C- 1 Performance Work Statement.pdf

PDF 240 KB Posted

Attached to
Hoist and Crane Services
Solicitation number
FA448424R0013
Issued by

About this file

This document is a Performance Work Statement (PWS) for the preventative maintenance, inspection/testing, repair, load testing, and certification of hoists and cranes at Joint Base McGuire-Dix-Lakehurst, New Jersey. The contractor shall provide all necessary management, tools, supplies, equipment, and labor to maintain continuous and safe operations of the listed hoists and cranes in accordance with all applicable local, state, federal laws/regulations and industry standards. Key requirements include performing annual preventative maintenance, inspections/testing, repairs, load testing, and certifications. The contractor shall respond to service calls within one business day and complete all repairs within specified timeframes. The government will provide utilities, security/fire/medical services, restricted area badges, and flight line driver training as government-furnished services. The estimated workload data is provided in Appendix A.

This PWS is related to a federal contract opportunity (Solicitation Number FA448424R0013) for Hoist and Crane Services in support of Joint Base McGuire-Dix-Lakehurst starting in FY25. The government is seeking proposals for these services.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

PREVENTATIVE MAINTENANCE,

INSPECTION / TESTING, REPAIR,

LOAD TESTING AND CERTIFICATION

OF HOISTS AND CRANES

AT

JOINT BASE MCGUIRE-DIX-LAKEHURST

Joint Base McGuire-Dix-Lakehurst Rev 1

21 Feb 23

PERFORMANCE WORK STATEMENT

FOR

PREVENTATIVE MAINTENANCE,

INSPECTION / TESTING, REPAIR, LOAD TESTING, AND

CERTIFICATION OF HOISTS AND CRANES

AT

JOINT BASE MCGUIRE-DIX-LAKEHURST

1.0. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to maintain continuous and safe operations of hoists and cranes located at Joint Base McGuire-Dix-Lakehurst, New Jersey. The scope of performance includes, but is not limited to the preventative maintenance, inspection / testing, repair, load testing and certification of hoists and cranes listed on Appendix A In Accordance With (IAW) all local, state, federal laws / regulations and applicable American Society of Mechanical Engineers / American National Standards Institute (ASME / ANSI) codes and manufacturer’s requirements in a manner that shall ensure continuous and safe operation. The contractor shall maintain records of any preventative maintenance, inspection / testing, repair, load testing, and certification conducted on hoists and cranes.

1.1. BASIC SERVICES. The contractor shall perform preventative maintenance, inspection / testing, repair, load testing, and certification of hoists and cranes on an annual basis. The contractor shall repair mechanical / electrical deficiencies found during the preventative maintenance and inspection / testing cycle. The contractor shall use the following publications for guidance: Air Force Occupational Safety, Fire and Health Standards (AFMAN 91-203), American National Standards Institute (ANSI), American Society of Mechanical Engineers (ASME), and Occupational Safety and Health Administration (OSHA). All routine annual preventative maintenance, inspections / testing, repairs, load testing, and certifications shall be scheduled in advance with the Contracting Officer Representative (COR) to minimize disruption to government operations / employees. The government reserves the right to postpone, or interrupt scheduled services up to four days per contract year, total, with no increase cost to the government.

1.1.1. PREVENTATIVE MAINTENANCE. The contractor shall perform preventative maintenance on all hoists and cranes on an annual basis concurrent with inspection / testing, repair, load testing and certification cycle. The scope of performance includes but is not limited to the lubrication of all moving parts, guide rails, track assemblies and components, cabling, hook assemblies, the adjustment / replacement of sensor limit switches / sensors, braking systems, safety systems, control push buttons, remote control units, etc. Preventative maintenance shall be completed in accordance with AFMAN 91-203, ASME / B30, ASME / BTH, ASME / HST, OSHA, and manufacturer’s recommendations / warranty requirements. The contractor shall provide a written report of all preventative maintenance actions performed on each hoist and crane.

1.1.2. INSPECTION / TESTING. The contractor shall perform an annual inspection / testing of all hoists and cranes listed in Appendix A concurrent with the preventative maintenance, repair, load testing and certification cycle. The contractor shall structure the annual inspection / testing schedule to ensure maximum availability of hoists and cranes. Inspection / testing may be witnessed and certified by the government’s authorized representative. Hoist and crane inspections / testing shall be completed in accordance with DAFMAN, ASME / B30, ASME / BTH, ASME / HST, OSHA, and manufacturer’s recommendations / warranty requirements. Any deficiencies, malfunctions, or discrepancies discovered as a result of these inspections / testing shall be immediately reported to the COR by written report for determination of repair procedure.

All defects found shall be corrected by the contractor under the provisions of Paragraph 1.1.3.

After repairs are made, the failed inspection / testing shall be re-performed at no additional cost to the government. Documentation of inspections shall be maintained by the contractor and a copy shall be provided to the COR.

1.1.3. REPAIRS. The contractor shall repair all mechanical / electrical / control / safety deficiencies as a result of the preventative maintenance, inspection / testing, load testing and certification procedures as well as service calls.

1.1.3.1. MINOR REPAIRS. During the annual maintenance and required emergency service calls the contractor shall be responsible for any repairs to the hoist and crane systems at the contractor’s expense if the material cost is $100.00 or less per system. The contractor shall absorb the labor expenditure. Once identified, the contractor shall ensure all minor repair work is completed within twenty-four (24) hours, unless granted an extension by the COR; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a repair completion report for all repairs to the COR in accordance with par. 1.5.

1.1.3.2. MAJOR REPAIRS. If the repair work is between $100.00 and $2,500.00 in total costs, the contractor shall provide a written repair cost estimate to the COR within two (2) business days of finding the deficiency requesting authorization to proceed. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of material, the labor hours needed to complete repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for material and labor costs only if COR authorization is granted. At no time shall work in excess of $100.00 be completed without COR approval. If the work exceeds $2,500.00 in total costs, the contractor shall provide a written repair cost estimate directly to the Contracting Officer (CO) only (not to the COR) within two (2) business days of finding the deficiency. The written repair cost estimate shall include, at a minimum, the following: the estimated cost of the material, the labor hours needed to complete the repairs, and the projected time the equipment will be out of service. The contractor shall be financially compensated for the material and labor costs only if CO authorization is granted. At no time shall work in excess of $2,500.00 be completed without CO approval. There’s no maximum financial threshold for major repairs under this contract. The contractor shall ensure all major repair work commences within three (3) days of COR or CO approval. The contractor shall ensure that all repair work is completed within seven (7) days of its commencement unless otherwise authorized; however, the contractor is encouraged to keep equipment downtime to a minimum. The contractor shall provide a written repair completion report to include but not limited to: mechanical / electrical deficiencies found, actual parts replaced, parts cost, and actual man hours per repair. A copy of the repair report shall be provided to the COR.

1.1.4. LOAD TESTING. All hoists and cranes shall be load tested on an annual basis using certified test weights. The load testing shall be conducted in conjunction with the preventative maintenance, inspection / test, repair, and certification cycle / process. The contractor shall ensure additional load tests are completed whenever the contractor removes, repairs, or replaces a primary component of the lifting system. The contractor shall ensure all load tests are completed according to governing regulations using common commercial methods. The contractor shall notify the COR for guidance in the event that a hoist or crane fails a load test.

1.1.5. CERTIFICATION. The contractor shall certify each hoist and crane on an annual basis to ensure that all units have passed the requirements of DAFMAN, ASME / B30, ASME / BTH, ASME / HST, OSHA, and manufacturer’s recommendations. The hoists and cranes shall be certified in conjunction with the annual preventative maintenance, inspection / test, repairs (if applicable), and load test cycles. The contractor shall physically attach an annual certification sticker on each hoist and crane. The contractor shall provide a certification document / report for each hoist and crane to the COR.

1.2. SERVICE CALLS. In the event that a hoist or crane fails or malfunctions, the contractor shall respond to service calls within one (1) business day upon notification by the COR. The contractor shall conduct preventative maintenance, inspection / testing, repairs, load testing, and certification of the defective hoist or crane in accordance with paragraph 1.1 inclusive if required.

Due to the urgency of mission requirements, the contractor shall ensure that all repair work is completed within two (2) business days unless a major repair is discovered resulting in additional repair time as stated in Paragraph 1.1.3.2.

1.3. REPORTS / DOCUMENTATION. The contractor shall prepare and submit written reports and documentation for the preventative maintenance, inspection / testing, repair, load testing, and certification of each hoist and crane. The reports and / or documentation shall be forwarded to the COR within two (2) business days of the completion of any service. The reports and / or documentation shall include but not limited to: location, type, manufacturer, and model number of each hoist and crane; work performed; repairs completed (if applicable); preventative maintenance, date of inspection, date of repair, load testing criteria / date, date of certification, name of technician, and overall condition of the equipment.

2.0. SERVICE DELIVERY SUMMARY

Performance Objectives Statement of Work

Paragraph Performance Thresholds

Preventative Maintenance.

Performs full preventative maintenance actions on an annual basis.

1.1.1 All preventative maintenance shall be

completed 98% of the time

Inspections / Testing. Performs inspections / testing on an annual basis.

1.1.2 All units shall be inspected / tested 99%

of the time.

Repairs. Performs repairs found during preventative maintenance, inspection / testing, and service calls.

1.1.3 All repairs shall be completed within the

allotted timeframes 98% of the time.

Load Testing. Performs load testing on an annual cycle and after lift repairs.

1.1.4 All load testing shall be completed 98%

of the time.

Certifications. Conducts the certification process on an annual basis in accordance with all publications / industry standards.

1.1.5 All certifications shall be completed 99%

of the time

Service Calls. Responds to service requests. 1.2 All repairs shall be completed within the allotted timeframes 98% of the time.

Reports / Documentation.

Provides accurate reports and documentation.

1.3 All reports / documentation are current

and available 90% of the time.

3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES. All reasonable quantities of utilities will be available to the contractor without charge. Any temporary lines and connections that may be required shall be installed, maintained and removed by the contractor at his expense and in a manner satisfactory to the COR.

3.1. SECURITY, FIRE, AND MEDICAL SERVICES. The government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available. The Government will provide police and fire protection. McGuire Security Forces / Dix DOD Police Force can be reached at phone numbers

(609) 562-6001/2/3. Lakehurst DOD Police Force can be reached by dialing (732) 323-4000.

Base Fire Departments shall provide initial response and fire protection services to the contractor. The Base Fire Alarm Control Centers can be reached at phone number 911 from a base phone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified. The 87th Medical Treatment Facility may provide urgent health care to any contractor employees or agents for injuries occurring while on duty. Urgent health care is defined as medical care authorized to the extent necessary to save life or limb and prevent undue pain and suffering. Contractor employees will be transferred to a civilian medical facility as soon as they are appropriately stabilized. The cost of such treatment will be paid for, in full, within a reasonable period of time, by the contractor or the contractor’s employee and will not be borne by the 87th Medical Treatment Facility, the United States Air Force or the government. An AF Form 1127, Hospital Invoice/Receipt / Accounts Receivable Record, will be prepared to ensure collection and/or billing of charges. If a contractor employee or agent cannot pay for the treatment at the time of discharge, a statement of charges and a letter of indebtedness will be completed and billed to such contractor employee for medical services rendered. An accounts receivable record will be established for each contract employee that receives medical care and is unable to pay at the time of discharge. Follow-up on accounts receivable will be conducted IAWAFI 41-120, Medical Resource Operations. After an accounts receivable record is established and billing for outpatient medical services has occurred, the SF 558, Medical Record

- Emergency Care and Treatment, will be annotated with the date of billing and the voucher number and forwarded to Outpatient Records to be filed in the medical record folder. Contractor employee or agents shall ensure they provide timely notice to their medical insurance company and to the extent an insurance company is to make payment, provide the insurance company with adequate information and documentation necessary to make payment. Any contractor employee or agent treated in a natural disaster is not charged for outpatient care. Lakehurst Specific:

Follow-on emergency medical care will be provided to contractor and their employees at Community Medical Center, Toms River. Charges for medical care will be at the contractors or employees’ expense. Emergency Medical Service phone number is 911 from a base phone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified.

3.2. RESTRICTED AREA BADGES. The government shall furnish an USAF Restricted Area Badge (AF Form 1199A) to all authorized contractor employees with proper security clearances and a validated need for access to flight line areas to perform maintenance services. The contractor shall coordinate the required request for restricted area badges with the COR.

3.3. RESTRICTED AREA ESCORTS. The government shall provide escort services for contractor employees to provide maintenance services within base restricted areas only until the contractor has been provided with the required AF Form 1199A (with escort authorization) to provide their own escorts. The contractor shall coordinate the necessary government escort services with the COR. The contractor is required to obtain restricted area badges for employees.

The contractor shall obtain the appropriate number of employees with badges to escort the workforce.

3.4. PHYSICAL SECURITY. The contractor shall be held fully accountable for any failure to maintain the physical security of all base restricted areas, secured facilities or sites that they are responsible for providing services within. The contractor shall be responsible for the safekeeping and inventorying of all government-furnished keys and combinations issued for the performance of services within secured areas. All losses or damages caused by the contractor, or by the contractor’s failure or negligence in maintaining proper security of these areas will be paid for by the contractor. Upon termination or completion of the contract, the contractor shall secure the previously issued keys and return them to the COR or CO within twenty-four (24) hours.

3.5. FLIGHTLINE DRIVERS TRAINING. The government shall provide all required flight drivers flight line certification training to the contractor as required to perform maintenance services. Once the contractor’s employees have successfully completed the required training, the government will issue to all employees a Base Flight line Competency Card (AF Form 483). The contractor shall coordinate the required flight line driver’s training with the COR.

4.0. GENERAL INFORMATION.

4.1. HOURS OF OPERATION. The contractor shall perform services during normal duty hours which are daylight hours 0730 - 1615, Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the CO. When the contractor’s work schedule conflicts with an Air Force mission requirement, advise the COR and reschedule the work to minimize disruption.

4.2. RECOGNIZED HOLIDAYS. The contractor is not required to provide service on federal holidays. Federal holidays are as follows:

• New Year’s Day - 1 January

• Martin Luther King Day - 3rd Monday in January

• President’s Day - 3rd Monday in February

• Memorial Day - last Monday in May

• Juneteenth – 19 June

• Independence Day - 4 July

• Labor Day - 1st Monday in September

• Columbus Day - 2nd Monday in October

• Veteran’s Day - 11 November

• Thanksgiving Day - 4th Thursday in November

• Christmas Day - 25 December

4.3. CONTRACTOR PERSONNEL. The contractor and their employees shall comply with all base regulations at all times and shall conduct themselves in a professional manner. Uniforms, badges, and good behavioral conduct will be mandatory. The contractor shall provide a complete and current employee roster of employees working under this contract to the COR and CO within ten (10) working days of the contract award. The contractor’s employee roster shall identify the primary and alternate site manager or foreman and the Quality Control inspector and their telephone number. As required, the contractor shall provide updated copies of their employee roster to the COR.

4.4. CONTRACTOR EMPLOYEE UNIFORMS AND IDENTIFICATION. All contractor employees shall wear a distinctive company logo on their outer garment at all times. The contractor employee shall be neat and professional in appearance and meet current commercial standards. In addition, the contractor’s employees shall wear a company-issued identification badge with the company’s name, employee’s name and employee’s photo prominently displayed on their outer clothing.

4.5. TOBACCO POLICY. The contractor shall ensure that all contractor employees do not use tobacco products within 50 ft. of any base facility, around fuel tanks and generators, within any clearly marked “No Smoking” areas or within 50 ft. of any flight line aircraft parking areas.

4.6. SAFETY AND ACCIDENT REPORTING. The contractor shall be responsible for providing services under this contract IAW all base, local, state and Federal occupational safety requirements. The contractor shall ensure that all services are conducted safely at all times. The contractor shall ensure that all contractor employees are issued and properly use all required safety personal protective equipment. The contractor shall use mechanically sound and safe vehicles and equipment in the performance of services under this contract. The contractors shall take necessary corrective actions if the contractor’s employees are conducting operations in an unsafe manner. In the event of an accident, the contractor shall contact the base emergency 911 service and the COR and CO immediately. Additionally, the contractor and contractor’s personnel will be knowledgeable of and comply with all other base incident-reporting procedures. See the Safety Guide for Civilian Contractors on Appendix B for additional information.

4.7. INCLEMENT WEATHER SCHEDULE. The contractor shall provide operational service during periods of inclement weather. No exceptions shall be granted.

4.8. HIRING GOVERNMENT PERSONNEL. The contractor is restricted from hiring the COR, inspectors, monitors or any other government employees whose employment could result in conflict of interests in accordance with DOD 5500.7R

4.9. SECURITY REQUIREMENTS / VEHICLES AND PASSES. All contractor or contractor employees’ vehicles used for the performance of this contract shall comply with all local, state and federal regulations. In addition, all vehicles described above must be registered through the Security Forces Squadron, Pass and Registration and will comply with all pertinent directives.

After award of contract, the contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the attached contractor Security Appendix – Sep 21. Reference Appendix C.

4.10. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY OR THE LOCAL INSTALLATION

COMMANDER. This service does meet the criteria for continuation of performance during a crisis.

4.11. EXECUTIVE ORDER (EO) 13423 (Strengthening Federal Environmental, Energy, and Transportation Management). The contractor shall assist in compliance with this EO through the:

(a) Use of products with post-consumer recycled content

(b) Use of products that are recyclable

(c) Use of low toxicity or non-toxic products

(d) Use and installation of low-maintenance products

5.0. ENVIRONMENTAL COMPLIANCE. The contractor is required to comply with all applicable bases, local, state and Federal environmental laws and regulations, including Air Force and Naval Instructions, in effect at the time of performance of this contract. The contractor shall be responsible for obtaining and complying with any required operating permits. The contractor shall be responsible and liable for penalties, fines, or environmental damage claims that may be required or assessed by the local, state or Federal governments as a result of the contractor’s performance, or failure to perform, during the course of this contract. The government will inspect for environmental compliance at their discretion and will notify the COR of any discrepancies found. In addition, the contractor may be subject to contractual sanctions including, but not limited to, termination, suspension, and debarment and adverse past performance assessment.

5.1. SOLID WASTE. The contractor is responsible for the proper handling and disposal of solid waste. The contractor shall also be responsible for any enforcement action that may be taken by the State of New Jersey, other State or the Federal Government related to handling, transportation and the proper disposal of solid waste materials. If notification, certifications, documentation, manifests, permits or any other written materials are required by law to be obtained, prepared and/or submitted, the contractor shall prepare same and provide a written copy to the COR. Any action, which violates permit requirements for compliance, must be reported to the Environmental Flight immediately.

5.2. NOTIFICATION OF ENVIRONMENTAL SPILLS. In the event that the contractor spills or releases any un-permitted substance, hazardous substance or hazardous waste into the environment, the contractor shall immediately report the incident to the Fire Department, the COR, and the CO. The contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment. The government shall provide the contractor with the following utilities: electricity, and water. The government will only provide reasonable amounts in accordance with the PWS.

5.3. MATERIALS. All materials used in the performance of services on the installation shall be in compliance with industry standards, local, Federal and State laws, and will be used according to manufactures' recommendations. Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards. The contractor will submit Safety Data Sheets on all materials to be used fifteen (15) days prior use for approval by the COR.

6. APPENDICES:

A. ESTIMATED WORKLOAD DATA

B. SAFETY GUIDE FOR CIVILIAN CONTRACTORS

C. SECURITY REQUIREMENTS

APPENDIX A

ESTIMATED WORKLOAD DATA

The estimated workload data is predicated on current known requirements and does not reflect a commitment or guarantee of firm work due to the dynamic mission of Joint Base McGuire-Dix-Lakehurst. The quantities listed on the bid schedule reflect the hoists and cranes that shall be serviced which could change due to mission requirements, facility modifications or budgetary constraints.

Facility Number Facility Type Number Manufacturer Model Number Serial

Number Capacity Funds Type

Remote Pump Station Monorail 1 YALE

KEL240RT71/

252 K131137 4,000 O&M

Airfield Lighting Vault Monorail 1

R&M

MATERIALS

HANDLING J13953/5

HFW0419

8 4,000 O&M

Mechanical Shop

Monorail 1

GARDENER/

DENVER 75042AB8 B370703 2,200 O&M

Air Freight Terminal Bridge 1 KONECRANE S/N 1361392 A 41178 70,000 TWCF

1816 BOEING Bridge 60 ACCO CSW07 533-20- 8259 10,000 O&M

BOEING

(supply) Bridge 61 DETROIT

DY20M2213M50

142865 20,000 O&M

1837 3 Bay Hangar Monorail A1 YALE

BEW1-95-

RT39/1352 1846012C 2,000 TWCF

1837 3 Bay Hangar Bridge A2 ACCO C3WO5 533-20-

8299 10,000 TWCF

1837 3 Bay Hangar Monorail B1 YALE

BEW1-95-

RT39/13S2 1846012B 2,000

TWCF

1837 3 Bay Hangar Monorail C1 YALE

BEW1-95-

RT39/13S2 1846012A 2,000

1837 3 Bay Hangar Bridge C2 ACCO C2WO5 533-20-

8300 10,000 TWCF

Fuel Truck Stop Bridge 1 RM SC417

17709496 01 8,000 O&M

Fuel Truck Stop Bridge 2 RM LB224

17709396 01 4,000 O&M

1929 Hangar-Aft Chain A1 COFFING COFFING

5 TON -

Max 8500 8,500 O&M

1929 Hangar-Aft Chain A2 COFFING COFFING

5 TON –

Max 8500 8,500 O&M

1929 Hangar-Aft Chain B1 COFFING COFFING

5 TON –

Max 8500 8,500 O&M

1929 Hangar-Aft Chain B2 COFFING COFFING

5 TON –

Max 8500 8,500 O&M

1929* Hangar-Aft Chain C COFFING

COFFING

(no power at all )

3 TON-

Max 6200 6,000 O&M

C-17 Maintenance Hangar UnderHung A DETROIT OMNI 149695 6,000

C-17 Maintenance Hangar UnderHung B DETROIT OMNI 149697 6,000 TWCF

C-17 Maintenance Hangar UnderHung C DETROIT OMNI 149696 6,000 TWCF

C-17 Maintenance Hangar UnderHung D DETROIT OMNI 149698 6,000 TWCF

C-17 Maintenance Hangar Overhead E DETROIT OMNI 149702 6,000 TWCF

C-17 Maintenance Hangar Overhead F DETROIT OMNI 149703 6,000 TWCF

C-17

Hangar Overhead G DETROIT OMNI 149701 6,000

C-17 Maintenance Hangar UnderHung H DETROIT OMNI 149699 6,000 TWCF

C-17

Hangar UnderHung I DETROIT OMNI 149704 6,000 TWCF

C-17 Maintenance Hangar UnderHung J DETROIT OMNI 149706 6,000 TWCF

C-17 Maintenance Hangar UnderHung K DETROIT OMNI 149705 6,000 TWCF

2251 Hangar Bridge 1 RM D33-5- 60M30V

151527PL

1 7,000 TWCF

2251 Hangar Bridge 2 RM F2 427815Y1 7,000 TWCF

Generator Shop Monorail 11 COFFING EC2016.1

EC1D.103

.USD 4,000 TWCF

Generator Shop Monorail 11 COFFING EC2016.3

ECMT

4016736 4,000 TWCF

Generator Shop

Jack Stand Hoist

STND

12 CM 556729

1724054000

3,000 TWCF

Generator Shop

Engine Hoist FH02 JET JFHC-200X

JFHC0205

062 4,000 TWCF

Generator Shop

Jack Stand Hoist

STND

12 CM R L0098LJ 3,000 TWCF

Flight Simulator Facility Bridge 1 GAFFEY R&M

SX5022004OP

56FENOS

4090-CC

100477935 2,000 O&M

C-17 Flight Simulator Facility. Overhead 1

OMNI CRANE

SYSTEMS 149783 6,000 O&M

Truck Repair Shop Monorail 1 WRIGHT HP2A 94H37802 6,000 O&M

Truck Repair Shop Bridge 2 RM J-3-BG S-9625 7,000 O&M

Truck Repair Shop

Mobile Hoist 3 RANGER RSC-2TF

395-000- 1026406 4,000 O&M

Truck Repair Shop

Mobile Hoist 4

BRIDGE/MAC

TOOLS CMAA-C 05EH 6,000 O&M

3210 Hangar-Front Bridge 11 DETROIT DY7L7M50 39311 7000 O&M

3210 Hangar-Aft Bridge 12 DETROIT DY7L7M50 39309 7,000 O&M

3210 Hangar Mobile KOEHRING LRT-180A 79570 30,000 O&M

Hangar Front Unit Bridge 11 RM

D3-3.5-

44V3CV

151528RL

1 7,000 TWCF

Hangar Runway Side Bridge 12 RM

D3-3.5- 60M30V

151527RL

2 7,000 TWCF

Hangar AFT Maintenance Platform Hoist A COFFING ECO516.1

EC1D193

VTD 500 TWCF

Hangar MID Maintenance Platform Hoist B COFFING ECO516.1

EC1D484

VTD 500 TWCF

Hangar FWD Maintenance Platform Hoist C COFFING ECO516.1

EC1D195

VTD 500 TWCF

3211 Hangar Mobile M GROVE AP308 75562 17,000 TWCF

3370 Navy Hangar Monorail 1 ACCO

NEMA-12

TEFC-60 131532.2 10,000 O&M

3370 Navy Hangar Monorail 1 ACCO 531-23- 04541 4,000 O&M

Expeditionary Center

Man Basket 1 N/A N/A N/A 500 O&M

* The noted hoist and crane is currently not being utilized therefore not requiring any servicing, testing or certification

APPENDIX B

SAFETY GUIDE FOR CIVILIAN CONTRACTORS

(ATTACHMENT PROVIDED UPON AWARD)

APPENDIX C

SECURITY REQUIREMENTS

INSTALLATION ENTRY CONTROL PROCEDURES FOR ALL CONTRACTORS

After award of contract, the contractor shall request through the COR, CO and Security Forces to be issued base passes and identification badges for their employees and work vehicles in accordance with the attached contractor Security Appendix – Sep 21.

(ATTACHMENT PROVIDED UPON AWARD)

ESTIMATED WORKLOAD DATA
APPENDIX B
SECURITY REQUIREMENTS

File details come from the government source that posted it. Updated .