J-3-Cat-B(2023.11.03).xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- USNS MEDGAR EVERS ( T-AKE 13) ROH/DD
- Solicitation number
- N3220526R6120
About this file
This is a Contractor Price Breakdown attachment (J-3) for Category B items related to the USNS MEDGAR EVERS (T-AKE 13) Repair, Overhaul, and Modernization (ROHDD) contract with the Department of the Navy Military Sealift Command under solicitation number N3220526R6120.
The pricing template outlines labor and material costs for physical security services at the contractor's facility and continuation of services. Category B items include establishing and maintaining FPCON (Force Protection Condition) Charlie and Delta status, with units of measure specified as jobs or days. Additionally, the template includes line items for the continuation of multiple work items (WI 0010 through WI 0020) over 15-day periods and a five-year drydocking and undocking service for the vessel. All pricing fields in this template are currently blank, indicating this is a template for contractor submission of pricing data. The document references the ship name and hull number placeholder and is formatted as page attachment J-3 for the contractor price breakdown submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-11 MSC Dry Dock Eval Form.pdf | ||
| J-5 WORK PACKAGE REVIEW SUMMARY SHEET.pdf | ||
| J-7 MSC Ship Repair Facility Survey.docx | DOCX document | |
| J-12 Past Perf Data.docx | DOCX document | |
| J-8-RFC(2022.12.28).docx | DOCX document | |
| Solicitation_N3220526R6120_RFP_MEV.pdf | ||
| J-9-DisclosureofLobbyingActivities(1997.07).pdf | ||
| J-13-PastPerfQuestionaire(2022.11.22).docx | DOCX document | |
| J-14-TechnicalNDA(2023.07.07).docx | DOCX document | |
| J-10-InterportDifferential(2026.04.10).docx | DOCX document | |
| J-2-Cat-A(2022.11 (version 1).xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-3
| GENERAL REQUIREMENT | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 0025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 1.3 | ESTABLISH FPCON CHARLIE | 1 | job | $ - 0 | |||||||||||
| 1.3 | ESTABLISH FPCON DELTA | 1 | job | $ - 0 | |||||||||||
| 1.3 | MAINTAIN FPCON CHARLIE | 1 | day | $ - 0 | |||||||||||
| 1.3 | MAINTAIN FPCON DELTA | 1 | day | $ - 0 | |||||||||||
| WI 0025 SUBTOTAL | $ - 0 | ||||||||||||||
| 0030 | CONTINUATION OF SERVICES | ||||||||||||||
| 7.1 | CONTINUATION OF WI 0010 | 15 | day | $ - 0 | |||||||||||
| 7.2 | CONTINUATION OF WI 0011 | 15 | day | $ - 0 | |||||||||||
| 7.3 | CONTINUATION OF WI 0012 | 15 | day | $ - 0 | |||||||||||
| 7.4 | CONTINUATION OF WI 0013 | 15 | day | $ - 0 | |||||||||||
| 7.5 | CONTINUATION OF WI 0016 | 15 | day | $ - 0 | |||||||||||
| 7.6 | CONTINUATION OF WI 0017 | 15 | day | $ - 0 | |||||||||||
| 7.7 | CONTINUATION OF WI 0019 | 15 | day | $ - 0 | |||||||||||
| 7.8 | CONTINUATION OF WI 0020 | 15 | day | $ - 0 | |||||||||||
| WI 0030 SUBTOTAL | $ - 0 | ||||||||||||||
| 951 | TAKE-CCSI-DRYDOCKING AND UNDOCKING THE VESSEL (5 YR) (CAT B) | 0 | $0.00 | $0.00 | |||||||||||
| 0 | $0.00 | $0.00 | |||||||||||||
| 15 | day | $ - 0 | $ - 0 | ||||||||||||
| TOTAL | $ - 0 |
| &"Times New Roman,Regular"&10{ship name and hull number} | &"Times New Roman,Regular"&10CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N3220526R6120 |
&"Times New Roman,Regular"&10ATTACHMENT J-3 Page &P of &N
File details come from the government source that posted it. Updated .