J.5 Cost Proposal Template.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
Design-Build & Construction Multiple Award Task Order Contract (MATOC) in support of Job Corps Centers Nationwide
Solicitation number
1605AE-25-R-00001
Issued by

About this file

This is a Cost Proposal Template designed for contractors bidding on construction projects for Job Corps Centers. The template uses a summary structure organized by Construction Specifications Institute (CSI) divisions, allowing contractors to itemize labor, materials/subcontractors, and equipment costs across 21 construction categories including demolition, concrete, masonry, metals, thermal protection, doors and windows, finishes, plumbing, mechanical, electrical, excavation, and exterior improvements. The template also accommodates design costs for Design-Build projects, with separate sections for labor hours (Architect, Project Manager, Civil Engineer, Structural Engineer, Mechanical Engineer, and Electrical Engineer) and materials/subcontractors allocated across site visits, construction administration services, submittal review, and closeout documentation phases.

The template incorporates a General Conditions section for overhead costs including project management salaries, vehicles, per diem, lodging, cell phone expenses, and miscellaneous items such as rental equipment, field office supplies, safety materials, temporary utilities, office trailers, inspections, tools, waste disposal, and final cleaning. The summary sheet automatically calculates subtotals for each division, applies contractor overhead and profit percentages, and incorporates bonds and insurance costs to generate the total project price. Bidders are instructed to complete only yellow-shaded cells, with all other calculations performed automatically by the spreadsheet. The template is formatted to support multiple project scenarios, including Design-Build and traditional construction delivery methods.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

CONTRACTOR COST PROPOSAL TEMPLATE
PROJECT NAME: <<INSERT>>
<<INSERT>> JOB CORPS CENTER
DATE:
PREPARED BY:
DIVISION AND DESIGN SUMMARYLABORMATERIALS/SUBEQUIPMENTTOTAL
Division 2 - Demolition$0.00$0.00$0.00$0.00
Division 3 - Concrete$0.00$0.00$0.00$0.00
Division 4 - Masonry$0.00$0.00$0.00$0.00
Division 5 - Metals$0.00$0.00$0.00$0.00
Division 6 - Woods and Plastics$0.00$0.00$0.00$0.00
Division 7 - Thermal and Moisture Protection$0.00$0.00$0.00$0.00
Division 8 - Doors and windows$0.00$0.00$0.00$0.00
Division 9 - Finishes$0.00$0.00$0.00$0.00
Division 10 - Specialties$0.00$0.00$0.00$0.00
Division 11 - Equipment$0.00$0.00$0.00$0.00
Division 12 - Furnishings$0.00$0.00$0.00$0.00
Division 13 - Special Construction$0.00$0.00$0.00$0.00
Division 14 - Conveying Equipment$0.00$0.00$0.00$0.00
Division 21 - Fire Suppression$0.00$0.00$0.00$0.00
Division 22 - Plumbing$0.00$0.00$0.00$0.00
Division 23 - Mechanical$0.00$0.00$0.00$0.00
Division 26 - Electrical$0.00$0.00$0.00$0.00
Division 28- Electronic Safety and Security$0.00$0.00$0.00$0.00
Division 31 - Excavation$0.00$0.00$0.00$0.00
Division 32 - Exterior Improvements$0.00$0.00$0.00$0.00
Division 33 - Utilities$0.00$0.00$0.00$0.00
Design (For Design/Build Projects)$0.00$0.00N/A$0.00
General Conditions$0.00$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00
Contractor Overhead$0.000.00%
SUBTOTAL WITH OVERHEAD$0.00
Contractor Profit$0.000.00%
SUBTOTAL WITH O&P$0.00
Bonds/Insurance0.000.00%
TOTAL$0.00
INSTRUCTIONS TO BIDDER
1. Only complete cells shaded in yellow. All other cells are automatically calculated.
2. Add tasks to "CSI DIVISION" Tab and applicable units, rates, and quantifies. If a CSI Section is N/A, leave blank.
3. If this is a Design-Build project, add applicable rates, hours, and materials costs to "DESIGN" Tab.
4. Add applicable units, rates, and quantifies in the "GENERAL CONDITIONS" Tab.
5. Add applicalbe Overhead, Profit, and Bonds/Insurance Percentages in the "SUMMARY" Tab.

CSI DIVISION

CSI DIVISION

LABORMATERIALS/SUBCONTRACTOREQUIPMENT
ITEMRATEHOURSTOTALUNITQTYUNIT RATETOTALRATEDURATIONTOTALITEM TOTAL
Division 2 - Demolition$0.00$0.00$0.00$0.00
[List Tasks Under Each Division Heading]$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 3 - Concrete$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 4 - Masonry$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 5 - Metals$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 6 - Woods and Plastics$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 7 - Thermal and Moisture Protection$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 8 - Doors and windows$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 9 - Finishes$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 10 - Specialties$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 11 - Equipment$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 12 - Furnishings$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 13 - Special Construction$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 14 - Conveying Equipment$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 21 - Fire Suppression$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 22 - Plumbing$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 23 - Mechanical$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 26 - Electrical$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 28- Electronic Safety and Security$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 31 - Excavation$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 32 - Exterior Improvements$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
Division 33 - Utilities$0.00$0.00$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
$0.000$0.000$0.00$0.00$0.000$0.00$0.00
SUBTOTAL CSI DIVISIONS$0.00$0.00$0.00$0.00

DESIGN (DB ONLY)

DESIGN (DESIGN-BUILD PROJECTS ONLY)

LABOR HOURS
Design (for Design/Build Projects)RATESITE VISITS15% or 30%50% or 60%100%CA SERVICESSUBMITTAL REVIEWCLOSEOUT DOCSTOTAL HOURSTOTAL
Architect$0.0000000000$0.00
Project Manager$0.0000000000$0.00
Civil Engineer$0.0000000000$0.00
Structural Engineer$0.0000000000$0.00
Mechanical Engineer$0.0000000000$0.00
Electrical Enginer$0.0000000000$0.00
SUBTOTAL HOURS00000000$0.00
MATERIALS/SUBCONTRACTORS
Design (for Design/Build Projects)RATESITE VISITS15% or 30%50% or 60%100%CA SERVICESSUBMITTAL REVIEWCLOSEOUT DOCSTOTAL HOURSTOTAL
[LIST ITEMS]$0.0000000000$0.00
$0.0000000000$0.00
$0.0000000000$0.00
$0.0000000000$0.00
$0.0000000000$0.00
$0.0000000000$0.00
SUBTOTAL MATERIALS/SUB00000000$0.00

SUBTOTAL DESIGN $0.00

GENERAL CONDITIONS

GENERAL CONDITIONS

ITEM DESCRIPTIONQTYUNITSMATERIAL/SUBLABOREQUIPMENTTOTAL
UNIT COSTCOSTUNIT COSTCOSTUNIT COSTCOST
SALARIES
Project Manager (Labor)0.0Hours$ - 0$ - 0$ - 0
Project Scheduler (Labor)0.0Hours$ - 0$ - 0$ - 0
Quality Control Manager (Labor)0.0Hours$ - 0$ - 0$ - 0
Superintendent (Labor)0.0Hours$ - 0$ - 0$ - 0
SALARIES SUBTOTAL0.0Hours$ - 0$ - 0
VEHICLES
Project Superintendent Vehicle0.0Days$ - 0$ - 0$ - 0
QCM Vehicle0.0Days$ - 0$ - 0$ - 0
VEHICLES SUBTOTAL$ - 0$ - 0
PER DIEM
Project Manager Per Diem0.0Days$ - 0$ - 0$ - 0
Project Superintendent Per Diem0.0Days$ - 0$ - 0$ - 0
QCM Per Diem0.0Days$ - 0$ - 0$ - 0
PER DIEM SUBTOTAL$ - 0$ - 0
LODGING
Project Manager Lodging0.0Days$ - 0$ - 0$ - 0
Project Superintendent Lodging0.0Days$ - 0$ - 0$ - 0
QCM Lodging0.0Days$ - 0$ - 0$ - 0
LODGING SUBTOTAL$ - 0$ - 0
CELL PHONE
Project Manager Cell Phone0.0Days$ - 0$ - 0$ - 0
Project Scheduler Cell Phone0.0Days$ - 0$ - 0$ - 0
Project Superintendent Cell Phone0.0Days$ - 0$ - 0$ - 0
QCM Cell Phone0.0Days$ - 0$ - 0$ - 0
CELL PHONE SUBTOTAL$ - 0$ - 0
OTHER
Rental Equipment0.0LS$ - 0$ - 0$ - 0
Field Office Printer/Copier0.0Months$ - 0$ - 0$ - 0
As-builts0.0LS$ - 0$ - 0$ - 0
Temp fencing0.0Feet$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Field Office Supplies0.0Months$ - 0$ - 0$ - 0
Safety Material0.0Months$ - 0$ - 0$ - 0
Temp Lighting0.0Days$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Office Trailer0.0Months$ - 0$ - 0$ - 0
Office Trailer Setup0.0LS$ - 0$ - 0$ - 0$ - 0$ - 0
Sanitary Faciltiies0.0Months$ - 0$ - 0$ - 0$ - 0$ - 0
Soils and concrete inspection0.0LS$ - 0$ - 0$ - 0$ - 0$ - 0
Tools0.0Weeks$ - 0$ - 0$ - 0
Construction Waste Disposal0.0Weeks$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Final Cleaning0.0LS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OTHER SUBTOTAL$ - 0$ - 0$ - 0$ - 0
GENERAL CONDITIONS SUBTOTAL$ - 0$ - 0$ - 0$ - 0