This is a Cost Proposal Template designed for contractors bidding on construction projects for Job Corps Centers. The template uses a summary structure organized by Construction Specifications Institute (CSI) divisions, allowing contractors to itemize labor, materials/subcontractors, and equipment costs across 21 construction categories including demolition, concrete, masonry, metals, thermal protection, doors and windows, finishes, plumbing, mechanical, electrical, excavation, and exterior improvements. The template also accommodates design costs for Design-Build projects, with separate sections for labor hours (Architect, Project Manager, Civil Engineer, Structural Engineer, Mechanical Engineer, and Electrical Engineer) and materials/subcontractors allocated across site visits, construction administration services, submittal review, and closeout documentation phases.
The template incorporates a General Conditions section for overhead costs including project management salaries, vehicles, per diem, lodging, cell phone expenses, and miscellaneous items such as rental equipment, field office supplies, safety materials, temporary utilities, office trailers, inspections, tools, waste disposal, and final cleaning. The summary sheet automatically calculates subtotals for each division, applies contractor overhead and profit percentages, and incorporates bonds and insurance costs to generate the total project price. Bidders are instructed to complete only yellow-shaded cells, with all other calculations performed automatically by the spreadsheet. The template is formatted to support multiple project scenarios, including Design-Build and traditional construction delivery methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONTRACTOR COST PROPOSAL TEMPLATE |
| PROJECT NAME: <<INSERT>> |
| <<INSERT>> JOB CORPS CENTER |
| DATE: |
| PREPARED BY: |
| DIVISION AND DESIGN SUMMARY | LABOR | MATERIALS/SUB | EQUIPMENT | TOTAL | |
| Division 2 - Demolition | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 3 - Concrete | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 4 - Masonry | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 5 - Metals | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 6 - Woods and Plastics | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 7 - Thermal and Moisture Protection | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 8 - Doors and windows | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 9 - Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 10 - Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 11 - Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 12 - Furnishings | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 13 - Special Construction | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 14 - Conveying Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 21 - Fire Suppression | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 22 - Plumbing | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 23 - Mechanical | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 26 - Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 28- Electronic Safety and Security | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 31 - Excavation | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 32 - Exterior Improvements | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 33 - Utilities | $0.00 | $0.00 | $0.00 | $0.00 | |
| Design (For Design/Build Projects) | $0.00 | $0.00 | N/A | $0.00 | |
| General Conditions | $0.00 | $0.00 | $0.00 | $0.00 | |
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 | |
| Contractor Overhead | $0.00 | 0.00% | |||
| SUBTOTAL WITH OVERHEAD | $0.00 | ||||
| Contractor Profit | $0.00 | 0.00% | |||
| SUBTOTAL WITH O&P | $0.00 | ||||
| Bonds/Insurance | 0.00 | 0.00% | |||
| TOTAL | $0.00 | ||||
| INSTRUCTIONS TO BIDDER | |||||
| 1. Only complete cells shaded in yellow. All other cells are automatically calculated. | |||||
| 2. Add tasks to "CSI DIVISION" Tab and applicable units, rates, and quantifies. If a CSI Section is N/A, leave blank. | |||||
| 3. If this is a Design-Build project, add applicable rates, hours, and materials costs to "DESIGN" Tab. | |||||
| 4. Add applicable units, rates, and quantifies in the "GENERAL CONDITIONS" Tab. | |||||
| 5. Add applicalbe Overhead, Profit, and Bonds/Insurance Percentages in the "SUMMARY" Tab. |
CSI DIVISION
CSI DIVISION
| LABOR | MATERIALS/SUBCONTRACTOR | EQUIPMENT | |||||||||
| ITEM | RATE | HOURS | TOTAL | UNIT | QTY | UNIT RATE | TOTAL | RATE | DURATION | TOTAL | ITEM TOTAL |
| Division 2 - Demolition | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| [List Tasks Under Each Division Heading] | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 3 - Concrete | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 4 - Masonry | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 5 - Metals | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 6 - Woods and Plastics | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 7 - Thermal and Moisture Protection | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 8 - Doors and windows | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 9 - Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 10 - Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 11 - Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 12 - Furnishings | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 13 - Special Construction | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 14 - Conveying Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 21 - Fire Suppression | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 22 - Plumbing | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 23 - Mechanical | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 26 - Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 28- Electronic Safety and Security | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 31 - Excavation | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 32 - Exterior Improvements | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 33 - Utilities | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| SUBTOTAL CSI DIVISIONS | $0.00 | $0.00 | $0.00 | $0.00 |
DESIGN (DB ONLY)
DESIGN (DESIGN-BUILD PROJECTS ONLY)
| LABOR HOURS | ||||||||||
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% or 30% | 50% or 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL |
| Architect | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Project Manager | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Civil Engineer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Structural Engineer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Mechanical Engineer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Electrical Enginer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| SUBTOTAL HOURS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| MATERIALS/SUBCONTRACTORS | ||||||||||
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% or 30% | 50% or 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL |
| [LIST ITEMS] | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| SUBTOTAL MATERIALS/SUB | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
SUBTOTAL DESIGN $0.00
GENERAL CONDITIONS
GENERAL CONDITIONS
| ITEM DESCRIPTION | QTY | UNITS | MATERIAL/SUB | LABOR | EQUIPMENT | TOTAL | |||
| UNIT COST | COST | UNIT COST | COST | UNIT COST | COST | ||||
| SALARIES | |||||||||
| Project Manager (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Scheduler (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Quality Control Manager (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Superintendent (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| SALARIES SUBTOTAL | 0.0 | Hours | $ - 0 | $ - 0 | |||||
| VEHICLES | |||||||||
| Project Superintendent Vehicle | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Vehicle | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| VEHICLES SUBTOTAL | $ - 0 | $ - 0 | |||||||
| PER DIEM | |||||||||
| Project Manager Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| PER DIEM SUBTOTAL | $ - 0 | $ - 0 | |||||||
| LODGING | |||||||||
| Project Manager Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| LODGING SUBTOTAL | $ - 0 | $ - 0 | |||||||
| CELL PHONE | |||||||||
| Project Manager Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Scheduler Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| CELL PHONE SUBTOTAL | $ - 0 | $ - 0 | |||||||
| OTHER | |||||||||
| Rental Equipment | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | ||||
| Field Office Printer/Copier | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| As-builts | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | ||||
| Temp fencing | 0.0 | Feet | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Office Supplies | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Safety Material | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Temp Lighting | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Office Trailer | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Office Trailer Setup | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Sanitary Faciltiies | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Soils and concrete inspection | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Tools | 0.0 | Weeks | $ - 0 | $ - 0 | $ - 0 | ||||
| Construction Waste Disposal | 0.0 | Weeks | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Final Cleaning | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OTHER SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| GENERAL CONDITIONS SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .