J03 Ktr Price Schedule - Pod 2.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Western Oregon POD2 Server Room Upgrades Federal contract opportunity
- Solicitation number
- 75H70126Q00023
About this file
This is a pricing schedule template for a federal contract opportunity related to server room upgrades at a Western Oregon facility operated by the Indian Health Service (Department of Health and Human Services). The document is structured as a line-item cost estimate for HVAC and electrical installation work, organized into materials and labor categories.
The scope of work includes installation of a 3-ton inverter mini-split HVAC system with associated components (refrigerant line sets, condensate pump, digital thermostat, and roofing penetration/flashing), as well as electrical infrastructure upgrades consisting of a 200-amp 208/120V three-phase subpanel, 16 branch circuits with NEMA L6-20R receptacles, feeder conductors, and related wiring and conduit. Labor line items encompass HVAC demolition and installation, electrical subpanel and circuit installation, roofing penetration sealing, inspection coordination, permit closeout, general labor, mobilization, disposal of removed equipment, hazardous materials/asbestos inspection, and permit fees. The pricing template includes sections for materials subtotal, labor and installation subtotal, overhead and profit calculation using an industry standard percentage, project manager costs, location adjustment factors based on RS Means data for Salem, Oregon, and a final total for all work. All cost fields are currently blank (showing $0), indicating this is a template awaiting contractor pricing input. The document does not specify response dates, award dates, or set-aside information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J01 PWS.pdf | ||
| A11 Pre-Solicitation SAM notice DRAFT.pdf | ||
| J04 US DOL WD OR20260104 Dated 1-2-2026.pdf | ||
| J02 Map Server Rm Location.pdf | ||
| B01 75H70126Q00023 - Rev.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Scope | Qty | Unit | Cost/Unit | Source | Cost | Notes |
| 3-Ton Inverter Mini-Split, Single Head | EA | $ - 0 | Daikin | $ - 0 | ||
| Refrigerant Line Set and Fittings | EA | $ - 0 | Market | $ - 0 | ||
| Condensate Pump | EA | $ - 0 | Market | $ - 0 | ||
| Digital Thermostat / Wall Control | EA | $ - 0 | Market | $ - 0 | ||
| 200A 208/120V 3-Phase Subpanel | EA | $ - 0 | Market | $ - 0 | ||
| 2-Pole 20A Breakers (16 + spares) | EA | $ - 0 | Market | $ - 0 | ||
| NEMA L6-20R Receptacles and Covers | EA | $ - 0 | Market | $ - 0 | ||
| Branch Circuit Wire and Conduit (16 circuits) | LS | $ - 0 | Market | $ - 0 | ||
| Feeder Conductors, 208V Tap to Subpanel | LS | $ - 0 | Market | $ - 0 | ||
| Roofing Penetration, Flashing, and Sealant | LS | $ - 0 | Market | $ - 0 | ||
| Miscellaneous Hardware and Fittings | LS | $ - 0 | Allowance | $ - 0 | ||
| Miscellaneous Hardware and Fittings | LS | $ - 0 | Allowance | $ - 0 | ||
| Subtotal – Materials | $ - 0 | |||||
| HVAC: Demo Existing 1-Ton Mini-Split | HR | $ - 0 | Market + O&P | $ - 0 | ||
| HVAC: Install New Outdoor Unit, Head, Line Set, Controls | HR | $ - 0 | Market + O&P | $ - 0 | ||
| HVAC: Roofing Penetration and Seal | HR | $ - 0 | Market + O&P | $ - 0 | ||
| Electrical: Subpanel Installation and 208V Tap | HR | $ - 0 | Market + O&P | $ - 0 | ||
| Electrical: Install 16 Branch Circuits and Receptacles | HR | $ - 0 | Market + O&P | $ - 0 | ||
| Electrical: Inspection Coordination and Permit Closeout | HR | $ - 0 | Market + O&P | $ - 0 | ||
| General Labor | HR | $ - 0 | Market | $ - 0 | ||
| Mobilization | EA | $ - 0 | Allowance | $ - 0 | ||
| Disposal – Removed Equipment and Debris | LS | $ - 0 | Allowance | $ - 0 | ||
| Hazardous Materials / Asbestos Inspection | LS | $ - 0 | Allowance | $ - 0 | ||
| Permit Fees (Electrical and Mechanical) | LS | $ - 0 | Allowance | $ - 0 | ||
| Subtotal – Labor and Installation | $ - 0 | |||||
| Total – Materials + Installation | $ - 0 | |||||
| Overhead and Profit (__%) | Industry Standard | $ - 0 | ||||
| Project Manager | HR | $ - 0 | Market | $ - 0 | ||
| Total – Overhead, Profit, and Management | $ - 0 | |||||
| Total – All Work Before Adjustments | $ - 0 | |||||
| Location Factor – Salem, OR | RS Means | |||||
| Subtotal After Adjustments |
Total $