J2 SOW Electrical Panel replacement.pdf
PDF 262 KB Posted
- Attached to
- NRS Rhinelander, WI Replace 2 Electrical Panels 600 AMP and 100 AMP with surge protection
- Solicitation number
- 12445523Q0107
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| photo4.jpg | JPG image | |
| 230714 SF 30 Amendment 0003.pdf | ||
| photo1.jpg | JPG image | |
| photo0.jpg | JPG image | |
| photo2.jpg | JPG image | |
| photo3.jpg | JPG image | |
| 230707 SF 30 Amendment 0002.pdf | ||
| Questions and Answers for NRS Electrical Panels.docx | DOCX document | |
| SF 30 (11_2016).pdf | ||
| J1 DBA Wage Determination.pdf | ||
| Sol_12445523Q0107.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
Project Insert Project Title Here
General Information
1.0 Scope of Work
Replace outdated 600 AMP circuit breaker panel and breakers along with 100 AMP panel and breakers with surg protection. The old panel will have to be removed before the new can be installed all wiring needs to be hard piped into boxes.
2.0 Background
600 and 100 AMP for 1960’s Wing does not provide a positive lock out tag out on circuit breakers and are too old. The breakers are not abled to be replaced because company does not exist or make them anymore. This is a major safety concern when replacing any equipment or lighting in 1960’s wing.
Contractor Requirements
3.0 Technical Requirements / Tasks
Describe the specific tasks or work the contractor must perform. Provide direction on any specific methodologies.
• Demo old 600 AMP and 100 AMP panel for 1960’s Wing, fix any old worn-out wire that does not meet NFPA or electrical code.
• Install new 600 AMP main and 100 AMP sub panels all wiring going to panel will be hard piped and secured. New breakers will be installed into panel and labeled to the location they feed. The new panels need to have arc flash sticker signed off by Master electrician.
• With install a surg protection system needs to be installed to protect high dollar lab equipment.
4.0 Government Furnished
Storage for any supplies that need to be shipped to Northern Research Station in Rhinelander.
5.0 Deliverables / Schedule
All written deliverables shall be phrased in layperson language.
• All work can be done during normal working hours, the Facilities Operation Specialist Mr. Kasprak will arrange lab shut down and telework arrangements with building personal.
• Day 1. Lockout power source to panel remove old panels and replace wiring.
• Day2. Install new 600- and 100-amp panel with breakers, install surg protection, label breaker panels and test system.
• Facilities Operations Specialist will do the final inspection before job is signed off as completed.
Insert Deliverables / Schedule Here
6.0 Travel
None
7.0 Contractor’s Key Personnel
Key personal will be certified and licensed with the knowledge of NFPA and Electrical Code for State of Wisconsin.
8.0 Security Requirements
Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.
Insert Security Requirements Here
9.0 Data Rights
If data is to be produced, furnished, acquired, or used in meeting contract requirements, delineate the respective rights and obligations of the government and the contractor regarding the use, production, and disclosure of that data.
Insert Data Rights Here
10.0 Section 508 – Electronic and Information Technology Standards When information technology is to be acquired, include language describing Section 508 requirements.
Insert Section 508 Here
Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision.