ATTACHMENT J02: MEASUREMENT AND PAYMENT FOR PRICE SCHEDULE LINE ITEMS.
COMMUNITY WATER AND SEWER CONNECTION CONSTRUCTION
MOBILIZATION & DEMOBILIZATION
Payment for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), required permits and fees, and all other necessary items to complete the work.
CITY OF STANWOOD WATER CONNECTION FEES (FIXED AMOUNT)
Payment for city water connection fees shall be made at the rate specified in the bid schedule. Compensation shall include payment to City of Stanwood for the water system plant investment charge, additional charge for the
Cedarhome Benefit Area, base connection fee, and water meter service connection charge as specified in Section J, Attachment J07, City Fees.
INSTALLATION OF HDPE SDR 11 WATER SERVICE LINE
Payment for water service line installation shall be made at the contract unit price for the size of line listed in the bid schedule based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling and compaction; all fittings; disinfection and testing; connecting to existing home water stubout;
reduction to 1” to connect to water meter, installation of city-provided water meter to existing setter in existing concrete meter box shared with 7404 284th St; and all other necessary items for a complete and operational installation.
ABANDON EXISTING WELL
Payment for well abandonment as specified in Technical Provisions 33.0 shall be made at the contract unit price as a lump sum. A water well operator license is required for all operators engaging in well decommissioning per the
Washington Administrative Code (WAC) 173-162-040. Existing well is hand-dug of unknown depth. Compensation shall include payment for mobilization/demobilization, all cutting and perforation of the well casing, grouting and sealing of the well, removal of excess materials from the site, cleanup as applicable, and all other equipment and work required for a complete abandonment.
CITY OF STANWOOD SEWER CONNECTION FEES (FIXED AMOUNT)
Payment for city sewer connection fees shall be made at the rate specified in the Price Schedule. Compensation shall include payment to City of Stanwood for sewer system plant investment charge, administrative fee, and service connection charge as specified in Attachment J07, City Fees.
ROW AND STREET CUT PERMIT FEE
Payment for ROW and street cut fees shall be made at the rate specified in the Price Schedule. Compensation shall include payment to City of Stanwood as specified in Attachment J07, City Fees.
INSTALLATION OF PVC GRAVITY SEWER SERVICE LINE
Payment for sewer service line for the size of pipe listed in the Price Schedule shall be made at the contract unit price for the sizes of pipe listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling and compaction; all pipe and fittings; connecting to existing sewer pipe to existing septic tank; and all other necessary items for a complete and operational installation.
UNDERGROUND DOUBLESWEEP CLEANOUT
Payment for the underground cleanouts shall be made at the contract unit price for the sizes listed based on the number of underground cleanouts installed. Compensation shall include payment for excavation, backfilling and compaction, all pipe and fittings, and all other necessary items for a complete and operational installation. No payment shall be made for cleanouts installed above grade as part of the connection to existing house.
INSTALLATION OF SEWER SERVICE LINE UNDER ROAD (AS NEEDED)
Payment for water service line installation shall be made at the contract unit price for the size of line listed based on the number of linear feet installed. Compensation shall include payment for all potholing for existing utilities, required equipment, casing pipe of approved material and diameter (if required); all fittings; disinfection and testing;
and all other necessary items for a complete and operational installation.
CONNECTION TO 8” PVC SEWER MAIN
Payment for sewer service line connections to the main as specified in Site Plan and Technical Provisions shall be made at the contract lump sum price. Compensation shall include payment for locating the sewer main, sewer saddle, fittings, and all other necessary items for a complete and operational connection.
ASPHALTIC RESURFACING (AS NEEDED)
Payment for asphaltic resurfacing as specified in Detail Drawing and Technical Provision 3.0 shall be made at the contract unit price based on the number of square feet placed, with a minimum thickness of 2- inches.
Compensation shall include payment for the required preparation, asphalt, compaction, gravel base, and other incidentals. Compensation shall be made only for that asphalt placed as necessary to complete the work in accordance with the specifications. No payment shall be made for resurfacing in excess of the quantity specified on the bid schedule without authorization from the Contracting Officer. No payment shall be made for asphalt placed outside of a 3-foot width, running the length of any and all open cut trenching in pavement.