FLOOR FINISH WHEN ESTABLISHING THE MOUNTING HEIGHTS
OF ACCESSIBLE ITEMS.
A C C E S S I B L E E L E M E N T S N O T E S
04. ADA PLAN DIMENSIONS: ALL PLAN DIMENSIONS SHALL BE MEASURED
FROM THE FINSH FACE OF SCHEDULED WALL FINISH. THE CONTRACTOR
SHALL ACCOUNT FOR THE THICKNESS OF THE SPECIFIED WALL FINISH e.g., WALL TILE, WHEN ESTABLISHING PLAN DIMENSIONS AND CLEARANCES FOR
ACCESSIBLE ELEMENTS.
05. PLUMBING ELEMENTS AND FIXTURES: SEE PLUMBING DRAWINGS AND
SPECIFICATIONS FOR REQUIRED LOCATIONS AND MOUNTING HEIGHT OF
PLUMBING ELEMENTS AND FIXTURES. SHOULD CONFLICT EXIST BETWEEN
MOUNTING HEIGHTS AND/OR CLEARANCES INDICATED HEREIN AND THE
REQUIREMENTS OF THE PLUMBING ENGINEER, THE GENERAL CONTRACTOR
SHALL NOTIFY THE ARCHITECT FOR CLARIFICATION PRIOR TO ROUGH-IN.
06. ELECTRICAL DEVICES: SEE ELECTRICAL DRAWINGS AND SPECIFICATIONS
FOR REQUIRED MOUNTING HEIGHT OF ELECTRICAL DEVICES AND FIXTURES.
SHOULD CONFLICT EXIST BETWEEN MOUNTING HEIGHTS INDICATED HEREIN
AND THE REQUIREMENTS OF THE ELECTRICAL ENGINEER, THE GENERAL
CONTRACTOR SHALL NOTIFY THE ARCHITECT FOR CLARIFICATIONPRIOR TO
ROUGH-IN.
CONTROLS
AREA
ENTRANCE SIDE
SEAT WALLBACK WALL
TO
G
B
A
FF
M
IN
ENTRANCE SIDE
A
FF
'-6
FOLDING SHOWER
SEAT
3" MIN
A
FF
'-6
M
A X
A
FF
TO
G
B
6"MAX
6" MAX
MAX
2'-3"
HEAD WALL
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H F O L D I N G S E A T )
SHOWER
CURTAIN ROD
M
IN
TOWEL BAR AT ACCESSIBLE
LOCATIONS
MAX
4"
F.F.E.
SEE ELEVATIONS FOR
STANDARD BAR HEIGHT
M
IN
'-6
C
N
TR
TP
'-6
U .N
.O
M
A X
TO
L
EN
S O
F S
TR
O B E
M
IN
M
A X
CLEAR
1'-6"MIN
9" MIN
CL
EQ EQ
CENTERED ON TACTILE
CHARACTERS
T O
P U
LL
L
EV
ER
A
FF
C H A R A C
TE
R S
V
ER
IF
Y
EX
A C T
M O
U N
TI
N G
H
EI
G H
T
IF CEILING DOES NOT PERMIT 80"
VERIFY HEIGHT W / ARCH
LATCH SIDE OR NEAREST
ADJACENT WALL
F I R E A L A R M W / S T R O B E
*NOTE: ROTATE ELECTRICAL COVER PLATES
HORIZONTAL IF COUNTERTOP IS ABOVE 42" HIGH
TO
T O
P
E L E C T R I C A L D E V I C E SA D A I N T E R I O R S I G N A G E
F.F.E.
HEAD WALL
CONTROLS
AREA MAY BE ON
ANY SHOWER WALL
ENTRANCE
SIDE
END WALLBACK WALL
TO
G
B
A
FF
M
IN
ENTRANCE
SIDE
M
A X
A
FF
T O
G B
A
FF
A C C E S S I B L E R O L L - I N S H O W E R ( W I T H O U T F O L D I N G S E A T )
SHOWER
CURTAIN ROD
M
IN6"MAX
6" MAX
6"MAX
6" MAX
MAX
4"
F.F.E.
TOILET
ACCESSORY
TYPE
DRAWING
DESIGNATION
TOILET TISSUE
HOLDER
CL
TA01
M
A X
TA14
M
A X
SOAP
DISPENSER
RECESSED
TA18
M
IN
G R A B B
A R
B O
G B
-1
/2 M
IN
WC
8" FO H
EI
G H T
O F
O
PE
R A B
LE
D
EV
IC
E
H
EI
G H T
O F
O
PE
R A B
LE
D
EV
IC
E
VERIFY EXACT MOUNTING
HEIGHT OF SUBMITTED
DEVICE WITH ARCHITECT
T Y P I C A L A C C E S S I B L E M O U N T I N G H E I G H T S
REFER TO PLAN &
SPEC FOR LENGTH
AND CONFIGURATION
GRAB BAR
HORIZONTAL
TA85
BABY CHANGING
STATION
B O
TT
O
F
R
EF
LE
C
TI
V E
S U R
FA
C E
MIRROR
ADA
M
A X
TO
TA31
TA38
TOILET SEAT
COVER
DISPENSER
ROBE HOOK AT
ACCESSIBLE
LOCATIONS (SEE
ELEVATIONS FOR
STANDARD HOOK HT)
TA33
/3
TA95
MOP AND BROOM
HOLDER
TA24
TA25
H T.
O F
O
PE
R A B
LE
D
EV
IC
E
H
EI
G H T
O F
O
PE
R A B
LE
D
EV
IC
E
H
EI
G H T
O F
O
PE
R A B
LE
D
EV
IC
E
FIRE
EXTINGUISHER
CABINET
FEC
36"
42"
F.F.E.
TA36
SANITARY
NAPKIN
DISPOSAL
GRAB BAR
VERTICAL
TA2318"
NOTE: TOP OF GRAB BAR MAY BE 36"
WHERE USED WITH TANK TOILETS
SEMI RECESSED
WASTE RECEPTACLE &
PAPER TOWEL
DISPENSER
TA2648"
A B B R E V I A T I O N S A N D A C R O N Y M S
AFF . . . . . . . . . . . . . . . . . . . . . . . ABOVE FINISHED FLOOR
BOGB . . . . . . . . . . . . . . . . . . . . . . BOTTOM OF GRAB BAR
FFE . . . . . . . . . . . . . . . . . . . . . . FINISHED FLOOR ELEVATION
FFW . . . . . . . . . . . . . . . . . . . . . . . . .FINISH FACE OF WALL
GB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRAB BAR
HOD . . . . . . . . . . . . . . . . . . . . . HIGHEST OPERABLE DEVICE
MAX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAXIMUM
MIN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MINIMUM
TOGB . . . . . . . . . . . . . . . . . . . . . . . . . TOP OF GRAB BAR
WC . . . . . . . . . . . . . . . . . . . . . . . . . . . WATER CLOSET
W/ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITH
W/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WITHOUT
FO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FACE OF
(A)
FRONT APPROACH,
PULL SIDE
(B)
FRONT APPROACH,
PUSH SIDE
M
IN
(C)
FRONT APPROACH, PUSH
SIDE, DOOR PROVIDED W/
BOTH CLOSER AND LATCH
M
IN
M
IN
(D)
HINGE APPROACH,
PULL SIDE
M
IN
(E)
HINGE APPROACH,
PULL SIDE
(F)
HINGE APPROACH,
PUSH SIDE
M
IN
(G)
HINGE APPROACH, PUSH
SIDE, DOOR PROVIDED W/
BOTH CLOSER AND LATCH
M
IN
M
IN
MIN
24"
(H)
HINGE APPROACH,
PULL SIDE
M
IN
MIN
24"
(I)
LATCH APPROACH,
PULL SIDE, DOOR
PROVIDED W/ CLOSER
(J)
LATCH APPROACH,
PUSH SIDE
M
IN
MIN
24"
(K)
LATCH APPROACH,
PUSH SIDE, DOOR
PROVIDED W/ CLOSER
M
IN
MIN
24"
404.2.4.1 MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS AND GATES
404.2.4.2 MANEUVERING CLEARANCES AT DOORWAYS WITHOUT DOORS OR GATES, MANUAL SLIDING DOORS, AND MANUAL FOLDING DOORS
(A)
FRONT APPROACH
M
IN
(B)
SIDE APPROACH
M
IN
(C)
POCKET OR HINGE
APPROACH
M
IN
(D)
STOP OR LATCH
APPROACH
M
IN
404.2.4.3 RECESSED DOORS AND GATES
404.2.4.6 DOORS IN SERIES AND GATES IN SERIES
M
IN
(A)
PULL SIDE
(B)
PUSH SIDE
M
IN
X
X
(C)
PUSH SIDE, DOOR PROVIDED
W/ CLOSER & LATCH
M
IN
X
(A)
48" MIN
(B)
48" MIN
(C)
48" MIN
404.2.4.3 RECESSED DOORS AND
GATES. A DOOR CAN BE RECESSED DUE
TO WALL THICKNESS OR BECAUSE OF
CASEWORK AND OTHER FIXED ELEMENTS
ADJACENT TO THE DOORWAY. THIS
PROVISION MUST BE APPLIED WHEREVER
DOORS ARE RECESSED.
MIN
18"
MIN
12"
MIN
36"
MIN
42"
MIN
22"
MIN
22"
D O O R A N D G A T E M A N E U V E R I N G C L E A R A N C E S
M
IN
MIN
22"
MIN
24"
MIN
18"
MIN
12"
M
IN
30" X 48" CLEAR
FLOOR AREA AT
LAVATORY
ACCESSIBLE LAVATORY
FRONT APPROACH
PLAN
SECTION
M
A X
M
IN
M
IN
FOR EQUIPMENT
17" MIN CLEARANCE
LAVATORY
CLEARANCES
M
IN
11" MIN
CLEARANCE
8" MIN KNEE
CLEARANCE
6" MAX TOE
FINISH
FLOOR
NON-ACCESSIBLE SHOWER
PLAN DESIGNATION
SH4
PLAN
E L
E V
S
EE
P
LA
N
'-0
SEE PLAN
3'-0" FOF MIN
SH4
EQ EQ
SHOWER
HEAD
CONTROL
AREA
'-6
R
EC
O M
M
EN
D
ED
'-0
ELEVATION
C O
N T
R O
L W
A L
L
SH2
PLAN
30" X 60" CLEAR
FLOOR SPACE SIDE
APPROACH
FO
F M
IN
5'-0" FOF MIN
E L
E V
ROLL-IN SHOWER STALL, NO SHOWER SEAT
PLAN DESIGNATION SH2
TO
C /L
CONTROL
AREA
FLEXIBLE SHOWER
SPRAY HOSE -
60" LONG MIN
15" 3"
ELEVATION
MAX
6"
M A X
"MAX
6"
TA23TA23
TA26
C O
N T
R O
L W
A L
L
SH3
PLAN
30" X 60" CLEAR
FLOOR SPACE SIDE
APPROACH
FO
F M
IN
5'-0" FOF MIN.
ELEV
ROLL-IN SHOWER STALL - W/ SHOWER SEAT
PLAN DESIGNATION SH3
CONTROL
AREA
FLEXIBLE SHOWER
SPRAY HOSE -
60" LONG MIN
MAX
2'-3"
ELEVATION
TO
C /L
M A X
MAX
6"
TA23
TA25
TA44
CONTROL WALL
B ro a d S tr e e t, S u it e
.3
.3
G M
C N
E T
W O
R K
C
O M
A u g u st a
, G A
G o o d w y n M il ls
C a w o o d
, L L
C
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
D R
A W
N B
Y
IS
S
U E
C H
E C
K E
D B
Y
D A
T E
G M
C
/3
1/
:5
:5
P M
A C
C E
S S
IB
IL
IT
Y
D A
T A
P A
N T
H E
R D
R , J
E F
F E
R S
O N
, G A
T E
M P
L A
T E
V E
R S
IO
N
.1
N O
T F
O R
C O
N
ST
RU
C
T
IO
N
G 1.
K
P
W J
P
/3
1/
C O
N S
T R
U C
T
IO
N
D O
C U
M E
N T
A T
IO
N
J A
C K
S O
N C
O U
N T
Y E
M S
S T
A T
IO
N
A
A U
G
A C C E S S I B L E P L U M B I N G E L E M E N T S A N D F A C I L I T I E S - E L E V A T I O N V I E W SEE G1.12 FOR PLAN DETAILS
I M P O R T A N T N O T E: A L L H E I G H TS G I V E N B E L O W A R E F R O M F A C E O F F L O O R F I N I S H ( N O T F R O M F I N I S H S L A B )
36" FOF MIN
FO
F M
IN
MIN. 36" WIDE X 48"
LONG CLEAR FLOOR
AREA. MEASURED
FROM CONTROL WALL
C O
N T
R O
L W
A L
L
PLAN
TRANSFER SHOWER STALL
PLAN DESIGNATION SH1
TA43
E L
E V
15" 3" FLEXIBLE SHOWER
SPRAY HOSE -
60" LONG MIN
TO
C /L
/2
M
A X
CONTROL AREA
TA23
TA27
18"
ELEVATION
12"
SH1
FOUNTAIN / COOLER - HI-LO
30" X 48"
CLEAR FLOOR
AREA
1'-6" 1'-6"
'-0
M
A X
A T
A C C
ES
S
IB
LE
PLAN
ELEVATION
61" FOF MIN - SEE PLAN
18"
32" MIN CLEAR
O F
W
ET
W A
LL
M
IN
T
O F
IN
IS
H
W
A
LL
H U
N G
F
IX
TU
R E
I N C
H L
O N G
F
LO
O
R M
TD
FI
XT
U R E
I N C
H L
O N G
ST1
WHEELCHAIR ACCESS. STALL
PLAN DESIGNATION ST1
TA23
TA33
TA24 1
6"
TA25
TA36
TA02TA01or
TO
A
N Y
O B S
TR
U C
TI
O
N
M
IN
CLEARANCE
6" MIN TOE4" MAX
TA37
85" FOF MIN - SEE PLAN
18"
4" MAX
32" MIN CLEAR
O F
W
ET
W A
LL
M
IN
T
O F
IN
IS
H
LL
H U
N G
F
IX
TU
R E
I N C
H L
O
O
R M
TD
FI
XT
U R E
I N C
H L
O N G
ST2
WHEELCHAIR ACCESS. STALL W/LAV.
PLAN DESIGNATION ST2
6"
60" MIN
TA33
TA23
TA24
TA25
TA36
TA02TA01 or
TO
A
N Y
O B S
TR
U C
TI
O
N
M
IN
CLEARANCE
6" MIN TOE
TA37
61" FOF MIN CLEARANCE
6" MIN TOE
18"
'-1
M
IN
T
O F
A C
E O
F W
ET
W
A
LL
S
EE
P
LA
N
"M
A X
ST3
WHEELCHAIR ACCESS. STALL - END OF ROW
PLAN DESIGNATION ST3
LL
H U
N G
F
IX
TU
R E
I N C
H L
O
O
R M
TD
FI
XT
U R E
I N C
H L
O N G
6"
TA33
NOTE: PROVIDE
SUPPORT BRACKET
@ 8'-0" AFF @ THIS
STALL TYPE
TA23
TA24
TA25
TA36
TA02TA01 or
M
IN
C
LE
A R
M
IN
A
IS
LE
A
D
JA
C
EN
T S
TA
LL
D
EP
TH
TA37
61" FOF MIN CLEARANCE
6" MIN TOE
18"
'-1 M
IN
T
O F
A C
E O
F W
ET
W
A
LL
S
EE
P
LA
N
ST4
WHEELCHAIR STALL W /LAV - END OF ROW
PLAN DESIGNATION ST4
LL
H U
N G
F
IX
TU
R E
I N C
H L
O
O
R M
TD
FI
XT
U R E
I N C
H L
O N G
6"
TA33
M
IN
TA23
TA24
TA25
TA36
TA02TA01 or
NOTE: PROVIDE
SUPPORT BRACKET
@ 8'-0" AFF @ THIS
STALL TYPE
M
A X
A
D
JA
C
EN
T S
TA
LL
D
EP
TH
M
IN
M
IN
C
LE
A R
TA37
ST5
18 1/2" 18 1/2"
CLR INSIDE
37" MAX
32" MIN CLEAR
TA33
LL
H U
N G
F
IX
TU
R E
I N C
H L
O
O
R M
TD
FI
XT
U R E
I N C
H L
O N G
TO
F
IN
IS
H F
A C
E O
F W
ET
W
A
LL
TA23
TA25
TA02
TA36
AMBULATORY ACCESSIBLE STALL
PLAN DESIGNATION ST5
"TA01or
TO
A
N Y
O B S
TR
U C
TI
O
N
M
IN
TA37
INSIDE
36" CLEAR
CLEAR
24" MIN
TO
F
IN
IS
H F
A C
E O
F W
ET
W
A
LL
ST6
STANDARD TOILET STALL
PLAN DESIGNATION ST6
TA02
TA33
TA36
18"
TA01 or
TA37
STANDARD URINAL STALL
EQ EQ
PLAN DESIGNATION ST7
HC
ACCESSIBLE URINAL STALL
SEE PLAN
36" MIN CLEAR
EQ EQ
30" X 48" REQ'D.
FLOOR CLEARANCE
AT URINAL
PLAN DESIGNATION ST8
36" MAX. CLR.
30" MIN. CLR.
O
R M
TD
FI
XT
U
R E
A T
LO
LL
H U
N G
F
IX
TU
R E
A T
LO
N G
18"
ACCESSIBLE TOILET ROOM TYPE 1
TA36
TA23
TA25
TA01
TA17
TA03
TA09
TA24
TA33
30" X 48"
LAVATORY CLEAR
SPACE
36" X 48" CLEAR
SPACE REQ'D AT
OUTSWING DOOR
56" X 60" REQ'D
WATER CLOSET
CLEARANCE
ADA WHEELCHAIR
TURNING RADIUS
INSWING OR
OUTSWING DOOR
AS SHOWN ON
FLOOR PLAN
61" MIN CLEAR
INSWING OR OUTSWING DOOR ON FRONT WALL
TA02
or
54" X 60" CLEAR
SPACE REQ'D AT
INSWING DOOR
NOTE:
ACTUAL LOCATIONS OF SOAP
DISPENSERS, TOWEL DISPENSERS
AND WASTE RECEPTACLES MAY VARY.
SEE PLANS FOR LOCATIONS.
7'-6" MIN TO FINISH OF WET WALL
M
IN
T
O F
IN
IS
H O
F W
ET
W
A
LL
TA18 or TA19
TA10thru
6"
TA37
ACCESSIBLE TOILET ROOM TYPE 2
18"
O
R M
TD
FI
XT
U
R E
A T
LO
LL
H U
N G
F
IX
TU
R E
'-2
A T
LO
N G
MIN TO FACE OF
LAVATORY IF DOOR HAS
BOTH CLOSURE & LATCH
M
IN
TA33
TA11
61" MIN CLEAR
OUTSWING DOOR ON SIDE WALL
TA36
TA23
TA25
TA01
TA24
TA02
or
30" X 48"
LAVATORY CLEAR
SPACE
36" X 48" CLEAR
SPACE REQ'D AT
OUTSWING DOOR
56" X 60" REQ'D WATER
CLOSET CLEARANCE
ADA WHEELCHAIR
TURNING RADIUS90" MIN TO FINISH OF WET WALL
M
IN
T
O F
IN
S H O
F W
ET
W
A
LL
TA17
TA03
TA18 or TA19
TA10thru
NOTE:
ACTUAL LOCATIONS OF SOAP
DISPENSERS, TOWEL DISPENSERS
AND WASTE RECEPTACLES MAY
VARY. SEE PLANS FOR LOCATIONS.
TA376"
O
R M
TD
FI
XT
U
R E
A T
LO
LL
H U
N G
F
IX
TU
R E
A T
LO
N G
18"
ACCESSIBLE TOILET ROOM TYPE 3
56" X 60" WATER
CLOSET CLEAR SPACE
ADA WHEELCHAIR
TURNING RADIUS
30" X 48" LAVATORY
CLEAR SPACE
36" X 48" DOOR
APPROACH SPACE
TA33
61" MIN CLEAR
INSWING DOOR ON SIDE WALL
TA09
TA36
TA23
TA25
TA01
TA17
TA03
TA02
or
30" X 48"
LAVATORY CLEAR
SPACE
90" MIN TO FINISH OF WET WALL
M
IN
T
O F
IN
IS
H O
F W
ET
W
A
LL
TA18 or TA19
TA10thru
N…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .