J-7 Performance Work Statement.pdf

PDF 2 MB Posted

Attached to
Pest Control- Joint Base MDL
Solicitation number
FA448426R0008
Issued by

About this file

Performance Work Statement Summary: Pest Control Services

This is a Performance Work Statement (PWS) for pest control services at Joint Base McGuire-Dix-Lakehurst (JB MDL), effective February 5, 2026 (Revision 1). The contractor must provide comprehensive integrated pest management (IPM) services covering grounds, ranges, training areas, and buildings at Dix and Lakehurst installations (excluding family housing). Services include common pest control (rodents, insects, arachnids), food facility inspections (22 monthly scheduled inspections), animal control and carcass removal, mosquito surveillance and control, weed and broadleaf control, hanta virus cleanup, and emergency services. The contractor is responsible for all management, licenses, certifications, tools, supplies, equipment, labor, and transportation. Pesticides must be mixed and stored off-base, with all unused pesticides and empty containers disposed of at approved off-base facilities. The contractor must maintain full New Jersey state certification for all applicators in required categories (3A, 3B, 6, 7A, 7B, 7C, 7D, 8A, 8B per Technical Exhibit 1), with a certified pest control manager specifically assigned to the contract.

The contract requires strict compliance with Air Force Instruction 32-1053, DOD Instruction 4150.07, EPA, OSHA, and New Jersey regulatory requirements. Performance standards include: no more than three discrepancies per month for pest control services and response times, zero discrepancies for pesticide storage/mixing, 100 percent requirement for Quality Control Plan (QCP) submission within 30 days of award, and 100 percent requirement for employee certifications. Service response times are Priority 1 (half-hour response for food facilities, rats, stinging insects, carcass removal), Priority 2 (24-hour response for fleas, ticks, termites, rodents), and Priority 3 (48-hour response for ants, spiders, weed control). Normal operating hours are 7:30 a.m. to 4:15 p.m., Monday-Friday, with extended availability until 8:00 p.m. and emergency after-hours service available. The contractor must submit DD Form 1532-1 pest management reports within five days of month-end and maintain complete service records. Estimated workload includes monthly facility inspections, arthropod treatments (234 units), rodent control (112 units), animal control services (74 units), and approximately 260 acres of weed control annually.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

PEST CONTROL SERVICES

AT

JOINT BASE MCGUIRE-DIX-LAKEHURST

Joint Base McGuire-Dix-Lakehurst 5 February 2026

Revision 1

PERFORMANCE WORK STATEMENT

FOR

PEST CONTROL SERVICES

AT

JOINT BASE MCGUIRE-DIX-LAKEHURST

1.0. Description of Services and General Information. Contractor shall provide all management, licenses/certifications, tools, supplies, equipment, labor, and transportation, to implement a government provided Integrated Pest Management (IPM) plan for pest control services at Joint Base McGuire-Dix-Lakehurst (JB MDL).

Pest control services shall be performed in accordance with (IAW) all current applicable Air Force (AF) and Department of Defense (DOD) standards, and Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA) and State of New Jersey regulatory guidance on pesticide usage, disposal and applications. Service shall be performed in a manner that will ensure the health and general well-being of installation personnel, and effectively control pests. Area of service shall include Dix and Lakehurst only. All pest control service orders shall be submitted via Contractor supplied toll free telephone number, in person, in writing from the Contracting Officer Representative (COR), or government approved electronic communication.

1.1. Integrated Pest Management (IPM) Plan. Contractor shall adhere to the current JB MDL IPM plan, and sections of AFMAN 32-1053 that apply to pest management operations. The IPM plan is updated and is approved by the Installation Pest Management Coordinator (IPMC) every year prior to implementation. Contractor shall review the plan annually as strategies or chemicals change for all pest control categories. All pesticide applications shall be recorded IAW government directed procedures.

1.1.1. The IPM plan establishes the strategy and methods for conducting safe, effective, and environmentally sound pest management. Contractor shall provide continuous monitoring, pest response and removal procedures, record keeping, warranties, pest education and communication to prevent pests and disease vectors. The IPM approach shall use targeted (effective and environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and, where necessary, the judicious use of the least hazardous pesticides in compliance with all federal, State, and local requirements.

1.2. Contractor Employees. Contractor and their employees shall comply with all base regulations at all times and shall conduct themselves in a professional manner. Contractor shall have a New Jersey certified pest control manager specifically assigned to support this contract. Note: The Department of Defense (DoD Instruction 4150.07) requires full state certification all applicators. An uncertified commercial employee may not apply pesticides working under a supervisor’s state certification in any case. Contractor’s employee roster shall identify the primary and alternate manager or foreman and the Quality Control inspector and in each case, list their telephone numbers.

Contractor site Foreman must provide cell phone number(s) to the COR at the Pre-Performance Conference (PPC) for contact purposes. As required, Contractor shall provide updated copies of their employee roster to the COR. Contractor personnel performing pest control work shall be certified under the EPA Plan accepted in the State of New Jersey contained in the Pesticide Control Act for the Certification of Pesticide Applicators for the categories of pest control listed in Technical Exhibit 1. Contractor shall be available within one hour to meet with Government personnel, via telephone, or in person during business hours.

Contractor personnel will not be permitted to apply any pesticide on Dix or Lakehurst without the appropriate certification. Application of pesticides shall be restricted to the level of certification held by Contractor employees.

Proof of certification shall be carried at all times by Contractor personnel, while performing work under this contract. Certification required for each contract employee is shown in Technical exhibit 1. Contractor’s pesticide applicators shall be re-certified in accordance with State of New Jersey for the categories of pest control to be performed.

1.3. Pesticides Mixing and Storage. All pesticides shall be stored and mixed off-base. All unused pesticides, empty pesticide containers and residue shall be disposed of properly at an approved off-base disposal area. Contractor shall provide the name of the state or local disposal site to the COR.

1.4. Environmental Compliance. Contractor is required to comply with all applicable Base, local, State and federal environmental laws and regulations, including JB MDL instructions concerning environmental protection, hazardous and toxic material, pesticide use and application, disposition, protective equipment, transportation, spills, and fires. Contractor shall be responsible for obtaining and complying with any required operating permits. Contractor shall be wholly responsible and liable for penalties, fines, or environmental damage claims that may be required or assessed by the local, State or Federal governments as a result of the Contractor’s performance, or failure to perform, during the course of this contract. The Government will inspect for environmental compliance at their discretion, and will notify the COR of any discrepancies found. In addition, contractor may be subject to contractual sanctions for environmental non-compliance including, but not limited to, termination, suspension, and debarment and adverse past performance assessment. Contractor shall supply copies of Safety Data Sheets (SDS) and chemical list to the COR.

1.5. Notification of Environmental Spills. In the event Contractor spills or releases any un-permitted substance, hazardous substance or hazardous waste into the environment, Contractor shall immediately report the incident to the Fire Department (dial 911) and the COR. Contractor shall be liable for the costs of clean up and remediation of any spills or the release of such substance into the environment.

1.6. Materials. All materials used in the performance of services on the installation shall be in compliance with industry standards, local, federal and State laws, and will be used according to manufacturers' recommendations.

Materials will be used for intended purposes and will be stored and utilized in accordance with industry standards.

A list of all pesticides to be used for pest control services at JB MDL shall be submitted to the COR 30 days after the start of the Base Year and 30 days prior to the start of each contract year. Any request during the contract period to use unapproved pesticides will be forwarded to the Air Mobility Command (AMC) Pest Management Consultant (PMC) for approval for use. A list of all pesticides to be used for pest control services at JB MDL shall be submitted to the COR. Contractor shall only use pesticides from Federal listings approved by the Air Force Pest Management Board. All pesticides shall be approved by the State of New Jersey, and AMC PMC, prior to use on JB MDL.

1.6.1. The Contractor must provide data for daily pesticide use on DD Form 1532-1 (no later than 5 days after the end of each month). Contractors may use equivalent electronic reporting mechanisms if available.

1.6.2. Contractor shall properly dispose of all wastes and empty material containers generated in the performance of this contract at a State or federally approved disposal site located off JB MDL.

1.7. Safety Requirements. Contractor shall conduct all work in a safe manner and in compliance with the Occupational Safety and Health Act (OSHA), federal and State requirements. If Contractor fails, or refuses, to promptly comply with safety requirements, the Contracting Officer (CO) may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the Contractor.

1.8. Inspection by Regulatory Agencies. Contractor shall notify the COR immediately, by phone, of any inspection visit by an agent(s) of any regulatory agency. Contractor shall submit a written report to the COR by close of business of the work day following completion of the inspection or visit, to include the name, identification number, agency of the inspectors and the reason for the visit. Contractor shall submit a copy of any reports received from any regulatory agencies (including but not limited to the EPA and the State of New Jersey) to the COR. Such reports shall be submitted to the COR before close of business of the next work day after completion of the inspection or visit.

1.9. Citations. Citations for non-compliance shall be immediately reported to the COR. Contractor shall hold harmless and indemnify the Government from and against all claims, demands, violations, or liabilities whatsoever arising out of or in any matter predicated upon the conduct of the Contractor or any of the Contractor’s subcontractors.

1.10. Quarterly Performance Meetings. Contractor shall be available to meet periodically with multi-functional team members, other Government personnel as appropriate, to discuss the Contractor’s performance. The following issues shall be discussed: opportunities to improve the contract; any modifications required of the contract; unsatisfactory inspections and trends against each performance objective observed; positive performance; and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. The minutes of these meetings will be signed by the COR and any other signatures as deemed appropriate by the CO, distributed to

1048039673C Sticky Note Accepted set by 1048039673C the functional area and the contractor. Should the Contractor not concur with the minutes, Contractor shall provide written notification, within 10 business days, to the CO identifying areas of non-concurrence.

SERVICE SUMMARY (SS)

2.0. Contractor service requirements are summarized into performance objectives that relate to mission essential items. The performance thresholds briefly describe the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective PWS Para

Performance Threshold

Quality Control Plan (QCP). Contractor shall develop and submit a QCP within 30 days of contract start date and as changes to chemicals or strategies are made.

2.1.1 100 percent requirement

Pest Control Services. Pests are under control IAW the JB MDL Integrated Pest Management Plan.

1.0.

1.1.

Technical Exhibit 4

No more than 3 discrepancies per month

Animal Control Services and Animal Waste Cleanup and Screen Installation

2.2.7.

2.2.8.

No more than l discrepancy per month

Pest Control Response Times. Contractor responds to required response times in the PWS

Technical Exhibit 2

No more than 3 discrepancies per month

Emergency Services. Contractor shall perform emergency services within 2 hours from time of notification

2.3. No more than 1 discrepancy

per month

Pesticide Mixing and Storage. All pesticides shall be stored off-base. All unused pesticides, empty pesticide containers and residue shall be disposed of properly at an approved off-base disposal area

1.3. 0 discrepancies per month

Pest Control Records and Reports. All Reports and Monthly Summary are submitted as required in the PWS

2.4. – 2.4.1.

100 percent requirement

Contractor Employee Certification. All contractor employees shall have full New Jersey pesticide applicator certifications in the necessary categories for the work at hand. An uncertified commercial employee may not apply pesticides working under a supervisor’s state certification. Contractor shall be available within one hour to meet with Government personnel, via telephone, or in person during business hours

1.2. 100 percent requirement

2.1. Quality Assurance. The contract will be monitored by an appointed COR, DOD trained in the Pesticide Application categories covered in this contract. The Government will evaluate the Contractor’s performance by appointing a COR to monitor performance to ensure services are received. The COR will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor's QCP and from complaints from base personnel. The Government may inspect periodic tasks as completed or increase the number of inspections if deemed appropriate because of repeated failures discovered during inspections or because of repeated customer complaints.

Likewise, the Government may decrease the number of inspections if performance dictates. The Government will also receive and investigate complaints from various customers located throughout the installation. All customer complaints will be submitted to the COR. However, the CO shall make final determination of the validity of customer complaint(s) in cases of disagreement.

2.1.1. Quality Control. Contractor shall develop, maintain, and implement a Quality Control Plan (QCP) and necessary quality control procedures to assure the requirements of the contract are performed in accordance with this PWS and established commercial standards. Contractor shall ensure inspection of facilities for pests, a customer service call/emergency response system for pest removal, and a continuous pest prevention education program for facility managers and food handling managers. As a minimum, Contractor shall develop quality control procedures that address the areas identified in Section 2, Service Delivery Summary. The Government, through the COR, shall periodically evaluate Contractor’s work performance in accordance with the specific contract performance requirements. Contractor shall identify their quality control representative in writing to the COR for notification and resolution of valid customer complaints or Quality Control issues.

2.2. Basic Services. Contractor shall provide Pest Control Services on all grounds, ranges, training areas, buildings and structures on Dix and Lakehurst (except family housing) only. Contractor will receive location maps after contract award. All quantities listed in the bid schedule are estimated quantities. Contractor shall be licensed by the State of New Jersey to apply restricted and non-restricted use pesticides in the State of New Jersey and in accordance with the DOD Plan for Certification and training of pesticide applicators in all appropriate categories to which the Performance Work Statement (PWS) specifies. Contractor’s personnel shall have valid certifications (Technical exhibit 1) to apply restricted use pesticides upon contract award and throughout the duration of the contract. Contractor shall provide sufficient qualified personnel to perform the requirements of this contract, to insure continuous coverage at installations during regular working hours. Contractor shall not hire off duty civilian and military employees where employment would result in a conflict with DoD Directive 5500.07-R, “Joint Ethics Regulation”.

2.2.1. Common Pests. Common pests are described as any insect, invertebrate, arachnid, rodent, mammal, bird, or snake that causes an economic loss, or presents a hazard to Air Force property, personal health or morale. These pests include mice, rats, squirrels, gophers, birds, bats, ants, bees, snakes, mosquitoes, ticks, bed bugs, gnats, beetles, grubs, weeds, and spiders. This list is not all inclusive and shall not be considered to be a complete list of the pests the Contractor shall be responsible to control. Contractor shall insure applicators are trained in the proper and safe handling of snakes.

2.2.2. Monthly Food Facility Inspections and Treatment. Inspections of food service facilities and child care food facilities shall be accomplished on a monthly basis (list of facilities is Appendix D, (Technical Exhibit 7).

Contractor Treatments shall be performed prior to the facility opening, or at a time approved by the COR or Military Public Health. Contractor shall complete all requests for treatment/service within four hours of notification and shall coordinate all treatments performed at food service facilities and child care food facilities with the COR and Military Public Health. Contractor shall provide a written schedule one month prior to scheduled inspections to the COR. Inspections and treatments include all areas of the facility that have food preparation, storage or dining areas. These areas shall include adjoining rooms and openings to the exterior of the facility.

2.2.3. Pest Control for Commercial/Industrial Facilities. Contractor shall coordinate with the facility managers on pest management practices to keep pests under control using the least amount of pesticides and contact the POC of the service order/ facility manager/or alternate prior to any pest control actions.

2.2.4. Pest Control for Athletic Fields and Park Areas. Athletic fields and park area pest control service requests shall be approved in writing by the COR prior to work being accomplished. The control method used and notifications shall comply with approved Federal, State, County, DOD, AF and local regulations. Contractor shall start pest control actions within 1 duty day from receipt of written request from COR. Notifications shall be posted to advise personnel of pending actions a minimum of 24 hours before treatment and for at least 72 hours after pest control treatment is completed. Service will include posting notification of times personnel are not to enter the area. For control actions that are scheduled to be started after a weekend, notices shall be posted the last duty day before the weekend.

2.2.5. Hanta Virus Service. Contractor shall clean, disinfect, and certify area is free of all rodent feces and related contaminants. Service shall include posting notification of personnel to not enter. Contractor is responsible for proper disposal of all debris off base at Contractor expense. Contractor shall inspect for openings in the facility where pests can enter, and notify the facility manager in writing of any repairs required to prevent re-occurrence of infestation. All requests for hanta virus service shall be via written request from the COR.

2.2.6. Mosquito and Larvae Control. Contractor shall perform treatment and ensure effectiveness of treatment of areas that have been identified as mosquito harborage and breeding areas by Military Public Health, IPMC, or the COR through surveillance techniques such as larvae dipping or setting adult mosquito traps.

2.2.7. Animal Control. Animals to be controlled include, but are not limited to, live or dead dogs, skunks, cats, rats, raccoons, squirrels, possums, snakes, and ground hogs. Contractor shall trap, transport and release live animals and remove, transport and dispose of dead animals. Contractor shall apply the appropriate burrow treatment for ground hogs. Contractor shall post signs around the treated area which are readable from a distance of fifty (50) feet.

Handling of animals shall be in accordance with all applicable State and federal regulations. Dead animals shall be removed, transported and disposed of in an approved off-site landfill. All domestic animals captured shall be transported to a suitable approved animal shelter as directed by the COR, this shall be a twenty four (24) hours, seven (7) day a week service. Wild animals shall not be released in populated areas. Contractor shall be responsible for gaining access to a given space within a structure to retrieve a live or dead animal. Access shall be through openings that can be made in the existing structure without cutting or damaging the structure. Contractor shall provide the necessary hand tools (screw driver, hammer, or pliers) and equipment needed to gain access. Only those portions of a structure which can be reassembled shall be dismantled by the Contractor. If access is not possible, Contractor shall notify the COR and the Government will arrange access. All feral and domestic animals shall be controlled on both installations as directed by the COR. Carcass removal shall be performed as Priority 1 service order action. Disposal shall be at an off-site facility. Contractor will be paid one additional unit for deer carcass removal. For live animal control, Contractor shall trap the animal in a humane manner and permanently remove within ten (10) days. Traps shall be of a cage type that will not harm the animal and shall be marked "CAUTION TRAP". Set traps shall be checked twice daily (morning and afternoon). Captured and released wild animals shall not return to the area where they were trapped. Evidence such as droppings, tracks, commodity damage, structural damage, grounds damage or actual sightings within thirty (30) days after capture and release shall indicate the quality standard has not been met. If a wild animal returns to the site of its capture and removal within thirty (30) days, Contractor shall trap the animal again, transport and release the animal off-site at no cost to the Government. If an animal leaves an area without being trapped, Contractor shall be reimbursed for setting and checking the traps only.

2.2.8. Animal Waste Cleanup and Screen Installation. Contractor shall remove animal waste from in and around buildings and restrict pests from re-entering the building by installing screen material over openings in a structure.

The primary source of waste for this work requirement is birds and bats. Animal waste includes droppings, carcasses, feathers, fur and nesting materials. Removal of stains is required when visible in locations such as exterior surfaces of buildings, interior living spaces and interior public spaces. Locations which do not require stain removal are unfinished, unoccupied attics or basements, spaces above suspended ceilings and crawl spaces. Loose materials such as insulation and soil which have been contaminated with animal wastes shall be removed with the waste. Insulation shall be replaced with cellulosic loose fill insulation. Contractor shall fasten screen over pest access openings. If an opening is too large to effectively be covered with screen, Contractor shall notify the COR and describe in writing or with a sketch the size and location of the opening. Screening shall be concealed as much as possible in locations visible to the residence. All building components moved during cleaning shall be put back the way they were found.

2.2.9. Weed Control. COR will make the determination which Dix and Lakehurst areas will be treated for weed or broadleaf control. Treatment shall control germinating plants for a period of 5 months. Ninety (90) percent of all weed spraying shall be completed by July 31st of each year. Areas to be treated include, but are not limited to all sign posts, utility poles, hydrants, wires, structures, fence line, gutters, and curbs. Methods of application may include fan spraying (square foot), pin nozzle type spraying (Linear foot), and boom spraying (acre).

2.2.10. SERVICE ORDERS: Service Order (S/O) work is pest control work other than the scheduled monthly inspections of food service facilities and child care food facilities. This work shall be accomplished by Contractor only when required in accordance with provisions described herein, and shall be accomplished as outlined below and in accordance with this section.

2.2.11. PRIORITIES: Priority breakdown is described in (Technical exhibit 2).

2.2.12. Contractor shall accept S/O's submitted by telephone, in person, or in writing from the COR. Contractor shall pick up the service order requests a minimum of (2) two times daily at Building 3104. Each request will include date and time of the S/O request, time Contractor was notified, the requester's name and telephone number, the location of the work, to include facility number and, when applicable, the specific room or area in a facility, the nature of the problem or work requested, the priority of the request and S/O number. When the Contractor receives an S/O by telephone, a hard copy will be available the next work day. Contractor shall schedule and accomplish all S/O's according to (Technical Exhibit 2). When Contractor picks up S/O’s in person, he shall be required to sign as receipt of the S/O’s.

2.2.13. Contractor shall report to the COR any potential S/O work identified at any time by Contractor personnel.

Contractor shall submit to the COR, in writing, a description of the problem, and the work required correcting the problem, unless the work is an emergency in nature. Contractor shall respond to and complete all S/O within the time frames specified in Technical Exhibit 2.

2.2.14 Contractor shall perform work as described on the S/O form. Contractor shall generate the required copies and distribute as follows: The original and one copy to the COR the following day after the S/O is completed; one copy to the customer after the work is completed; and one copy for the Contractor's file. Contractor shall ensure all information and the customer's signature is present, before any copy is distributed.

2.3. Emergency Services. Contractor may have to perform work at times other than the normal duty hours for emergencies. Contractor shall perform emergency services upon notification by the COR. Contractor shall provide an after hour emergency contact number to the COR.

2.4. Pest Control Records and Reports.

2.4.1. General. The contractor shall maintain a complete pest control record and report use on use on DD Form 1532-1 The contractor may use an equivalent electronic reporting mechanisms if available. The record shall provide all information required by DOD, AF, federal, State and local regulations. All reports shall have the Percentage of Active Ingredient used and for each chemical used.

3.1 Government Furnished Property. The Government will provide the following items without charge to Contractor, for exclusive use on this contract:

3.1.1 The COR will assign the location for a Contractor owned trailer used for office space only. No storage of chemicals is permitted within the trailer.

3.1.2 Utility services will be metered for each utility involved, and all costs involved up to the point of connection to the Government owned supply systems shall be at Contractor’s expense. Final connection of Contractor supplied service laterals to existing Government owned supply systems will be made at Contractor’s expense. Water and electric at existing outlets may be utilized for the requirements of this contract.

3.1.3 The Government will provide initial copies of DD Form 1532-1, Pest Management Report (Technical exhibit

4) for Contractor’s use. Contractor may use (technical exhibit 3), Pest Management Weekly Mosquito Survey. Contractor shall be responsible for supplying any additional forms needed to fulfill reporting requirements.

3.1.4 The most recent copy of the JB MDL Integrated Pest Management Plan (IPM) plan, (IPM will be provided after award), which serves as the basis for treatment of pests (chemical and non-chemical) will be provided to the Contractor. The IPM plan will be the governing factor in determining the method of operations for pest management when detailed procedures are not understood.

1009115370C Cross-Out

3.2 Hours of Operation. The contractor shall perform pest control services during normal duty hours which are 7:30 a.m. – 4:15 p.m., Mondays through Fridays, excluding federal holidays, unless otherwise required in the contract or approved by the COR. The contractor shall be available to perform the required services during extended hours from 4:30 p.m. until 8:00 p.m. There may be situations that require the contractor to work at times other than normal working hours. When the contractor’s work schedule conflicts with an Air Force mission requirement, advise the COR and reschedule the work to minimize disruption.

3.3. Federal Holidays.

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Juneteenth - 19 June Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day post the holiday observance.

3.4 Base Closures. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base. In the cases of severe weather, the contractor will call 609-754-2273 for Joint Base McGuire-Dix .

3.5 Police Protection. Base Security Forces shall provide initial law enforcement response and services to Contractor. The Base Security Operations Desk at Dix can be reached at phone number (609)562-6001, Lakehurst at phone number (732)323-4000.

3.6 Fire Protection. Base Fire Department shall provide initial response for fire protection and emergencies to Contractor. The base fire alarm control center can be reached at phone number 911 from a base telephone. If dialing 911 from a cell phone, the location must be fully identified to ensure that the proper responder is notified.

3.7 Physical Security. Contractor shall be held fully accountable for any failure to maintain the physical security of all base restricted areas, secured facilities or sites within which Contractor provides service. Contractor shall be responsible for the safekeeping and inventory of all Government-furnished keys and combinations issued in the performance of services within secured areas. Contractor shall be responsible for all losses or damages caused by Contractor acts or omissions which cause a breach in security in the areas where services are performed. Upon termination or completion of the contract, Contractor shall secure the previously issued keys and return them to the COR within twenty-four (24) hours.

3.8 Performance of Services During Crisis Declared By the National Command Authority or the Local Installation Commander. This service meets the criteria for continuation of performance during a crisis in accordance with Department of Defense Instruction (DoDI) 1100.

3.9 OPSEC. The contractor shall be responsible for safeguarding military information as outlined by the JB MDL Commander. Contractor personnel will not take photographs of military facilities, equipment or personnel unless cleared through the proper channels

APPENDICES

A. Applicable Publications B. Workload Summary C. Contract Data Requirement List (Deliverables) D. Technical Exhibits

APPENDIX A

The following documents are applicable to this PWS. Every pest management shop should have the following:

Publications:

AFI 32-7064 The Integrated Natural Resources Management AFI 48-102 Medical Entomology Program AR 385-40 Pest Control Services EM 385-1-1 Safety and Health Requirements Armed Forces Pest Management Board publications https://www.acq.osd.mil/eie/afpmb/ Integrated Pest Management Information System (IPMIS) http://www.envirosoftinc.com/ipmis.html

DOD Directive 4150-7 Department of Defense Pest Management Program DOD 5500.07-R Joint Ethics Regulation DOD Plan for the Certification of Pesticide Applicators, (Available from the Armed Forces Pest Management board, Forest Glen Section, WRAMC, Washington D.C. 20307).

Armed Forces Pest Management Board (AFPMB) Publications:

AFPMB Technical Guide 11, Hydrogen Phosphide Fumigation with Aluminum Phosphide, March 2013 Environmental Protection Agency (EPA) Regulations:

40 CFR 117

40 CFR 152

40 CFR 260-261

40 CFR 300

40 CFR 702-704

Clean Water Act Federal Insecticide Fungicide and Rodenticide Act Resource Conservation Recovery Act Compensation and Liability Act Toxic Substance Control Act New Jersey Pesticide Control Regulation http://www.acq.osd.mil/eie/afpmb/ http://www.envirosoftinc.com/ipmis.html

APPENDIX B ESTIMATED WORKLOAD SUMMARY

ITEM DESCRIPTION QTY QTY QTY U/M

NAVAIR O&M Total

1 Monthly Scheduled Maintenance 22 facilities Reference PWS 1 21 22 MO

Arthropods – Buildings Reference JB M-D-L Integrated Pest Management Plan

2AA Less than 5000 SF 15 138 153 EA

2AB Between 5,001 – 10,000 SF 1 3 4 EA

2AC Over 10,001 SF 12 65 77 EA

2AD 1 Room Full Service Bed Bug Treatment Reference

PWS 0 9 9 EA

2AE 1 Room Bed Bug Survey Reference PWS 10 20 30 EA

Rodents Reference JB M-D-L Integrated Pest Management Plan

12 100 112 EA

Structural- Wood Destroying Insects Reference JB M-D-L Integrated Pest Management Plan

4AA Spot Treat – Infested Area Only 1 3 4 EA

4AB Termite Survey/Map Form 1070 0 1 1 EA

4AC Interior – Termites/Wood Borers 12 70 82 SF

4AD Exterior – Termites/Wood Borers 47 235 282 LF

5 Service Calls – Bathroom Traps Reference PWS 0 1 1 EA

6 Animal Control / Vertebrates (All wild and domestic) Reference PWS 25 49 74 EA

7 Carcass Removal Reference PWS 20 108 128 EA

Stinging Insects Reference JB M-D-L Integrated Pest Management Plan

20 122 142 EA

9 Bird / Bat Control Reference PWS 5 40 45 EA

Service Calls – Venomous Arthropods Reference JB M-D-L Integrated Pest Management Plan

0 1 1 EA

Service Calls – Ticks/Fleas – All Buildings Reference JB M-D-L Integrated Pest Management Plan 0 1 1 EA

Service Calls; Ticks/Fleas, All grounds, wood line area Reference JB M-D-L Integrated Pest Management Plan

8 65 73 EA

Service Calls – Stored Product Pests Reference JB M-D-L Integrated Pest Management Plan

0 1 1 EA

14 Service Calls – Biting Flies Reference PWS 0 1 1 AC

15 Service Calls – Turf Insect Reference PWS 0 1 1 AC

16 Service Calls – Turf / Shrub Reference PWS 1 10 11 EA

Service Calls – Gypsy Moth Larva Control Reference JB M-D-L Integrated Pest Management Plan

0 1 1 AC

18 Service Calls – Miscellaneous Pests Reference PWS 0 3 3 EA

Emergency Service Calls – Non Duty Hours Reference JB M-D-L Integrated Pest Management Plan and PWS

0 1 1 EA

20 No Show Service Charge 0 1 1 EA

21 Survey / Inspection 4 43 47 EA

22 Broadleaf Weed Control (March thru Sept) Reference PWS 0 4 4 AC

23 Weed Control (March thru Sept) Reference PWS 45,000 197,453 242,453 SF

23AA

Weed Control (March thru Sept) Reference JB M-D-L Integrated Pest Management Plan and PWS

118.89 141.17 260.06 AC

Mosquito Survey (Dipping) Reference JB M-D-L Integrated Pest Management Plan and PWS

0 24 24 WK

Mosquito Larva Control (1 Apr – 30 Sept) Reference JB M-D-L Integrated Pest Management Plan and

PWS

0 6 6 Mo

Adult Mosquito Control Reference JB M-D-L Integrated Pest Management Plan and PWS

0 1 1 AC

Bird Control in Hangars Reference JB M-D-L Integrated Pest Management Plan and PWS

6 6 12 MO

Transporting of Animals Reference JB M-D-L Integrated Pest Management Plan and PWS

1 10 11 EA

28AA Animal Quarantine Reference PWS 0 10 10 EA

APPENDIX C

CONTRACT DATA REQUIREMENT LISTS (CDRL) (DELIVERABLES)

REPORT DUE

Contractor shall provide a complete and current employee roster to the COR. PWS section 1.2

Within ten (10) business days of the contract award.

Contractor shall provide a copy of the current certification of all personnel applying pesticides on Dix and Lakehurst to the COR and renewed certifications, as required. PWS section 1.2

Seven (7) business days after contract award or renewal.

Contractor shall supply copies of Safety Data Sheets (SDS) and Chemical Labels to the COR. PWS section 1.4

Within ten (10) days after contract award and 30 days prior to the start of each contract year.

Liability Insurance (Addendum to 52.228-5) Due at the Pre Performance Conference Contractor shall provide the name of the State or federal approved disposal site to the COR. PWS section 1.3

Due at the Pre Performance Conference

Contractor shall develop and submit a Quality Control Plan to the COR. PWS section 2.1.1

Within 30 days of contract start date, when changes to chemicals and strategies are made, and within 30 days prior to the start of each option year.

Contractor shall provide COR with a monthly quantity list of service calls. PWS section 2.3

Service Call Summary shall be provided within the first five days of the month.

NOTE: ALL CDRLs are not separately priced.

APPENDIX D TECHNICAL EXHIBITS

1. Certification Categories

2. Pest Management Service Order Priority List

3. Pest Management Weekly Mosquito Surveys

4. DD1532, Pest Management Report

5. Termite and Wood Decay Inspection DD Form 1070

6. Pest Control Survey and Inspection Sheet

7. Monthly Food Facility Inspections List

TECHNICAL EXHIBIT 1

Certification Categories

Personnel performing the following services shall possess the specified certifications at time of award.

Description of Services Certification Category Ornamental Pest Control 3A Turf Pest Control 3B Right of Way Pest Control 6 General and Household Pest Control 7A Termite and Other Wood Destroying Pest Control 7B Fumigation Pest Control 7C Food Processing Pest Control 7D General Public Health Pest Control 8A Mosquito Pest Control 8B

* Contained in NJ Administrative Code 7, Chapter 30

TECHNICAL EXHIBIT 2

Pest Management Service Order Priority List

Priority 1 Half Hour Response Time Complete When Service Is Performed A All S/O requests in food handling buildings B Rats C Bees/Wasps/Hornets - Stinging insects D Odors E Carcass Removal F Vertebrates in buildings G Child Development Centers - All S/O requests H Venomous Arthropods I Stored products pests in food warehouses

Priority 2 24 Hours Response Time To Set Up Appointment 48 Hrs. To Complete A Fleas B Ticks C Termites/Wood Destroying Insects D Mice E Roaches F Flies/Mosquito’s G Birds H Bats I All Vertebrate pests - wild/domestic

Priority 3 48 Hours Response Time to Set Up Appointment 72 Hrs. To Complete A Ants B Spiders C Miscellaneous Pests D Weed Control E Survey / Inspection F Turf & Ornament

Fort Dix

Weekly Mosquito Survey.

Date:

Weather Conditions:

SITE

Shopette Pond

Burger King Pond

8000 Area Pond

Duck Pond

4 , • ., . - ..

,-.LillJJ1auiuw lr'vilu

Comments:

#DIPS#LARVA

LARVACIDE

USED

Certified Technician:._•;_·_. _________ _

TECHNICAL EXHIBIT

Lakehurst Weekly Mosquito Survey_.

Date:

Weather Conditions:

SITE # DIPS# LARVA.

LARVACIDE

. USED

Golf Course

Retention Area

Hangers 5&6

Alan Road

Taxiway

Comments: ---------------------

Certified Technician:.;· • · • · • • · · • · • • •

; , •• I ., , _,• 1

3a

TYPE OF

I USE DESIGNATION BUILDING/AREA SIZE CONSTRUCTION

Units Work Unit of Target Control If Pesticide is Used Labor Appli- Date Serviced Origin Measure Pest Operation Time cator

Name EPA Reg % Cone Amount Initials

Form Approved. 0MB No. 0704-0188 REPORT CONTROL SYMBOL: PEST MANAGEMENT MAINTENANCE RECORD The public reporting burden for this collection of informtition is estimated to aver11ge 4 hours per response, including the t ime for reviewing instructions, searching existing dlltll sources, g11thering &nd m&intaining the data needed, &nd completing and reviewing the collection of information. Send comments regarding this burden estimate or &ny other aspect of this collection of informtition, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorllte (0704-0188). Respondents should be nw.-,re thllt notwithstanding llny other provision of l nw, no person shall be subject to any penalty for failing to comply with 11 collection of information i f it does not display 11 currently vnlid 0MB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION.

MEASUREMENT UNITS

MSF = 1,000 square feet MCF - 1,000 cubic feet

LFF = Linellr feet AC = Acres

DD FORM 1532-1, AUG 96

Units Work Unit of Date Serviced Origin Measure

REMARKS

DD FORM 1532-1 (BACK), AUG 96

ORIGIN OF WORK

SW = Scheduled work SC = Service or trouble call WR = Work request A = Routine inspection

Target Control Pest Operation Name

TYPE OF CONSTRUCTION

CO = Concret e BL = Block

Reset

BV = Brick veneer WO = Wood ST = Steel, sheet metlll OT = Other

Adobe Professional 7 .0 lf Pesticide is Used Labor Appti-

Time cator EPA Reg % Cone Amount Initials

Reset (Attach additional card to continue record}

TERMITE AND WOOD DECAY INSPECTION

DATE INSPECTED BUILDING NUMBER

INSTALLATION TYPE BUILDING

PERM TEMP

INSPECTOR

FAVORABLE TERMITE AND FUNGI INFESTATION CONDITIONSI.

WOOD IN CONTACT WITH SOIL

FORM BOARDS LEFT IN CONCRETE

WOOD MEMBERS SET IN CONCRETE FLOOR

WOOD STEPS IN CONTACT WITH SOIL

WOOD STEPS WITHOUT SHIELDS

WOOD SIDING IN CONTACT WITH SOIL

PIPES IN CONTACT WITH SOIL AND WOOD

NO SHIELDS ON FOUNDATION

FAULTY TERMITE SHIELD

POOR VENTILATION UNDER BUILDING

WATER COLLECTIONS UNDER BUILDING

VINES AND SHRUBS AGAINST BUILDING

LEAKY PLUMBING IN BUILDING

WOOD SCRAP PILED UNDER BUILDING

LOOSE WIRE IN CONTACT WITH SOIL

OTHER (Specify)

LOCATION OF INFESTATIONSII.

FOUNDATION TIMBERS

WOOD PILLARS

SILLS

CROSS BEAMS

FURNITURE

FLOOR JOIST

FLOOR

STUDS

BASE BOARDS

DOOR FRAMES

WINDOW FRAMES

STEPS

ROOF

OTHER (Specify)

TYPE OF TERMITEIII. TYPE OF FUNGIIV. DAMAGEV.

SUBTER-

RANEAN

NONSUBTER-

RANEAN

WOOD DECAY

WOOD

STAINING

STRUCTURAL

WEAKENING

SUPERFICIAL

ESTIMATED COST

TYPE

REPAIR AND TREATMENTVI.

RECM ACCOMP TYPE RECM ACCOMP

REMOVAL OF WOOD FROM SOIL CONTACT

SEALING CRACKS IN CONCRETE

POINTING UP POOR MORTAR

LOWERING GRADE LEVEL

CAPPING CONCRETE FOUNDATION

IMPROVING DRAINAGE UNDER BUILDING

IMPROVING VENTILATION UNDER BUILDING

REPAIR OF TERMITE SHIELDS

REMOVAL OF CONCRETE FORMS

REMOVAL OF VINES AND SHRUBS

REMOVAL OF WOOD TRASH

OTHER (Specify)

APPLICATION OF POISON DUST TO SHELTER TUBES

YES NO

CHEMICAL USED

SOIL POISON

YES NO

TRENCH DEPTH LINEAR FEET CHEMICAL USED

REPLACEMENT OF DAMAGED

WOOD YES NO

NO. OF M BD FEET REPLACED UNTREATED DIPPED SOAKED SPRAYED PRESSURE TREATED

DRILLING AND FLOODING TREATMENTS

YES NO

CHEMICAL USED

WOOD INJECTION FOR DRY WOOD TERMITE

YES NO

CHEMICAL USED

CHEMICAL CONTROLVII.

COSTVIII.

LABOR MATERIAL OTHER TOTAL

TREATMENT EFFECTIVENESSIX.

DATE REMARKS INSPECTOR

DATE REMARKS INSPECTOR

DATE REMARKS INSPECTOR

DATE TITLE OF INDIVIDUAL AFFECTING REPAIR AND TREATMENT SIGNATURE

DD Form 1070, FEB 58

TECHNICAL EXHIBIT 7

Monthly Food and Childcare Facilities List

Facility Number Description 1188 ( Dix) Child Care 1279 (Dix) Youth Center 3140 (Dix) Cold Storage 3152 ( Dix) Golf Course 5219 (Dix) Child Care- SAS 5359 (Dix) Shopette 5399 (Dix) Dining Facility 5502 (Dix) Dining Facility 5509 (Dix) Dining Facility 5601 (Dix) Dining Facility 5610 (Dix) Enlisted Personnel Dining

Facility 5640 (Dix) Dining Facility 5904 (Dix) Dining Facility 5986 (Dix) Dining Facility 6054 (Dix) Bowling Alley

33 (Lakehurst) Golf Course 123 (Lakehurst) Gym

333 (Lakehurst NAVAIR) All American Grill 484 (Lakehurst) Dining Facility Flight Deck 485 (Lakehurst) Commissary 657 (Lakehurst) Child Care

5555 Dining Facility (Dix) Dining Facility

PERFORMANCE WORK STATEMENT FOR
JOINT BASE MCGUIRE-DIX-LAKEHURST
SERVICE SUMMARY (SS)
APPENDICES
APPENDIX A
APPENDIX B
APPENDIX C
NOTE: ALL CDRLs are not separately priced.
APPENDIX E TECHNICAL EXHIBITS
TECHNICAL EXHIBIT 1
Certification Categories
Description of Services Certification Category
TECHNICAL EXHIBIT 2
TECHNICAL EXHIBIT 9
Tech exhibit (4) Integrated Pest Management Plan.pdf
Joint Base McGuire-Dix-Lakehurst, NEW JERSEY INTEGRATED PEST MANAGEMENT PLAN
DEPARTMENT OF THE AIR FORCE
EXECUTIVE SUMMARY
A. BACKGROUND
B. RESPONSIBILITIES
2. 87th Medical Group Public Health
3. Installation Pest Management Coordinator (IPMC)
C. INTEGRATED PEST MANAGEMENT PLAN (IPMP)
D. PRIORITY OF PEST MANAGEMENT WORK
1. Public Health Pests
2. Pests found in and Around Buildings
3. Structural Pests
8. Vertebrate Pests (including BASH)
https://eim.amc.af.mil/org/305se/bash/default.aspx
F. ENVIONMENTAL CONSIDERATIONS
2. Endangered or Protected Species
G. PROGRAM ADMINISTRATION
Table 6.1
Table 6.2
H. Sale and Distribution of Pesticides
I. IPM References and Links
J. Appendices--
Security Forces Appendix.pdf
1. SITUATION. This annex provides the 87th Security Forces Squadron (SFS) appendix to all statements of work for JB MDL.
3.3. Contractor, Commercial and Oversized Vehicles. All contractors, commercial, and oversized vehicles not on the Installation Commercial Vehicle Access list must enter JB MDL Main Base through Checkpoint-9 located on Saylor’s Pond Road or through L...
3.4. Contractor vehicle and personnel processing requirements. Checkpoint - 9 is open for personnel and vehicle processing from 0600-1600 hours Monday through Friday and 0600-1400 hours Saturday, Closed on Sunday and some Holidays.
3.6. Sub-Contractors. All subcontractors are required to follow the same instructions listed above for their subcontractor personnel.
3.6.1. Contractors with an immediate access requirement for a short-term subcontractor must coordinate with their Contracting Officer prior to authorization of access without following the normal procedures.
3.6.2. Short term Subcontractors will be issued a pass not to exceed 1 week.
3.7. Contractors. Contractors working in USAF Restricted Areas will comply with the following:
3.9. Flightline Driving. Only authorized contracted or privately owned vehicles with colored cones/placards are authorized on the flightline and/or flightline road unless driving a government vehicle or under authorized escort.
Contractor Free Zone Requirements and Procedures
title:
DATEINSPECTED:
BUILDING_NUMBER:
INSTALLATION:
xperm: Off
xtemp: Off
INSPECTOR1:
x1a: Off
x1b: Off
x1c: Off
x1d: Off
x1e: Off
x1f: Off
x1g: Off
x1h: Off
x1i: Off
x1j: Off
x1k: Off
x1l: Off
x1m: Off
x1n: Off
x1o: Off
OTHER1:
x2a: Off
x2c: Off
x2d: Off
x2e: Off
x2f: Off
x2g: Off
x2h: Off
x2i: Off
x2j: Off
x2k: Off
x2l: Off
x2m: Off
OTHER2:
x3a: Off
x3b: Off
x4a: Off
x4b: Off
x5a: Off
x5b: Off
ESTIMATED_COST:
REC6a: Off
acc6a: Off
REC6b: Off
acc6b: Off
REC6c: Off
acc6c: Off
REC6d: Off
acc6d: Off
REC6e: Off
acc6e: Off
REC6f: Off
acc6f: Off
REC6g: Off
acc6g: Off
REC6h: Off
acc6h: Off
REC6i: Off
acc6i: Off
REC6j: Off
acc6j: Off
REC6k: Off
acc6k: Off
other_repair1:
REC6l: Off
acc6l: Off
other_repair2:
REC6m: Off
acc6m: Off
xyes7a: Off
xno7a: Off
CHEMICAL_USED:
xyes7b: Off
xno7b: Off
TRENCH_DEPTH:
LINEAR_FEET:
CHEMICAL_USED1:
xyes7c: Off
xno7c: Off
NO_OF_M_ED_FEET_REPLACED:
UNTREATED:
DIPPED:
SOAKED:
SPRAYED:
PRESSURE_TREATED:
xyes7d: Off
xno7d: Off
CHEMICAL_USED2:
xyes7e: Off
xno7e: Off
CHEMICAL_USED3:
LABOR:
MATERIAL:
OTHER:
TOTAL: 0
DATE1:
REMARKS1:
INSPECTOR2:
DATE2:
REMARKS2:
INSPECTOR3:
DATE3:
REMARKS3:
INSPECTOR4:
DATE4:
TITLE_OF_INDIVIDUAL_AFFEC:
Reset:

File details come from the government source that posted it. Updated .