JA-3 FTQW 21-2009 PC Submittal Register_02 AUG 21.pdf

PDF 145 KB Posted

Attached to
POWER UPGRADES AT THE CHARLIE BATTERY Federal contract opportunity
Solicitation number
FTQW-21-2009PC
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document is a submittal register for a federal construction contract solicitation to upgrade power infrastructure at Charlie Battery near Eielson Air Force Base in Alaska. The solicitation requires the delivery, installation and construction of a 500kVA transformer, one power drop, five power poles, associated guy wires and lines, a three bank transformer, a concrete pad, utility vault and other related work. The contractor must provide underground service from an existing three bank transformer pole to a new pole across the road. The work includes a ground-mounted 500kVA transformer requiring a concrete pad and a utility vault. The estimated value is between $100,000 and $250,000. Questions are due by August 20, 2021 and sealed bids must be submitted electronically by September 9, 2021 to the Department of the Air Force Pacific Air Forces. The contractor must be registered in the System for Award Management.

View the file

Other files for this federal contract opportunity

Other files attached to POWER UPGRADES AT THE CHARLIE BATTERY, newest first.
File Type Posted
Solicitation Amendment FA500421B00050001 SF 30.pdf PDF
Solicitation Amendment - FA500421B00050001.pdf PDF
JA-4 Wage Detemination AK20210001 07-30-21.pdf PDF
Solicitation - FA500421B0005.pdf PDF
JA-1 PWS Charlie Electrical.pdf PDF
JA-2 FTQW 21-2009 PC Project Specifications 02 AUG 21.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Trans-mittal #

Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classificati on: GOVT or A/E Revwr Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth Date RCD From

CONTR

Date FWD To

Other Revwr

Date

RCD

From Other Revwr

Action Code

Date Of Action

Mailed To

CONTR/

Date RCD From

APPR

Authority Remarks

01 20 00 01 Preconstruction Submittals Schedule of Prices 1.3 G

1 01 30 00 01 Preconstruction Submittals View Location Map 1.4

2 01 30 00 01 Preconstruction Submittals Progress and Completion Pictures 1.5

3 01 30 00 04 Samples Color Boards 1.3

4 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G

5 01 32 16.00 20 07 Certificates Monthly Updates 1.4 G

6 01 33 00 01 Preconstruction Submittals Submittal Register 1.7 G

7 01 35 13 01 Preconstruction Submittals Construction Operation Plan 3.1 G

8 01 35 26 01 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G

9 01 35 26 06 Test Reports Notifications and Reports 1.11

10 01 35 26 06 Test Reports Accident Reports 1.11.2 G

11 01 35 26 06 Test Reports LHE Inspection Reports 1.11.3

12 01 35 26 07 Certificates Crane Operators/Riggers 1.5.1.4

13 01 35 26 07 Certificates Standard Lift Plan 1.6.2.2

14 01 35 26 07 Certificates Critical Lift Plan 1.6.2.3 G

15 01 35 26 07 Certificates Activity Hazard Analysis (AHA) 1.7

16 01 35 26 07 Certificates Confined Space Entry Permit 1.8.1

17 01 35 26 07 Certificates Hot Work Permit 1.8.1 G

18 01 35 26 07 Certificates Certificate of Compliance 1.11.4

19 01 35 26 07 Certificates License Certificates 1.13

20 01 45 00.00 10 01 Preconstruction Submittals Contractor Quality Control (CQC) Plan 3.2 G

21 01 45 00.00 10 06 Test Reports Verification Statement 3.5.2

22 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3 G

23 01 50 00 01 Preconstruction Submittals Traffic Control Plan 2.2 G

24 01 57 19 01 Preconstruction Submittals Preconstruction Survey 1.6.1

25 01 57 19 01 Preconstruction Submittals Regulatory Notifications 1.6.2

26 01 57 19 01 Preconstruction Submittals Environmental Protection Plan (EPP)

27 01 57 19 01 Preconstruction Submittals Stormwater Notice of Intent and copy of ADEC approval

28 01 57 19 01 Preconstruction Submittals Dirt and Dust Control Plan 1.7.11.1

29 01 57 19 01 Preconstruction Submittals Employee Training Records 1.6.5

30 01 57 19 01 Preconstruction Submittals Environmental Manager Qualifications 1.6.4

31 01 57 19 01 Preconstruction Submittals Completed Checklist For Spruce Lake Disposal

32 01 57 19 01 Preconstruction Submittals Notice of Intent For Asbestos Abatement

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Construct Electrical Components at Charlie Battery

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 21-2009 PC

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Construct Electrical Components at Charlie Battery

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 21-2009 PC

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

33 01 57 19 01 Preconstruction Submittals Notice Of Building Demolition

34 01 57 19 01 Preconstruction Submittals Stormwater Pollution Prevention Plan

(SWPPP)

35 01 57 19 01 Preconstruction Submittals Evidence Of Delivery Of SWPPP to

ADEC

36 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Plan (SAP)

37 01 57 19 01 Preconstruction Submittals Contaminated Soil Sampling And Analysis Field Report

38 01 57 19 01 Preconstruction Submittals Initial Contractor Hazardous Material Inventory G

39 01 57 19 06 Test Reports Laboratory Analysis 3.7.1.1.2

40 01 57 19 06 Test Reports Inspection Reports 3.2.1.3

41 01 57 19 06 Test Reports Solid Waste Management Report 3.7.2.1

42 01 57 19 07 Certificates Employee Training Records 1.6.5

43 01 57 19 07 Certificates Erosion and Sediment Control Inspector 1.6.5

44 01 57 19 07 Certificates ADEC Transport, Treatment, & Disposal Approval Form For Contaminated Media

(ATT)

G

45 01 57 19 11 Closeout Submittals Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4

46 01 57 19 11 Closeout Submittals Stormwater Notice of Termination to

ADEC

47 01 57 19 11 Closeout Submittals Waste Determination Documentation 3.7.1

48 01 57 19 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.7.3.6 G

49 01 57 19 11 Closeout Submittals Assembled Employee Training Records 1.6.5

50 01 57 19 11 Closeout Submittals Solid Waste Management Permit G

51 01 57 19 11 Closeout Submittals Solid Waste Management Report 3.7.2.1 G

52 01 57 19 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.3.1 G

53 01 57 19 11 Closeout Submittals Regulatory Notifications 1.6.2

54 01 57 19 11 Closeout Submittals Sales Documentation 3.7.2.1

55 01 57 19 11 Closeout Submittals Contractor Certification

56 01 57 19 11 Closeout Submittals As-Built Topographic Survey

57 01 57 19 11 Closeout Submittals ADEC Approved Disposal Facility Weight and/or Acceptance Ticket for Contaminated Soil

G

58 01 57 19 11 Closeout Submittals

ADEC Approved Disposal Facility Certificate of Thermal Incineration or Disposal of Contaminated Soil along with Confirmatory Sample Results

G

59 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G

60 01 78 00 03 Product Data Manufacturer's Warranties G

61 01 78 00 03 Product Data Warranty Management Plan 1.6.1 G

62 01 78 00 03 Product Data Warranty Tags 1.6.3 G

63 01 78 00 03 Product Data Spare Parts Data 1.4

TITLE: CONSTRUCTION DOCUMENT

SUBMITTAL REGISTER

JOB NAME: Construct Electrical Components at Charlie Battery

LOCATION: EIELSON AFB, ALASKA

CONTRACT NO: FTQW 21-2009 PC

CONTRACTOR:

APPROVING AUTHORITY

(d)

CONTRACTOR SCHEDULE

DATES

CONTRACTOR

ACTION

64 01 78 00 08 Manufacturer’s Instructions Posted Instructions 1.6.1 G

65 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G

66 01 78 00 11 Closeout Submittals As-Built Drawings 2.1 G

67 01 78 00 11 Closeout Submittals As-Built Record of Equipment and Materials 2.1 G

68 01 78 00 11 Closeout Submittals Final Approved Shop Drawings 2.1 G 69 01 78 00 11 Closeout Submittals Interim DD Form 1354 3.8 G

70 01 78 00 11 Closeout Submittals Checklist For DD Form 1354 3.8 G

71 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G

72 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1

73 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3

74 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2

75 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4

76 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6

Submittal Register