J5_Phase 4 Lucerne.Drawings.pdf
PDF 20 MB Posted
- Attached to
- GAOA - Lucerne Campground Group Site Reconstruction Project for the Ashley National Forest
- Solicitation number
- 1240LT22R0021
- Issued by
-
Department of Agriculture Forest Service
About this file
This file provides details on a federal solicitation for construction services. The solicitation number is 1240LT22R0021 and seeks bids for the Lucerne Campground Group Site Reconstruction Project for the Ashley National Forest. The work involves reconstructing group sites at the Lucerne Campground and is set aside competitively for 8(a) contractors. The solicitation and attachments are available for download. The Department of Agriculture Forest Service is the contracting agency. The response due date and anticipated award date are not stated.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
SHEET OF
United States Department of Agriculture Forest Service
1 52
THE PROJECT IS LOCATED IN THE FLAMING GORGE NATIONAL RECREATION AREA OF THE ASHLEY NATIONAL FOREST, DAGGETT COUNTY, UTAH, IN SECTION 20, T 3 N, R 21 E. IT IS LOCATED APPROXIMATELY 8 MILES EAST OF MANILA, UTAH. THE PROJECT MAY BE ACCESSED FROM WYOMING
STATE ROAD 530 AND LUCERNE VALLEY RECREATION ROAD.
BORROW SOURCE: THE GOVERNMENT SOURCE FOR PIPE ZONE MATERIAL, SPECIAL BEDDING AND
SELECT BORROW IS LOCATED APPROX. 3 MILES FROM THE CAMPGROUND.
GREAT DIVIDE DISTRICT OFFICE
22223 STATE HIGHWAY 13
GLIDDEN, WI 54527
APPROVED:
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
3/2 6/2
:2
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\01
.G 1.L
UC
ER
NE
.C
OV
ER
.D W
G
UTAH
DAGGETT COUNTY
R4 INTERMOUNTAIN REGION
ASHLEY NATIONAL FOREST
FLAMING GORGE NATIONAL RECREATION AREA
LUCERNE CAMPGROUND RECONSTRUCTION
PHASE 4
INDEX OF SHEETS
SHEET DWG SHEET TITLE
1 G1 COVER SHEET
2 G2 PROJECT DESCRIPTION
3 G3 SCHEDULE OF ITEMS
4 DE1 DEMOLITION PLAN - OVERVIEW
5 DE2 DEMOLITION PLAN - LOOPS E AND F
6 S1 SITE PLAN - OVERVIEW
7 S2 SITE PLAN - LOOP E
8 S3 SITE PLAN - LOOP F
9 S4 SITE PLAN - LOOP F ENTRANCE AND OVERFLOW PARKING AREA
10 D1 CONCRETE FAMILY UNIT PADS
11 D2 PRE-CAST CONCRETE PICNIC TABLES WITH BENCHES
12 D3 UTILITY TABLE DETAILS
13 D4 CONCRETE FIRE RING
14 D5 CURB STOP, UNIT MARKER, SIDEWALK, ASPHALT PATH,
DUMPSTER PAD AND DIRECTIONAL ARROW DETAILS
15 D6 WINDSCREEN FENCE DETAILS
16 D7 COMFORT STATION INSTALLATION - VAULT TOILET
17 D8 BULLETIN BOARD CASE AND BENCH DETAILS
18 R1 ROADS OVERVIEW AND CONTROL POINTS
19 R2 LOOP E ROAD PLAN AND PROFILE
20 R3 LOOP E ROAD PLAN AND PROFILE
21 R4 LOOP F ROAD PLAN AND PROFILE
22 R5 LOOP F ROAD PLAN AND PROFILE
23 R6 OVERFLOW PARKING PLAN AND PROFILE AND VAULT TOILET
PULLOUT
24 R7 TYPICAL ROAD CROSS SECTIONS
25 R8 TYPICAL SPUR SECTION AND DETAILS
26 R9 TYPICAL SPUR SECTION AND DETAILS (CONT.)
27 R10 SIGN LIST AND INSTALLATION DETAILS
28 R11 GATE FABRICATION DETAILS
29 R12 GATE FABRICATION DETAILS (CONT.)
30 R13 GATE INSTALLATION DETAILS
31 R14 CONSTRUCTION POINTS
32 W1 WATER SYSTEM OVERVIEW
33 W2 WATER SYSTEM SITE PLAN - LOOPS E AND F
34 W3 VALVE, VALVE BOX, TRENCH AND IRRIGATION DRAIN DETAIL
35 W4 HYDRANT WITH POST, FRAME AND GRATE
36 W5 POTABLE/NON-POTABLE PIPE SEPARATION AND THRUST BLOCK
DETAILS
37 PL1 PLANTING PLAN - OVERVIEW
38 PL2 PLANTING PLAN - LOOP F
39 PL3 PLANTING PLAN - LOOP E
40 PL4 PLANTING PLAN - ROADSIDE STRIP
41 PL5 PLANTING DETAILS
42 IR1 IRRIGATION PLAN - OVERVIEW
43 IR2 IRRIGATION PLAN - LOOP F
44 IR3 IRRIGATION PLAN - LOOP E
45 IR4 IRRIGATION PLAN - ROADSIDE STRIP
46 IR5 IRRIGATION SYSTEM DETAILS
47 IR6 IRRIGATION SYSTEM DETAILS (CONT.)
48 IR7 IRRIGATION MAINLINE - LOOPS E-F PLAN AND PROFILE
49 IR8 IRRIGATION MAINLINE - ROADSIDE STRIP PLAN AND PROFILE
50 E100 ELECTRICAL GENERAL INCLUDING IRRIGATION NOTES
51 E101 ELECTRICAL - LOOP E
52 E102 ELECTRICAL - LOOP F
PROJECT LOCATION
{THIS PROJECT CONSISTS OF RECONSTRUCTING PORTIONS OF THE LUCERNE CAMPGROUND, INCLUDING LOOPS E AND F. ELECTRICAL, POTABLE WATER AND IRRIGATION SYSTEMS WILL ALSO BE IMPROVED.
A. DEMOLITION WORK INCLUDES THE FOLLOWING:
1. DEMOLITION OF ALL EXISTING ABOVE GROUND IMPROVEMENTS IN LOOPS E AND F, INCLUDING PULVERIZING THE EXISTING ASPHALT, AND REMOVING CAMPING SPURS, FAMILY UNITS, SHELTERS, CONCRETE BARRIERS, WATER HYDRANTS, SITE FURNITURE, IRRIGATION SPRINKLERS, SIGNS, ETC. THE EXISTING POTABLE WATER, SEWER AND ELECTRICAL UTILITIES ARE TO REMAIN, AS DESIGNATED. THE EXISTING DUMPSTERS ARE TO BE SALVAGED AND
REUSED.
2. IF OPTIONS #3 AND #4 ARE NOT AWARDED, THE EXISTING RESTROOMS SHALL REMAIN UNDISTURBED, INCLUDING ANY CONCRETE WALKWAYS AROUND THE PERIMETER OF THE BUILDING.
B. NEW CONSTRUCTION WORK INCLUDES THE FOLLOWING:
1. RECONSTRUCTION OF LOOPS E AND F, INCLUDING NEW ASPHALT ROADS AND CAMPING SPURS, FAMILY UNITS, SIGNS, SITE FURNITURE, PATHS, ELECTRICAL SYSTEM, IRRIGATION SYSTEM, LANDSCAPING, AND OTHER WORK AS
DESCRIBED IN THE PLANS. CONSTRUCT NEW WATER LATERALS TO SERVE NEW HYDRANTS.
2. CONSTRUCTION OF A NEW ASPHALT PULLOUT FOR THE VAULT TOILET.
3. CONSTRUCTION OF A NEW OVERFLOW PARKING AREA WITH ASPHALT SURFACE.
C. OPTIONAL WORK THAT MAY BE AWARDED INCLUDES ALL WORK DESCRIBED ABOVE ASSOCIATED WITH:
1. OPTION #1: SHELTERS FOR FAMILY UNITS
1.1 IF OPTION #1 “SHELTERS FOR FAMILY UNITS” IS NOT AWARDED, COORDINATION IS REQUIRED TO ENSURE THE PROPER CONCRETE FOOTERS ARE INSTALLED FOR THE FUTURE SHELTERS. SEE SECTION 136000
“PRE-MANUFACTURED SHELTER”.
2. OPTION #2: WIND SCREENS FOR FAMILY UNITS
3. OPTION #3: LOOP E RESTROOM BUILDING
3.1 DEMOLITION: THE EXISTING RESTROOM IN LOOP E SHALL BE DEMOLISHED, REMOVED AND DISPOSED OF, INCLUDING ADJACENT CONCRETE SIDEWALKS.
3.2 THIS ITEM INCLUDES GRADING AROUND THE NEW BUILDING; NEW CONCRETE SIDEWALKS AROUND THE PERIMETER OF THE BUILDING; AND CONCRETE SIDEWALKS BETWEEN THE RESTROOM AND THE ASPHALT PULLOUT.
4. OPTION #4: LOOP F RESTROOM AND SHOWER BUILDING
4.1 DEMOLITION: THE EXISTING RESTROOM IN LOOP F SHALL BE DEMOLISHED, REMOVED AND DISPOSED OF, INCLUDING ADJACENT CONCRETE SIDEWALKS.
4.2 THIS ITEM INCLUDES GRADING AROUND THE NEW BUILDING; NEW CONCRETE SIDEWALKS AROUND THE PERIMETER OF THE BUILDING; AND CONCRETE SIDEWALKS BETWEEN THE RESTROOM AND THE ASPHALT PULLOUT.
5. OPTION #5: IRRIGATION SYSTEM AND LANDSCAPING
5.1 THIS ITEM INCLUDES THE CONSTRUCTION OF THE NEW “ROADSIDE STRIP” LANDSCAPING AREA ALONG THE EXISTING ENTRANCE ROAD, AND LANDSCAPING WITHIN AND ADJACENT TO LOOPS E AND F.
5.2 THE 4-INCH IRRIGATION MAINLINE IS INCLUDED IN THE BASE BID.
5.3 CONTROL CABLING AND RELATED TRENCH WORK IS INCLUDED IN THE BASE BID. SEE SPECIFICATION 260500 FOR INSTRUCTIONS IF OPTION #5 IS NOT AWARDED.
6. OPTION #6: ASPHALT REPAIRS
7. OPTION #7: VAULT TOILET
7.1 THIS ITEM INCLUDES THE CONCRETE SIDEWALK AROUND THE PERIMETER OF THE VAULT TOILET.
7.2 THE ASPHALT PULLOUT AND SIGNS ARE INCLUDED IN THE BASE BID.}
{\Fcomplex|c0;\LPROJECT DESCRIPTION}
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/2 6/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\02
-0 3_
G2 -3
.L
UC
ER
NE
.S
CH
.V
IC
IN
IT
YM
AP
.D W
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
PROJECT DESCRIPTION
RB/DW/SB
RB/DW/SB
D. JEPPSEN
G2 2 52
FINAL - 3/26/2021
SCHEDULE OF ITEMS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/2 6/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\02
-0 3_
G2 -3
.L
UC
ER
NE
.S
CH
.V
IC
IN
IT
YM
AP
.D W
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
SCHEDULE OF ITEMS
RB/DW/SB
RB/DW/SB
D. JEPPSEN
G3 3 52
P
P P
P
PP PP
P P
P P
P
PP
P
P P P
P P
P P
PP
mh mh mh mh mh mh mh mh mh mh
H2O
H2O
H2O
H2O
H2OH2O D
D D
D
D
S S S S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S S S S S S S
M
M
M
M
S
S
M
M
M
M
M
M
M
M
M M
M M
M
IR
IR
IR
IR
IR IR
IR
IR
IR IR IR IR IR
IR IR IR
IR IR IR IR IR
IR
IR
IR
IR
IR
IR
H
H
H
H
H H
D
S
S
M
M
M
V
W W
W
W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W W W W W W
W
W
W
W
W
W
W
W
W
W
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PPPPTP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
E
TP
TP
TPTP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TP
TPTPTP
TP
TP
E
TP
TP
TPTP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TPTP
TP
TP
TP
TP
TPTP
TP
TPTP
TPTPTP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TPTP
TP
TP
M
E E
TP
TP
TP
TP
TP
T P
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
T P
T P
TP
TP
T P
T P
TP
TP
TP
TP
TP
TP
TP
T P
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
DAY USE AND
MARINA PARKING
SCALE IN FEET
100' 200'100'
{NOTES:
1. AN EXTENSIVE EFFORT HAS BEEN MADE TO LOCATE ALL POSSIBLE EXISTING UTILITY LINES FROM RECORDS AND EVIDENCE IN THE FIELD, HOWEVER, THE COMPLETENESS OR ACCURACY OF THE LOCATIONS SHOWN CANNOT BE GUARANTEED. ADDITIONAL BURIED ELECTRICAL AND IRRIGATION LINES ARE KNOWN TO EXIST, HOWEVER THE LOCATION IS UNKNOWN. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING THE LOCATION OF ALL EXISTING UTILITIES. ANY LOCATION STAKED OR SHOWN IS APPROXIMATE. CALL 811 TO HAVE UTILITIES MARKED BEFORE
BEGINNING CONSTRUCTION. IF CONFLICTS ARE FOUND, NOTIFY THE CONTRACTING OFFICER.
2. DO NOT DAMAGE EXISTING TREES.
3. LOOPS E AND F: PULVERIZE ASPHALT ROADS AND SPURS TO A DEPTH OF 5 INCHES. EXISTING ASPHALT CONSISTS OF AN APPROXIMATELY 1" DOUBLE CHIP SEAL. ASPHALT TO BE THOROUGHLY MIXED WITH ROAD BASE MATERIAL.
REMOVE ALL SIGNS, GATES, CULVERTS, HYDRANTS, IRRIGATION SYSTEM QUICK COUPLERS, SPRINKLERS, CONCRETE BARRIERS, PEDESTAL GRILLS, FIRE RINGS, PICNIC TABLES, CONCRETE FAMILY UNIT SLABS AND SHELTERS AND DISPOSE OF IN A SANITARY LANDFILL. REMOVE ALL IRRIGATION PIPE ENCOUNTERED TO A DEPTH OF 12 INCHES BELOW GRADE. ABANDON REMAINING IRRIGATION PIPE IN PLACE. REMOVE EXISTING RESTROOMS AND RELATED CONCRETE SIDEWALKS. EXISTING UNDERGROUND UTILITIES ARE TO REMAIN. SALVAGE THE PADDLE-HANDLE FAUCETS FROM THE EXISTING HYDRANTS - PROVIDE FAUCETS TO THE CONTRACTING OFFICER. EXISTING DUMPSTERS ARE TO BE SALVAGED AND REUSED. PLACE DUMPSTERS ON NEW PADS AT COMPLETION OF PROJECT.
SIGNS DESIGNATED TO REMAIN ARE TO REMAIN AS-IS. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY
DAMAGE TO ITEMS DESIGNATED TO REMAIN AS-IS.
4. LOOPS A, B, C, D AND G: NO DEMOLITION WORK IS TO BE DONE IN THIS AREA, OTHER THAN ASPHALT REMOVAL
FOR REPAIR WORK.
5. FOR ALL ROADS DESIGNATED TO BE PULVERIZED, RE-USE THE PULVERIZED MATERIAL FOR NEW ROAD BASE. AT MOST LOCATIONS, THE ROAD BASE SHALL REMAIN IN PLACE AND SHALL BE RESHAPED ACCORDING TO "R" SHEETS.
IN PLACES DESIGNATED TO BE OBLITERATED (SEE HATCHING ON LEGEND), THE ROAD BASE SHALL BE 1) PULVERIZED;
2) COMPLETELY REMOVED; 3) REPLACED WITH SELECT BORROW (COMPACTED) AND TOP SOIL; AND 4) LEFT IN A STATE READY FOR SEEDING. USE REMOVED ROAD BASE FOR THE CONSTRUCTION OF NEW ROADS AND SPURS.
6. NO PULVERIZED ASPHALT SHALL BE EXPOSED UPON COMPLETION OF THE PROJECT.}
SEE SHEET DE2
FLAMING GORGE
RESERVOIR
LUCERNE VALLEY ROAD
LOOP ALOOP BLOOP C
LOOP D
LOOP E
LOOP F
LOOP G
LEGEND:
EXISTING WATERLINE (TO REMAIN)
EXISTING SEWERLINE (TO REMAIN)
EXISTING OVERHEAD ELECTRICAL LINE (TO REMAIN)
EXISTING IRRIGATION LINE (TO REMAIN)
EXISTING IRRIGATION LINE (TO BE ABANDONED)
EXISTING CURB VALVE AND BOX (TO REMAIN)
EXISTING HYDRANT (TO BE REMOVED)
EXISTING DRAIN (TO REMAIN)
EXISTING MANHOLE (TO REMAIN)
RESERVOIR
EXISTING ROAD (TO REMAIN)
EXISTING ROAD (TO BE PULVERIZED)
EXISTING ROAD (TO BE OBLITERATED, SEE NOTE 5)
EXISTING TREE (DO NOT DAMAGE UNLESS WITHIN
CLEARING LIMITS)
EXISTING CONCRETE PAD, SHELTER & TABLE (REMOVE)
EXISTING GRILL (TO BE REMOVED)
EXISTING FIRE RING (TO BE REMOVED)
EXISTING ELECTRICAL PEDESTAL (TO BE REMOVED)
EXISTING POWER POLE (TO REMAIN)
EXISTING SPRINKLER HEAD (TO BE REMOVED)
W
S
E
M
H
IR
D
IR
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 7/2
:3
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\04
-0 5_
DE
-0 2.L
UC
ER
NE
.D
EM
OP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
DEMOLITION PLAN
OVERVIEW
D. WEWER
D. WEWER
D. JEPPSEN
DE1
4 52
FINAL - 3/18/2021
mh mh
H2 O
H2O D
D
D
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
M
M
M
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
H
H
D
S
S
S
S
S
M
M
M
W W
W W
W W
W W
W W
W W
W
WWWW
W
W
W
W
W
W
W
W
W
W
PP
PP
PP
PP
M
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
SCALE IN FEET
40' 80'40'
{NOTES:
1. NOTES AND LEGENDS ON SHEET DE1 APPLY.
2. SEE NOTES ON DE1 FOR DESCRIPTION OF ITEMS TO BE
REMOVED.}
LOOP F
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 7/2
:3
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\04
-0 5_
DE
-0 2.L
UC
ER
NE
.D
EM
OP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
DEMOLITION PLAN
LOOPS E AND F
D. WEWER
D. WEWER
D. JEPPSEN
DE2
5 52
LOOP E
IR
IR
IR
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:0
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\06
-0 9_
S1 -S
4.L
UC
ER
NE
4.S
IT
EP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
SITE PLAN
OVERVIEW
BUDGE/WEWER
BUDGE/WEWER
D. JEPPSEN
S1 6 52
SCALE IN FEET
150' 300'150'
LOOP A
LOOP B
LOOP C
LOOP D
LOOP E
LOOP F
LOOP G
SE
E
SH
EE
T S3
SEE SHEET S4
SE
E
SH
EE
T S2
S4
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
NEW WATERLINE
EXISTING WATERLINE
NEW IRRIGATION LINE
EXISTING IRRIGATION LINE
EXISTING SEWERLINE
EXISTING ELECTRICAL LINE}
W
W
S
E
{EXISTING MANHOLE
RESERVOIR
NEW ASPHALT ROAD
MAJOR CONTOUR AND ELEVATION (FEET)
NEW SIGN
NEW HYDRANT - STANDARD TYPE B}
{\Fsimplex.shx;9310} M
IR
TP
SCALE IN FEET
25' 50'25'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:0
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\06
-0 9_
S1 -S
4.L
UC
ER
NE
4.S
IT
EP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
SITE PLAN
LOOP E
BUDGE/WEWER
BUDGE/WEWER
D. JEPPSEN
S2 7 52
LOOP E
NEW WATERLINE
EXISTING WATERLINE
NEW IRRIGATION LINE
EXISTING IRRIGATION LINE
EXISTING SEWERLINE
EXISTING ELECTRICAL LINE}
W
W
S
E
{EXISTING MANHOLE
RESERVOIR
NEW ASPHALT ROAD
MAJOR CONTOUR AND ELEVATION (FEET)
NEW SIGN
NEW HYDRANT - STANDARD TYPE B}
{\Fsimplex.shx;9310} M
IR
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TPTP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
SCALE IN FEET
25' 50'25'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/2 6/2
:2
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\06
-0 9_
S1 -S
4.L
UC
ER
NE
4.S
IT
EP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
SITE PLAN
LOOP F
BUDGE/WEWER
BUDGE/WEWER
D. JEPPSEN
S3 8 52
LOOP F
TP
TP
TP
IR
IR
IR
IR
IR
IR
S
S
S
S
NEW WATERLINE
EXISTING WATERLINE
NEW IRRIGATION LINE
EXISTING IRRIGATION LINE
EXISTING SEWERLINE
EXISTING ELECTRICAL LINE}
W
W
S
E
{EXISTING MANHOLE
RESERVOIR
NEW ASPHALT ROAD
MAJOR CONTOUR AND ELEVATION (FEET)
NEW SIGN
NEW HYDRANT - STANDARD TYPE B}
{\Fsimplex.shx;9310} M
IR
TP
SCALE IN FEET
25' 50'25'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:0
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\06
-0 9_
S1 -S
4.L
UC
ER
NE
4.S
IT
EP
LA
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
SITE PLAN
LOOP F ENTRANCE AND
OVERFLOW PARKING
BUDGE/WEWER
BUDGE/WEWER
D. JEPPSEN
S4 9 52
LOOP F ENTRANCE AND OVERFLOW PARKING
SCALE IN FEET
25' 50'25' INSTALL DIRECTIONAL ARROWS
(TYP), SEE SHEET D5
VAULT RESTROOM
AND PULLOUT
\A1;VARIES
\pxql;5 FT. MINIMUM DISTANCE FOR SLOPE TRANSITION FROM PATH TO CONC. PAD
\pxql;SELECT BORROW OR NATIVE SOIL AND FILL AS SPECIFIED
DRAINAGE HOLE
FOR FIRE RING
(SEE FIRE RING
DETAILS, SHEET
\pxql;NATIVE SOIL
\pxql;4" CONCRETE
\pxql;4" COMPACTED CRUSHED AGGREGATE BASE GRADING "C".
\pxql;2:1 FILLS UNDER 5'
\pxql;1-1/2:1 FILLS OVER 5'
\pxql;1:1 CUT SLOPES OVER 10'\pxql;1-1/2:1 CUT SLOPES 5' TO 10'\pxql;3:1 CUT SLOPES TO 5' \pxql,t2;3:1 SLOPE\pxql;PATH 5% SLOPE
{NOTE:
USE EXCESS EXCAVATED MATERIAL TO GRADE
AROUND THE EDGE OF THE PADS.
\A1;4"\A1;4"
CONRETE PAD W/
LIGHT BROOM FINISH
\pxql;CRUSHED AGGREGATE BASE COMPACT AS SPECIFIED
\pxql;4" CONCRETE PAD WITH LIGHT BROOM FINISH
\pxql;SUBGRADE COMPACT AS SPECIFIED
14' X 14' METAL SHELTER
W/ MONOSLOPE ROOF
(SEE SPECIFICATION 136000)
\pxql;8-FOOT TABLE (TYP.) (SEE SHEET D2)
CONCRETE CONTRACTION JOINT (TYP)
\A1;FIRE RING (SEE DETAIL SHEET D4)
UTILITY TABLE
(SEE DETAIL SHEET D3)
\A1;4' \A1;14'\A1;14'\A1;5'-9"
\A1;24 '-9"
\A1;16'
{\LTYPICAL PAD SECTION WITH CUT & FILL\H0.5x;\l (NO SCALE)}
{\LTYPICAL PAD SECTION\H0.5x;\l (NO SCALE)}
\pxql;{\LHAND TOOLED CONTRACTION JOINTS\H0.5x;\l (NO SCALE)}
{NOTES:
}1. INSTALL 1/2" COMPRESSED FELT EXPANSION JOINT WHEN POURING
OPERATIONS ARE SUSPENDED FOR ONE HOUR OR MORE.
2. CONCRETE PADS SHALL BE SLOPED AT 1% IN ONE DIRECTION TO DRAIN.
3. ALL PADS THAT CONNECT DIRECTLY TO PARKING SPURS SHALL HAVE A 4'
MIN. WIDE AREA WITH LESS THAN 1/2" GRADE CHANGE BETWEEN THE PAD AND
THE SPUR TO PROVIDE FOR ACCESSIBILITY.(SEE "S" SHEETS)
4. WHERE AN ACCESSIBLE 4' WIDE ASPHALT PATH CONNECTS PAD WITH THE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 1/2
:5
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\10
_D
_C
ON
CR
ET
E_
PA
D_
FA
MI
LY
_U
NI
TS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
CONCRETE FAMILY UNIT
PADS
BUDGE
BUDGE
D. JEPPSEN
D1 10 52
{\LSINGLE FAMILY UNIT WITH SHELTER\H0.5x;\l (NO SCALE)}
{\LCONCRETE PAD DETAILS FOR FAMILY UNITS}
(PLAN VIEW)
(SECTION VIEW)
(SECTION VIEW)
\A1;92"
\A1;32"
\A1;2'
\A1 ;10
\A
1;
4"
\A ;1
\A1 ;11
\A1;5"
\A1;33"\A1;65"
{NOTES:
1. TABLES SHALL BE PLACED AT SINGLE FAMILY
UNITS AS SHOWN ON SHEETS D1.
2. TABLE SHALL BE MODEL NO. 104FSS, AVAILABLE
FROM OUTDOOR CREATIONS INC,. 2270 BARNEY
ROAD, ANDERSON CA 96007, 530-337-6674 OR
APPROVED EQUAL.
{\LEND VIEW} {\H0.5x;(NO SCALE)} {\H2x;\LSIDE VIEW} (NO SCALE)
{\H2x;\LPLAN VIEW} (NO SCALE)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 1/2
:5
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\11
_D
_C
ON
C_
TA
BL
E.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
PRE-CAST CONCRETE
PICNIC TABLE WITH
BENCHES
BUDGE
BUDGE
D. JEPPSEN
D2 11 52
%%UTABLE TOP SIDE FIN
CONCRETE BASE
C
THICKENED
{\LTABLE BASE PLATE}
1/2" STEEL PLATE BASE
TYPICAL J BOLT
PLACEMENT (4 PLACES
3/4" HOLE) SEE NOTE 3
\pxql;RECTANGULAR TUBING POST
\pxql ;8"
{\LTABLE ROLLED SURFACE PLATE SECTION}
{NOTE:
}TURN DOWN FRONT FIN AND TURN UP
BACK & SIDE FINS @ 90 DEGREED
FROM TABLE SURFACE
\pxql;ROLL OR WELD 2" FIN TO TABLE SURFACE
\pxql ;2"
\pxql;26"
\pxql;22" \pxql ;2"
\pxql ;2"
\pxql ;2"
\pxql;30"
\pxql ;2"
\pxql ;2"
\pxql ;2"
\pxql ;2"
\pxql;18"
\pxql;REAR AND SIDE FINS TURNED UP \pxql;1/4" ROLLED STEEL PLATE FOR TABLE SURFACE
\pxql;RECTANGULAR TUBING POST
FRONT FIN TURNED DOWN
SEE "ROLLED SURFACE PLATE SECTION" DETAIL
{\LTABLE TOP VIEW}
{\LTABLE SIDE VIEW & BASE INSTALLATION}
\pxql;30"
\pxql ;2"
\pxql ;2"
\pxql ;2"
\pxql ;2"
\pxql;32"
\pxql;5"
MIN.
\pxql ;6" \pxql;12" \pxql ;6"\pxql;12"
\pxql;4" X 6" X 1/4" TUBE STEEL RECTANGULAR STRUCTURAL TUBING \pxql;CONTINUOUS WELD AROUND BASE AND TOP CONNECTIONS
\pxql;CAP ALL BOLTS WITH SPOT WELDS AGAINST TAMPERING AS DIRECTED BY THE CONTRACTING OFFICER
\pxql;5/8" DIA. X 6" GALVANIZED STEEL J BOLT TYP. (4 PLACES) SEE NOTE 3 \pxql;BASE PLATE
\pxql;FINISHED GRADE
\pxql;CONCRETE PAD
\pxql;4" COMPACTED CRUSHED AGGREGATE
\pxql;10"
{NOTES:
1. SPURS AND SHARP EDGES SHALL BE GROUND SMOOTH
2. ALL SURFACES SHALL BE POWDER COATED WITH HEAT
RESISTANT STOVE BLACK PAINT
3. {}" DIA. x 6" GALVANIZED STEEL WEDGE ANCHORS MAY BE
SUBSTITUTED FOR {}" J BOLTS
4. UTILITY TABLES SHALL BE PILOT ROCK MODELS: UTL/B-1 (18"
X 30") AS MANUFACTURED BY THE R.J. THOMAS MFG. CO. INC.,
CHEROKEE, IOWA
PHONE: 1-800-762-5002,
WEBSITE: WWW.PILOTROCK.COM
5. UTILITY TABLES SHALL BE FURNISHED AND INSTALLED BY
THE CONTRACTOR. THE CONTRACTOR SHALL PROVIDE ALL
BOLTS AND ANCHORING MECHANISMS NECESSARY TO
COMPLETE THE INSTALLATION. INSTALL IN LOCATION AS SHOWN
ON SHEET D1.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 1/2
:5
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\12
_D
_U
TI
LI
TY
_T
AB
LE
S_
FA
MI
LY
_U
NI
T.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
UTILITY TABLE DETAILS
BUDGE
BUDGE
D. JEPPSEN
D3 12 52 http://WWW.PILOTROCK.COM
#4 REBAR @ 45° SPACING
2 LAYERS PLACED AS SHOWN
TIE TO REBAR CIRCLES WITH
CONCRETE CIRCLE 18" HIGH, 10" WIDE
SEE SIDE VIEW & DETAIL FOR
EXTERIOR GROOVE DETAIL
30°
TYP.
1'- 1/2
4"
STEEL RISER TACK WELDED TO SURFACE PLATE
12 @ 30° OFFSET SPACING EACH
SECTION
NOT TO SCALE
1"
1/16''
DETAIL SHOWN
ON RIGHT
TYPICAL 4" CONCRETE
PAD WITH FIBER
1"
45°
7"
EXTERIOR GROOVE
CONCRETE CIRCLE
1/4" MIN. THICK STEEL
4"
TYPICAL 4" CONCRETE PICNIC PAD
9"
" M
IN
8" 10"
WELDED BEAD
1/4" MIN. STEEL INSERT
EXTERIOR GROOVE
AIR SPACE 1 1/2" FROM CONCRETE1 1/2"
16- 5" LONG #4 REBAR
#4 REBAR
COMPACTED AGGREGATE BASE
4"
EXTERIOR GROOVE
(2) 15" #4 REBAR, PLACE
VERTICAL AS SHOWN IN SECTION TIE
CHAMFER TOP EDGE
ON BOTH SIDES OF
7"
18"
FINISHED GRADE
ROUND EDGE
1/4
4"
FIN. GRADE
URETHANE CAULK CIRCLE TO PAD
12" DIA. DRAINAGE HOLE
IN CONCRETE PAD
12" DIA. DRAINAGE HOLE IN
CONC. PAD UNDER FIRE CIRCLE
WASHED DRAIN ROCK 3'x 3'x 3'
TO REBAR WITH #4 GAUGE SMOOTH
DRAIN ROCK UNDER CONCRETE SLAB
AT THE FIRE CIRCLE LOCATION. USE
PLACE 1 CY (3'x 3'x 3') WASHED
UNIFORM GRADATION FROM 1/2" TO 2"UNDER FIRE CIRCLE
WALL ON FIRE CIRCLE
18" HIGH, 8" WIDE
45° 3/8"
7"
REINFORCMENT
#4 REBAR TYP.
FORMED INTO CIRCLE
#4 GAUGE SMOOTH
TO
1/8"
R1'-2"
10"
PRECAST CONCRETE RING IS AVAILABLE FROM DURA-CRETE
http://www.duracrete.com/
DURA-CRETE, INC.
1475 WEST 3500 SOUTH
WEST VALLEY CITY, UT 84119
TEL. 801-972-8686
OR APPROVED EQUAL
GRADED AGGREGATE 3/4" MINUS
(13" DEPTH TO BOTTOM OF
CONCRETE PAD)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 1/2
:5
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\13
_D
_F
IR
E_
RI
NG
_C
ON
CR
ET
E_
FA
MI
LY
_U
NI
T.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
CONCRETE FIRE RING
BUDGE
BUDGE
D. JEPPSEN
D4 13 52
CONCRETE FIRE RING CIRCLE
(NO SCALE)
(PLAN VIEW)
STEEL INSERT DETAIL
(NO SCALE)
(PLAN VIEW)
(SECTION VIEW)
(SIDE VIEW) DETAIL
(NO SCALE)
(SECTION VIEW)
http://www.duracrete.com/
SLOPE TO DRAIN 1/4" PER FOOT FROM BUILDING
4" THICK CONCRETE SIDEWALK
4" COMPACTED CRUSHED AGG. BASE GRADING "C"
BOTH SIDES1/2" RADIUS
FINISH GRADE1"
5'-0" PATHS AROUND RESTROOMS
{CONCRETE SIDEWALK NOTES:
1. SIDEWALK CONTROL JOINTS SHALL BE LOCATED A MAXIMUM OF EVERY 5 LINEAR FEET.
CONTROL JOINTS SHALL BE A MINIMUM 1/2" TOOLED JOINT. NO SAWCUT JOINTS.
2. SIDEWALK EXPANSION JOINTS SHALL BE LOCATED A MAXIMUM EVERY 50 LINEAR FEET
AND AT JUNCTIONS WITH OTHERS SLABS, FOUNDATIONS AND VERTICAL SURFACES.
\pxqc;{\Fsimplex|c0;2% CROWN OR CROSS SLOPE AS STAKED}
1' M
IN
\A1;10' 1'
MIN.
\A1;20'
1' M
IN
\pxql;DEPTHS SHOWN ARE COMPACTED.
10'
6" THICK CONCRETE SLAB WIDTH
VARIES\A1;6' O
R 8'
\A1 ;4"
\A1;9{ \H1x;\S
1/2;}"
A
A C
\A1;VARIABLE\A1;VARIABLE
\A1;VARIABLE
\A1;60"
\A1;36"
\pxql;REFLECTORIZED WHITE PAINT \A1;12"
\A 1;
5'
\A1;2'
\A ;3
\A
;6
"\A1;6"\A1;4"\A1;5.5"\A1;5.5"
\pxqc;6" THICK CONCRETE PAD W/ #3 REBAR REINFORCING 18" O.C. BOTH WAYS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 7/2
:0
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\14
_D
_D
UM
PS
TE
R
PA
D_ _C
UR
B
ST
OP
_U
NI
T
MA
RK
ER
.D W
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
CURB STOP, UNIT MARKER,
SIDEWALK, ASPHALT
PATH, DUMPSTER PAD &
DIRECTIONAL ARROW
DETAILS
BUDGE
BUDGE
D. JEPPSEN
D5 14 52
{\L6' OR 8' PRECAST CONCRETE CURB\H0.5x;\l (NO SCALE)}
{\LSECTION A-A}
{\L(ELEVATION VIEW)} {DUMPSTER PAD
(NO SCALE)}
{DOUBLE DUMPSTER PAD DETAIL
(NO SCALE)}
{DIRECTIONAL ARROW
(NO SCALE)}
{\LASPHALT PATH CROSS SECTION\H0.5x;\l (NO SCALE)}
{CONCRETE SIDEWALK CROSS SECTION
(NO SCALE)}
{\H0.5x; (SECTION VIEW)}
(ISOMETRIC VIEW)
{UNIT MARKER DETAIL
(NO SCALE)}
{\H0.5x; (SECTION VIEW)}
{\H0.5x; (SECTION VIEW)}
CONCRETE PAD
WINDSCREEN IS A TREX SURROUNDINGS SHADOW BOX STYLE FENCE - LOCATION AND CONFIGURATION RELATIVE TO THE PAD VARIES SEE "S" SHEETS S2-S4 FOR LOCATIONS A
(SEE DETAIL 'A' THIS SHEET)
1. CONSTRUCT A TREX SURROUNDINGS SHADOW
BOX STYLE FENCE TO FUNCTION AS A WINDSCREEN.
2. INSTALL POSTS AND FOOTERS EVERY 8' O.C.
3. ATTACH HORIZONTAL WOOD MEMBERS TO
POSTS WITH BRACKETS AS SPECIFIED BY TREX
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
FASTEN ALL VERTICAL MEMBERS WITH DECKING
SCREWS. SCREWS SHALL NOT PENETRATE
THROUGH WOOD MEMBERS AND BE EXPOSED ON
THE OPPOSITE SIDE.
NOTES:
GROUND
\A ;8
\A1;16'CONSTRUCTED IN 8' UNITS - TOTAL LENGTH VARIES, SEE "S" SHEETS
\A1;5'-3"
\A1;2'-11"\A1;6"
TAMPED GRAVEL SUB-BASE (GRADING C)
UNDISTURBED SOIL
30" FROST DEPTH
CONCRETE COLLAR - DO NOT ENCASE BOTTOM OF POST
\A1;6'-2"
\A1;2"
\A1;1'\A1;6" \A1;2"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 1/2
:5
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\15
_D
_W
IN
DS
CR
EE
N.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
WINDSCREEN FENCE
DETAILS
BUDGE
BUDGE
D. JEPPSEN
D6 15 52
{SITE LAYOUT - PLAN VIEW
(NO SCALE)}
{WINDSCREEN FRAMING - ELEVATION
(NO SCALE)}
{DETAIL 'A' - PLAN VIEW
(NO SCALE)}
{WINDSCREEN - ELEVATION
(NO SCALE)}
EDGE OF VAULT
(DISTANCE VARIES)
\pxqc;2%
4" THICK
AGGREGATE
OR NATIVE
SURFACE
\A1;4" MIN.
\pxql;FINISH FLOOR ELEVATION
\pxqc;2%
NATIVE SOIL
BACKFILL WITH SELECT MATERIAL AND COMPACT
AGGREGATE LEVELING COURSE 6" DEPTH
VAULT
EXCAVATE HOLE APPROXIMATELY 2' WIDER ON EACH SIDE OF THE VAULT
{NOTES:
1. FINAL GRADING SHALL ENSURE POSITIVE DRAINAGE AWAY FROM THE BUILDINGS AT 2% SLOPE.
2. PATHWAYS AROUND THE BUILDINGS SHALL BE CONSTRUCTED AS SHOWN IN PATH
* DOUBLE-UNIT VAULT SIZE IS APPROXIMATELY
14'-4" X 11'-11" X 4'-4" DEEP
SIDEWALK SEE
DETAIL ABOVE
\A1;VARIES
\A1;4" MIN.
\A1;VARIES
{\Fsimplex|c0;FINISHED GRADE}{\Fsimplex|c0;2% OUTSLOPE}
\A1;5' IN FRONT- 4' BACK AND SIDES
\A1;14'-4"\A 1;
2' -1
\A1;7'-11 1/2"
\A1;1'-5 1/2"\A1;5"
\A1;11'-11"
\A1;20'-11"
\A1;
5'
\A1;4'\A1;4' \pxql;ROOFLINE
CONSTRUCT CONCRETE APRON PATHS (ALL SIDES)COMFORT STATION
TO BE INSTALLED
{NOTE:
1. COMFORT STATION SHALL BE IN ACCORDANCE WITH SPECIFICATION 133402.}
{RESTROOM VAULT INSTALLATION
(NO SCALE)}
{CONCRETE APRON PATH INSTALLATION
(NO SCALE)}
{2-UNIT VAULT COMFORT STATION LAYOUT
(NO SCALE)}
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
AR TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 7/2
:3
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\16
_D
_R
ES
TR
OO
M_
VA
UL
T.
DW
G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
COMFORT STATION
INSTALLATION - VAULT
TOILET
BUDGE
BUDGE
D. JEPPSEN
D7 16 52
{\fAvenir Roman|b0|i0|c0|p0;\H0.57146x;(SEE DETAIL THIS SHEET)\H1.74989x; }A
\A 1;5
\A1;9'-7"
\A1;6'-8"
\A 1;5
'-0
\A1;1'-2"
\A1;13'-2"
{NOTES :
1. ONE BULLETIN CASE TO BE INSTALLED ON EACH TOILET AND SHOWER BUILDING IN LOOPS E AND F.
2. THE LOCATION OF THE INSTALLATION TO BE SPECIFIED BY THE CONTRACTING OFFICER.
3. INSTALL PER THE MANUFACTURER'S INSTALLATION INSTRUCTION.
4. EACH BULLETIN CASE TO HAVE ALUMINUM CONSTRUCTION WITH A POWDER COAT FINISH. FINISH SELECTION TO BE
SUBMITTED AND APPROVED BY THE CONTRACTING OFFICER.
5. KNOWN VENDOR FOR THIS PRODUCT IS:
KVO INDUSTRIES
1825 EMPIRE INDUSTRIAL CT. SUITE A
SANTA ROSA CA 95403
800 657 6412 http://www.kvoindustries.com
3648 NPS BC BULLETIN CASE - WALL MOUNT OR APPROVED EQUAL
\A1;18"
\A1;
6'
\A1;12"
\A1;18"\A1;24"
\A1;2"
\A1;1"
\A1;18"
\A1;18"\A1;24"
\A1;2"
\A1;
1"
\A1;22"
\A1;38"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
AR TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/2 6/2
:2
RY
AN
BU
DG
E C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\17
_D
_B
UL
LE
TI
N_
CA
SE
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
BULLETIN BOARD CASE
AND BENCH DETAILS
R. BUDGE
R. BUDGE
D. JEPPSEN
D8 17 52
BULLETIN BOARD
{(NO SCALE)}
{\H0.5x;(BULLETIN BOARD FRAME DETAIL)}
{\H0.5x;(SIDE VIEW)}
{\H0.5x;(ISOMETRIC VIEW)}
BENCH DETAIL
{(NO SCALE)}
{\H0.5x;(CROSS-SECTION)}
{\H0.5x;(SECTION-ELEVATON)}
BENCH CONCRETE PLAZA LAYOUT DETAIL
{(NO SCALE)}
P
P P
PP P
P P
P
PP
P P P
P
P P
P P P P
P P
P
MH
MH
D
H
H
H
H
S
S
S
S
S
S
S
S
S S
S
S S S
S S
S
S
S
S
S
S
S
S
S
S
S
M
M
M
M
M
M
S
M
M
M
M
M
M
M
M
V M
M
M
M
M
M
IR
IR
IR
IR
IR IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
H
H
H
H
H
H
S M
M
M
W
W
W
W
W
W
W
W
W
W
W
W
WWWWWW
W
W W
W
W W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
V
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PPPP
D
V
A2
A1
A3
A4
A5
A6
B1
C1
C2
C3
C6
C5
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
V
V
D
Point Table Point #
Elevation
5991.01
5993.28
6055.20
6099.08
Northing
9449.50
10000.00
11478.68
11723.70
Easting
5224.87
5000.00
6293.39
7376.61
Description
CP1
CP2
Q-1
CP4
22.5'
\A1;22.5'
SCALE IN FEET
150' 300'150'
FLAMING
GORGE
RESERVOIR
LOOP B
LOOP C
LOOP D
LOOP E
LOOP F
LOOP G
LOOP A
PARKING
LUCERNE CAMPGROUND
CONTROL POINT #4
CONTROL POINT #3
CONTROL POINT #2
ADJACENT TO SITE #2 IN LOOP C
CONTROL POINT #1
ADJACENT TO SITE #13 IN LOOP B
BOAT
RAMP
EMPLOYEE HOUSING AND
EXISTING GROUP SITE
DUMP STATION
ADMIN
SITE
STORE AND
BOAT STORAGE
TO MANILA
LUCERNE VALLEY RECREATION ROAD (FS ROAD 146)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:5
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
ROADS OVERVIEW AND
CONTROL POINTS
WEWER
WEWER
D. JEPPSEN
R1 18 52
SE
E
SH
EE
TS
R
AN
D R3
SHEET R6
NOTES:
1. CONSTRUCT NEW ROAD, SPURS, UNIT PADS AND INSTALL SITE FURNITURE, GATE AND SIGNS.
2. EXISTING ROADS CONSIST OF APPROXIMATELY 5" OF CRUSHED AGGREGATE BASE AND 1" DOUBLE CHIP
SEAL.
3. PULVERIZE AND MIX THE EXISTING ASPHALT AND BASE MATERIAL TO A DEPTH OF 5 INCHES AS SHOWN ON
THE DEMOLITION PLAN. RESHAPE THIS MATERIAL AND RECOMPACT TO FORM NEW ROAD SUB-BASE. COVER WITH NEW CRUSHED AGGREGATE ROAD BASE ABOVE. PAVE NEW ASPHALT DIRECTLY ON AGGREGATE ROAD BASE. INSTALL 3 INCHES OF NEW ASPHALT ON NEW ROADS. CARE SHOULD BE TAKEN TO AVOID
MIXING NATIVE SOIL WITH ROAD BASE MATERIAL.
4. WHERE NEW ROADS OR SPURS ARE TO BE INSTALLED IN AN AREA WHERE A ROAD OR SPUR DID NOT PREVIOUSLY EXIST, CONSTRUCT NEW SUBGRADE, INSTALL 4 INCHES OF NEW CRUSHED AGGREGATE (OR PULVERIZED ROAD BASE) AND PLACE ASPHALT ON NEW AGGREGATE. SALVAGE TOP 3" OF TOPSOIL AND
STOCKPILE FOR PLACEMENT ON OBLITERATED AREAS.
5. ANY EXISTING ASPHALT THAT WILL NOT BE COVERED WITH NEW ASPHALT SHALL BE COMPLETELY PULVERIZED AND OBLITERATED. REMOVE AND STOCKPILE THE ROAD BASE MATERIAL AND REPLACE WITH
BACKFILL. REGRADE THE OBLITERATED AREA TO MATCH SURROUNDING GROUND. USE EXCESS
EXCAVATED MATERIAL OR SELECT BORROW TO BACKFILL OBLITERATED ROAD AND SPUR AREAS. SEE
SHEET DE1.
6. THE SUBGRADE WILL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO ASPHALT PLACEMENT. THE CONTRACTOR SHALL ENSURE A MINIMUM OF 4 INCHES OF AGGREGATE IS UNDER THE NEW ASPHALT. IF BASE IS LESS THAN 4 INCHES DEEP, THEN THE EXISTING BASE SHALL BE REMOVED AND THE SUBGRADE
DEEPENED.
7. NEW SHOULDERS SHALL BE CONSTRUCTED WITH IMPORTED AGGREGATE AND NOT FROM EXISTING PULVERIZED MATERIAL. NO PULVERIZED ASPHALT SHALL BE VISIBLE AT COMPLETION OF THE PROJECT.
8. DO NOT DAMAGE EXISTING TREES UNLESS DESIGNATED TO BE REMOVED.
9. ENSURE THAT WATER WILL DRAIN AWAY FROM ROADWAYS.
10. ALL CLEARING AND GRUBBING SHALL BE HANDLED IN ACCORDANCE WITH SPECIFICATION 311000.
11. CONSTRUCTION STAKING SHALL BE COMPLETED BY THE CONTRACTOR AND APPROVED BY THE
CONTRACTING OFFICER PRIOR TO BEGINNING WORK.
12. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO NEW ASPHALT ROADS AND SPURS AS A RESULT
OF CONSTRUCTION ACTIVITIES.
13. VERTICAL CURVES ARE NOT SHOWN FOR ALL GRADE TRANSITIONS, HOWEVER, CONTRACTOR SHALL
CONSTRUCT SMOOTH TRANSITIONS BETWEEN ALL ROADWAY GRADES.
14. SEE "DE" SHEETS FOR DEMOLITION PLAN.
15. SEE "S" SHEETS FOR SITE PLAN AND SIGN PLAN.
16. SEE "W" SHEETS FOR WATER DESIGN.
17. SEE "IR" SHEETS FOR IRRIGATION DESIGN.
18. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR CONSTRUCTION POINTS.
19. REPAIR DAMAGED ASPHALT IN LOOPS A, B, C AND D. SEE SPECIFICATION SECTION 3211200.
20. THE EARTHWORK QUANTITIES FOR THE CAMPGROUND SPURS, DUMPSTER PADS AND RESTROOM GRADING
IS ESTIMATED TO BE APPROXIMATELY 50 CY CUT AND 1,000 CY FILL.
SE
E
SH
EE
TS
R
AN
D R5
SHEET R6
0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+75
-0.9%
-4.1% 1.4% 0.0% 0.5% 0.9%
STA = 0+00.0
ELEV = 5998.962
ST
A
0+
.0
EL
EV
9.
ST
A
3+
.0
EL
EV
9.
ST
A
4+
.6
EL
EV
9.
LVC: 50.00
BV
C
S:
+7 5.
BV
C E:
0.
EV
C
S:
+2 5.
EV
C E:
0.
LVC: 50.00
BV
C
S:
+5 2.
BV
C E:
0.
EV
C
S:
+0 2.
EV
C E:
9.
LVC: 50.00
BV
C
S:
+5 2.
BV
C E:
6.
LOOP E - MAIN ROAD PROFILE
SCALE: 1:50 H, 1:10 V
EXISTING TOP OF ASPHALT (TYP)
NEW TOP OF ASPHALT (TYP)
14' WIDE ASPHALT ROAD, CROSS SLOPE: 2% LEFT
APPROX. EXC. 13 CY
APPROX. EMB. 85 CY
22' WIDE ASPHALT
2% LEFT
14' WIDE ASPHALT
2% RIGHT
16' PULLOUT LEFT
WITH CONCRETE WATERWAYINTERSECTION LEFT
BLEND INTERSECTION TO
MATCH EXISTING AND DRAIN
CROSS-SLOPE
TRANSITION
STA:0+66.3
ELEV:5999.39
INTERSECTION CENTERLINE
CURVE WIDEN 3 FEET LEFT
CURVE TABLE
CURVE
C1
C2
C3
RADIUS
(FT)
LENGTH
(FT)
117.62
274.85
252.80
DELTA
11°13'54"
26°14'45"
181°03'16"
TANGENT
(FT)
59.00
139.88
8693.41
START POINT
(NORTHING, EASTING)
10427.89, 4480.84
10290.92, 4375.41
9997.13, 4231.77
END POINT
(NORTHING, EASTING)
10332.62, 4412.17
10050.97, 4246.35
9956.73, 4386.58
S S
S S
S
S S
S S
S S
VM
IR
IR
IR
IR
H
W W
W W
W W
PP
PP O
E
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
EE
E
E
E
E
E
E
E
E
E
E
EE
EE
E
E
E
E
E E
TP
TP
TP
E E
1 2
W
W
W
W
W
0+00
1+00 2+00
3+00 4+00
5+00
6+00
7+
10+0011+00
+0
+0
+1
3+00
C1
C2
C3
C4
C5
28 29
191194
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
LOOP E ROAD
PLAN AND PROFILE
WEWER
WEWER
D. JEPPSEN
R2 19 52
SCALE IN FEET
25' 50'25'
SAW CUT EXISTING ASPHALT.
BEGIN NEW ROAD CONSTRUCTION.
BLEND TO MATCH EXISTING ROAD,
TRANSITION TO MATCH EXISTING ASPHALT WIDTH
LOOP E MAIN ROAD
ALIGNMENT
CONSTRUCT 14' WIDE,
SINGLE LANE, ASPHALT ROAD
NOTES:
1. NOTES ON SHEET R1 APPLY. LEGEND ON SHEET S2 APPLIES.
2. SEE SHEET R7 FOR TYPICAL ROAD TEMPLATES.
3. SEE "S" SHEETS FOR SIGN LOCATIONS AND SHEET R10 FOR SIGN
LIST AND INSTALLATION DETAILS.
4. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR
CONSTRUCTION POINTS.
5. ROAD SHOULDER AND CUT/FILL LINES NOT SHOWN FOR CLARITY.
6. STA. 0+00 TO 0+50: IN ORDER TO MAINTAIN A MINIMUM OF 4" OF
AGGREGATE AND TO MATCH GRADES WITH EXISTING ASPHALT AT
THE INTERSECTION, IT WILL BE NECESSARY TO REMOVE THE
EXISTING ROAD BASE AND DEEPEN THE SUBGRADE.
CONSTRUCT 22' WIDE, DOUBLE
LANE, ASPHALT ROAD
2%
SLO
PE
2%
SLO
PE
2%
SLO
PE
2%
SLO
PE
1%
SLO
PE
2% SLOPE
INSTALL NEW 30-FOOT GATE
SEE DETAIL ON SHEET R11
ENSURE WATER DRAINS
TO ROAD SHOULDER
WITHOUT PONDING
CONSTRUCT CONCRETE
WATERWAY (SEE SHEET R7)
INSTALL 5' WIDE CONCRETE
SIDEWALK (4 SIDES), SLOPED
2% AWAY FROM BUILDING (TYP)
INSTALL 5' WIDE
CONCRETE SIDEWALK
GRADING: SLOPE 5% MIN.
FOR 5' FROM EDGE OF
SIDEWALK (TYP 3 SIDES)
2% INSTALL 6-UNIT RESTROOM BUILDING
20'
16' (TYP)
10' (TYP)
TY
P)
TY
P)
70'
30'
24'
22'
14'
R
TY
P)
R3' (TYP)
R40
R40'
R
0'
R80'
R600'
CURVE WIDEN 3'
17'
30'
77'
65'INSTALL DIRECTIONAL ARROWS
(TYP), SEE SHEET D5
INSTALL 6-FOOT
CURB STOP (TYP)
INSTALL 8-FOOT
CURB STOP (TYP)
CONSTRUCT SPUR (TYP)
EDGE OF
EXISTING
ASPHALT
EDGE OF NEW
ASPHALT (TYP)
LOOP E - MAIN ROAD PLAN
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% S
LO
PE
6+75 7+00 8+00 9+00 10+00 11+00 12+00 13+00 13+50
13+50 14+00 14+15
-0.3% -0.8%
-0.1% 3.6%
2.0% 0.8%
STA = 9+48.5
ELEV = 5999.301
STA = 10+78.0
ELEV = 5998.215
ST
A
+7 3.
EL
EV
8.
STA = 13+50.0
ELEV = 5998.600
LVC: 25.00
BV
C
S:
+2 0.
BV
C E:
7.
EV
C
S:
+4 5.
EV
C E:
8.
LVC: 50.00
BV
C
S:
+9 8.
BV
C E:
9.
EV
C
S:
+4 8.
EV
C E:
9.
LVC: 50.00
EV
C
S:
+0 2.
EV
C E:
6.
0.8%STA = 13+50.0
ELEV = 5998.600
STA = 14+14.6
ELEV = 5999.089
NEW TOP OF ASPHALT (TYP)
14' WIDE ASPHALT ROAD, CROSS SLOPE: 2% RIGHT
APPROX. EXC. 3 CY
APPROX. EMB. 305 CY
LOOP E - MAIN ROAD PROFILE
SCALE: 1:50 H, 1:10 V
14' WIDE ASPHALT ROAD, CROSS SLOPE: 2% RIGHT
EXC/EMB. CONTINUED
PULL-THROUGH SPUR #12 ON RIGHT
BLEND INTERSECTION TO
MATCH AND DRAIN
EXISTING TOP OF ASPHALT (TYP)
EXISTING TOP OF ASPHALT (TYP)
NEW TOP OF ASPHALT (TYP)
CURVE WIDEN 3 FEET LEFTCURVE WIDEN 3 FEET LEFT
CURVE TABLE
CURVE
C3
C4
C5
RADIUS
(FT)
LENGTH
(FT)
252.80
238.49
150.93
DELTA
181°03'16"
34°09'39"
108°05'33"
TANGENT
(FT)
8693.41
122.91
110.30
START POINT
(NORTHING, EASTING)
9997.13, 4231.77
10023.68, 4403.39
10263.74, 4568.77
END POINT
(NORTHING, EASTING)
9956.73, 4386.58
10224.71, 4525.04
10392.60, 4555.71
S S
S S
S
S S
S
SV
M
IR
IR
W W
W W
W W
PPO
E
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
E E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E E
TP
TP
E E
18 20
W
W
W
W
W
D
0+00
1+00 2+004+00
5+00
6+00 7+
8+00
9+00
10+00 11+00
12+00
+0
+0
+1
C3
C4
C5
157 158
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
LOOP E ROAD
PLAN AND PROFILE
WEWER
WEWER
D. JEPPSEN
R3 20 52
SCALE IN FEET
25' 50'25'
CONSTRUCT 14' WIDE,
SINGLE LANE, ASPHALT ROAD
2% SLOPE 2%
SLO
PE
2% SLOPE
2% S
LO
PE
0% S
LO
PE
2%
SLO
PE
INSTALL HATCHED PARKING AREA
OF PULL-THROUGH SPUR WITH 0%
CROSS SLOPE AND 2% MAX. SLOPE
IN ANY DIRECTION. BLEND
TRANSITIONS TO LOOP E ROAD
LOOP E MAIN ROAD
ALIGNMENT
CONSTRUCT DUMPSTER PAD
SEE SHEET D5
CURVE WIDEN 3'
CURVE WIDEN 3'
TAPER LAST 20 FEET
OF CURVE WIDENING
17'
' 16' (TYP)
10' (TYP)
' (T
YP)
' (T
YP)
70'
20'
INSTALL 5' WIDE
CONCRETE SIDEWALK
2%
R8 0' R
400'
R80'
R
R40'
R10'
R 2'
R40 ' (T
YP)
R3' (TYP)
R60
INSTALL 6-FOOT
CURB STOP (TYP)
INSTALL 8-FOOT
CURB STOP (TYP)
CONSTRUCT SPUR (TYP)
CONSTRUCT PULL-THROUGH
SPUR (TYP)
EDGE OF
EXISTING
ASPHALT
EDGE OF NEW
ASPHALT (TYP)
LOOP E - MAIN ROAD PLAN
NOTES:
1. NOTES ON SHEET R1 APPLY. LEGEND ON SHEET S2 APPLIES.
2. SEE SHEET R7 FOR TYPICAL ROAD TEMPLATES.
3. SEE "S" SHEETS FOR SIGN LOCATIONS AND SHEET R10 FOR SIGN LIST AND
INSTALLATION DETAILS.
4. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR CONSTRUCTION POINTS.
5. ROAD SHOULDER AND CUT/FILL LINES NOT SHOWN FOR CLARITY.
2% S
LO
PE
2% S
LO
PE
2% S
LO
PE
2% SLOPE
2% SLOPE
2% SLOPE
2%
SLOPE
2%
SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
0% SLOPE
R100'
R30'
0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+75
1.0% 0.5% -0.6%0.4%
-1.0% 0.3% 0.7% -1.5%
STA = 0+00.0
ELEV = 6002.996
ST
A
2+
.5
EL
EV
2.
ST
A
4+
.0
EL
EV
2.
ST
A
4+
.0
EL
EV
3.
STA = 6+28.0
ELEV = 6003.930
STA = 6+75.0
ELEV = 6003.577
LVC: 50.00
BV
C
S:
+1 1.
BV
C E:
3.
EV
C
S:
+6 1.
EV
C E:
3.
1 LVC: 50.00
BV
C
S:
+6 8.
BV
C E:
2.
EV
C
S:
+1 8.
EV
C E:
1.
LOOP F - MAIN ROAD PROFILE
SCALE: 1:50 H, 1:10 V
14' WIDE ASPHALT ROAD, CROSS SLOPE: 2% LEFT
APPROX. EXC. 21 CY
APPROX. EMB. 141 CY
EXISTING TOP OF ASPHALT (TYP)
NEW TOP OF ASPHALT (TYP)
STA:1+35.9
ELEV:6002.40
INTERSECTION CENTERLINE
22' WIDE ASPHALT ROAD,
CROSS-SLOPE 2% LEFT
INTERSECTION LEFT
BLEND INTERSECTION TO
MATCH EXISTING AND DRAIN
16' PULLOUT LEFT
WITH CONCRETE WATERWAY
14' WIDE ASPHALT ROAD,
CROSS SLOPE: 2% RIGHT
CROSS-SLOPE
TRANSITION
CURVE WIDEN 3 FEET LEFT
STA:6+67.6
ELEV:6003.69
CURVE TABLE
CURVE
C6
C7
C8
RADIUS
(FT)
LENGTH
(FT)
91.48
314.84
252.04
DELTA
26°12'29"
18°02'21"
180°30'36"
TANGENT
(FT)
46.56
158.74
17979.00
START POINT
(NORTHING, EASTING)
10723.43, 4172.61
10582.10, 4126.46
10295.88, 3917.78
END POINT
(NORTHING, EASTING)
10635.04, 4152.32
10325.42, 3946.38
10185.11, 4033.22
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S S
S S
S
M
VM
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR
H
W
W W
W W
W
W
W
W
W
W
PPPP
W
TP
TPTP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
E
E E
EE
E
E E
E
EE
E E
E
E
E
E
E
E
TP
TP
E
E
5 8
W
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+
+0
14+65
1+
C6
C7
C8
C10
39 40
48 49
119 120
141145
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
LOOP F ROAD
PLAN AND PROFILE
WEWER
WEWER
D. JEPPSEN
R4 21 52
SCALE IN FEET
25' 50'25'
CONSTRUCT 14' WIDE,
SINGLE LANE, ASPHALT ROAD
CONSTRUCT 22' WIDE, DOUBLE
LANE, ASPHALT ROAD
2%
SLOPE
2%
SLO
PE
2% SLOPE
2% S
LO
PE
1% S
LO
PE 2% SLOPE
SAW CUT EXISTING ASPHALT
BEGIN NEW ROAD CONSTRUCTION
BLEND TO MATCH EXISTING ROAD
LOOP F MAIN ROAD
ALIGNMENT
INSTALL NEW 30-FOOT GATE
SEE DETAIL ON SHEET R11
ENSURE WATER DRAINS
TO ROAD SHOULDER
WITHOUT PONDING
CONSTRUCT CONCRETE
WATERWAY (SEE SHEET R7)
INSTALL 6-UNIT RESTROOM WITH
4-UNIT SHOWER BUILDING
INSTALL 5' WIDE CONCRETE
SIDEWALK (4 SIDES), SLOPED
2% AWAY FROM BUILDING
INSTALL 5' WIDE
CONCRETE SIDEWALK
GRADING: SLOPE 5% MIN.
FOR 5' FROM EDGE OF
SIDEWALK (TYP 3 SIDES)
2%
CURVE WIDEN 3'
16' (TYP)
10' (TYP)
65' (T
YP)
30' (T
YP)
20'
24'
10'
65'
75'
70'
R1 0'
22'
17'
R
R40'
R200'
R 1000'
R80'
INSTALL DIRECTIONAL ARROWS
(TYP), SEE SHEET D5
INSTALL 6-FOOT
CURB STOP (TYP)
INSTALL 8-FOOT
CURB STOP (TYP)
CONSTRUCT SPUR (TYP)
EDGE OF
EXISTING
ASPHALT
EDGE OF NEW
ASPHALT (TYP)
LOOP F - MAIN ROAD PLAN NOTES:
1. NOTES ON SHEET R1 APPLY. LEGEND ON SHEET S2 APPLIES.
2. SEE SHEET R7 FOR TYPICAL ROAD TEMPLATES.
3. SEE "S" SHEETS FOR SIGN LOCATIONS AND SHEET R10 FOR SIGN
LIST AND INSTALLATION DETAILS.
4. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR
CONSTRUCTION POINTS.
5. ROAD SHOULDER AND CUT/FILL LINES NOT SHOWN FOR CLARITY.
2% SLOPE
2% SLOPE 2% SLOPE
2% SLOPE
2%
SLOPE
2%
SLO
PE
2% SLOPE
2% SLOPE
2%
SLO
PE
2% S
LO
PE
2% S
LO
PE
2% SLOPE
6+75 7+00 8+00 9+00 10+00 11+00 12+00 13+00
13+00 14+00 14+65
0.5%
-0.5% -2.8%
-0.8% -0.2% 0.7%
-1.5%
0.2%
STA = 6+75.0
ELEV = 6003.577
ST
A
7+
.4
EL
EV
2.
ST
A
8+
.4
EL
EV
3.
ST
A
8+
.5
EL
EV
2.
ST
A
9+
.8
EL
EV
1.
ST
A
+2 5.
EL
EV
1.
ST
A
+8 0.
EL
EV
0.
ST
A
+7 7.
EL
EV
1.
STA = 13+00.0
ELEV = 6001.564
1.5% 0.2%
0.2%STA = 13+00.0
ELEV = 6001.564
STA = 13+39.3
ELEV = 6001.648
STA = 13+79.8
ELEV = 6002.265
STA = 14+64.9
ELEV = 6002.418
14' WIDE ASPHALT ROAD, CROSS SLOPE: 2% RIGHT
APPROX. EXC. 3 CY
APPROX. EMB. 122 CY
LOOP F - MAIN ROAD PROFILE
SCALE: 1:50 H, 1:10 V
14' WIDE ASPHALT ROAD,
CROSS SLOPE: 2% LEFT
EXC/EMB. CONTINUED
PULL-THROUGH SPUR #13 ON RIGHT
EXISTING TOP OF ASPHALT (TYP)
EXISTING TOP OF ASPHALT (TYP)
NEW TOP OF ASPHALT (TYP)
NEW TOP OF ASPHALT (TYP)
BLEND
INTERSECTION
TO MATCH
AND DRAIN
14' WIDE ASPHALT ROAD,
CROSS SLOPE: 2% RIGHT
TRANSITION
CROSS-SLOPE
CURVE WIDEN 3 FEET LEFT
CURVE TABLE
CURVE
C8
C9
C10
RADIUS
(FT)
LENGTH
(FT)
252.04
124.46
187.82
DELTA
180°30'36"
11°53'06"
107°36'45"
TANGENT
(FT)
17979.00
62.45
136.66
START POINT
(NORTHING, EASTING)
10295.88, 3917.78
10292.10, 4134.98
10510.33, 4284.76
END POINT
(NORTHING, EASTING)
10185.11, 4033.22
10390.50, 4210.82
10659.84, 4223.96
S S
S S
S S
S
S
S
S
S
S S
VM
IR
H
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
PPPP
W
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
E
E
E
E E
E
E E
E
E E
E
E E
E
E
E
E
E
TP
TP
E
E
W
V
2+00
3+00
4+00 5+00
6+00
7+
8+00
9+00
10+00 11+00 12+00
+00
+0
14+65
90 59
60006000
2+
C7
C8
C9
C10
107111
163 324
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
LOOP F ROAD
PLAN AND PROFILE
WEWER
WEWER
D. JEPPSEN
R5 22 52
SCALE IN FEET
25' 50'25'
CONSTRUCT 14' WIDE,
SINGLE LANE, ASPHALT ROAD
2% SLOPE
2% S
LO
PE
2% SLOPE
2%
SLO
PE
2% SLOPE
2% SLOPE
2% S
LO
PE
LOOP F MAIN ROAD
ALIGNMENT
CONSTRUCT DUMPSTER PAD
SEE SHEET D5
CURVE WIDEN 3'
TAPER LAST 20 FEET
OF CURVE WIDENING
16' (TYP) 10' (TYP)
65' (TYP)
30' (TYP)
16'
17'
R8 0'
R 600'
R100'
20'
R4 0'
(T
YP
R3' (TYP)
INSTALL 5' WIDE
CONCRETE SIDEWALK
2%
INSTALL 6-FOOT
CURB STOP (TYP)
INSTALL 8-FOOT
CURB STOP (TYP)
CONSTRUCT SPUR (TYP)CONSTRUCT PULL-THROUGH
SPUR (TYP)
EDGE OF
EXISTING
ASPHALT
EDGE OF NEW
ASPHALT (TYP)
LOOP F - MAIN ROAD PLAN
NOTES:
1. NOTES ON SHEET R1 APPLY. LEGEND ON SHEET S2 APPLIES.
2. SEE SHEET R7 FOR TYPICAL ROAD TEMPLATES.
3. SEE "S" SHEETS FOR SIGN LOCATIONS AND SHEET R10 FOR SIGN
LIST AND INSTALLATION DETAILS.
4. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR
CONSTRUCTION POINTS.
5. ROAD SHOULDER AND CUT/FILL LINES NOT SHOWN FOR CLARITY.
2% SLOPE
2% SLOPE
2%
SLOPE 2%
SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2% SLOPE
2%
SLO
PE
2% S
LO
PE
2% S
LO
PE
2% SLOPE
2% SLOPE
R50'
R30' FINAL - 3/18/2021
0+00 1+00 2+00 3+00 3+63
0.0% -1.5%
0.0%
STA = 0+00.0
ELEV = 6003.646
ST
A
0+
.2
EL
EV
3.
ST
A
2+
.1
EL
EV
0.
STA = 3+63.2
ELEV = 6000.870
ASPHALT ROAD AND PARKING, WIDTH AND SLOPE VARIES
APPROX. EXC. 20 CY
APPROX. EMB. 250 CY
OVERFLOW PARKING AREA - PROFILE
SCALE: 1:50 H, 1:10 V
EXISTING GROUND (TYP)
NEW TOP OF ASPHALT (TYP)
S
S
S
S
S
S
S
S
S
SIR
IR
IR
IR
IR
IR
IR
IR
IR
IR
IR IR IR IR IR IR IR IR
IR
S
W
W
W
TP
0+00
1+00
2+00
3+
3+63
65 66
72 73
105 106
152 153
IR
IR
S
S
S
S
SCALE IN FEET
25' 50'25'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
FOREST SER CE
D E P
A R TMENT OF AGR CU
T U R
E
United States Department of Agriculture Forest Service
3/1 8/2
:2
DW
EW
ER
C:
\D
OU
G\ _T
EL
EW
OR
K\
LU
CE
RN
EC
G.
PH
AS
E4
\D
RA
W
IN
GS
\18
-2 3_
R1 -R
6.L
UC
ER
NE
4.R
OA
DS
.D
W G
R4
INTERMOUNTAIN REGION
LUCERNE
CAMPGROUND
RECONSTRUCTION
PHASE 4
ASHLEY
NATIONAL FOREST
FLAMING GORGE
NATIONAL RECREATION AREA
OVERFLOW PARKING
PLAN AND PROFILE
AND VAULT TOILET
PULLOUT
WEWER
WEWER
D. JEPPSEN
R6 23 52
SCALE IN FEET
25' 50'25'
CONSTRUCT 16' WIDE ACCESSIBLE
PULLOUT WITH ASPHALT SURFACE
AND 2% MAXIMUM SLOPE.
16'
135°
5'
SAW CUT EDGE OF
EXISTING ASPHALT
ROAD. BLEND NEW
ASPHALT TO MATCH
EXISTING ASPHALT
ENTRANCE ROAD TO REMAIN
INSTALL NEW 2-UNIT VAULT TOILET
AND PERIMETER SIDEWALK, SEE
DETAIL ON SHEET D7
2% S
LO
PE
VAULT TOILET PULLOUT
(NO PROFILE)
56.6'
12'
'140'
28'
120°
135°
R 45'
R 60'
R 30'
R2'
R 1' R40'
R40
R8'
R
R 15'
R40'
R 40'
1.
4%
CR
O
SS
SL
O
PE
2% SLOPE
2% SLOPE
2.1%
SLO
PE
1.
4%
CR
O
SS
SL
O
PE
2% SLOPE
EXISTING ASPHALT
ENTRANCE ROAD TO REMAIN
REMOVE TREES WITHIN
NEW PARKING AREA
CONSTRUCT NEW
11-STALL ASPHALT
OVERFLOW PARKING AREA
SAW CUT EXISTING ASPHALT
BEGIN NEW ROAD CONSTRUCTION
BLEND TO MATCH EXISTING ROAD
OVERFLOW
PARKING
AREA
ALIGNMENT
INSTALL DIRECTIONAL ARROWS
(TYP), SEE SHEET D5
SAW CUT EXISTING ASPHALT
END NEW ROAD CONSTRUCTION
BLEND TO MATCH EXISTING ROAD
EDGE OF NEW
ASPHALT (TYP)
INSTALL NEW LINE
STRIPING (TYP)
INSTALL NEW LINE
STRIPING (TYP)
NOTES:
1. NOTES ON SHEET R1 APPLY. LEGEND ON SHEET S2 APPLIES.
2. SEE SHEET R7 FOR TYPICAL ROAD TEMPLATES.
3. SEE "S" SHEETS FOR SIGN LOCATIONS AND SHEET R10 FOR SIGN
LIST AND INSTALLATION DETAILS.
4. SEE SHEET R1 FOR CONTROL POINTS AND SHEET R14 FOR
CONSTRUCTION POINTS.
5. ROAD SHOULDER AND CUT/FILL LINES NOT SHOWN FOR CLARITY.
6. INTERSECTIONS WITH EXISTING ROADS: IN ORDER TO MAINTAIN A
MINIMUM OF 4" OF AGGREGATE AND TO MATCH GRADES WITH
EXISTING ASPHALT AT THE INTERSECTIONS, IT WILL BE
NECESSARY TO REMOVE THE EXISTING ROAD BASE AND DEEPEN
THE SUBGRADE.
OVERFLOW PARKING AREA - PLAN
INSTALL 5' WIDE CONCRETE
SIDEWALK. SLOPE AT 2%
AWAY FROM BUILDING
ROAD CROSS SECTIONS TABLE
ROAD STATIONING TYPICAL SECTION
LOOP E 0+00 TO 0+66 22' TWO-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP E 0+66 TO 3+24 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP E 3+24 TO 4+15 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT WITH RESTROOM PULLOUT
LOOP E 4+15 TO 6+02 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP E 6+02 TO 14+10 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% RIGHT
LOOP F 0+00 TO 1+36 22' TWO-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP F 1+36 TO 4+00 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP F 4+00 TO 4+89 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT WITH RESTROOM PULLOUT
LOOP F 4+89 TO 6+51 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT
LOOP F 6+51 TO 13+64 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% RIGHT
LOOP F 13+64 TO 14+00 14' SINGLE-LANE ASPHALT, CROSS-SLOPE 2% LEFT
{NOTES}:
1. TRANSITIONS BETWEEN CROSS SECTIONS SHALL BE GRADUAL. TRANSITIONS SHALL BE 40' IN LENGTH, 20' ON EACH SIDE OF TRANSITIONING ROADWAYS. EXACT STATIONING FOR CROSS SECTIONS IS SHOWN FOR REFERENCE ONLY.
2. ALL EXCAVATED BOULDERS SHALL BE PLACED AS DESIGNATED BY THE CONTRACTING OFFICER.
3. ALL AGGREGATE AND ASPHALT DEPTHS SHOWN ARE COMPACTED DEPTHS.
4. NEATLY PLACE ANY EXCAVATED ROCK TO ARMOR FILL SLOPES FROM EROSION AND FOOT TRAFFIC AS DIRECTED.
5. ROADWAY WIDTHS AND CROSS-SLOPES VARY. SEE PLAN VIEW SHEETS FOR ROADWAY WIDENING AND SLOPE
DIRECTIONS.
6. CONCRETE WATERWAY SHALL BE SLOPED TO THE MIDDLE AT 1" VERTICALLY PER 18" HORIZONTALLY MINIMUM. ENSURE
WATERWAYS DRAIN TO ROAD SHOULDER WITHOUT PONDING.
7. NO PULVERIZED ASPHALT SHALL BE VISIBLE AT COMPLETION OF THE PROJECT.
8. WHERE NEW ROADS ARE BUILT OVER EXISTING PULVERIZED ASPHALT, CONSTRUCT SUBGRADE WITH COMPACTED CRUSHED AGGREGATE - GRADING "C" OR PULVERIZED ROAD BASE. DO NOT PLACE SELECT BORROW OR OTHER NATIVE FILL
C
%%UTYPICAL RESTROOM PULLOUT ROAD SECTION
C
LE
A R
IN
G
LIMIT\A1;4'-0" MIN.
'-0
PU
LL
O
U T
NATURAL GROUND
C
LE
A R
IN
G
LIMIT
14'-0"
TRAVEL LANE
\A1;3'-0"
1"
(SEE
NOTE
\A1;6" \A1;3'-0"
%%UCONCRETE WATERWAY DETAIL
2:1 MAX.
3:1
C
%%UTYPICAL 14' OR 22' 2%%% SLOPED ASPHALT ROAD SECTION
C
LE
A R
IN
G
LI
M
IT
\A1;4'-0" MIN.
\A1;4'-0" MIN.
\A1;14'-0" OR 22'-0" TRAVEL LANE
2% SLOPE
NATURA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .