This document contains a shipyard facility survey form and information on an upcoming federal contract opportunity. The facility survey form requests technical details about a shipyard's dry docks, cranes, buildings, services, and certifications to support evaluation for ship repair work. The related federal contract opportunity is solicitation number N3220523R4212 for the US Navy's Military Sealift Command, requiring ship repair services at a contractor's facility for the USNS JOHN LEWIS from September 2023 to January 2024. Relevant details include the 165-day period of performance for post shakedown availability work on the vessel, beginning in September 2023.

View the file

Other files for this federal contract opportunity

Other files attached to USNS JOHN LEWIS PSA, newest first.
File Type Posted
N3220523R4212 Amendment 0004.docx DOCX document
N3220523R4212 Amendment 0003.docx DOCX document
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-14 Technical Data OEM Non-Disclosure (NDA) Rev. 2.docx DOCX document
J-3 USNS John Lewis PSA Rev.- Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
N3220523R4212 Amendment 0002.docx DOCX document
J-13 Past Performance Questionnaire Rev. 2.docx DOCX document
J-13 Past Performance Questionnaire.docx DOCX document
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
N3220523C4212 Amendment 0001.docx DOCX document
N3220523R4212.docx DOCX document
J-3 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-8 RFC JL PSA 23R4212.doc DOC document
J-9 JL Disclosure of Lobbying Activities SF-LLL.doc DOC document
J-12 Past Performance Data.doc DOC document
J-14 Technical Data Non-Disclosure (NDA).docx DOCX document
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-10 Interport Differential JL PSA.doc DOC document
J-11 Dry Dock Evaluation Form-fnl.docx DOCX document
J_13_Past_Performance_Questionnaire.docx DOCX document
J-4 LEWIS PSA-2023-08-01.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-23-R-4212

N32205-22-R-4008USNS HENRY J. KAISER (T-AO 187)
N32205-23-R-4212USNS JOHN LEWIS (T-AO 205)
USNS JOHN LEWIS (T-AO 205)
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.

DATE:

Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511

S
HIPYARD AND ADDRESS
SHIPYARD DATA

Telephone No:

Telex No:

Date Found:

BUILDING WAYS (M. I. W.)

NO.

OF

WAY

LAUNCHING

(check one)

DIMENSIONS
MAXIMUM SHIP SIZE

(ton 2,240 lbs)

DEPTH OF WATER
CRANES SERVING WAY
OVER WAY END
AT DROP

OFF

NO.
TYPE
LIFT CAPACITY

(std. tons)

CERTIFICATION DATE & CERTIFIED BY WHOM

[ ] END

[ ] SIDE

[ ] BASIN

[ ] SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

WIDTH:

DEPTH:

[ ] END
LENGTH:
LENGTH:

[ ] SIDE

[ ] BASIN

[ ] SLAB

WIDTH: DEPTH:
WIDTH: DEPTH:

[ ] END

[ ] BASIN

[ ] SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

[ ] END

[ ] BASIN

[ ] SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

[ ] END

[ ] BASIN

[ ] SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

[ ] END

[ ] BASIN

[ ] SLAB

LENGTH:

WIDTH:

DEPTH:

LENGTH:

.W.
TIDAL RANGE (DIFF. OF M.L. M.H)
IS FIRE PROTECTION AVAILABLE ON BUILDING WAY?
IS SNUBBING NECESSARY?
LENGTH OF LAUNCHING RUN
DEPTH OF RUN AT M.L

YES NO

YES NO

SHEE T 1 OF 5

MSC SHIP REPAIR FACILITY SURVEY (continued)SHIP
YARD:
BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.)
DRY DOCKS (means high water)
NO.
TYPE
LENGTH

(actual & usable)

WATER DEPTH

(M. L. W.)

HEIGHT

OF

DOCK

(M.L.W.)

USE

REPAIR/

OUTFIT-

ING

SERVICES AVAILABLE

(use abbreviation of service below)

DOCK

NO.

MATERIAL TYPE

Floating--(FD)
Graving--(GD)Marine Railway (MR)

IN-

BOARD

OUT-

BOARD

ACT:

USE:

ACT:

ACT:

ACT:

ACT:

ACT:

DRY DOCKS (continued)

DOCK NO.
MAXIMUM SHIP SIZE

ACCOMMODATED

LENGTH OA-BEAM

LENGTH

CLEAR WIDTH
DEPTH/DRAFT
LIFTING CAPACITY

(ton 2,240)

DATE CERTIFIED, CERTIFIED BY WHOM, & DATE CERTIFICATION EXPIRES

OVERALL

at coping (GD), at keel blocks on cradle (MR), on PONTOON (FD)

at top cradle (MR), at top inboard wing wall (FD, GD)
at keel block height
OVER

SILL

(GD)

OVER FLOOR
OVER KEEL

BLOCKS

LEGE
ND (abbreviation of servi
ces)
Fres
h Water --- F.W. - G.P.M
. - P.S.I.
Steam --- S - P/HR
- P.S.I.
El
ectric Po
wer --- E - V -
AC - AMP
Fire P
rotection --- FP - G.P.M. - P.S.I.

Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO

MSC SHIP REPAIR FACILITY SURVEY (continued)
SHIPYARD:

BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)

MA
X REACH

HEIGHT OF HOOK

NO
TYPE
CAPACITY
MAX SPAN
CAPACITY
BOOM
HEIGH
TABOVE BASE
HEIGHT OF HO
OKAREA SERVIC
EDATE CERTIFIED, CERTIFIED BY WHOM &
(STD TONS)
(BRIDGE)
AT REACH
LENGT
H HINGE
ABOUT REACH
(BRIDGE)

DATE CERTIFICATION EXPIRES

NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
DISTANCE TO NEAREST

RAILROAD CONNECTION

DISTANCE TO NEAREST AIRPORT

(identify)

MINIMUM CHANNEL (depth width)
MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES

LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)

MSC SHIP FACILITY SURVEY (continued)

SHIPYARD:

PRINCIPAL SHOPS AND BUILDINGS
STORAGE SPACE FOR COMPONENTS AND MATERIALS

(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)

NAME OF SHOP OR BUILDING
DIMENSIONS OF SHOP OR BUILDING
LARGEST EXIT
ALL OTHER SHOPS (LIST NAMES AND DIMENSIONS)
WIDTH
HEIGHT

FABRICATING

PLATE

SHEET METAL

SUBASSEMBLY

WOOD WORKING

BOAT ASSEMBLY

OR MOLDING

BOILER

MACHINE

ELECTRICAL

ELECTRONIC

PIPE

FOUNDRY

RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________ WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________

RIGGER

LIST TYPES OF WORK NORMALLY SUBCONTRACTED
ACREAGE LEGALLY CONTROLLED
IN USE
DEVELOPED
TOTAL

MSC SHIP REPAIR FACILITY SURVEY (continued)

SHIPYARD:

LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM

EMPLOYMENT
CURRENT
CURRENT SHIFTS
POTENTIAL MAXIMUM
MAXIMUM SHIFTS
NORMAL
NORMAL

SHIFTS

REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:

1. PLOT PLAN OF YARD.

2. CERTIFIED DEPTH OF WATER PLOT

3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.

4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN ACCOMPLISHED BY THE APPLICANT.

5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP

REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE LINE

6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN LIST EACH FACILITY AND ITS LOCATION.

7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM (NAME/TITLE/PHONE NUMBER).

MANAGEMENT, ADMINISTRATION

PROFESSIONAL ENGINEERING

PRODUCTION SKILLED

PRODUCTION UNSKILLED

NONPRODUCTION

TOTAL:

ARE YOU CERTIFIED AS A SMALL BUSINESS ?

YES

NO

NAME AND TITLE OF SENIOR SURVEYOR
SIGNATURE

DATE SIGNED

ATTACHMENT J - 7MSC Form 4330/26
ATTACHMENT J - 7MSC Form 4330/26
ATTACHMENT J - 7MSC Form 4330/26

File details come from the government source that posted it. Updated .