J-4B Reference Document - Appendix 10.5 Master Test List.pdf

PDF 252 KB Posted

Attached to
Mars Ascent Vehicle Integrated System (MAVIS) Federal contract opportunity
Solicitation number
80MSFC21R0001
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

This document contains a master test list for the Mars Ascent Vehicle (MAV) integrated system procurement. Key details include that the solicitation is for the MAV Integrated System (MAVIS) acquisition issued by NASA's Marshall Space Flight Center. The test list outlines the extensive testing required on components, subsystems, and integrated vehicles including engineering models, flight test articles, and flight models. Tests identified include inspections, functional testing, life testing, thermal vacuum chamber testing, vibration testing, shock testing, and environmental testing among many others. The list covers avionics, power systems, structures, thermal control systems, reaction control systems, propulsion elements, and integrated vehicle testing. Substantial qualification and acceptance testing is outlined for components and materials.

View the file

Other files for this federal contract opportunity

Other files attached to Mars Ascent Vehicle Integrated System (MAVIS), newest first.
File Type Posted
80MSFC21R0001-P00001 MAVIS Amendment 01 Documents.zip ZIP file
MAVIS Pre-Proposal Conference Slides_19 AUG 2021.pdf PDF
J-4A Applicable Documents.zip ZIP file
MAVIS RFP 80MSFC21R0001.pdf PDF
Signed RFP Letter_MAVIS.pdf PDF
Att L-1 EPM.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAV Master Test List Page 1 of 1

A

Assemblies N u m b e r o f

F lig h t

It e m s

N u m b e r o f

T e s t

It e m s

C ir c u it P ro te c ti o n a n d

W ir e S iz in g

T e s t

P ro g ra m

S S

E

M

F T

A

T L

O

F M

In s p e c ti o n

F u n c ti o n a l

B u rn -I n

W e a r-in /R u n

-i n

L if e

B a k e o u t (P

P /C

C

T h e rm a l V a c

T h e rm a l C y c le

C lim a ti c

P re s s u re

L a u n c h

D e c a y

M a rs

R e p re s s

L e a k

P ro o f

S tr u c tu ra l T e s t

M u lt ip a c ti n g /I o n iz a ti o n B re a k d o w n

S p in B a la n c e n d

S ta g e

O n ly

M a s s M e a s u re m e n ts

V ib ra ti o n

S h o c k

E D

L

L a n d in g

V

E C

T O je tt is o n s t

S ta g e

I g n it io n

Q u a s i-

S ta ti c A c c e le ra ti o n c o u s ti c N o is e

E M

I/ E

M C

G ro u n d /B o n d

S u b s y te m T e s ts

S e p a ra ti o n

B o lt C u tt e r

S e p a ra ti o n -B o lt C u tt e r

R e

-T e s t

S e p a ra ti o n -R

U A

G P u lle y T e s t

A m b ie n t/

T h e rm a l V a c

S e p a ra ti o n -N

E A

P u lle y T e s t

A m b ie n t/

T h e rm a l V a c

S ta g e

U m b ili c a l D is c o n n e c t

T e s t

B e llv ill e W a s h e r

S e p a ra ti o n -F la t

F lo o r

L if e c y c le

S ta ti c L o a d s

P lu m e

I n d u c e d a c o u s ti c s

L if to ff a c o u s ti c s

Ig n it io n O v e rp re s s u re

M o d a l S u rv e y

R C

S T h e m a l

A v io n ic s T h e rm a l

T P

S D e v e lo p m e n t

C o a ti n g D e v e lo p m e n t

T V

C P ro to ty p e T e s ts

T V

C C o m p o n e n t

A c c e p ta n c e

T e s ts

T V

C C o m p o n e n t

Q u a lif ic a ti o n T e s ts

T V

C A c c e p ta n c e

T e s ts

T V

C Q u a lif ic a ti o n T e s t

S R

M I n s u la ti o n L o t

A c c e p ta n

T s ts

M e c h a n ic a l)

S R

M I n s u la ti o n M a te ri a l

C h a ra c te ri z a ti o n T e s ts

M e c h a n ic a l a n d T h e rm a l)

S R

M I n s u la ti o n E ro s io n T e s t

S R

M P

L I

L o t A c c e p ta n c e

T e s t

S R

M P

L I

M a te ri a l C h a ra c te ri z a ti te s t

S R

M S u b s c a le B a lli s ti c L o t

A c c e p ta n c e

T e s ts

S R

M S u b s c a le B a lli s ti

C h a ra c te ri z a ti o n T e s ts

S R

M I g n it e r P ro o f T e s t

S R

M I g n it e r S tr u c tu ra l T e s ts

S R

M I g n it e r B u rs t T e s t

S R

M C a s e

P ro o f

T e s t

S R

M C a s e

S tr u c tu ra l T e s t

S R

M C a s e

B u rs t

T e s t

S R

M S tr u c tu ra l T e s t

A rt ic le

S R

M I g n it e r O p e n A ir T e ts

S

M P y ro te c h n ic

C h a rg e

B K

N O

T e s ti n g

S R

M O

-R in g R e s ili e n c y T e s ts

S R

M F u ll-

S c a le S ta ti c T e ts

S

M S ta ti c I m b a la n c e

T e s t

T ri s o n ic

F o rc e a n d M o m e n t W in d u n n e l te s t

U n s te a d y A e ro

T e s ti n g

L a

R C o r

A R

C

M a c h

A e ro /R

C S

T e s t

(L a

R C

U n it a ry P la n

W in d T u n n e l (U

P W

T

F o rc e

/M o m e n t

T e s t

(L a

R C

H y p e rv e lo c it y F re e

F lig h t

A e ro d y n a m ic F a c ili ty

H F

F A

F

F re

F lig h t

T e s t

(A R

C

T ri s o n ic

W in d T u n n e l T e s t

(M S

F C

G ro u n d A c o u s ti c s T e s t

S o ft w a re

I n te g ra ti o n T e s ti n g

S o ft w a re

-F o rm a l Q u a lif ic a ti s ti n g

H a rd w a re

/S o ft w a re

I n te g ra ti s ti n g

S

IL

S o ft w a re

-F u n c ti o n a l C h e c k o u t w it h

I&

T

V ib e -2 n d s ta g e a v io n ic s b o x e s

V ib e -A v io n ic s S h e lf A s s e m b ly

INTEGRATED MAV VEHICLES

Engineering Model (EM) Unit Y Y Y Y Y Y Y Y ? Y Y Y Y Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - .

Flight Test (FT) Unit Y Y Y Y Y Y Y Y ? Y Y Y ? Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - - ACTION: 2nd Stage + Interstage Only

Flight Model (FM) Unit Y Y Y - Y Y Y Y ? - Y Y - Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - AT Thermal vac will be done before shipment to JPL. At KSC, ATLO

Assembly, Test, Launch Operations Y Y - - - Y Y Y ? - Y Y - Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - Analysis and test activies identified will occur before hardware is sent

INTERSTAGE AVIONICS DV

Avionics Instrumentation Sensors (TBR) Y Y Y - - - Y Y - Y - - - - Y**** Y Y Y - - Y Y Y - - Y - Y Y - - - - - - - - Y - Y Y Y Y Y Y Y Y

Command & Data Handling Coyote Flight Computer Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - - - - - Y - - - - - - - - - - - - - - - - - Y Thermal cycling included with vac

IMU Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y Extended environmental testing, Ground Testing of Nav FSW

RCS Controller Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y Thermal cycling included with vac, acoustic noise included with vibe.

MUC Board Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y

Pyro Controller Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y What about Radiation/Plasma testing?

Avionics Shelf Avionics Mounting Plate A - - - - Y Y Y - - - - Y - - Y Y Y Y Y Y Y

Avionics Board Chassis Y - - - - Y Y - Y** - - Y - - Y Y Y Y Y Y Y Thermal cycling included with vac, acoustic noise included with vibe

Transmitter Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y Thermal cycling included with vac

Power System -

Batteries Y Y - - - Y Y - Y - - - - Y**** Y Y Y Y Y Y Y

Power Cabling Y Y Y - - Y Y Y - Y - - - - Y**** Y Y Y Y Y Y Y

Power Umbilical Y Y Y - - Y Y Y - Y - - - - Y**** Y Y Y Y Y Y ?

Power Distribution Board Y Y Y - - Y Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y Tantalum capacitors may require Leak testing, or may be covered by

Cables and Harnesses (from AV Y Y -

Umbilical Connector Y Y - - - Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y

Cables and Harnesses Y Y - - - Y Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y

FORWARD STRUCTURE AVIONICS

Antenna Y Y - - - Y Y Y - Y - - Y Y Y Y Y Y Y Y Y Y FQT in lab with at least EDU; AT in SIL

Beacon Box Heater Y Y Y - - Y Y - Y - - - Y Y Y Y Y Y Y Y Y

Beacon Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

FSA Avionics Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

FSA Batteries Y Y - - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

FSA Timer Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

FSA Cabling Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

FSA Power Umbilical Y Y - - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

RF Switch Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

RF Switch Heater Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

Timer Heater Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y

PROPULSION

First Stage Solid Rocket Motor Q Q A

Aero Ramp QA - - - Q? - - - - - QA Q Q - - Y QA? Q? Q? Y*** - QA

SRM 1 Aft Dome Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****

SRM 1 Barrel Heaters Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****

SRM 1 Case QA Q - - Q? - - - - Y QA - Y - - Y Q? Q? Q? Y*** - QA A A? MV Q Functional verified by analysis, validated by full-scale qualification

SRM 1 Aft Closure Y Y - - - - - - - Y - - Y Y Y*** Y*** Y*** Y*** - - A A? MV Q

SRM 1 EDL Bracket Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - -

SRM 1 Forward Dome Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****

SRM 1 MLP Attach QA - - - Q? - - - - - QA Q Q - - Y QA? Q? Q? Y*** - QA A? Q

SRM 1 Nozzle QA Q - QA Q? - - - - - QA - Q - - Y QA? Q? Q? Y*** - QA Functional verified by analysis, validated by full-scale qualification

SRM 1 Nozzle Boss Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - -

SRM 1 Igniter 1 QA Q - - Q? - - - - Y - QA Q - - Y Q? Q? Q? Y*** - QA A A? MV Q MV Functional verified by analysis, validated by open air igniter tests.

SRM 1 Igniter 2 Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y***** A A? MV Q MV

SRM 1 Initiator 1 Q Y - - - - - Q - Y - - - - - Y Q Q Y*** Y*** - Y***** DV DV DV

SRM 1 Initiator 2 Q Y - - - - - Q - Y - - - - - Y Q Q Y*** Y*** - Y***** DV DV DV

SRM 1 Propellant Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - - A MV A MV

SRM 1 Insulation Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y A MV MV

Joint Seals (O-Rings, etc) A - - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - - MV Validation Tests

First Stage Thrust Vector Control A Q MV

TVC Controllers>>>TVC Y Y Y - Y Y Y - - Y - - - - - Y Y Y Y Y*** Y Y MV A Q

TVC Actuators Y Y Y Y Y - Y - - Y - - Y*** - - Y Y Y Y Y*** Y Y MV A Q

TVC Controller Heater Y Y Y - - Y*** - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****

TVC Thermal Battery Y Y - - Y - Y - - Y Y - - - - Y Y Y Y Y*** Y Y MV A Q

TVC Thermal Battery Initiator Y Y - - - Y - - Y - - - - - Y Y*** Y*** Y*** Y*** Y Y*****

TVC Thermal Battery Initiator Y Y - - - Y - - Y - - - - - Y Y*** Y*** Y*** Y*** Y Y*****

Second Stage Solid Rocket Motor Aft Skirt Structure Y - - - Y - - - - - Y Y Y - Y Y Y Y Y Y*** - Y

SRM 2 AFT Dome Heater Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

SRM 2 Barrel Heater Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

SRM 2 Case Y Y - - Y - - - - Y Y - Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by full-scale qualification

SRM 2 Forward Dome Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

SRM 2 Igniter Y Y - - Y - - - - Y - Y Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by open air igniter tests.

SRM 2 Initiator 1 Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

SRM 2 Initiator 2 Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

SRM 2 MLP Attach Y - - - Y - - - - Y Y Y Y - Y Y Y Y Y Y*** - Y

SRM 2 Nozzle Y Y - Y Y - - - - - Y - Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by full-scale qualification

SRM 2 Propellant Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - -

Joint Seals (O-Rings, etc) Y - - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - -

Despin Motor Assembly Despin Motor 1 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y

Despin Motor 1 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

Despin Motor 1 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Despin Motor 1 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Despin Motor 2 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y

Despin Motor 2 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

Despin Motor 2 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Despin Motor 2 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Spin Motor Assembly Spin Motor 1 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y

Spin Motor 1 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

Spin Motor 1 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Spin Motor 1 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Spin Motor 2 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y

Spin Motor 2 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****

Spin Motor 2 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

Spin Motor 2 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****

ISA Reaction Control System (RCS) Y Y -

Non-wetted Prop Line Y Y - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - ?

Pyro Valve Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y

Pyro Valve Heater Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - Y*****

Pyro Valve Initiator 1 Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y*****

Pyro Valve Initiator 2 Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y*****

RCS Filter Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - - RCS team proposed SMC-S-016 as the appropriate controlling spec.

RCS Service Panel Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -

Service Valve Y Y* - - - - Y Y - Y Y Y - - - Y Y Y Y Y - -

RCS Tank (MMH) Y Y* - - - - Y Y - Y Y* Y* Y*** - - Y Y Y Y Y - Y Pressure vessel random vibe is required for Q, ER for A. Designated

RCS Tank Heaters Y Y* - - - - Y Y - Y Y Y - - - Y Y Y Y Y - Y*****

RCS Thruster Heaters Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - Y*****

RCS Thrusters (5N / 22N ) Y Y* - Y Y - Y Y - Y Y* Y* Y*** - - Y Y Y Y Y Y Y

RCS Structures & Mounting Y - - - - - Y Y - Y - - Y*** - - Y Y Y Y Y - Y

RCS Lines - - - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -

Venturi Flowmeter Y - - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -

Wetted Prop Line Heaters Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - ?

STRUCTURES

Primary Structure Interstage Structure Y - - - - - Y Y - Y - - Y - Y Y Y Y Y Y - Y

Forward Structure Y - - - - - Y Y - Y - - Y - Y Y Y Y Y Y - Y

Separation System Y Y -

RUAG/NEAs Y Y - - - - Y Y - Y - - Y*** - - Y Y Y Y Y Y Y

Spring Assembly Y Y - - - - Y Y - Y - - Y*** - - Y Y Y Y Y - Y

Thermal Control System (TCS) -

Heaters Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y - Y***** Assumes one heater per zone

Temperature Sensors Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y Y Y***** Assumes 2 PRTs per zone

Multi-Layer Insulation (MLI), Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y - Y

Paints & Tapes Y - - - Y Y Y Y - Y - - - - Y Y Y Y Y Y - - Includes visibility paint on 2nd stage

Insulators (G10, etc.) Y - - - Y Y Y Y - Y - - - - Y Y Y Y Y Y - Y