J4-FSR 225 Cove Creek DOW.pdf

PDF 98 KB Posted

Attached to
Pisgah RD Road Maintenance Project Federal contract opportunity
Solicitation number
12445224B0005
Issued by
Department of Agriculture Forest Service

About this file

This document appears to be a Detailed Scope of Work (SOW) for three separate federal road maintenance projects on the Pisgah National Forest. The SOW outlines the required work for reconditioning a total of 15.7 miles of forest service roads, including blading and shaping the existing roadways, maintaining ditches, cleaning drainage structures, and placing 5,520 tons of aggregate surfacing. Additionally, the SOW specifies the replacement of 316 feet of culvert pipe.

The related federal contract opportunity is for the Pisgah RD Road Maintenance Project, a solicitation issued by the USDA Forest Service. The project requires the contractor to provide all equipment, labor, materials, and supervision necessary to perform the road maintenance activities. A site visit is scheduled for April 30, 2024, and questions are due by May 3, 2024. The contract work is located within the boundaries of the Pisgah National Forest in North Carolina.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Number: 15707 20302 20401 30101B 60201 60708 62552 811 831 831 807.07 Unit of Measure: EA EA CY TON LF EA YD MI MI MI Day

Begin End Description of Work

0+00 118+46

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Scarify roadbed to remove, ruts, potholes, corrugations and berms to a depth up to 6 inches. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway. Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet.

Place materials away from inlet and outlets. Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow. Compact entire road after spot surfacing.

120 2.3 2.3 2.3 2

4+11

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 32 20

4+11 11+93 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

11+93

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 32 20

16+75 18+11 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

19+15

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 32 20

34+98 50+89 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

45+41

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 36 20

47+72

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 32 20

54+01 58+29 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

60+64 66+32 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

68+76 73+50 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

82+80 85+74 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

90+87

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC.

Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil. Dispose of culvert off Forest Service land. 6 1 16 20 30 20

90+87 95+64 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

103+50 109+60 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

118+60 End

36 6 96 2320 194 0 120 2.3 2.3 2.3 2

Spot Surfacing R eplacem ent N

C D

O

T ABC

. C om paction M ethod 2

Station (Feet)

FSR 225 Cove Creek

Erosion C ontrol (W attles)

R em oval and D isposal of

C ulvert off G overnm ent Land

R oadw ay Excavation of unclassified m aterials

C om paction R oller Vibratory

20 T

Description of Work

Total Quantity of Work

24" C M

P culvert, 14 gauge alum inized steel Type 2 w ith catch basin. See D etails.

C lean Existing C ulvert

Seeding/M ulching

Blading Aggregate Surface R oads

C lean and R eshape D itches

C lean C ulverts and Tail D itches

Begin End Description of Work

0+00 363+81

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Scarify roadbed to remove, ruts, potholes, corrugations and berms to a depth up to 6 inches. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials. Maintain ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway. Clean drainage structures, inlets, catch basins and outlets.

Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet.

Place materials away from inlet and outlets. Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow. Compact entire road after spot surfacing. 360 6.9 6.9 6.9 3

70+20 72+17 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

173+64 181+98 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

199+86 211+70 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

363+81 End

1240 6.9 6.9 6.9 3

Station (Feet)

FSR 471 Catheys Creek

Erosion C ontrol (W attles)

R em oval and D isposal of

C ulvert off G overnm ent Land

R oadw ay Excavation of unclassified m aterials

Spot Surfacing R eplacem ent N

C D

O

T ABC

. C om paction M ethod 2

C om paction R oller Vibratory

20 T

Description of Work

Total Quantity of Work

24" C M

P culvert, 14 gauge alum inized steel Type 2 w ith catch basin. See D etails.

C lean Existing C ulvert

Seeding/M ulching

Blading Aggregate Surface R oads

C lean and R eshape D itches

C lean C ulverts and Tail

Begin End Description of Work

0+00 340+77

Blade and shape the existing traveled way and shoulders, including turnouts, to produce a uniform surface, consistent to grade, and crowned or cross-sloped as indicated in existing surface to design specifications. Scarify roadbed to remove, ruts, potholes, corrugations and berms to a depth up to 6 inches. Maintain ditches, including lead-off ditches, by removing rock, soil, wood and other materials.

Maintain ditches to achieve proper drainage. Suitable materials up to 4 inches may be blended into road surface. Remove waste materials and debris from roadway.

Clean drainage structures, inlets, catch basins and outlets. Cleaning and reconditioning are limited the first 3 feet of the inlet and outlet. Place materials away from inlet and outlets. Recondition inlet and outlets by field methods such as jacking out or cutting away damaged metal which obstructs flow. Compact entire road after spot surfacing.

340 6.5 6.5 6.5 3 8+67 Clogged Culvert Clean inlet. Dispose of debris away from outlet. 1

12+59 20+82 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

15+86

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC. Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil.

Dispose of culvert off Forest Service land. 6 1 16 20 32 20

50+23 54+23 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

64+75 69+34 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

65+92

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC. Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil.

Dispose of culvert off Forest Service land. 6 1 16 20 26 20

75+95 79+85 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

83+07 87+47 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

110+25 117+64 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

172+92

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC. Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil.

Dispose of culvert off Forest Service land. 6 1 12 20 28 20

238+98 245+14 Spot gravel on COR designated sections. Compact with 20 ton roller (Method 2)

258+47

Replace 18" culvert with 24" CMP 36' in length at new skew. Surface with ABC. Use straw wattles for erosion control on disturbed areas. Seed and mulch disturbed soil.

Dispose of culvert off Forest Service land. 6 1 18 40 36 20

340+77 End 24 4 62 1960 122 1 80 6.5 6.5 6.5 3

Station (Feet)

FSR 475B Headwaters

Erosion C ontrol (W attles)

R em oval and D isposal of

C ulvert off G overnm ent

Land

R oadw ay Excavation of unclassified m aterials

Spot Surfacing R eplacem ent N

C D

O

T ABC

C om paction M ethod 2

C om paction R oller Vibratory

20 T

Description of Work

Total Quantity of Work

24" C M

P culvert, 14 gauge alum inized steel Type 2 w ith catch basin. See D etails.

C lean Existing C ulvert

Seeding/M ulching

Blading Aggregate Surface R oads

C lean and R eshape D itches

C lean C ulverts and Tail

DOW225
DOW471
DOW475B