This solicitation is for renovating stairwells at a Department of Veterans Affairs facility located in Gainesville, Florida. Proposals are due by November 28, 2022 for project 573-18-600, which involves renovating stairwells at the specified address. An optional site visit has been scheduled for November 3, 2022 at 10:00 AM for interested parties to meet at the basement entrance of building 1 after parking in one of the onsite garages. The solicitation was issued by the Veterans Health Administration Veterans Integrated Service Network 8 on behalf of the Department of Veterans Affairs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
G0.1
SHEET
NO. DRAWING TITLE
GENERAL
G0.2
ARCHITECTURAL
SHEET
NO.
COVER SHEET
NOTES, ABBREVIATIONS AND LEGEND
LOCATION MAP
NOT TO SCALE
AREA MAP
NOT TO SCALE
A1.3
A1.4
A2.2 STAIR NO. 2
A3.1
STAIR NO. 3A3.2
STAIR NO. 3
A1.2
A2.1 STAIR NO. 2
STAIR NO. 1 (ALTERNATE NO. 1)A1.1
TRUE
NORTH
TRUE
NORTH
RENOVATION OF HOSPITAL STAIRWELLS
PROJECT NO. 573-18-600
FINAL SUBMITTAL
MALCOM RANDALL VA MEDICAL CENTER
GAINESVILLE, FL 32608
A5.1 STAIR NO. 5
A5.2 STAIR NO. 5
PIPE BASEMENT KEY PLANA0.1
PLAN
NORTH
PLAN
NORTH
A6.1 STAIR NO. 6
A6.2 STAIR NO. 6
A7.1 STAIR NO. 7
A8.1 STAIR NO. 8
A9.1 STAIR NO. 9 (ALTERNATE NO. 2)
A9.2
A9.3
A10.1 STAIR NO. 10 (ALTERNATE NO. 3)
A10.2
A10.3
A11.1 STAIR NO. 11 (ALTERNATE NO. 4)
A11.2
A11.3
A12.1 STAIR NO. 12
A12.2 STAIR NO. 12
A12.3 STAIR NO. 12
A17.1 STAIR NO. 17
A17.2 STAIR NO. 17
A18.1 STAIR NO. 18 (ALTERNATE NO. 5)
A18.2
A19.1 STAIR NO. 19
ARCHITECTURAL (CONTINUED)
A21.1 STAIR NO. 21
A22.1 STAIR NO. 22
A31.1 STAIR NO. 31
A32.1 STAIR NO. 32
A43.1 STAIR NO. 43
A44.1 STAIR NO. 44
A51.1 STAIR NO. 51
A52.1 STAIR NO. 52
A53.1 STAIR NO. 53
A54.1 STAIR NO. 54
PLUMBING
P17.1
P18.1
M001
STRUCTURAL
STAIR NO. 17 - PLUMBING
STAIR NO. 18 - PLUMBING
STAIR NO. 17 - MECHANICALM17.1
M18.1 STAIR NO. 18 - MECHANICAL
ELECTRICAL
LEGEND AND SCHEDULESE0.1
E1.1
E1.2
E1.3
E2.1
E2.2
E3.1 E3.2
E5.1
E5.2
STAIR NO. 1 - ELECTRICAL
STAIR NO. 1 - ELECTRICAL
STAIR NO. 1 - ELECTRICAL
STAIR NO. 2 - ELECTRICAL
STAIR NO. 2 - ELECTRICAL
STAIR NO. 3 - ELECTRICAL
STAIR NO. 3 - ELECTRICAL
STAIR NO. 5 - ELECTRICAL
STAIR NO. 5 - ELECTRICAL
STAIR NO. 6 - ELECTRICAL
STAIR NO. 6 - ELECTRICAL
STAIR NO. 7 - ELECTRICAL
E6.1
E6.2
E7.1
E8.1
E9.1
E9.2
E9.3
E10.1
E10.2
E10.3
E11.1
E11.2
E11.3
E12.1
E12.2
E12.3
E17.1
E18.1
E19.1
E21.1
E22.1
E31.1
E32.1
E43.1
E44.1
E51.1
E52.1
E53.1
E54.1
STAIR NO. 8 - ELECTRICAL
STAIR NO. 9 - ELECTRICAL
STAIR NO. 9 - ELECTRICAL
STAIR NO. 9 - ELECTRICAL
STAIR NO. 10 - ELECTRICAL
STAIR NO. 10 - ELECTRICAL
STAIR NO. 10 - ELECTRICAL
STAIR NO. 11 - ELECTRICAL
STAIR NO. 11 - ELECTRICAL
STAIR NO. 11 - ELECTRICAL
STAIR NO. 12 - ELECTRICAL
STAIR NO. 12 - ELECTRICAL
STAIR NO. 12 - ELECTRICAL
STAIR NO. 17 - ELECTRICAL
STAIR NO. 18 - ELECTRICAL
STAIR NO. 19 - ELECTRICAL
STAIR NO. 21 - ELECTRICAL
STAIR NO. 22 - ELECTRICAL
STAIR NO. 31 - ELECTRICAL
STAIR NO. 32 - ELECTRICAL
STAIR NO. 43 - ELECTRICAL
STAIR NO. 44 - ELECTRICAL
STAIR NO. 51 - ELECTRICAL
STAIR NO. 52 - ELECTRICAL
STAIR NO. 53 - ELECTRICAL
STAIR NO. 54 - ELECTRICAL
E55.1 STAIR NO. 55 - ELECTRICAL
A55.1 STAIR NO. 55
E41.1
E42.1
STAIR NO. 41 - ELECTRICAL
STAIR NO. 42 - ELECTRICAL
A42.1 STAIR NO. 42
P001 LEGENDS AND NOTES
A2.3 STAIR NO. 2
A601 STAIR FINISH SCHEDULE - BUILDING 1
A602
A603
A604
STAIR FINISH SCHEDULE - E WING
STAIR FINISH SCHEDULE - ACA
STAIR FINISH SCHEDULE - BED TOWER
A611
A612
A613
A614
DOOR AND FRAME SCHEDULE - BUILDING 1
DOOR AND FRAME SCHEDULE - E WING
DOOR AND FRAME SCHEDULE - ACA
DOOR AND FRAME SCHEDULE - BED TOWER
A3.3 STAIR NO. 3
A5.3 STAIR NO. 5
A6.3 STAIR NO. 6
A7.2 STAIR NO. 7
A8.2 STAIR NO. 8
A9.4
A10.4
A11.4
A12.4 STAIR NO. 12
A701 SIGNAGE TYPES
E0.2 OVERALL KEY PLAN
A31.2 STAIR NO. 31
A32.2 STAIR NO. 32
A33.1 STAIR NO. 33
A42.2 STAIR NO. 42
BASEMENT KEY PLANA0.2
FIRST FLOOR KEY PLANA0.3
SECOND FLOOR KEY PLANA0.4
THIRD FLOOR KEY PLANA0.5
FOURTH FLOOR KEY PLANA0.6
FIFTH FLOOR KEY PLANA0.7
ROOF KEY PLANA0.8
STAIR NO. 1 (ALTERNATE NO. 1)
STAIR NO. 1 (ALTERNATE NO. 1)
STAIR NO. 1 (ALTERNATE NO. 1)
STAIR NO. 9 (ALTERNATE NO. 2)
STAIR NO. 9 (ALTERNATE NO. 2)
STAIR NO. 9 (ALTERNATE NO. 2)
STAIR NO. 10 (ALTERNATE NO. 3)
STAIR NO. 10 (ALTERNATE NO. 3)
STAIR NO. 10 (ALTERNATE NO. 3)
STAIR NO. 11 (ALTERNATE NO. 4)
STAIR NO. 11 (ALTERNATE NO. 4)
STAIR NO. 11 (ALTERNATE NO. 4)
STAIR NO. 18 (ALTERNATE NO. 5)
A501
A41.1
A22.2 STAIR NO. 22
STAIR DETAILS
STAIR NO. 41
LEGENDS, GENERAL NOTES, DETAIL, AND SCHEDULES
MECHANICAL (CONTINUED)
A17.3 STAIR NO. 17
A18.3 STAIR NO. 18 (ALTERNATE NO. 5)
S001 STRUCTURAL NOTES
S101 SLAB PLAN AND DETAILS
MECHANICAL
A702 SIGNAGE TYPES
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
COVER SHEET RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
G0.1
573-18-600
DN DB/AW/SJ5-13-2022
STAMP
ARCHITECTURAL ABBREVIATIONSARCHITECTURAL LEGEND ARCHITECTURAL GENERAL NOTES
GENERAL PROJECT NOTES
A
A301
A201
A401
ROOM
NAME
+ 0'-6"
AIR CONDITIONING
ACOUSTICAL CEILING TILE
ABOVE FINISH FLOOR
ALUMINUM
BATT INSULATION
BOTTOM OF
CEMENTITIOUS BACKER BOARD
CEMENTITIOUS CRYSTALLINE WATERPROOFING
COLD-FORMED METAL FRAMING
CORNER GUARD
CENTERLINE
CERAMIC MOSAIC TILE
CONCRETE MASONRY UNIT
CASED OPENING
COMMUNICATION
CONCRETE
CONCRETE WITH SEALER
CONTINUOUS
CONTRACTING OFFICER'S REPRESENTATIVE
CONTRACTING OFFICER'S TECHNICAL
REPRESENTATIVE
CERAMIC TILE
CERAMIC TILE BASE
CARPET
DIAMETER
EXPANSION JOINT
ELECTRICAL
EQUAL
EXPOSED STRUCTURE
ET CETERA
EXISTING
EXPOSED
FACTORY FINISH
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISHED FLOOR
FINISH
FLOOR
FACE OF
FIELD VERIFY
(PRIOR TO ORDERING OR CUTTING)
FABRIC WALLCOVERING
GAGE
GRANITE
GYPSUM (WALL) BOARD
HANDICAPPED
HOLLOW METAL
HANDRAIL
HEATING VENTILATION AND AIR-CONDITIONING
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MASONRY OPENING
METAL
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
PORCELAIN BASE
PLASTER
PLASTIC LAMINATE
PORCELAIN TILE
PAIR
PAINT
QUARRY TILE
RESILIENT BASE
REFRIGERATOR
REQUIRED
RESINOUS FLOORING
RESINOUS EPOXY WALL-CEILING
ROUGH OPENING
RUBBER FLOORING
RECESSED PAPER HOLDER
SEALED HIGH BUILD GLAZED COATING
(SPECIAL COATING)
SOAP DISPENSER
SOLID CORE WOOD
SIMILAR
SANITARY NAPKIN DISPENSER
SPECIAL FACED
STAINLESS STEEL/SOLID SURFACE
STEEL
SUBSTRATE
SHEET VINYL
SOLID VINYL TILE
TACK BOARD
TELEPHONE
TOP OF
TOILET PAPER
TYPICAL
UNLESS NOTED OTHERWISE
VINYL COMPOSITION TILE
VINYL WALL COVERING
WALL COVERING
WALL PROTECTION
WOOD
WELDED SEAM SHEET FLOORING
(HEAT WELDED WITH ROD)
AC
AT
AFF
ALUM
BATT
BO
CBB
CCW
CFMF
CG
C
CMT
CMU
CO
COMM
CONC
CONC-S
CONT
COR
COTR
CT
CTB
CP
DIA
EJ
ELEC
EQ
ES
ETC
EX
EXP
FAC FIN
FD
FEC
FHC
FF
FIN
FLR
FO
FV
FWC
GA
GRA
GYP BD/GWB
HC
HM
HR
HVAC
MATL
MAX
MECH
MFR
MIN
MO
MTL
NIC
NTS
OC
OH
PB
PLS
PL
PT
PR
P
QT
RB
REF
REQ'D
RES-2
RES-W
RO
RF
RPH
SC
SD
SCW
SIM
SND
SP
SS
STL
SUBS
SV
SVT
TB
TELE
TO
TP
TYP
UNO
VCT
VWC
WC
WP
WD
WSF
L
ROOM NAME AND NUMBER
DOOR NUMBER
KEYED NOTE
DETAIL CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
SECTION CALLOUT
VERTICAL ELEVATION
COLUMN CENTERLINE DESIGNATION
DEMOLITION NOTE
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
ELEVATION CALLOUT
DETAIL NUMBER
SHEET WHERE DETAIL IS DRAWN
A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO:
FACE OF NEW MASONRY
FACE OF NEW WALL STUDS
TOP OF SLAB
TOP OF MASONRY
B. COORDINATE WITH ELECTRICAL, HVAC, PLUMBING, AND FIRE PROTECTION
DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE DUCT, CONDUIT,
AND PIPE OPENINGS IN SLABS, ROOF, AND WALLS. COORDINATE DUCT,
CONDUIT, AND PIPE ROUTING ABOVE CEILINGS. PATCH HOLES CAUSED BY
THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLS, ETC. WITH
MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL,
THICKNESS, ALIGNMENT, GRADES, AND QUALITY.
C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD
AND METAL BLOCKING FOR HANDRAILS, GUARDRAILS, ETC.
COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED
EQUIPMENT.
D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE,
HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM
INDICATED.
E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED
PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP
TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS
AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION.
PROVIDE UL LISTED ASSEMBLIES.
F. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT
DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING.
G. COORDINATE DEMOLITION AND NEW WORK AMONG DISCIPLINES.
H.
I.
REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND
AS REQUIRED FOR NEW CONSTRUCTION.
A. THE CONTRACTOR SHALL BE PREPARED TO STOP ANY WORK AND CLEAR
UP THE WORK AREA IF SO ASKED IN MEDICAL SITUATIONS REQUIRING
SUCH ACTION.
B. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR
EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED.
C. ALL TOOLS AND MATERIALS USED IN THIS PROJECT SHALL BE PROPERLY
SECURED AT ALL TIMES BY THE CONTRACTOR TO REDUCE POSSIBILITY OF
ANY OF THESE TOOLS BEING A HAZARD TO PATIENTS, VISITORS, OR
EMPLOYEES.
D. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR
EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED
TO RECEIVE BADGES. COORDINATE WITH COR.
E. THE CONTRACTOR, AT HIS EXPENSE, WILL BE RESPONSIBLE FOR TRAINING
EACH MEMBER OF HIS WORK FORCE ON VA POLICIES FOR ON-SITE WORK
BEFORE ANY MEMBER WILL BE ALLOWED TO PERFORM WORK ON VA
PREMISES.
F. ABSOLUTELY NO VA TOOLS, MATERIALS, OR EQUIPMENT WILL BE LOANED OR
GIVEN BY THE VA TO ANY MEMBER OF THE CONTRACTOR'S WORK FORCE
AT ANY TIME.
G. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO
CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY
PROTECTED TO PREVENT ACCIDENTAL ALARM DURING CONSTRUCTION.
ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH
COR AND THE VA SAFETY OFFICER. ALL FUNCTIONAL FIRE ALARM
DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT
PRESENT IN WORK AREA.
H. THE CONTRACTOR MUST PROVIDE WRITTEN FIRE SAFETY CHECKLIST AT THE
END OF EVERY WORKDAY TO THE COR CERTIFYING THAT ALL WORK AREAS
HAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OF
ANY FLAMMABLE LIQUIDS.
I. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND
CONTRACTING OFFICER.
J. SEE SPECIFICATION SECTION 01 35 26 FOR INTERIM LIFE SAFETY
MEASURES.
K. ALL FINISH COLORS TO BE SELECTED BY COR/ VA INTERIOR
DESIGNER WHERE NOT OTHERWISE INDICATED. CONTRACTOR SHALL
SUBMIT THE COLORS PER SUBMITTAL REQUIREMENT OF CONTRACT.
L. THE CONTRACTOR SHALL NOT OPERATE ANY EXISTING VA EQUIPMENT
INCLUDING BUT NOT LIMITED TO ELECTRICAL, FIRE-HYDRANT, VALVES,
PUMPS, ETC., WITH OUT AUTHORIZATION FROM THE VAMC ENGINEERING
SERVICE, UNLESS AN EMERGENCY SITUATION EXISTS. IN GENERAL, THE
OPERATING STAFF OF THE VAMC ENGINEERING SERVICE WILL OPERATE
ANY EXISTING EQUIPMENT WHICH THE CONTRACTOR MAY REQUIRE
CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL CONSTRUCTION
PERMIT IS APPROVED/SIGNED.
CARD READERCR
HIGH-PRESSURE LAMINATEHPL
LUXURY VINYL TILELVT
EDGE OF DECKEOD
J. COMPLETE LAYOUT AND COORDINATION DRAWINGS AT 1/4" SCALE
SHALL BE PROVIDED. CONSTRUCTION WORK SHALL NOT START ON ANY
SYSTEM UNTIL THE LAYOUT AND COORDINATION DRAWINGS HAVE BEEN
APPROVED.
DOWNSPOUTDS
CONTROL JOINTCJ
ELECTRIC DRINKING FOUNTAINEDF
FIRE RETARDANT TREATEDFRT
EXTERIOR INSULATION FINISHING SYSTEMEIFS
WATER RESISTANTWR
J1
SECTION CUT
HEAD/JAMB/SILL DETAIL NUMBER
ACCESS TO STAIRS
A. THE CONTRACTOR WILL NOT HAVE ACCESS TO ALL STAIRS AT ONE TIME.
B. COR MUST APPROVE SEQUENCE AND PHASING OF WORK FOR EACH STAIR.
TRANSITIONAL STOPTS
M. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING
DIMENSIONS OF INSTALLED CONSTRUCTION PRIOR TO COMMENCING
WITH THE WORK. IN THE EVENT THAT ANY DISCREPANCIES BETWEEN
THE INDICATED WORK AND EXISTING CONDITIONS ARE DISCOVERED, THE
CONTRACTOR SHALL NOTIFY THE COR FOR INTERPRETATON AND
DIRECTION PRIOR TO PROCEDING WITH THE WORK.
K. PATCH AND REPAIR ALL DAMAGED SURFACES AS NEEDED TO INSTALL NEW
WORK.
ALL WORK SHALL COMPLY
WITH FEDERAL ABA,
LOCAL, AND STATE
ACCESSIBILITY CODES AND
REQUIREMENTS.
DOOR LOCATIONS
TYPICAL DETAILS
TYP DOOR LOCATION
SEE DOOR SCHEDULE
4"
TYP
ACCESSIBILITY REQUIREMENTS
FRONT APPROACHES
HINGE-SIDE APPROACHES
LATCH-SIDE APPROACHES
USE EITHER
OPTION 1 OR
OPTION 2
ALL DOOR ASSEMBLIES SHALL BE CONSTRUCTED TO MEET THE
INDICATED MINIMUM CLEARANCES AS APPLICABLE.
1'-0" IF DOOR HAS BOTH
A CLOSER AND A
LATCH
5' -0
1'-6"
3' -6
4'-6"
4' -0
O P
TI
O
N
5' -0
OPTION 1
3'-0"
O P
TI
O
N
4' -6
OPTION 2
3'-6"
2'-0"
4' -0
2'-0"
3' -6
4' -0
4' -6
W / C
LO
S
E R
4' -0
W / C
LO
S
E R
W /C
LO
S
E R
A N
D L
A
TC
H
UL DETAIL C-AJ-1254UL DETAIL W-L-2038
NOTE:ANY UL ASSEMBLY MEETING CRITERIA MAY
BE UTILIZED. ASSEMBLIES INDICATED ON THIS
SHEET ARE FOR INFORMATION ONLY.
Min Min Thk of
Concrete Floor In.
(mm)
4-1/2 (114)
4-1/2 (114)
4-1/2 (114)
4-1/2 (114)
3-1/2 (89)
3-1/2 (89)
3-1/2 (89)
3-1/2 (89)
Thk of Concrete Wall In.
(mm)
(127)
(127)
(127)
(127)
(102)
(102)
(102)
(102)
Type of Pipe
Steel Pipe
Iron Pipe
Copper Tube
Copper Pipe
Steel Pipe
Iron Pipe
Copper Tube
Copper Pipe
Annular Space In.
(mm)
1/2 to 1 (13 to 25)
1/2 to 1 (13 to 25)
3/8 to 1-1/2 (9.5 to 38)
3/8 to 1-1/2 (9.5 to 38)
1/4 to 5/8 (6 to 16)
1/4 to 5/8 (6 to 16)
1/4 to 5/8 (6 to 16)
1/4 to 5/8 (6 to 16)
Packing Mtl
Type
Mineral Wool
Mineral Wool
Mineral Wool
Mineral Wool
Ceramic Blanket
Ceramic Blanket
Ceramic Blanket
Ceramic Blanket
Packing Mtl Thk In.
(mm)
(102)
(102)
(102)
(102)
(76)
(76)
(76)
(76)
F Rating
Hr
T Rating
Hr
2 1
2 1
2 1/2
2 1/2
1-1/2 1/2
1-1/2 1/2
1-1/2 1/2
1-1/2 1/2
A/D FIRE PROTECTION SYSTEMS INC - A/D FIREBARRIER
Intumescent Sealant or A/D FIREBARRIER Acrylic Sealant
*Bearing the UL Classification Mark
Firestop System - The F and T Ratings of the system are dependent upon the thickness of concrete, type of pipe, annular space, packing material type and thickness as shown in the table below:
WALL
FLOOR
AND
WALL
PENETRATION DIAGRAM
EXISTING PARTITION
FIRE RATED SEALANT
PENETRANT
MUDDED CONDITION
SEE NOTE
NOTE: CLEAN EXISTING "MUDDED" SEALANT & REPLACE
A. Packing Material - Min. 4 in. (102 mm) thickness of min 4.0 pcf (64 kg/m3) mineral wool batt insulation or min. 3 in. (76 mm) thickness of min. 6 pcf (96 kg/m3) ceramic fiber blanket insulation firmly packed into opening as a permanent form as specified in the table above.
Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material.
B. Fill, Void or Cavity Material* - Caulk - Min. 1/2 in. (13 mm) thickness of fill material applied within the annulus, flush with top surface of floor or with both surfaces of wall.
FIRESTOP SYSTEM
FLOOR
AND
WALL
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
NOTES, ABBREVIATIONS AND
LEGEND
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
G0.2
573-18-600
DN DB/AW/SJ5-13-2022
DESIGN CODES
1.01 2018 INTERNATIONAL BUILDING CODE (IBC) AS MODIFIED BY:
A. ANSI/ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
1.02 AMERICAN CONCRETE INSTITUTE (ACI)
A. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
GENERAL STRUCTURAL NOTES
1.01 ELEVATIONS AS SHOWN ON THE STRUCTURAL DRAWINGS ARE ELEVATIONS RELATIVE TO
THE FINISHED EXISTING FIRST FLOOR ELEVATION 0FT 0IN.
1.02 WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR NOTE IS SHOWN FOR ONE
CONDITION, IT SHALL APPLY FOR ALL SIMILAR OR LIKE CONDITIONS UNLESS OTHERWISE
NOTED.
1.03 THE STRUCTURAL DESIGN OF THE BUILDING IS BASED ON THE FULL INTERACTION OF ALL ITS
COMPONENT PARTS, WITH NO PROVISION MADE FOR CONDITIONS OCCURRING DURING
CONSTRUCTION. THEREFORE, CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND
TEMPORARY SHORING DURING CONSTRUCTION IN ACCORDANCE WITH APPLICABLE
STANDARDS.
1.04 CONTRACTOR IS RESPONSIBLE FOR ALL JOB SITE SAFETY INCLUDING THE SAFE RIGGING, LIFTING AND SETTING OF MATERIALS AND EQUIPMENT IN ACCORDANCE WITH APPLICABLE
STANDARDS.
1.05 FURNISH AND INSTALL ALL NECESSARY ATTACHMENTS, ANCHORAGES AND ACCESSORIES
TO PROVIDE A COMPLETE STRUCTURALLY SOUND BUILDING, STRUCTURE, WITH A
CONTINUOUS LOAD PATH. BRING ANY DISCONTINUITIES TO THE ATTENTION OF THE
GOVERNMENT IMMEDIATELY.
1.06 FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF FABRICATION OR
CONSTRUCTION. BRING ANY DISCREPANCIES ALONG WITH DETAILED FIELD SKETCHES OF
AS-BUILT CONDITIONS TO THE ATTENTION OF THE GOVERNMENT IMMEDIATELY.
1.07 COORDINATE AND VERIFY ALL DIMENSIONS AND DETAILS WITH THE EXISTING, CIVIL,
PROCESS, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION, SHOP AND SUBMITTAL, DRAWINGS. NOTIFY THE GOVERNMENT IMMEDIATELY
OF ANY DISCREPANCIES
SHOP DRAWINGS
1.01 STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY.
SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED
STANDARDS AND THE SPECIFIC REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE
DRAWINGS.
1.02 PHOTOCOPY REPRODUCTIONS OF THE CONTRACT DOCUMENTS WILL BE REJECTED AND
CONTRACTOR WILL BE RESPONSIBLE FOR ANY ASSOCIATED DELAYS. STRUCTURAL
DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. SHOP DRAWINGS
SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE
SPECIFIC REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE DRAWINGS. THE
PURPOSE OF SHOP DRAWINGS IS TO VERIFY THAT THE CONTRACTOR HAS INTERPRETED
THE INTENT OF THE CONSTRUCTION DOCUMENTS CORRECTLY, DETAIL ALL CONDITIONS,
INDEPENDENTLY CHECK, CONFIRM AND COORDINATE ALL DIMENSIONS AND DETAILS, TAKE
FIELD MEASUREMENTS, VERIFY FIELD CONDITIONS, FUNCTIONALITY AND CONSTRUCTABILITY
AS WELL AS COORDINATE WITH OTHER TRADES AND ACTUAL PRODUCTS PURCHASED. THE
CONTRACT DRAWINGS ARE NOT INTENDED FOR THIS PURPOSE AND TRANSLATION OF
ELECTRONIC MEDIA MAY NOT BE ACCURATE. THE USE OF PHOTOCOPY REPRODUCTIONS
DEFEATS THE PURPOSE OF SHOP DRAWINGS AND DOING SO IS ENTIRELY AT THE
CONTRACTORS OWN RISK.
1.03 A COPY OF THE APPROVED, SIGNED AND SEALED DOCUMENTS SHALL BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND BE AVAILABLE AT THE JOB SITE DURING INSPECTION AS
REQUIRED.
1.04 REVIEW OF SUBMITTALS INCLUDING SHOP DRAWINGS DOES NOT RELIEVE THE CONTRACTOR
OF THE SOLE RESPONSIBILITY FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE
PREPARATION OF THOSE SUBMITTALS.
1.05 SUBMITTALS SHALL BE REVIEWED BY THE CONTRACTOR, PRIOR TO SUBMISSION FOR
ENGINEER'S REVIEW, FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS AND AS-
BUILT CONDITIONS. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE
CLEARLY NOTED ALONG WITH REASONS FOR THE DEVIATION.
1.06 ALLOW A MINIMUM OF TWO CALENDAR WEEKS (14 DAYS), THREE CALENDAR WEEKS (21
DAYS) AT CHRISTMAS AND NEW YEARS FROM RECEIPT OF SUBMITTALS AT THE ENGINEERS
OFFICE FOR REVIEW. ALLOW TIME IN THE CONSTRUCTION SCHEDULE FOR SHIPPING AND
PROCESSING TIME IN ADDITION TO SUCH REVIEWS.
EXISTING CONDITIONS
1.01 AS WITH ANY WORK AFFECTING EXISTING CONSTRUCTION, UNFORESEEN CONDITIONS ARE
UNAVOIDABLE WITHOUT DEMOLISHING OTHERWISE SERVICEABLE CONSTRUCTION,
DISRUPTING OCCUPIED OPERATIONS AND INCURRING SIGNIFICANT COST FOR CLOSE UP
EXAMINATION AND NON-DESTRUCTIVE TESTING DURING THE DESIGN STAGE.
1.02 WITH THE PASSAGE OF TIME SINCE THE CREATION OF AS-BUILT DRAWINGS AND/OR THE
DESIGNERS SURVEY, BOTH CONCEALED AND VISIBLE CONDITIONS MAY HAVE CHANGED DUE
TO ALTERATIONS, ADDITIONS, RENOVATIONS AND DETERIORATION.
1.03 PRIOR TO THE COMMENCEMENT OF ANY WORK IN PREPARATION OF CONSTRUCTION
RELATED ACTIVITIES, INCLUDING BUT NOT LIMITED TO SHOP DRAWING PREPARATION, ALL
EMBEDDED AND CONCEALED ITEMS LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION
SHALL BE LOCATED AND MARKED ON THE SURFACE. THIS WORK SHALL BE ACCOMPLISHED
BY DESTRUCTIVE AND/OR NON-DESTRUCTIVE MEANS WITHOUT IMPAIRING THE STRUCTURAL
INTEGRITY OF THE ASSOCIATED MEMBERS. SHORING AS REQUIRED SHALL BE DESIGNED BY
A PROFESSIONAL STRUCTURAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT, AND
FURNISHED AND INSTALLED AT NO ADDITIONAL COST.
1.04 EXISTING CONDITIONS THAT INTERFERE OR OTHERWISE AFFECT THE DESIGN,
CONSTRUCTION OR SERVICEABILITY OF THE WORK SHALL BE BROUGHT TO THE ATTENTION
OF THE STRUCTURAL ENGINEER, INCLUDING PLAN AND SECTION SKETCHES PREPARED BY A
LICENSED SURVEYOR, IMMEDIATELY FOR RESOLUTION. THE CONTRACTOR SHALL ALLOW
TWO CALENDAR WEEKS IN THE SCHEDULE FOR DESIGN RESOLUTION OF THE
INTERFERENCE AFTER ALL INFORMATION ABOUT THE INTERFERENCE, INCLUDING SIZE,
LOCATION AND FUNCTION OF THE EMBEDMENT, HAS BEEN RECEIVED BY THE STRUCTURAL
ENGINEER.
STRUCTURAL DRAWING ABBREVIATIONS:
BOT BOTTOM
B/STL BOTTOM OF STEEL
CB CONCRETE BEAM
C.J. CONSTRUCTION OR CONTROL JOINT
CMU CONCRETE MASONRY UNIT
CONN CONNECTION
DIAG DIAGONAL
EA EACH
EF EACH FACE
EL ELEVATION
EMBED EMBEDMENT
EOS EDGE OF SLAB
EW EACH WAY
EXF EXISTING FOOTING
FOB FACE OF BRICK
FF FAR FACE
FP FACE OF PANEL
FX FOOTING MARK NUMBER (SEE SCHEDULE)
HORIZ HORIZONTAL
IFW INSIDE FACE OF WALL
LLH LONG LEG HORIZONTAL
LLO LONG LEG OUT
LLV LONG LEG VERTICAL
LSH LONG SIDE HORIZONTAL
LSV LONG SIDE VERTICAL
MAX. MAXIMUM
MIN. MINIMUM
NF NEAR FACE
OC ON CENTER
OFW OUTSIDE FACE OF WALL
PLF POUNDS PER LINEAR FOOT
SOG SLAB-ON-GROUND
STD STANDARD
T&B TOP AND BOTTOM
T/FTG TOP OF FOOTING
T/STL TOP OF STEEL
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT VERTICAL
WWR WELDED WIRE REINFORCEMENT
REINFORCED CONCRETE NOTES:
1.01 CONCRETE DESIGN IS IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318.
1.02 CONCRETE WORK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE FIELD REFERENCE MANUAL: STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE ACI 301 WITH SELECTED ACI AND
ASTM REFERENCES (SP-15).
1.03 SUBMIT REINFORCING STEEL SHOP DRAWINGS AND RECEIVE APPROVAL PRIOR TO FABRICATION OF
SAME.
1.04 ALL CONCRETE SHALL BE NORMAL WEIGHT (145PCF) AND HAVE A MINIMUM 28-DAY COMPRESSIVE
STRENGTH AS FOLLOWS UNLESS NOTED OTHERWISE:
A. f'c = 4000 PSI FOR FOUNDATIONS AND LOCATIONS NOT OTHERWISE NOTED.
1.05 CONCRETE MIX DESIGN SUBMITTAL REQUIREMENTS:
A. FOR EACH UNIQUE MIX DESIGN/CODE PROPOSED, CLEARLY INDICATED WHICH COMPONENT THE MIX
WILL BE USED FOR. (E.G. FOOTING, EXTERIOR WALLS, INTERIOR WALLS, EXTERIOR SLAB ON GRADE, INTERIOR SLAB ON GRADE, ELEVATED SLAB, MASONRY GROUT FILL, PAVING ETC.)
B. CEMENT: AMOUNT PER CUBIC YARD AND SUPPLIER.
C. FLYASH: AMOUNT PER CUBIC YARD, SUPPLIER, A HISTORY OF SUCCESSFUL USE OF FLYASH
CONCRETE IN SIMILAR APPLICATIONS.
D. AGGREGATE: AMOUNT PER CUBIC YARD, TYPE AND COMPOSITE GRADATION ANALYSIS INCLUDING
BOTH COARSE AND FINE.
E. WATER: AMOUNT PER CUBIC YARD AND WATER/CEMENT RATIO.
F. ADMIXTURES: TYPE, AMOUNT PER CUBIC YARD, PRODUCT DATA INDICATING ASTM COMPLIANCE AND
CHLORIDE ION CONTENT.
G. COMPRESSIVE TESTS OF PAST USAGE OF THE SUBMITTED MIX DESIGN INDICATING THE SAME MIX
DESIGN CODE.
1.06 WHEN STRENGTH DATA FROM FIELD EXPERIENCE OR TRIAL MIXTURES ARE NOT AVAILABLE, CONCRETE
MIX DESIGN SHALL COMPLY WITH THE FOLLOWING:
A. 4000 PSI NORMAL WEIGHT CONCRETE SHALL BE BASED ON A MAXIMUM AGGREGATE SIZE OF 1 IN., MAXIMUM WATER/CEMENT RATIO OF .44 FOR NON-AIR-ENTRAINED AND.35 FOR AIR-ENTRAINED
CONCRETE AND A MAXIMUM SLUMP OF 3"
B. THE MAXIMUM SLUMPS SPECIFIED ABOVE SHALL NOT BE EXCEEDED PRIOR TO THE ADDITION OF
WATER REDUCING ADMIXTURES REGARDLESS OF THE EXISTENCE OF TEST DATA.
C. AIR ENTRAINED CONCRETE SHALL BE USED FOR EXTERIOR EXPOSED CONCRETE IN ACCORDANCE
WITH THE FOLLOWING:
1. MODERATE EXPOSURE BASED ON THE MAXIMUM NOMINAL AGGREGATE SIZE:
a. 3/4": 5 % +/- 1-1/2%
b. 1": 4.5 % +/- 1-1/2%
c. 1-1/2": 4.5 % +/- 1-1/2%
D. NORMAL WEIGHT AGGREGATE SHALL COMPLY WITH ASTM C 33.
E. WHEN PERMITTED, THE WEIGHT OF FLYASH SHALL NOT EXCEED 25% OF THE WEIGHT OF CEMENT
PLUS POZZOLAN.
1.07 CONCRETE SLABS ON GRADE SHALL NOT BE LOADED UNTIL A MINIMUM CONCRETE STRENGTH OF 1800
PSI HAS BEEN ATTAINED AND THE CONCRETE IS AT LEAST THREE DAYS OLD. ALL OTHER CONCRETE MEMBERS SHALL NOT BE LOADED UNTIL THE SPECIFIED CONCRETE DESIGN STRENGTH HAS BEEN
ATTAINED.
1.08 CONCRETE SHALL BE TESTED IN ACCORDANCE WITH ACI 301 AND THE SPECIFICATIONS, WHEN PROVIDED, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. AT A MINIMUM, CONCRETE SPECIMENS SHALL BE TAKEN FOR EVERY 100 YARDS OR PORTION THEREOF FOR EACH MIX DESIGN PLACED IN A DAY.
CONCRETE TEST REPORTS SHALL BE AVAILABLE ON SITE FOR INSPECTION.
1.09 C.J. ON THE SLAB AND FOUNDATION PLAN INDICATES A KEY-FORMED CONSTRUCTION JOINT OR SAW-CUT CONTROL JOINT IN THE CONCRETE SLAB ON GRADE. SAW-CUT CONTROL JOINTS SHALL BE INSTALLED WITHIN 12 HOURS OF SLAB PLACEMENT. CONTINUE REINFORCEMENT THROUGH JOINTS UNLESS NOTED
OTHERWISE, IN WHICH CASE DO NOT CUT REINFORCING STEEL. UNLESS OTHERWISE NOTED
CONSTRUCTION AND/OR CONTROL JOINTS SHALL BE SPACED NO FARTHER APART THAN 15-FT. O.C. IN
EACH DIRECTION CREATING PANELS WITH AN ASPECT RATIO NOT GREATER THAN 2:1.
1.10 ALL STEEL REINFORCEMENT SHALL CONFORM WITH THE FOLLOWING:
A. DEFORMED BARS SHALL CONFORM WITH ASTM A 615 GRADE 60.
B. DEFORMED BARS THAT WILL BE WELDED SHALL CONFORM TO ASTM A 706 GRADE 60. WELDING SHALL
BE IN ACCORDANCE WITH AWS D1.4 STRUCTURAL WELDING CODE.
C. WELDED WIRE FABRIC (WWF) SHALL CONFORM WITH ASTM A 185, LATEST ADOPTED EDITION, 65 KSI
YIELD AND SHALL BE SUPPLIED IN FLAT SHEETS.
1. SLAB-ON-GRADE WWF SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS OR CONCRETE BRICK 2"
BELOW THE TOP OF SLAB. THE USE OF CLAY BRICKS OR PULLING UP WWF DURING CONCRETE
PLACEMENT IS STRICTLY PROHIBITED. USE A MINIMUM OF 6 X 6 - W1.4 X W1.4.
2. WWF ABOVE FORMED SURFACES SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS AT THE MID
DEPTH BETWEEN THE CONCRETE SURFACE AND TOP OF FORM OR FLOOR DECK FLUTE.
1.11 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE. SPLICE ONLY AS SHOWN OR APPROVED.
STAGGER SPLICES WHERE POSSIBLE. DOWELS SHALL MATCH SIZE AND SPACING OF THE SPECIFIED REINFORCEMENT AND SHALL BE LAPPED WITH TENSION SPLICES. UNLESS OTHERWISE NOTED, ALL REINFORCING SHALL BE CONTACT LAP SPLICED WITH A CLASS B SPLICE IN ACCORDANCE WITH ACI 318-05. FOR BARS WITH A MINIMUM COVER AND SPACING GREATER THAN 2.0DB AND 3.0DB (DB = BAR DIAMETER) RESPECTIVELY, THE MINIMUM SPLICE LENGTH, EXPRESSED IN BAR DIAMETERS, SHALL NOT BE LESS THAN SPECIFIED IN THE REBAR SPLICE SCHEDULE. SPLICE LENGTHS SHALL BE INCREASED BY A FACTOR OF 1.3 FOR TOP REINFORCEMENT AND WHEN LIGHTWEIGHT CONCRETE IS USED. LAP WELDED
WIRE FABRIC (WWF) ONE SPACE PLUS 2" ON ALL SIDES AT SPLICES.
1.12 ALL DOWELS AND TERMINATING BARS SHALL HAVE A STANDARD 90-DEG HOOK UNO.
1.13 ALL HORIZONTAL REINFORCING SHALL BE CONTINUOUS AROUND CORNERS AND THROUGH
CONSTRUCTION JOINTS UNO.
1.14 CONCRETE COVER AT REINFORCEMENT:
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH -3"
B. FORMED CONCRETE EXPOSED TO WEATHER OR EARTH:
1. (#5 AND SMALLER) -1½ ".
2. (#6 TO #18) -2".
C. FORMED CONCRETE NOT EXPOSED TO WEATHER OR EARTH:
1. SLABS, WALL AND JOISTS:
a. # 11 BARS & SMALLER - 3/4".
2. BEAMS AND COLUMNS - 1½"
1.15 CORNER EDGES OF CONCRETE TO BE LEFT EXPOSED TO VIEW SHALL HAVE A CHAMFER OR RADIUS OR
AS INDICATED ON THE DRAWINGS.
1.16 CHECK ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND EQUIPMENT
DRAWINGS FOR EMBEDDED ITEMS AND PENETRATIONS PRIOR TO CONCRETE PLACEMENT
1.17 ALL CONSTRUCTION JOINTS SHALL HAVE A ROUGH SURFACE AND BE CLEAN PRIOR TO SUBSEQUENT
CONCRETE POUR.
1.18 NO HORIZONTAL CONSTRUCTION JOINTS WILL BE PERMITTED IN SLABS AND FOOTINGS UNO.
1.19 WHERE OPENINGS OCCUR IN SLABS AND WALLS, PLACE THE REINFORCING THAT NORMALLY OCCURS IN
LINE WITH THE OPENING EQUALLY TO EITHER SIDE OF THE OPENING.
1.20 CONCRETE SHALL RECEIVE THE FOLLOWING FINISHES:
A. EXTERIOR SLABS - BROOM FINISH IN DIRECTION OF SLOPE.
B. ALL OTHER CONCRETE - STEEL TROWEL FINISH
1.21 ALL CONCRETE SHALL BE CONSOLIDATED BY VIBRATION, SPADING, RODDING OR FORKING SO THAT THE CONCRETE IS THOROUGHLY WORKED AROUND THE REINFORCEMENT, AROUND EMBEDDED ITEMS, AND
INTO CORNERS OF FORMS, ELIMINATING ALL AIR OR STONE POCKETS WHICH MAY CAUSE
HONEYCOMBING, PITTING, OR PLANES OF WEAKNESS. IF VIBRATORS, OF ADEQUATE SIZE, ARE USED THEY SHALL BE INSERTED AND WITHDRAWN AT POINTS APPROXIMATELY 18 INCHES APART. AT EACH
INSERTION, THE DURATION SHALL BE SUFFICIENT TO CONSOLIDATE THE CONCRETE BUT NOT
SUFFICIENT TO CAUSE SEGREGATION (GENERALLY FROM 5 TO 15 SECONDS).
1.22 MAINTAIN CONCRETE AFTER PLACEMENT WITH MINIMAL MOISTURE LOSS AT RELATIVELY CONSTANT
TEMPERATURE FOR THE PERIOD NECESSARY FOR HYDRATION OF CEMENT AND HARDENING OF
CONCRETE (NOT LESS THAN 7 DAYS). COMPLY WITH THE REQUIREMENTS OF ACI 308 - STANDARD PRACTICE FOR CURING CONCRETE; AMERICAN CONCRETE INSTITUTE. A COMBINATION CURING AND SEALING COMPOUND SHALL BE APPLIED AFTER THE CONCRETE HAS BEEN FINISHED OR THE FORMS REMOVED. COMPOUND SHALL BE IN ACCORDANCE WITH ASTM C309, LATEST ADOPTED EDITION, TYPE I, CLASS B. (DESIGN BASIS W.R. MEADOWS CS-309).
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMPARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
STRUCTURAL NOTES RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
S001
573-18-600
5-13-2022
FINAL SUBMITTAL
DCASLW
UP
R.4
22W3E3
R
R E
F
/2
REF
1' - 6"
REF
7' - 0 3/8"
REF
13' - 1 5/8"
S101
4" SLAB W/ #4@12" @
SLAB MID DEPTH (HI)
5' - 5"
5'
5"
S101
S101
REF
1' - 2 1/4"
2'
4"
CB-1
CB-1
C B
-1
S101
9' - 6"
WALL
6"
WALL
6"
S101
S101
S101
S101
4" SLAB W/ #4@12" @
SLAB MID DEPTH (LOW)
CAST ALUMINUM
NOSINGS
EXIST.SIDEWALK
ELEV
+91'- 4"
ELEV
±89'- 1 5/8"
ELEV
±89'- 9 5/8"
ELEV
+91'- 4"
PLAN
NORTH
TRUE
NORTH
4"
#4@12" O.C. 2"
BELOW TOP OF SLAB
#4@12" O.C.
2'- 0"
6"
#4@12" O.C. COMPACTED
EARTH FILL
V A
R
IE
S
2" CLR 1
1 1/2" XS ASTM
A53 PIPE TYP.
WALL/FOOTING
BELOW
#4x4'-0" LG. +8" STD. HK.
AT MID-DEPTH OF SLAB
NOTE:
S.O.G. CORNER BAR @ RE-ENTRANT
CORNER & OTHER SIMILAR CONDITIONS
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF DENOTES FOR REFERENCE ONLY, FIELD VERIFY
3. TOP OF STAIR LANDING TO MATCH EXISTING FINISHED FLOOR
4. SEE ARCHITECTURAL FOR DEMOLITION
STAIR 55
3/16
1/4" ASTM A36 CAP
PLATE TYP.
1 1/2" XS ASTM
A53 PIPE TYP.
1/2"x7"x0'-7" ASTM
A36 PLATE TYP.
1/
2" 4"
1/
2" D
IS
T
. M
IN
4"
E D
G E
1 1/2"
4"
1 1/2"
1/8
DIST. MIN.
4" EDGE
DIST. MIN.
4" EDGE
1/2"x2 3/4" EMBED
HILTI HY200
ANCHORS TYPICAL
E Q
E Q
2'
- 1
0"
EXISTING
BUILDING
S101
TYP.
3/16
TYP
1 1/2" XS ASTM
A53 PIPE TYP.
PAINT RAILING
AND PLATE TYP.
SEE ARCH.
EXISTING
BUILDING
S101
TYP.
2'
- 1
0"
E Q
E Q
1 1/2" XS ASTM A53
PIPE TYP. PAINT
RAILING AND PLATE
TYP. SEE ARCH.
R
6"
6" SLAB WI #4@12" O.C. EA.
WAY AT MID DEPTH OF SLAB
4" SLAB WI #4@12" O.C. EA.
WAY AT MID DEPTH OF SLAB
EXISTING WALL
EXISTING
CONCRETE
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
#3 NOSING TYP.
5"
MAX
11"
EXISTING SIDEWALK
1/2" PJF & SEALANT
EXISTING
CONCRETE WALL
EXISTING CONCRETE WALL
1' - 0"
#4@12" O.C.
TYP R
E F
2'
- 2
/8
4"
COMPACTED EARTH FILL
DRILL HOLE INTO EXISTING CONCRETE WALL 10 BAR DIAM'S DEEP
BY ONE BAR DIAM. +1/4" MAX DIAMETER AND EPOXY INTO WALL IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
CLEAN AND ROUGHEN EXISTING SURFACE AND APPLY EPOXY
BONDING AGENT PRIOR TO PLACEMENT OF FRESH CONCRETE
IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
#4@12" O.C.
M A
X
7"
#4@12" O.C.
3"x48" CAST ALUMINUM
NOSING, AMERICAN STAIR
TREADS OR EQUAL
R
6" SLAB WI #4@12" O.C.
EA. WAY AT MID DEPTH
OF SLAB
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
EXISTING SIDEWALK
1/2" PJF & SEALANT
EXISTING WALL
EXISTING CONCRETE WALL
REF
1 1/4"
DRILL HOLE INTO EXISTING CONCRETE
WALL 10 BAR DIAM'S DEEP BY ONE BAR
DIAM. +1/4" MAX DIAMETER AND EPOXY
INTO WALL IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS
CLEAN AND ROUGHEN EXISTING SURFACE
AND APPLY EPOXY BONDING AGENT PRIOR
TO PLACEMENT OF FRESH CONCRETE IN
ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS
SLOPE
#4@12" O.C.
R
6"
6" SLAB WI #4@12" O.C.
EA. WAY AT MID DEPTH
OF SLAB
4" SLAB WI #4@12" O.C. EA.
WAY AT MID DEPTH OF SLAB
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5
BOTTOM
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
#3 NOSING TYP.
MAX
11"
EXISTING SIDEWALK
1/2" PJF & SEALANT
EXISTING CONCRETE WALL
1' - 0" R E
F
2'
- 2
/8
DRILL HOLE INTO EXISTING CONCRETE WALL 10 BAR DIAM'S DEEP
BY ONE BAR DIAM. +1/4" MAX DIAMETER AND EPOXY INTO WALL IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
CLEAN AND ROUGHEN EXISTING SURFACE AND APPLY EPOXY
BONDING AGENT PRIOR TO PLACEMENT OF FRESH CONCRETE
IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
EXISTING WALL
REF
1 1/4"
#4@12" O.C.
#4@12" O.C.
CB-1 12"x12" CONCRETE BEAM
W/ (2)#5 TOP AND (3)#5 BOTTOM
EXISTING LAWN
1/2" PJF & SEALANT
EXISTING
CONCRETE WALL
DRILL HOLE INTO EXISTING CONCRETE WALL 10 BAR DIAM'S DEEP
BY ONE BAR DIAM. +1/4" MAX DIAMETER AND EPOXY INTO WALL IN
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS
CLEAN AND ROUGHEN EXISTING SURFACE AND APPLY EPOXY
BONDING AGENT PRIOR TO PLACEMENT OF FRESH CONCRETE
IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS#4@12" O.C.
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMPARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
590 MEANS ST NW
STE. 200
ATLANTA, GA 30318
SLAB PLAN AND DETAILS RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
S101
573-18-600
5-13-2022
FINAL SUBMITTAL
DCASLW
1/2" = 1'-0"S101
1 STAIR 55 SLAB PLAN
1' 2'
Scale: 1/2"=1'-0"
6" 4' 6
8'
1" = 1'-0"S101
3 SECTION
Scale: 3/4"=1'-0"
1' 2' 4' 8'
3/4" = 1'-0"S101
4 TYPICAL SLAB CORNER BAR DETAILS
Scale: 3/4"=1'-0"
1' 2' 4' 8'
SLAB PLAN NOTES
KEY PLAN
1 1/2" = 1'-0"S101
5 DETAIL
3/4" = 1'-0"S101
6 STAIR RAILING WEST ELEVATION
3/4" = 1'-0"S101
7 STAIR RAILING EAST ELEVATION
1' 2' 3'
Scale: 1-1/2"=1'-0"
6"
Scale: 3/4"=1'-0"
1' 2' 4' 8'
Scale: 3/4"=1'-0"
1' 2' 4' 8'
3/4" = 1'-0"S101
2 NEW STAIR
3/4" = 1'-0"S101
9 DETAIL AT NEW SLAB
3/4" = 1'-0"S101
8 NEW WALL ELEVATION
Scale: 3/4"=1'-0"
1' 2' 4' 8'
Scale: 3/4"=1'-0"
1' 2' 4' 8'
1' 2' 3'
Scale: 1"=1'-0"
6" 4'
3/4" = 1'-0"S101
10 DETAIL AT NEW SLAB
Scale: 3/4"=1'-0"
1' 2' 4' 8'
STAIR 43
STAIR 44
STAIR 1STAIR 4
STAIR 2
STAIR 3 STAIR 17
STAIR 55
STAIR 18
STAIR 41
STAIR 42
STAIR 51
STAIR 19
STAIR 53
STAIR 54
STAIR 8
STAIR 21
STAIR 7
STAIR 5
STAIR 33
STAIR 52
(ALT. NO 1)
(ALT. NO 5)
(N.I.C)
R.4
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
Ms
35 34
32 31 30 29 28 27 26 25 24 23 22
N
M.6
M
K.3
J
G.7
F.5
E.8 E.7
E.2
D.2
C.2
B.2
17181920.2 202121.221.4
R.9
R.10
DS
D
DN
C
B
A
F
G
H
J
E.4
E.3
E
J.5
J.7
K
9 10 10.2 10.8 11 12 12.8 13 13.3 13.5
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL PIPE BASEMENT KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.01
573-18-600
DN AW5-13-2022
1" = 30'-0"A.01
1 OVERALL PIPE BASEMENT KEY PLAN
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
T ectonic Cop yright 2007 T ectonic Cop yright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
Tectonic Copyright 2007 Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
STAIR 43
STAIR 44
STAIR 3 STAIR 17
STAIR 55
STAIR 18
STAIR 42
STAIR 51
STAIR 19
STAIR 53
STAIR 54
STAIR 8
STAIR 21
STAIR 7
STAIR 5
STAIR 33
STAIR 4
STAIR 22
STAIR 10
STAIR 32
(ALT. NO 3)
STAIR 2
STAIR 1
(ALT. NO 1)
(ALT. NO 5)
(N.I.C)
R.4
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
STAIR 6
35 34
32 31 30 29 28 27 26 25 24 23 22
N
M.6
M
K.3
J
G.7
F.5
E.8 E.7
E.2
D.2
C.2
B.2
17181920.2 202121.221.4
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
R.9
R.10
37 36
Ms
DS
D
DN
C
B
A
F
G
H
J
E.4
E.3
E
J.5
J.7
K
9 10 10.2 10.8 11 12 12.8 13 13.3 13.5
D.5 C
STAIR 41
STAIR 31
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL BASEMENT KEY PLAN RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.02
573-18-600
DN DB/AW/SJ5-13-2022
1" = 30'-0"A.02
1 OVERALL BASEMENT KEY PLAN
FE
C
STAIR 31
STAIR 1
STAIR 4
STAIR 2
STAIR 3
STAIR 17 STAIR 55
STAIR 18
STAIR 42
STAIR 6
STAIR 51STAIR 53
STAIR 8
STAIR 21
STAIR 7
STAIR 22
STAIR 5
STAIR 9
STAIR 10
STAIR 11
STAIR 52
(ALT. NO 4)
(ALT. NO 3)
(ALT. NO 2)
(ALT. NO 1)
(ALT. NO 5)
STAIR 32
(N.I.C)
R.4
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
35 34
32 31 30 29 28 27 26 25 24 23 22
N
M.6
M
K.3
J
G.7
F.5
E.8 E.7
E.2
D.2
C.2
B.2
17181920.2 202121.221.4
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
R.9
R.10
Ms
37 36
DS
D
DN
C
B
A
F
G
H
J
E.4
E.3 E
J.5
J.7
K
D.5
J.3
F.8
F.2
E.6
D.7
2221.621.12120.520.420.320.220.12019.519.31918.118171615.815.51514.814.51413.913.513.31312.8120.1 0.3 0.5 0.7 1 1.4 2 2.6 3 4 5 6 6.5 7 7.5 8 8.1 8.5 9 10 10.210.8 11
1e 1.5e 2e 2.2e 2.5e 3e
3.5e 4e 5e
De
Ce
Be
Ae5w 4w
3.5w3w 2.5w
2w1.5w 1f
Cw
Bw
Aw
Dw E.1
E.8
F.1
F.3
F.4
G.1
H.4
J.4
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL FIRST FLOOR KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.03
573-18-600
DN DB/AW/SJ5-13-2022
1" = 30'-0"A.03
1 OVERALL FIRST FLOOR KEY PLAN
STAIR 1STAIR 4
STAIR 2
STAIR 3
STAIR 5
STAIR 9
STAIR 10STAIR 11
STAIR 6
(ALT. NO 4) (ALT. NO 3)
(ALT. NO 2)
(ALT. NO 1)
(N.I.C)
(ROOF ACCESS)
R
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
Ms
35 34
32 31 30 29 28 27 26 25 24 23 22
N
M.6
M
K.3
J
G.7
F.5
E.8 E.7
E.2
D.2
C.2
B.2
17181920.2 202121.221.4
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
R.9
R.10
DS
D
DN
C
B
A
M.3
N.9
F
G
H
J
E.4
E.3 E
J.5
J.7
K
D.5
J.3
F.8
F.2
E.6
D.7
2221.621.12120.520.420.320.220.12019.519.31918.118171615.815.51514.814.51413.913.513.31312.8120.1 0.3 0.5 0.7 1 1.4 2 2.6 3 4 5 6 6.5 7 7.5 8 8.1 8.5 9 10 10.210.8 11
1e 1.5e 2e 2.2e 2.5e 3e
3.5e 4e 5e
De
Ce
Be
Ae5w 4w
3.5w3w 2.5w
2w1.5w 1f
Cw
Bw
Aw
Dw E.1
E.8
F.1
F.3
F.4
G.1
H.4
J.4
C j k l
D1
E1
K5
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL SECOND FLOOR KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.04
573-18-600
DN AW/SJ/PF5-13-2022
1" = 30'-0"A.04
1 OVERALL SECOND FLOOR KEY PLAN
STAIR 3
STAIR 5
STAIR 10STAIR 11
STAIR 12
STAIR 6
(ALT. NO 4) (ALT. NO 3)
(ALT. NO 1)
(N.I.C)
R
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
28 27 26 25 24 23 22
17181920.2 202121.221.4
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
DS
D
DN
C
B
A
STAIR 9
(ALT. NO 2)
F
G
H
J
E.4
E.3 E
J.5
J.7
D.5
J.3
F.8
F.2
E.6
D.7
2221.621.12120.520.420.320.220.12019.519.31918.118171615.815.51514.814.51413.913.513.31312.8121 1.4 2 2.6 3 4 5 6 6.5 7 7.5 8 8.1 8.5 9 10 10.210.8 11
1e 1.5e 2e 2.2e 2.5e 3e
3.5e 4e 5e
De
Ce
Be
Ae5w 4w
3.5w3w 2.5w
2w1.5w 1f
Cw
Bw
Aw
Dw E.1
E.8
F.3
F.4
G.1
H.4
J.4
M.3
N.9
K
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL THIRD FLOOR KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.05
573-18-600
Checker Author5-13-2022
1" = 30'-0"A.05
1 OVERALL THIRD FLOOR KEY PLAN
STAIR 3
STAIR 5
STAIR 9
STAIR 10STAIR 11
STAIR 12
STAIR 6
(ALT. NO 4) (ALT. NO 3)
(ALT. NO 2)
(ALT. NO 1)
(N.I.C)
R
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
17181920.2 202121.221.425 24 23 22
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
DS
D
DN
C
B
A
D1
E1
F
G
H
J
E.4
E.3 E
J.5
J.7
D.5
J.3
F.8
F.2
D.7
2221.621.12120.520.420.320.220.12019.519.31918.118171615.815.51514.814.51413.913.513.31312.8121 1.4 2 2.6 3 4 5 6 6.5 7 7.5 8 8.1 8.5 9 10 10.210.8 11
1e 1.5e
2e 2.2e2.5e 3e 3.5e
4e 5e
De
Ce
Be
Ae5w 4w
3.5w3w 2.5w
2w1.5w 1f
Cw
Bw
Aw
Dw E.1
E.8
F.3
F.4
G.1
H.4
J.4
K
F.1
Ms
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL FOURTH FLOOR KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.06
573-18-600
DN AW/SJ/PF5-13-2022
1" = 30'-0"A.06
1 OVERALL FOURTH FLOOR KEY PLAN
STAIR 3
STAIR 5
STAIR 9
STAIR 10STAIR 11
STAIR 12
STAIR 6
(ALT. NO 4) (ALT. NO 3)
(ALT. NO 2)
(ALT. NO 1)
(N.I.C)
(ROOF ACCESS)
R
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
17181920.2 202121.221.425 24 23 22
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
DS
D
DN
C
B
A
Ce
Be
Ae
De
5e4e 3.5e
D.5
E.4
21.121 21.6
3e
Aw
Bw
Cw
4w 5w
R.9
R.10
F
G
H
J
E.6
E.3
J.5
J.7
J.3
F.8
F.2
D.7
2220.520.420.320.220.120
K
E Dw
E.1
E.8
F.3
F.4
G.1
H.4
J.4
F.1
1 1.4 2 2.6 3 4
3w 2.5w
2w1.5w 1f
3.5w
19.519.31918.118171615.815.51514.814.51413.913.513.31312.8126 6.5 7 7.5 8 8.1 8.5 9 10 10.210.8 11
1e 1.5e
2e 2.2e2.5e
M.3
N.9
Ms
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL FIFTH FLOOR KEY
PLAN
RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.07
573-18-600
DN AW/SJ/PF5-13-2022
1" = 30'-0"A.07
1 OVERALL FIFTH FLOOR KEY PLAN
TRUE
NORTH
PLAN
NORTH
0' 15' 30' 60' 90'
SCALE: 1" = 30'-0"
STAIR 9
STAIR 11
(ALT. NO 4) (ALT. NO 2)
STAIR 2
STAIR 5
(ROOF ACCESS)
(ROOF ACCESS)
(ROOF ACCESS)(INDIRECT ROOF ACCESS)
R
P
N
M
L
LS
LN
K
J
JN
H
G
F
E.9
ES
E
17181920.2 202121.221.425 24 23 22
122W3E345E55W6E66W7E77W88w910E1010W11E1111W12E1212W13141516
DS
D
DN
Ce
Be
Ae
De
5e4e 3.5e
D.5
E.3
E.4
21.121 21.6
3e
Aw
Bw
Cw
4w 5w
C
B
A
12.8129 10 10.210.8 11
M.3
N.9
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
FINAL SUBMITTAL
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
OVERALL ROOF KEY PLAN RENOVATION OF HOSPITAL
STAIRWELLS
GAINESVILLE, FL
A.08
573-18-600
DN AW/SJ/PF5-13-2022
1" = 30'-0"A.08
1 OVERALL ROOF KEY PLAN
DN
UP
DN
DN
UP
DN
UP
TRUE
NORTH
PLAN
NORTH
0' 2' 4' 8' 12'
SCALE: 1/4" = 1'-0"
F
ES
3E
E.9
STAIR
1-0PB1
F
ES
2W3E
E.9
STAIR
1-0PB1
A1.4
10' - 0"
CJ
A1.4
E Q
E Q
EXISTING COLUMN
F
ES
3E
E.9
STAIR
1-0
STAIR
1-0PB2
F
ES
3E
E.9
STAIR
1-0
STAIR
1-0PB2
A1.4
A1.4
A1.4
A1.4
I
B D
C
I1-0
1-0PB2
18' - 6 1/2" FV
F V
F
ES
3E
E.9
STAIR
1-11
F
ES
3E
E.9
STAIR
1-1
A1.4
A1.4
D
A1.4
A1.4
E
B
I
I
1-1
22' - 3 3/8" FV
F V
DEMOLITION PLAN GENERAL NOTES
A. REFER TO DRAWING G0.2 FOR ADDITIONAL INFORMATION.
B. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
C. REMOVE FLOOR FINISHES AND RESILIENT BASE.
D. REMOVE RESILIENT TREAD AND RISER FINISHES FROM STAIR.
E. REMOVE SIGNAGE.
DEMOLITON PLAN KEY NOTES
EXISTING HANDRAILS AND RAILING ASSEMBLIES TO REMAIN.
REMOVE EXISTING DOOR, FRAME, AND HARDWARE ASSEMBLY.
EXISTING STANDPIPE AND PIPING TO REMAIN.
EXISTING SHIPS LADDER AND ASSOCIATED RAILINGS TO REMAIN.
DEMO PLAN LEGEND
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO
BE DEMOLISHED
EXISTING 2-HOUR FIRE BARRIER
EXISTING 2-HOUR FIRE/SMOKE
ZONE BARRIER
FLOOR PLAN GENERAL NOTES
A. REFER TO DRAWING G0.2 FOR ADDITIONAL INFORMATION.
B. REFER TO FINISH SCHEDULE FOR SCHEDULED FINISHES TO BE
PROVIDED.
C. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
D. ANY EXISTING FIRESTOPPING MATERIAL AT EXISTING SPRINKLER
PIPING AND CONDUIT SHALL BE REPAIRED.
E. PATCH ALL SURFACES THAT WERE DAMAGED BY REMOVAL OF
FINISHES, RAILINGS, DOORS, FRAMES, HARDWARE, SIGNAGE,
ANCHORS, BRACKETS, AND ELECTRICAL DEVICES & FIXTURES.
FLOOR PLAN KEY NOTES
PAINT EXISTING HANDRAILS AND RAILING ASSEMBLIES.
REPLACE DOOR, FRAME, AND HARDWARE ASSEMBLY AS
SCHEDULED. REPAIR OR REPLACE ADJACENT RETAINED
MATERIALS THAT ARE DAMAGED BY ASSOCIATED WORK.
CLEAN AND PROTECT SPRINKLER PIPING THROUGHOUT
CONSTRUCTION TO ENSURE THAT SYSTEM IS NOT DAMAGED
AND OPERATION IS NOT DISRUPTED.
PAINT EXISTING SHIPS LADDER AND ASSOCIATED RAILINGS.
TRANSITION STRIP.
PROVIDE 4 INCH CONCRETE SLAB.
PLAN LEGEND
EXISTING CONSTRUCTION TO REMAIN
NEW CONSTRUCTION
EXISTING 2-HOUR FIRE BARRIER
EXISTING 2-HOUR FIRE/SMOKE ZONE BARRIER
KEY PLAN
NTS
STAIR 1
SIGNAGE PLAN KEY NOTES
PROVIDE SIGN TYPE "A" AS INDICATED. REFER TO DETAIL 1/A701
FOR ADDITIONAL INFORMATION.
PROVIDE SIGN TYPE "B" AS INDICATED. REFER TO DETAIL
2/A701 FOR ADDITIONAL INFORMATION.
PROVIDE SIGN TYPE "C" AS INDICATED.