1240LT22R0021_RFP.pdf
PDF 695 KB Posted
- Attached to
- GAOA - Lucerne Campground Group Site Reconstruction Project for the Ashley National Forest
- Solicitation number
- 1240LT22R0021
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for a construction project to reconstruct portions of the Lucerne Campground located in the Ashley National Forest. The solicitation requires base work to reconstruct Loop G group sites and Loops E and F single family units, along with associated electrical, water, and irrigation improvements. The solicitation also includes seven optional items for shelters, wind screens, restroom buildings, additional landscaping and irrigation, asphalt repairs, and a vault toilet. Offerors must provide pricing for all required base work and optional items. The solicitation is set aside for the 8(a) program. The Forest Service will award a single fixed price contract for the base work, and may exercise any number of the priced optional items at its discretion during contract performance.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1052847
USDA-FS CSA INTERMOUNTAIN 8
1405 HOLLIPARK DRIVE
IDAHO FALLS ID 83401
40LT
Kellie Shaw, Contracting Officer kellie.shaw@usda.gov
KELLIE SHAW 208-313-3852
GAOA
x 04/26/2022
1240LT22R0021
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
GAOA LUCERNE CAMPGROUND GROUP SITE RECONSTRUCTION
Ashley National Forest
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 180 calendar days and complete it within ________________ ________________ calendar days after receiving
F.2 FAR 52.211-10
05/26/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
KELLIE SHAW
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 55
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240LT22R0021
Delivery: 180 Days After Notice to Proceed Delivery Location Code: 8499
ASHLEY NATIONAL FOREST
355 NORTH VERNAL AVENUE
VERNAL UT 84078 US
ANF GAOA LUCERNE CAMPGROUND GROUP SITE
RECONSTRUCTION
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No: 1240LT22R0021 GAOA Lucerne Campground Group Site Reconstruction Project
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
This solicitation and any resulting contract is a firm-fixed price type of contract, which under the definition in FAR 16.202-1, “this type of contract provides for a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract. This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss.”
Prices on the Schedule shall reflect Contractor’s full cost for labor, supervision, overhead costs, and incidental items.
B.1 SCHEDULE OF ITEMS
BASE ITEMS – PHASE 3 - LOOP G Group Sites
Item Supplies/Services Qty Unit of Issue
Method of Measure
Unit Price Total Price
010250 Construction Staking 1 LS LSQ $ $ 011900 Mobilization 1 LS LSQ $ $ 024102 Removal and Disposal of
Existing Structures
1 LS LSQ $ $
026460 Dumpster Pad 1 EA AQ $ $ 033000-1 Cast-in-Place Concrete, Non-
Reinforced (Sidewalks)
320 SY DQ $ $
101400-1 Signs – Regulatory & Directional (Aluminum)
9 EA AQ $ $
101400-2 Signs – Relocate Existing Group B Sign
1 EA AQ $ $
1029410 Group Site, Sites A&C – 50 PAOT (Concrete Slab, Aggregate, Tables, Grill, Fire Ring)
2 EA AQ $ $
136000 Shelter 24’ x 54’ – Includes Concrete Footings
2 EA AQ $ $
221100 Water Pipeline, 2-Inch HDPE, 160 PSI, Heat Fusion Joints, Including Trench, Pipe Zone & Bedding
380 LF DQ $ $
221102 2” Poly Curb Valve and Box 2 EA AQ $ $ 221105 Hydrant, Type B 2 EA AQ $ $ 260500 Electrical Distribution System 1 LS LSQ $ $ 312010 Select Borrow (Government
Source)
900 CY DQ $ $
312100 Project Site Preparation and Grading
1 LS LSQ $ $
321200 Warm Mix Asphalt Pavement, Including Tack Coat and Saw Cuts
540 Ton AQ $ $
321204 Crushed Aggregate Base – Grading C – Commercial Source (For Roads, Spurs and Sidewalks)
240 CY DQ $ $
322622-1 Curbstop – 6-Foot Concrete 16 EA AQ $ $ 322622-2 Curbstop – 8-Foot Concrete 23 EA AQ $ $ 322640-1 Directional Arrows
(Reflectorized White)
6 EA AQ $ $
322640-2 Pavement Marking – 4-Inch Wide Line Striping (Reflectorized White)
700 LF DQ $ $
322640-3 Pavement Marking – Accessible Parking Symbol (Reflectorized White on Blue Background)
2 EA AQ $ $
322706 Pulverizing Existing Asphalt 3,200 SY DQ $ $ 323116 Road Closure Gate – 28 Foot 1 EA AQ $ $ 323125 Composite Wood Fences 160 LF AQ $ $ 328000-1 Irrigation System for Loop G
(Excluding Gov’t Furnished Controller and Controller Wire)
1 LS LSQ $ $
328000-2 Irrigation System Trenching (From Loop D controller to Loop G valve manifold.
Includes: 24” depth trench for controller wire, asphalt cut and patching, equipment, all connections, hand holes, cuts, etc. and all labor)
1 LS LSQ $ $
328000-3 Irrigation System (Jumbo Valve Boxes, 26” x 20”)
5 EA AQ $ $
328000-4 Irrigation System Controller Wire ( Labor Only for Installing Gov’t furnished wire)
1,400 LF DQ $ $
328000-5 Irrigation System Controller Wire (Labor and contractor provided 19-strand wire, 14
AWG)
485 LF DQ $ $
328000-6 Irrigation System Controller Wire (Labor and contractor provided 12-strand wire, 14
AWG)
195 LF DQ $ $
328000-7 Irrigation System Controller Wire (Labor and contractor provided 10-strand wire, 14
AWG)
725 LF DQ $ $
329206 Seeding 1 LS LSQ $ $
329310-1 Exterior Plants (Utah Juniper) 6 EA AQ $ $ 329310-2 Exterior Plants (Small
Deciduous) Netleaf Hackberry, Curlleaf Mountain Mahogany)
10 EA AQ $ $
329310-3 Exterior Plants (Large Deciduous) Common Hackberry, Green Ash, Honey Locust)
13 EA AQ $ $
TOTAL BASE PHASE 3 ITEMS $
BASE ITEMS – PHASE 4 - LOOPS E & F Single Family Units
Item Supplies/Services Qty Unit of Issue
Method of Measure
Unit Price Total Price
010250 Construction Staking 1 LS LSQ $ $ 011900 Mobilization 1 LS LSQ $ $ 024102 Removal and Disposal of
Existing Structures
1 LS LSQ $ $
026460 Dumpster Pads 2 EA AQ $ $ 033000-1 Cast-in-Place Concrete, Non-
Reinforced (Sidewalks)
105 SY DQ $ $
033000-2 Cast-in-Place Concrete, Reinforced (Waterways)
169 LF DQ $ $
101400-1 Signs 21 EA AQ $ $ 101400-2 Install New Sign on Existing
Post (Overflow Parking Directional Sign)
1 EA AQ $ $
101400-3 Relocate Existing Sign and Double Post (Loop E Directional Sign)
1 EA AQ $ $
129400-1 Family Unit – Single (Concrete Slab and Footings, Aggregate Base, Tables, Utility Table & Fire Ring)
51 EA AQ $ $
129400-2 Unit Marker (All Spurs) 49 EA AQ $ $ 221100-1 Potable Water Pipeline, 2”Inch
HDPE, 160 PSI, Heat Fusion Joints, Including Trench, Pipe Zone & Bedding
410 LF DQ $ $
221100-2 Irrigation Water Pipeline, 4” HDPE, 160 PSI with Heat Fusion Joints, Including Trench, Pipe Zone and Bedding
1,610 LF DQ $ $
221100-3 Irrigation Mainline Drain 1 EA AQ 221102-1 2” Poly Curb Valve and Box –
Potable
5 EA AQ $ $
221102-2 4” Poly Curb Valve and Box – Irrigation
3 EA AQ $ $
221105 Hydrant, Standard Type B 6 EA AQ $ $ 260500-1 Electrical Distribution System –
Loop E
1 LS LSQ $ $
260500-2 Electrical Distribution System – Loop F
1 LS LSQ $ $
260500-3 Electrical Distribution System – Irrigation System
1 LS LSQ $ $
312010 Select Borrow (Government Source, For Construction of Roads, Spurs and Grading)
2,200 CY VQ $ $
312100 Project Site Preparation and Grading
1 LS LSQ $ $
321200-1 Hot Mix Asphalt Pavement, Including Tack Coat and Saw Cuts
3,000 Ton VQ $ $
321204 Crushed Aggregate Base – Grading C – (For Under Roads, Spurs, Sidewalks, Waterways and for Road Shoulders and Aggregate Aprons)
2,400 CY DQ $ $
322622-1 Curbstop – 6-Foot Concrete 55 EA AQ $ $ 322622-2 Curbstop – 8-Foot Concrete 45 EA AQ $ $ 322640-1 Directional Arrows
(Reflectorized White)
17 EA AQ $ $
322640-2 Pavement Marking – 4-inch Wide Line Striping (Reflectorized White)
762 LF DQ $ $
322706 Pulverizing Existing Asphalt 12,000 SY DQ $ $ 323116 Road Closure Gate – 28 Foot 2 EA AQ $ $
TOTAL BASE PHASE 4 ITEMS $
OPTION#1 ITEMS – Shelters for Family Units Item Supplies/Services Qty Unit of
Issue Method of Measure
Unit Price Total Price
136000 Shelters 14’ by 14’, Includes Concrete Footings (For Family Units)
51 EA AQ $ $
TOTAL OPTION #1 ITEMS $
OPTION#2 ITEMS – Wind Screens for Family Units
Issue
Method of Measure
Unit Price Total Price
323125 Composite Wood Fence (Windscreens for Family Units)
1,570 LF AQ $ $
TOTAL OPTION #2 ITEMS $
OPTION#3 ITEMS – Loop E Restroom Building
Issue
Method of Measure
Unit Price Total Price
024102-2 Removal and Disposal of Existing Restroom Building in Loop E
1 LS LSQ $ $
033000-3 Cast-in-Place Concrete, Non- Reinforced (Sidewalks)
67 SY DQ $ $
133401-1 Precast Concrete Restroom – 6- Unit with Flush Toilets
1 LS LSQ $ $
260500-4 Electrical Distribution System – Service to Loop E Restroom Building
TOTAL OPTION #3 ITEMS $
OPTION#4 ITEMS – Loop F Restroom and Shower Building
Issue
Method of Measure
Unit Price Total Price
024102-3 Removal and Disposal of Existing Restroom Building in Loop F
1 LS LSQ $ $
033000-4 Cast-in-Place Concrete, Non- Reinforced (Sidewalks)
88 SY DQ $ $
133401-2 Precast Concrete Restroom – 6- Unit Flush Toilets with 4 Shower Units
260500-5 Electrical Distribution System – Service to Loop F Restroom Building
TOTAL OPTION #4 ITEMS $
OPTION#5 ITEMS – Irrigation System and Landscaping
Issue
Method of Measure
Unit Price Total Price
328000 Irrigation System 1 LS LSQ $ $ 329206-1 Broadcast Seeding (Disturbed
Areas)
1 LS LSQ $ $
329206-2 Hydroseeding (Irrigated Island Areas)
1 LS LSQ $ $
329310-1 Exterior Plants (Utah Juniper) 46 EA AQ $ $ 329310-2 Exterior Plants (Small
Deciduous) Netleaf Hackberry, Curlleaf Mountain Mahogany)
32 EA AQ $ $
329310-3 Exterior Plants (Large Deciduous) Common Hackberry, Green Ash, Honey Locust)
31 EA AQ $ $
TOTAL OPTION #5 ITEMS $
OPTION#6 ITEMS – Asphalt Repairs
Item Supplies/Services Qty Unit of Issue
Method of Measure
Unit Price Total Price
321200-2 Hot Mix Asphalt Pavement Repairs, including Tack Coat and Saw Cuts (Approx. 200 SF)
1 LS LSQ $ $
321203 Asphalt Crack Seal 5,000 LF DQ $ $
TOTAL OPTION #6 ITEMS $
OPTION#7 ITEMS – Vault Toilet
Issue
Method of Measure
Unit Price Total Price
033000-5 Cast-in-Place Concrete, Non- Reinforced (Sidewalks)
49 SY DQ $ $
133402 Precast Concrete Restroom – Double Vault
TOTAL OPTION #7 ITEMS $
TOTAL ALL BASE (PHASE 3 AND PHASE 4) ITEMS $
TOTAL ALL OPTIONAL ITEMS $
TOTAL BASE AND ALL OPTIONAL ITEMS $
B.2 SCHEDULE NOTES
a) Both base items (Phase 3 and Phase 4) will be awarded.
b) Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.
c) One award will be made from this solicitation, contractors must submit pricing for all items.
B.3 Payment for Bond Premiums Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 – Mobilization.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project consists of reconstructing portions of the Lucerne Campground, including Loops G Group Sites, and Loops E & F Single Family Units. Electrical, potable water and irrigation systems will also be improved.
Base Work - Phase 3 - Loop G Group Sites:
A. This portion of Base Work consists of reconstructing the remaining portion of the Lucerne Campground Loop G, including most of the asphalt loop road, Group Sites A and C, and a portion of Group Site B. Electrical, potable water and irrigation systems will also be improved. Sites will accommodate 50 PAOT.
B. Demolition work includes the following:
1. Demolition of most of the existing loop road (excluding a section running through Site B), including pulverizing the existing asphalt and removing the existing gate.
2. Demolition of all existing above ground improvements associated with Group Sites A & C, plus removal of one pull-out associated with Group B, including pulverizing the existing asphalt, and removing camping spurs, concrete barriers, fire rings, pedestal grills, irrigation sprinklers, signs, etc. The existing restrooms, potable water, sewer and electrical utilities are to remain, as designated.
C. New construction work includes the following:
1. Reconstruction of most of the existing loop road, including new asphalt, signs, and entrance gate.
2. Reconstruction of Group Sites A and C, including new asphalt roads, camping spurs, group shelter, signs, site furniture, paths, electrical system, irrigation system, landscaping, and other work as described in the plans. Construct new water laterals to serve new hydrants.
3. Construction of one new double-unit spur associated with Group Site B.
4. Modifications to the existing irrigation system between Loops G and D, including asphalt patching.
Base Work - Phase 4 - Loops E & F Single Family Units:
D. This portion of Base Work consists of reconstructing portions of the Lucerne Campground, including Loops E and F. Electrical, potable water and irrigation systems will also be improved.
E. Demolition work includes the following:
1. Demolition of all existing above ground improvements in Loops E and F, including pulverizing the existing asphalt, and removing camping spurs, family units, shelters, concrete barriers, water hydrants, site furniture, irrigation sprinklers, signs, etc. The existing potable water, sewer and electrical utilities are to remain, as designated. The existing dumpsters are to be salvaged and reused.
2. If Options #3 and #4 are not awarded, the existing restrooms shall remain undisturbed, including any concrete walkways around the perimeter of the building.
F. New construction work includes the following:
1. Reconstruction of Loops E and F, including new asphalt roads and camping spurs, family units, signs, site furniture, paths, electrical system, irrigation system, landscaping, and other work as described in the plans. Construct new water laterals to serve new hydrants.
2. Construction of a new asphalt pullout for the vault toilet.
3. Construction of a new overflow parking area with asphalt surface.
G. Optional Work - Phase 4 - Loops E & F Single Family Units, that may be awarded includes all work described above associated with:
1. Option #1: Shelters for Family Units
a. If Option #1 “Shelters for Family Units” is not awarded, coordination is required to ensure the proper concrete footers are installed for the future shelters. See Section 136000 “Pre-Manufactured Shelter”.
2. Option #2: Wind Screens for Family Units
3. Option #3: Loop E Restroom Building
a. Demolition: The existing restroom in Loop E shall be demolished, removed and disposed of, including adjacent concrete sidewalks.
b. This item includes grading around the new building; new concrete sidewalks around the perimeter of the building; and concrete sidewalks between the restroom and the asphalt pullout.
4. Option #4: Loop F Restroom and Shower Building
a. Demolition: The existing restroom in Loop F shall be demolished, removed and disposed of, including adjacent concrete sidewalks.
b. This item includes grading around the new building; new concrete sidewalks around the perimeter of the building; and concrete sidewalks between the restroom and the asphalt pullout.
5. Option #5: Irrigation System and Landscaping
a. This item includes the construction of the new “Roadside Strip” landscaping area along the existing entrance road, and landscaping within and adjacent to Loops E and F.
b. The 4-inch irrigation mainline is included in the base bid.
c. Control cabling and related trench work is included in the base bid. See specification
260500 for instructions if Option #5 is not awarded.
6. Option #6: Asphalt Repairs
7. Option #7: Vault Toilet
a. This item includes the concrete sidewalk around the perimeter of the vault toilet.
b. The asphalt pullout and signs are included in the base bid.
C.2 PROJECT LOCATON
The project is located in the Flaming Gorge National Recreation Area of the Ashley National Forest, Daggett County, Utah, in Sections 19, 20, T 3 N, R 21 E. It is located approximately 8 miles East of Manila, Utah. The project may be accessed from Wyoming State Road 530 and Lucerne Valley Recreation Road.
Government Pit Locations. There are 3 Government Source pits available within 3 miles of the project site:
1. Swim Beach - 40.993889°, -109.602056°. Expected Use: Pipe zone and special bedding material.
2. Linwood Bay - 40.994361°, -109.626556°. Expected Use: Select borrow.
3. Sewer Lagoons - 40.989694°, -109.598056°. Expected Use: Select borrow.
Note: Government source pits are available as-is to the contractor for the project, however, the material may need to be screened or processed to meet the specifications. It is the contractor’s responsibility to install material per the specifications whether it is obtained from a government source pit, or from a commercial source.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
The estimated price range of the project is between $1,000,000 and $5,000,000.
C.4 SITE INFORMATION AND LIMITATIONS
The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction site (Loop G) will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access. The Contractor shall construct a temporary fence with appropriate signing around Loop G during construction to prevent public access.
2. Access to Loops A - F and the main entrance road must remain open to the public at all times during construction, unless closures are deemed necessary to complete irrigation and electrical work.
3. Contractor will provide all materials and labor necessary to protect streams and lakes, wet or dry, during construction activities. The Contractor will be required to submit a stream and lake protection plan and receive approval from the COR, in writing, prior to the beginning of construction.
4. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treds, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
5. Dust Abatement: The contractor shall take precautions to prevent unnecessary wind-blown dust. It is especially important to prevent dust from blowing into occupied camping areas or other areas that are in use by the public. Cover or water stockpiles. To the extent possible, construct road subgrades during off-peak recreation periods. Keep all exposed subgrades watered or use other approved method to prevent dust from becoming airborne.
6. Water is available at the site for construction purposes.
7. Toilet facilities are available at the site.
C.5 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Utah Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
C.6 WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
C.7 INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
C.8 TECHNICAL SPECIFICATIONS
The following specifications are included as an attachment to Section J. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
Technical Specifications - Phase 3 – Loop G Group Sites:
Section 010250 - Construction Staking Section 011250 - Measurement And Payment With Asphalt Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 026460 - Dumpster Pad Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 033540 - Concrete Sidewalk Section 099100 - Painting Section 101400 - Signs Section 129410 - Group Site And Site Furnishings Section 136000 - Pre-Manufactured Shelter Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221105 - Water Hydrants Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceways And Boxes For Electrical Systems Section 262726 - Wiring Devices Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 312010 - Select Borrow Section 312100 - Project Site Preparation And Grading Section 312225 - Excavation & Embankment Section 321200 - Warm Mix Asphalt Paving Section 321204 - Crushed Aggregate Base Or Surface Course
Section 322622 - Precast Concrete Curb Stop Section 322640 - Pavement Marking Section 322706 - Asphalt Pavement Pulverizing Section 323116 - Gates For Roads Section 323125 - Composite Wood Fences (Windscreens) Section 328000 - Irrigation System Section 329206 - Seeding Section 329310 - Exterior Plants
Technical Specifications - Phase 4 – Loops E & F Single Family Units:
Section 010250 - Construction Staking Section 011250 - Measurement And Payment With Asphalt Section 011900 - Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 023701 - Sediment And Erosion Control Measures Section 024100 - Waste Material Disposal Section 024102 - Removal And Disposal Of Structures And Obstructions Section 026460 - Dumpster Pad Section 033000 - Cast-In-Place Concrete Section 033020 - Concrete From Packaged Dry Mix For Minor Structures Section 033540 - Concrete Sidewalk Section 099100 - Painting Section 101400 - Signs Section 129400 - Family Unit Site Furnishings Section 133401 - Precast Concrete Restroom Building Section 133402 - Precast Concrete Vault Restroom Building Section 136000 - Pre-Manufactured Shelter Section 221100 - Water Distribution Systems Section 221102 - Curb Valves And Boxes Section 221105 - Water Hydrants Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceways And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 311000 - Clearing And Grubbing Section 312000 - Earthwork Section 312010 - Select Borrow Section 312100 - Project Site Preparation And Grading Section 312225 - Excavation & Embankment Section 321200 - Hot-Mix Asphalt Paving Section 321203 - Crack Seal Section 321204 - Crushed Aggregate Base Or Surface Course Section 322622 - Precast Concrete Curb Stop Section 322640 - Pavement Marking Section 322706 - Asphalt Pavement Pulverizing Section 323116 - Gates For Roads Section 323125 - Composite Wood Fences (Windscreens) Section 328000 - Irrigation System
SECTION D--PACKAGING AND MARKING
D.1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D.2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
F.2 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after the start date identified on the notice to proceed. The time stated for completion shall include final cleanup of the premises.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 Post Award Conference A post award conference with the successful offeror is required. It will be scheduled and held after contract award. The conference will be held virtually via Teams meeting.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 KEY PERSONNEL
(a) The Contractor shall assign to this contract the following key personnel: project foreman or site superintendent.
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H.2 USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
H.3 ARCHAEOLOGICAL OR HISTORIC SITES
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
H.4 CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.
H.5 INSURANCE COVERAGE
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury.
Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:
https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY
2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of
Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(JAN 2017)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance
Services or Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT
2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-14 Limitations on Subcontracting (SEP 2021) 52.219-28 Post Award Small Business Program Rerepresentation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY
2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified
Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (NOV 2021) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN 2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts
(AUG 2018)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-5 Competition in Subcontracting (DEC 1996) 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2022)
(DEVIATION APR 2020)
52.246-21 Warranty of Construction (MAR 1994)
Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I
(SEP 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
I.2 52.217-7 Option for Increased quantity – Separately Priced Line Item (MAR 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 120 calendar days after contract award.
I.3 52.219-17 Section 8(a) Award (OCT 2019) (a)By execution of a contract, the Small Business Administration (SBA) agrees to the following:
(1)To furnish the supplies or services set forth in the contract according to the specifications and the terms and conditions by subcontracting with the Offeror who has been determined an eligible concern pursuant to the provisions of section8(a) of the Small Business Act, as amended (15 U.S.C.637(a)).
(2) Except for novation agreements, delegates to the USDA Forest Service the responsibility for administering the contract with complete authority to take any action on behalf of the Government under the terms and conditions of the contract; provided, however that the contracting agency shall give advance notice to the SBA before it issues a final notice terminating the right of the subcontractor to proceed with further performance, either in whole or in part, under the contract.
(3) That payments to be made under the contract will be made directly to the subcontractor by the contracting activity.
(4)To notify the USDA Forest Service Contracting Officer immediately upon notification by the subcontractor that the owner or owners upon whom 8(a) eligibility was based plan to relinquish ownership or control of the concern.
(5) That the subcontractor awarded a subcontract hereunder shall have the right of appeal from decisions of the cognizant Contracting Officer under the “Disputes” clause of the subcontract.
(b) The offeror/subcontractor agrees and acknowledges that it will, for and on behalf of the SBA, fulfill and perform all of the requirements of the contract.
I.4 52.219-18 Notification of Competition Limited to Eligible 8(a) PARTICIPANTS (MAR
2020)
(a) Offers are solicited only from small business concerns expressly certified by the Small Business Administration (SBA) for participation in the SBA’s 8(a) Program and which meet the following criteria at the time of submission of offer-
(1) The Offeror is in conformance with the 8(a) support limitation set forth in its approved business plan; and
(2) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by the SBA.
(b)By submission of its offer, the Offeror represents that it meets all of the criteria set forth in paragraph
(a) of this clause.
(c)Any award resulting from this solicitation will be made to the Small Business Administration, which will subcontract performance to the successful 8(a) offeror selected through the evaluation criteria set forth in this solicitation.
(d) The 8(a) participant will notify the USDA Forest Service Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock.
I.5 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items
(May 2008)
(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to: provided after contract award.
I.6 52.225-9 Buy American Act-Construction Materials (NOV 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the
United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel…