This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide preventative maintenance, inspection/testing, repair, load testing, and certification of hoists and cranes at Joint Base McGuire-Dix-Lakehurst.
The QASP establishes procedures for the government's continuous oversight and surveillance of the contractor's performance to ensure it meets contract standards. It defines the roles and responsibilities of the Contracting Officer, Contracting Officer's Representative, and Contractor representatives. The QASP includes a Surveillance Matrix that details the performance objectives, standards, and inspection methods the government will use to evaluate the contractor's work. It also outlines the performance rating definitions, remedies for non-conformance, and processes for performance reporting, customer complaints, and corrective actions. The related federal contract opportunity is for Hoist and Crane Services at Joint Base McGuire-Dix-Lakehurst starting in FY25.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE
SURVEILLANCE PLAN (QASP)
FOR
PREVENTATIVE MAINTENANCE,
INSPECTION / TESTING, REPAIR,
LOAD TESTING AND
CERTIFICATION
OF HOISTS & CRANES
AT
JOINT BASE MCGUIRE-DIX-
LAKEHURST
Joint Base McGuire-Dix-Lakehurst
21 Feb 23
Quality Assurance Surveillance Plan (QASP)
1. Purpose
This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
This QASP is based on the premise that the government requires a quality standard in the Hoists & Cranes. This QASP is the best means of achieving that objective.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
(Information only)
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance. (Information only)
2. Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
3. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Government Personnel
Contracting Officer (CO) The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO: Ramnarine Mahadeo Organization or Agency: 87th CONS Telephone: (609) 754-3956 Email: ramnarine.mahadeo.1@us.af.mil
Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR will use the QASP to conduct the oversight/surveillance process.
The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance.
The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Assigned COR: Lisa Ross Organization or Agency: 87th CES Telephone: (609) 754-5476 Email: lisa.ross@us.af.mil
Contracting Officer’s Representatives Supervisor Nominates Contracting Officer’s Representatives (CORs) in writing and sends nomination and COR nominee qualification documentation to the CO, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities, reviews COR documentation on a regular basis, evaluates performance of COR duties as part of performance assessment throughout the period of the contract.
COR Supervisor: Anthony Whiting Organization or Agency: 87th CES Telephone: (609) 754-6780 Email: anthony.whiting.3@us.af.mil
Contractor Representatives
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. Performance Requirements and Method of Surveillance
4.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the contracting officer, contracting specialist and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
4.2. Surveillance Matrix (Services Summary)
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements.
Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
4.3. Performance Rating Definitions
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Objectives Statement of Work
Paragraph Performance Thresholds
Preventative Maintenance.
Performs full preventative maintenance actions on an annual basis.
1.1.1 All preventative maintenance shall be
completed 98% of the time
Inspections / Testing. Performs inspections / testing on an annual basis.
1.1.2 All units shall be inspected / tested 99%
of the time.
Repairs. Performs repairs found during preventative maintenance, inspection / testing, and service calls.
1.1.3 All repairs shall be completed within the
allotted timeframes 98% of the time.
Load Testing. Performs load testing on an annual cycle and after lift repairs.
1.1.4 All load testing shall be completed 98%
of the time.
Certifications. Conducts the certification process on an annual basis in accordance with all publications / industry standards.
1.1.5 All certifications shall be completed 99%
of the time
Service Calls. Responds to service requests. 1.2 All repairs shall be completed within the allotted timeframes 98% of the time.
Reports / Documentation.
Provides accurate reports and documentation.
1.3 All reports / documentation are current
and available 90% of the time.
Performance Reporting Remedies for Non-Conformance If inspections indicate unacceptable performance, the COR will notify the contractor’s POC of the deficiencies for correction. Use the remedy the government is going to use per what is stated in the Services Summary (SS). If deficiencies are not corrected within the required time frame, the COR should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall be notified for a final decision.
Performance Assessment Report (PAR) PARs will be used to report ALL minor discrepancies and will be generated by the COR and sent to the contractor for corrective action. Contractors will be given 10 days to correct PARs unless they have requested an extension. If 3 minor discrepancies are found, combine them and process a CAR.
Customer Complaint Form The COR must furnish instructions to the customer receiving the contractor’s service.
The customer must retain supporting evidence of complaint or feedback. After the COR validates feedback or complaint demonstrating contractor noncompliance, the COR processes a Performance Assessment Report (PAR) or Corrective Action Report (CAR) to the CO. ALL Customer Complaint forms WILL be validated by the COR prior to notifying the contractor.
Corrective Action Report (CAR) The CAR will be forwarded to the Chief COR for review. The COR will forward the CAR to the CO for action. A copy will be provided to the contractor’s representative by the CO. Most CARs will be corrected within 30 calendar days depending on the complexity of the finding, the contractor may be allowed up to six months (maximum) correcting a CAR. The contractor will be asked the status of the CAR on a monthly basis.
The COR will keep an electronic log of all CARs and will keep a hard copy of CARs in the contract oversight file.
Contract Performance Assessment Reporting System (CPARS) CPARS will be initiated annually, documenting contractor performance for this specific contract. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance.
Disputes Every attempt will be made to resolve all disputes arising under this contact/plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. If no resolution can be made under ADR, the CO will render a Contracting Officer’s final decision.
Attachments:
1. APPENDIX 1 – SURVEILLANCE MATRIX (SERVICE SUMMARY)
2. CORRECTIVE ACTION REPORT (CAR)
3. CUSTOMER COMPLAINT RECORD
4. PERFORMANCE ASSESSMENT REPORT (PAR)
Appendix 1 – Surveillance Matrix (Service Summary)
Performance Objective (PO)
PWS
Para
Performance Threshold
Method of
Surveillance
PO – 1 – Preventative Maintenance
1.1.1
Excellent: 0 Defects Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects Unsatisfactory: More than 4 Defects
Customer Complaint;
Periodic Validation
PO – 2 – Inspection / Testing
1.1.2
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects Unsatisfactory: More than 4 Defects
PO – 3 – Repairs
1.1.3
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects
Inspection of Reports
PO - 4 – Load Testing
1.1.4
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects
Periodic Validation;
Inspection of Reports
PO - 5 – Certifications:
1.1.5
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects
PO - 6- Service Calls:
1.2
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects
PO - 7 – Reports / Documentation
1.3
Very Good: 1 Defect Satisfactory: 3 Defects Marginal: 4 Defects
Inspections of Reports
Inspection Metrologies:
M1: Periodic. Periodic surveillance/inspection is the type of surveillance that is based upon selecting samples for evaluation on other than 100% inspection or on a statistically random basis. Periodic surveillance can be accomplished, weekly, monthly or quarterly using a checklist method.
(100% performance standard should be reserved for certifications requirement, medical items, Public Health inspections, EPA, safety, health standards, etc. The standards should be compared to what is performed within the industry.)
M2: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).
M3: Technical Inspection: Surveillance/inspection is the type of surveillance that will be performed as specified on the project schedule by actually looking at the work being done.
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Quality Assurance Surveillance Plan
(QASP)
Version – 23 June 2021
FOR: Hoist & Cranes
CONTRACT NUMBER:
CONTRACT DESCRIPTION:
Perform preventative maintenance, inspection/testing, repair, load testing and certification on an annual basis.
CONTRACTOR’S NAME:
This Performance Based QASP was Approved by Program Manager/Functional Service Manager, as required by AFI 63-138 para 2.10.8:
Program Mgr/Functional Service Mgr
X
| 1. Purpose |
| 2. Authority |
| Government Personnel |
| Contracting Officer (CO) |
| Contracting Officer’s Representative (COR) |
| Contracting Officer’s Representatives Supervisor |
| Contractor Representatives |
| 4. Performance Requirements and Method of Surveillance |
| 4.1. Contract Surveillance |
| 4.2. Surveillance Matrix (Services Summary) |
| 4.3. Performance Rating Definitions |
| Performance Reporting |
| Remedies for Non-Conformance |
| Performance Assessment Report (PAR) |
| Customer Complaint Form |
| Corrective Action Report (CAR) |
| Contract Performance Assessment Reporting System (CPARS) |
| Disputes |