Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14.
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
3. EFFECTIVE DATE
7/31/2020A00001
75H70120Q00046
9B. DATED (SEE ITEM 11)
7/21/2020 X
See Item 7.Indian Health Service, Division of Engineering Services (DES) 701 5th Avenue, Suite 1600 Seattle, WA 98104
X X
DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Johnson Community Water/Sewer Connection
The purpose of Amendment A00001 is to answer questions asked regarding the solicitation. See the continuation page.
All other terms and conditions remain unchanged. Bidders/Offerors are reminded to acknowledge receipt of all amendments when submitting bids/proposals in accordance with solicitation instructions.
1 2
PO-19-C42M
SF 30 Continuation Page
75H70120Q00046-A00001 Page 2 of 2
Amendment A00001 – SF 30, Block 14 (Cont’d)
1. The following questions have been received in response to this solicitation. The answers are as follows:
NO. QUESTION ANSWER
Is there a requirement for Native American participation/ownership to perform the project?
In accordance with the Statement of Work paragraph C.3., Tribal Employment Rights Ordinance/Office (TERO) fees do not apply to this project.
Is the construction permit cost to be included in the unit pricing?
Any required construction permits for installation of the water and sewer lines specified in the solicitation must be included in the quoted price.
What specific taxes are to be included in the bid price?
It is the responsibility of the bidder/offeror to determine the applicable state, local and tribal taxes and fees within their bids/quotes and to perform their own due diligence in ascertaining them. Failure to do so will not constitute a request for an equitable adjustment to the contract price.
What are the grade requirements for the driveway?
IE: Material, Compaction Testing, etc…
The grade requirements are included in Attachment J04, Technical Provision 3.0. Section 3.05.02 refers to materials:
“All streets, alleys, driveways, sidewalks, curbs, or other surfaces which have been disturbed or damaged shall be resurfaced with like materials to a condition equal to or better than the original condition”. Also, Section 3.04 refers to compaction requirements, “Compaction shall be performed in a manner to avoid damage and disturbance of the embedded pipe.” A specific compaction test is not required, however, verification of adequate compaction may be required by the IHS
Project Engineer if there are any doubts or concerns.
Is the connection to the sewer main at the driveway entrance? Or is the intention to make it at the sewer manhole?
There is no sewer main right in front of the driveway; it begins at the closest manhole west of the driveway entrance as shown in the Site Plan (Attachment J06), with sewage flowing westward.
The city engineer has said that tapping into the sewer main is simpler and preferred over drilling into the manhole. The proposal is to tap into the sewer main just beyond (west of) the closest manhole.
Do any of the City of Stanwood costs include their public works department making mainline connections for the services? Does their line item costs cover the water purification testing?
Purification of the water service line is not included in the city fees and must be factored into the bid price. A representative of the City of Stanwood must be present during the connections to the water & sewer mains (see Statement of Work section E.4).
However, the actual connection must be accomplished by the contractor. For the water service line, the meter box and setter are already in place and the water meter is provided by the city
(see Attachment J02, Measurement & Payment and Attachment
J06, Site Plan), all remaining work and materials must be provided by the contractor.
The Stanwood Street and Utility standards, Chapters 4 & 5
(referenced in part E of the Statement of Work), have further details on city requirements for water/sewer service line installation. PDFs can be accessed here:
https://stanwoodwa.org/362/Street-Utility-Standards
2. The quote due date remains unchanged at August 4, 2020 no later than 2:00pm PDT.
3. All other terms and conditions remain unchanged.
https://stanwoodwa.org/362/Street-Utility-Standards