J-7 MSC Ship Repair Facility Survey.docx

DOCX document 199 KB Posted

Attached to
USNS MEDGAR EVERS ( T-AKE 13) ROH/DD
Solicitation number
N3220526R6120
Issued by

About this file

This is a Military Sealift Command (MSC) Ship Repair Facility Survey form used to assess shipyard capabilities for potential ship repair contracts. The form is associated with Solicitation N3220526R6120 for USNS MEDGAR EVERS (T-AKE 13) ROHDD and is completed by shipyards seeking to become qualified repair facilities for MSC vessels.

The survey captures comprehensive facility data including building ways and launching dimensions, dry dock specifications (floating, graving, or marine railway), maximum ship sizes accommodated, water depths, berthing capacity, and available support services such as fresh water, steam, electric power, fire protection, salt water, compressed air, and sanitary sewer systems. The form also documents cranes and lifting equipment (3 tons or over) with specifications on capacity, reach, and height; navigational restrictions and clearances; storage space for components and materials; and principal shop capabilities including fabricating, plate, sheet metal, welding, machining, electrical, electronic, pipe work, and foundry services. Applicants must submit detailed supporting documentation including yard plot plans, certified water depth plots, machine tools and equipment lists for each shop, historical ship repair work examples with project names, dates and costs, staff qualifications and experience, employment levels across management and production categories, small business certification status, and a primary point of contact. The survey is signed by a senior surveyor and establishes the baseline facility information necessary for MSC to evaluate shipyard suitability for government ship repair contracts.

View the file

Other files

File Type Posted
J-9-DisclosureofLobbyingActivities(1997.07).pdf PDF
J-13-PastPerfQuestionaire(2022.11.22).docx DOCX document
J-14-TechnicalNDA(2023.07.07).docx DOCX document
J-10-InterportDifferential(2026.04.10).docx DOCX document
J-2-Cat-A(2022.11 (version 1).xlsx XLSX spreadsheet
J-5 WORK PACKAGE REVIEW SUMMARY SHEET.pdf PDF
J-12 Past Perf Data.docx DOCX document
J-8-RFC(2022.12.28).docx DOCX document
J-3-Cat-B(2023.11.03).xlsx XLSX spreadsheet
Solicitation_N3220526R6120_RFP_MEV.pdf PDF
J-11 MSC Dry Dock Eval Form.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220526R6120 USNS MEDGAR EVERS

MSC SHIP REPAIR FACILITY SURVEY

NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

SHIPYARD AND ADDRESS

Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511

SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE

OF (check one) (ton 2,240 lbs)

WAY

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] SLAB

DEPTH: DEPTH:

DEPTH OF WATER

CRANES SERVING WAY

CERTIFICATION DATE &

CERTIFIED BY WHOM

LIFT CAPACITY

(std. tons)

TYPE

NO.

AT DROP

OFF

OVER

WAY END

[ ] END LENGTH: LENGTH:

[ ] SIDE

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

[ ] BASIN WIDTH: WIDTH:

LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.

TIDAL RANGE (DIFF. OF M.L. M.H)

IS SNUBBING NECESSARY?

YES NO

IS FIRE PROTECTION AVAILABLE

ON BUILDING WAY?

YES NO

SHEET 1 OF 5

DOCK

MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON

(FD)

CLEAR WIDTH

at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height

DEPTH/DRAFT

OVER OVER OVER

SILL FLOOR KEEL

(GD) BLOCKS

LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, &

DATE CERTIFICATION EXPIRES

DRY DOCKS (continued)

MATERIAL TYPE

Floating--(FD) Graving--(GD) Marine Railway (MR)

DOCK

SERVICES AVAILABLE

(use abbreviation of service below)

USE

REPAIR/

OUTFIT-

ING

HEIGHT

OF

DOCK

(M.L.W.)

OUT-

BOARD

IN-

BOARD

TYPE

LENGTH

(actual & usable)

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

ACT:

USE:

WATER DEPTH

(M. L. W.)

BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)DRY DOCKS (means high water)
MSC SHIP REPAIR FACILITY SURVEY (continued)SHIPYARD:

LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MAX REACH HEIGHT OF HOOK

NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM & (STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES

DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT

RAILROAD CONNECTION (identify)

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)

MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)

STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

PRINCIPAL SHOPS AND BUILDINGS

ALL OTHER SHOPS

(LIST NAMES AND DIMENSIONS)

LARGEST EXIT

WIDTH HEIGHT

DIMENSIONS OF

SHOP OR BUILDING

NAME OF SHOP

OR BUILDING

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RIGGER

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________

WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

ACREAGE LEGALLY CONTROLLED

IN USE DEVELOPED TOTAL

LIST TYPES OF WORK NORMALLY SUBCONTRACTED

SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND

EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND

DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN

ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN

LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM

(NAME/TITLE/PHONE NUMBER).

NORMAL

SHIFTS

NORMAL

MAXIMUM

POTENTIAL MAXIMUM

CURRENT

CURRENT

EMPLOYMENT

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO

NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED

ATTACHMENT J - 7 MSC Form 4330/26

File details come from the government source that posted it. Updated .