N3220523R4212.docx

DOCX document 147 KB Posted

Attached to
USNS JOHN LEWIS PSA Federal contract opportunity
Solicitation number
N3220523R4212
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines a solicitation for a Post Shakedown Availability for the USNS JOHN LEWIS (T-AO 205). The Military Sealift Command has a requirement for shipyard services including maintenance, repairs, and alterations to commence on or about September 1, 2023 at the contractor's facility. The period of performance is anticipated to be 165 calendar days. Services required include project planning, production support, quality assurance, hazardous waste handling, and general services such as utilities, office space, and IT support. The document establishes pricing terms for firm fixed price line items, additional labor requirements, other direct costs, and optional work items that can be exercised at the government's discretion. It identifies standard clauses to be incorporated, invoicing instructions, and points of contact for the Department of the Navy Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS JOHN LEWIS PSA, newest first.
File Type Posted
N3220523R4212 Amendment 0004.docx DOCX document
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
N3220523R4212 Amendment 0003.docx DOCX document
J-13 Past Performance Questionnaire Rev. 2.docx DOCX document
N3220523R4212 Amendment 0002.docx DOCX document
J-14 Technical Data OEM Non-Disclosure (NDA) Rev. 2.docx DOCX document
J-3 USNS John Lewis PSA Rev.- Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
N3220523C4212 Amendment 0001.docx DOCX document
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-13 Past Performance Questionnaire.docx DOCX document
J-4 LEWIS PSA-2023-08-01.xlsx XLSX spreadsheet
J-2 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-10 Interport Differential JL PSA.doc DOC document
J-11 Dry Dock Evaluation Form-fnl.docx DOCX document
J_13_Past_Performance_Questionnaire.docx DOCX document
J-3 USNS John Lewis PSA - Work Item Estimates - 23R4212.xlsx XLSX spreadsheet
J-7 JL MSC Ship Repair Facility Survey.docx DOCX document
J-8 RFC JL PSA 23R4212.doc DOC document
J-9 JL Disclosure of Lobbying Activities SF-LLL.doc DOC document
J-12 Past Performance Data.doc DOC document
J-14 Technical Data Non-Disclosure (NDA).docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220523R4212

Section B - Supplies or Services and Prices

CLAUSES INCORPORATED BY FULL TEXT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "A" WIs

FFP

Prepare for and accomplish the MTA of the USNS JOHN LEWIS (T-AO 205) Total Category "A" WIs $_____________

Proposed unit price per KWh of electrical shore power $_____ IAW WI 0011, 7.1.1.4 Proposed unit price per gallon of potable water $______ IAW WI 0011, 7.1.2.2 Proposed unit price per gallon of distilled water $______ IAW WI 0011, 7.1.3.2 Proposed unit price per gallon of bilge water removal $______ IAW WI 0011, 7.1.20.3 Proposed unit price per crane usage $______ IAW WI 0011, 7.9.1 Proposed Hazardous Waste handling fee rate IAW WI 0023, 7.4.3. ______%

CDRLs FOR CLINs INCLUDING OPTION CLINs, IF EXERCISED:

The data to be furnished hereunder shall be prepared and submitted IAW the CDRL, DD Form 1423, Exhibit A, attached hereto. The CDRLs form a part of the schedule of this solicitation.

SEE PARAGRAPH 1.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

AGR and ODC

AGR

30,000 man-hours @ $________ per man-hour = $_____________

ODC

Base $3,000,000

Proposed G&A Rate _______________% Subtotal: $_____________

Proposed Profit Rate _______________% Subtotal: $_____________

SEE PARAGRAPH 2, 3, AND 4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0025

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

SEE PARAGRAPH 5.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0030

WI 030 – Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0138

WI 0138 – Tank Striker Plate Repairs

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0322

WI 0322 – PCI Repair Shipyard Support

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0323

WI 0323 – PCI Repairs

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0528

WI 0528 – Reverse Osmosis Cyclone Separators

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0529

WI 0529 – Butterfly Valve Reorientation

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0538

WI 0538 – RO Unit High Purity Upgrade Installation

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0589

WI 0589 – Miscellaneous Piping Replacement

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0910

WI 0910 - CPP Hub Replacement Shipyard Suppport

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0911

WI 0911 - CPP Blade Palm Face Machining Shipyard Support

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0951

WI 0951 - CCSI Drydocking and Undocking Vessel

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The ACO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0014 $______________

The contractor shall enter the total proposed price of all CLINs.

Section B, Price Schedule, detailed information

1. Attachment J-2, Category “A” WIs, provides a WI breakdown of CLIN 0001 pricing.

2. AGR and ODC

a. This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated during the contract. Changes are inherent to vessel repair contracts and should be expected by Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

b. Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

c. Consumable materials are goods used in the ordinary course of work performance that do not become an integral part of the repaired vessel (e.g., office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing). Consumable material shall be included in the contractor's FBLR and not separately priced.

d. The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The ACO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

e. The base cost stated in this CLIN does not include profit or G&A rates.

f. This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

3. AGR details.

a. The Government may utilize CLIN 0002 for, and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time as may be granted, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the ACO to take any of the three (3) options set forth in subparagraph “d” below. AGR proposals shall be priced using the FBLR set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and for negotiating changes. As part of the contractor’s proposal submission for AGR, the following shall be included:

- FBLR
- Proposed Labor Mix/Categories
- Proposed Man Hours
- Total Proposed AGR

c. Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “d”, below.

d. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

e. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in subparagraphs “d.1” and “d.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

f. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for AGR (CLIN 0002). Settlement of AGR (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0014 at contract completion shall be de-obligated.

4. ODC details.

a. The Government may utilize CLIN 0002 for and not limited to, material and equipment generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. ODC does not include work performed pursuant to DFARS 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 ODC, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned WIs, to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with AGR, and therefore will be performed concurrently.

b. As a result of a discrepancy found between the WI and the current conditions or a needed repair found during the open and inspect phase of the WI, the contractor may submit a CFR to the ACO and the PPE. As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders ODC pursuant to this CLIN, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the ACO. The contractor's failure to submit its proposal within the three (3) day period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the ODC and will permit the ACO to take any of the three options set forth in subparagraph “e” below. As part of the contractor’s proposal submission for ODCs, the following shall be included:

MaterialEquipment
-Part number- Part number
-Order quantity- Order quantity
-Unit price- Unit price
-Total price- Total price

Other Direct Costs not captured above

- Travel

- Per diem (lodging, M&IE daily rates)

- Subcontractor Proposal Breakdown shall include but not be limited to, Material (Part number, Order Quantity, Unit Price, and Total Price), equipment (Part Number, Order Quantity, Unit Price, and Total Price), labor (FBLR, Proposed Labor Mix/Categories, and Proposed Manhours), and ODC (Travel and Per Diem)

The G&A and profit rates proposed shall be the same as the rates provided under CLIN 0002.

c. The contractor shall demonstrate due diligence in the assessment, evaluation, and determination resulting in the proposed utilization of other than local specialized labor resources. Only with ACO approval to proceed will a contractor, technical representative, or subcontractor be reimbursed for reasonable per diem costs (transportation, travel expenses, lodging, meals, and incidental expenses) required in connection with the associated change order. Per diem costs are considered reasonable, allowable, and reimbursable only to the extent that they do not exceed the allowed per diem rate in effect at the time of travel as set forth in the JTR.

d. Considering G&A and profit rates have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of ODCs proposed to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) the price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the ACO reserves the right to procure these ODCs utilizing alternative means described in subparagraph “e”, below.

e. Upon receipt of the contractor's price proposal for the AGR the contractor and the ACO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the ACO, the ACO reserves the right to:

1) Have the work performed by the Government;

2) Issue a unilateral modification; or

3) Cancel the requirement.

f. The contractor knowingly and voluntarily waives all claims against the Government and/or other third-party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing this work at the contractor's facility. Furthermore, in cases described in subparagraphs “e.1” and “e.2” above, the contractor waives any right to claims of interference under the DFARS 252.217-7011 - Access to Vessels.

g. The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the ODC (CLIN 0002). Settlement of ODC (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the ACO. The contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled CCO and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0014 at contract completion shall be de-obligated.

5. Attachment J-3, Category “B” WIs, provides a WI breakdown of CLIN 0003 through 0014 pricing.

Section C - Descriptions and Specifications

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS JOHN LEWIS (T-AO 205) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 01 SEP 2023. All work shall be completed in no more than 165 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility. Due to operational and national security availability considerations, the location shall be West Coast.

Table 1: List of WIs:

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
TAO205-SWI-SCOPE GENERAL REQUIREMENTS AND
NSP
0002
TAO205-SWI-TECHNICAL AND MANUFACTURERS
NSP
0003
TAO205-SWI-APPROACH BERTHING AND MOORING
NSP
0004
TAO205-SWI-TESTING AND QUALITY ASSURANCE REV
NSP
0005
TAO205-SWI-ELECTRICAL SAFETY PROCEDURE
NSP
0006
TAO205-SWI-HEAVY WEATHER PLAN REV 20FEB21
NSP
0007
TAO205-SWI-COLD WEATHER PLAN REV 20FEB21
NSP
0008
TAO205-SWI-PROCUREMENT AND USE OF LUBRICANTS
NSP
0010
TAO205-SWI-FURNISH OFFICE FOR OVERHAUL
A
0011
TAO205-SWI-GENERAL SERVICES FOR SHIP (T-AO 205) REV
A
0012
TAO205-SWI-INFORMATION TECHNOLOGY SERVICES 03
A
0013
TAO205-SWI-PROJECT PLANNING AND PRODUCTION
A
0014
TAO205-SWI-WEIGHT AND MOMENT REPORT REV 20FEB21
A
0015
TAO205-SWI-ILS GFM REV 20FEB21
A
0016
TAO205-SWI-FIRE PROTECTION AND SHIPS SAFETY
A
0017
TAO205-SWI-HANDLING SHIPS STORES REV 20FEB21
A
0018
TAO205-SWI-DELIVERY AND REDELIVERY OF THE VESSEL
A
0019
TAO205-SWI-SHIPBOARD ACCESS AND SECURITY REV
A
0020
TAO205-SWI-GAS FREE CERTIFICATES REV 20FEB21
A
0021
TAO205-SWI-CLEAN AND GAS FREE TANKS, VOIDS,
A
0022
TAO205-SWI-MACHINERY SPACE TURN-OVER DOCK
A
0023
TAO205-SWI-HAZARDOUS WASTE DISPOSAL AT A
A
0024
TAO205-SWI-PHYSICAL SECURITY AT PRIVATE
NSP
0025
TAO205-SWI-PHYSICAL SECURITY AT PRIVATE
B
0030
TAO205-SWI-CONTINUATION OF SERVICES REV 20FEB21
B
SECTION 0100
HULL AND STRUCTURAL
0128
TAO205 STABILITY TEST
A
0130
PERSONNEL ACCESS AMR to MMR 1st PLT ACCESS (T-ALT
A
0132
-Heavy Door Closure Mechanism Installation (T-Alt 205-0063)
A
0133
FOLDING MAST MODIFICATIONS (T-ALT 205-0064)
A
0134
ATFP GUN STATION AWNING INSTALLATION (T-ALT 205-
A
0135
CARGO POTABLE WATER ROOM PERSONNEL ACCESS
A
0136
INSTALL ROOF OVER FUEL CRANKCASE VENTS (T-ALT 205-
A
0137
INSTALL SECOND BROW LOCATION (T-ALT 205-0069)
A
0138
-TANK STRIKER PLATE REPAIRS
B
0139
-TANK SOUNDING TUBE INSPECTION
A
SECTION 0200
PROPULSION MACHINERY
0203
TAO205 MAIN ENGINE 18K HR OVERHAUL INDUSTRIAL
A
0225
THROTTLE DETENTS MODS (T-ALT 205-0067)
A
SECTION 0300
ELECTRICAL
0304
TAO205-CSI-PTO PTI SERVICE (1 YR)
A
0306
TAO205-CSI-UPS BATTERY - REPLACE (5 YR)
A
0310
UPS EMERGENCY SOURCE OF POWER (T-Alt 205-0006)
A
0311
SHIP AFT WHISTLE RELOCATION (T-Alt 205-0009)
A
0312
REFRIGERANT LEAK DETECTION (T-Alt 205-0010)
A
0313
POTABLE WATER SYSTEM ALTERNATE POWER (T-ALT 205-
A
0314
ME FUEL INJECTION CABINET REQUIREMENTS ((T-ALT 205-
A
0315
GALLEY DOOR HOLDBACKS (T-ALT 205-0044)
A
0316
MCCS INTERFACE & AUX CABINETS COOLING INSTALL (T-
A
0320
MRG SENSOR REDUNDANCY (T-ALT 205-0048)
A
0321
-Reduction Gear PLC Battery Backup (T-ALT 205-0073) - 20220607
A
0322
-PCI REPAIR SHIPYARD SUPPORT
B
0323
-PCI REPAIRS
B
0324
-MOV VALVE LOOP MODS SHIPYARD SUPPORT
A
0351
TAO205-CSI-SWITCHBOARD CLEANING (2.5 YR)
A
0352
TAO205-CCSI-LOAD CENTER CLEANING (2.5YR)
A
0353
TAO205-CCSI-THERMOGRAPHY SURVEY (1 YR)
A
0354
TAO205-CSI-GENERATOR CLEANING AND INSPECTION
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0403
TAO205-CSI-DOPPLER SPEED LOG MAINTENANCE (2.5 YR)
A
0404
TAO205-CSI-TV DTS SERVICE (1YR)
A
0421
DIAL TELEPHONE ADDITION (T-ALT 205-0017)
A
0422
LAN DROP ADDITION (T-ALT 205-0021)
A
0451
TAO205-CCSI-ANNUAL RADAR SERVICE
A
0452
TAO205-CCSI-ANNUAL ECDIS SERVICE (SCSI)
A
0453
TAO205-CCSI-ANNUAL GYRO SERVICE
A
0454
TAO205-CCSI-ANNUAL VDR RECERTIFICATION
A
0455
TAO205-CCSI-ANNUAL RADIO COMMUNICATION
A
0456
TAO205-CCSI-MAGNETIC COMPASS SERVICE (2YR)
A
0459
TAO205-CCSI-ECHO SOUNDER SERVICE (2.5 YR)
A
0460
TAO205-CCSI-ANNUAL INSPECTION OF MANUALLY
A
SECTION 0500
AUXILIARY MACHINERY
0501
TAO205-CSI-SSDG ENGINE SERVICE (5K HRS)(SCSI)
A
0507
TAO205-CSI-SSDG ENGINE FUEL INJECTOR MAINTENANCE
A
0509
TAO205-CSI-HVAC WATER HEATER SERVICE(1YR)
A
0513
TAO205-CSI-WATER MIST FIREFIGHTING SYSTEM
A
0514
TAO205-CSI-START AIR COMPRESSOR MAINTENANCE (6K
A
0520
TAO205-CSI-AIR COMPRESSOR SERVICE (1YR)
A
0523
TAO205-CSI-ENGINE ROOM OWS SERVICE AND OCM
A
0524
TAO205-CSI-PTO COUPLING ALIGNMENT CHECKS (1 YR)
A
0527
FLUSH LT FRESH WATER SYSTEM
A
0528
REVERSE OSMOSIS CYCLONE SEPARATORS (T-Alt 205-0001)
B
0529
BUTTERFLY VALVE REORIENTATION
B
0530
TAO205-CSI-SALT WATER SPRINKLING SYSTEM (1YR)
A
0531
SHIP SERVICE AIR REDUNDANCY (T-Alt 205-0002)
A
0532
PIPING SYSTEM ISOLATION VALVES (T-ALT 205-0003)
A
0533
FUEL OIL PURIFIER CROSS CONNECT PIPING
A
0534
AIR SYSTEM INSTRUMENTATION & MONITORING (T-Alt
A
0535
CONDENSATE DRAIN OVERBOARD MODIFICATIONS (T-Alt
A
0536
STERN TUBE SEAL SWITCH TO CONTROL AIR (T-ALT 205-
A
0538
RO UNIT HIGH PURITY UPGRADE INSTALLATION (T-ALT
B
0539
WASTE OIL TANK DECANTING REQUIREMENTS (T-ALT 205-
A
0540
LTFW COOLER CLEANING SYSTEM (T-ALT 205-0031)
A
0541
SW STRAINER DRAINS PIPING MODS (T-Alt 205-0036)
A
0542
FORK TRUCK CHARGER REQUIREMENTS (T-Alt 205-0038)
A
0543
CARGO PUMP ROOM WATER & AIR CONNECTION MODS (T-
A
0545
-INSTALL FLASH EVAPORATOR (T-ALT 205-0068) RevA
A
0546
MDE FUEL SERVICE BYPASS FILTER INSTALLATION (T-ALT
A
0547
TOILET ISOLATION VALVES (T-ALT 205-0057)
A
0548
WATER FOUNTAIN INSTALL (T-ALT 205-0058)
A
0549
-CARGO WASTE OIL PIPING MODIFICATIONS (T-ALT 205-
A
0550
HTFW BUTTERFLY VALVE SEAT REPLACEMENT (T-ALT
A
0551
LTFW BUTTERFLY VALVE SEAT REPLACEMENT (T-ALT
A
0552
LTFW BUTTERFLY VALVE SEAT REPLACEMENT FOR ISO
A
0553
TAO205-CCSI-PRESSURE VESSELS AND RELIEF VALVES
A
0554
TAO205-CCSI-INSPECT TEST AND CERTIFY MACHINERY
A
0556
TAO205-CCSI-INSPECT DECK CRANES (1YR)(SCSI)
A
0558
TAO205-CCSI-PERSONNEL ELEVATOR ANNUAL
A
0561
TAO205-CCSI-GAUGE CALIBRATION (1YR)
A
0562
TAO205-CCSI-SCBA ANNUAL INSPECTION
A
0563
TAO205-CCSI-SCBA COMPRESOR AND FILLING STATION
A
0565
TAO205-CCSI-FIXED GAS FIREFIGHTING SYSTEM
A
0567
TAO205-CCSI-FIXED FOAM FIREFIGHTING SYSTEM
A
0569
TAO205-CCSI-FIRE SMOKE DETECTION AND ALARM
A
0570
TAO205-CCSI-PORTABLE FIRE EXTINGUISHING SERVICE (1
A
0571
TAO205-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR)
A
0572
TAO205-CCSI-DEEP FAT FRYER AND RANGE HOOD FIRE
A
0573
TAO205-CCSI-FIRE HOSES (1 YR)
A
0574
TAO205-CCSI-FIRE DOORS AND SHUTTERS (1 YR)
A
0575
TAO205-CSI-ANNUAL INCINERATOR SERVICE (ABS)
A
0589
MISCELLANEOUS PIPING REPLACEMENT
B
0590
HYDRO & INSPECTION OF CARGO PIPING
A
0591
REMOVAL OF LINE BLIND ASSEMBLIES
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
TAO205-CSI-GALLEY EQUIPMENT SERVICE (2.5YR)
A
0602
TAO205-CSI-ANNUAL LAUNDRY EQUIPMENT SERVICE
A
0610
BALLISTIC SHIELDING & GUN MOUNT RELOCATION (T-ALT
A
0611
CARGO PUMP ROOM MODIFICATIONS (T-ALT 205-0020)
A
0612
ADDITIONAL PAINT LOCKER REQUIREMENT (T-ALT 205-
A
0613
MAIN DECK CLEANING GEAR LOCKER (T-ALT 205-0030)
A
0614
CO2 HOSE REEL MODS (T-ALT 205-0040)
A
0615
MASTER & CHENG STATEROOM FURNITURE MODS (T-ALT
A
0616
HABITABILITY MODIFICATIONS (T-ALT 205-0049)
A
0617
LIFE RAFT ADDITIONS (T-ALT 205-0054)
A
0618
RESCUE BOAT REPLACEMENT (T-ALT 205-0052)
A
0619
RAS FAS LOCKER WORKSPACE MODS (T-ALT 205-0014)
A
0620
STATEROOM MCCS PANEL RELOCATION (T-ALT 205-0005)
A
0623
-SHIPS LAUNDRY WASHER AND DRYER REPLACEMENT (T-
A
0624
-GALLEY MODIFICATIONS (T-ALT 205-0071)
A
0651
TAO205-CSI-ANNUAL LIFEBOAT AND RESCUE BOAT AND
A
0653
TAO205-CCSI-ANNUAL RESCUE BOAT AND DAVIT
A
0656
TAO205-CCSI-ANNUAL LIFE RAFT CERTIFICATION
A
0657
TAO205-CSI-ACCOMMODATION LADDER INSPECTION (1
A
0662
TAO205-CCSI-DEEP FAT FRYER INSPECTION (1 YR)
A
SECTION 0800
HVAC
0801
PACKAGE AC UNITS IN EOS & RADIO (T-ALT 205-0037)
A
0851
TAO205-CCSI-GALLEY VENTILATION SYSTEM AND
A
0852
TAO205-CCS-LAUNDRY VENT CLEANING(2.5YR)
A
0853
TAO205-CCSI-ACCOMMODATION SPACE VENT CLEANING
A
SECTION 0900
DRYDOCKING
0901
TAO205-CCSI-DRYDOCKING AND UNDOCKING VESSEL
A
0902
TAO205-CSI-PROPULSION SHAFT WEAR DOWN READINGS
A
0903
TAO205-CSI-NET CUTTER REPAIRS (2.5YR)
A
0904
TAO205-CSI-ZINC ANODE INSPECTION AND REPLACEMENT
A
0906
TAO205-CSI-PROPELLER SYSTEM MAINTENANCE (2.5 YR)
A
0907
TAO205-CSI-STERN TUBE SEAL SYSTEM MAINTENANCE (2.5
A
0910
-CPP HUB REPLACEMENT SHIPYARD SUPPORT
B
0911
-CPP BLADE PALM FACE MACHINING SHIPYARD SUPPORT
B
0912
LINE SHAFT BEARING REPAIR SHIPYARD SUPPORT
A
0951
TAO205-CCSI-DRYDOCKING AND UNDOCKING THE VESSEL
B
0954
TAO205-CCSI-RUDDER AND STERN FRAME EXAM (5 YR)
A
0956
TAO205-CCSI-OVERHAULING SEA VALVES (5 YR)
A
0957
TAO205-CCSI-PROPELLER CLEAN AND POLISH - ON DOCK
A
0960
TAO205-CCSI-UNDERWATER HULL CLEANING AND
A
0961
TAO205-CCSI-FREEBOARD PRESERVATION
A
0962
TAO205-CCSI-CATHODIC PROTECTION SYSTEM (2.5YR OR
A
0963
TAO205-CSI-SEA CHEST MARINE GROWTH PROTECTION
A
0966
TAO205-CCSI-SHAFT ALIGNMENT AND BEARING
A
0988
TAO205-CSI-RUDDER REMOVAL (TWO EACH)
A
0989
TAO205-CSI-REMOVAL OF PROPELLER SHAFTS (TWO
A
0990
TAO205-STERN TUBE AFT FLANGE FACE MACHINING (TWO
A
SECTION 1000
UNDERWAY REPLENISHMENT EQUIPMENT
1001
MESSENGER LINE HANDLING MODIFICATIONS (T-Alt 205-
A
1002
RAM CHARGING STATION PRESERVATION
A

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within . Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause) Section D - Packaging and Marking

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

(end of instructions)

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

252.217-7005
Inspection and Manner of Doing Work
JUL 2009
252.217-7006
Title
DEC 1991
252.217-7013
Guarantees
DEC 1991

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003

Section G - Contract Administration Data

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .