J-4B Reference Document - Appendix 10.5 Master Test List.pdf
PDF 252 KB Posted
- Attached to
- Mars Ascent Vehicle Integrated System (MAVIS) Federal contract opportunity
- Solicitation number
- 80MSFC21R0001
About this file
This document contains a master test list for the Mars Ascent Vehicle (MAV) integrated system procurement. Key details include that the solicitation is for the MAV Integrated System (MAVIS) acquisition issued by NASA's Marshall Space Flight Center. The test list outlines the extensive testing required on components, subsystems, and integrated vehicles including engineering models, flight test articles, and flight models. Tests identified include inspections, functional testing, life testing, thermal vacuum chamber testing, vibration testing, shock testing, and environmental testing among many others. The list covers avionics, power systems, structures, thermal control systems, reaction control systems, propulsion elements, and integrated vehicle testing. Substantial qualification and acceptance testing is outlined for components and materials.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 80MSFC21R0001-P00001 MAVIS Amendment 01 Documents.zip | ZIP file | |
| MAVIS Pre-Proposal Conference Slides_19 AUG 2021.pdf | ||
| J-4A Applicable Documents.zip | ZIP file | |
| MAVIS RFP 80MSFC21R0001.pdf | ||
| Signed RFP Letter_MAVIS.pdf | ||
| Att L-1 EPM.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAV Master Test List Page 1 of 1
A
Assemblies N u m b e r o f
F lig h t
It e m s
N u m b e r o f
T e s t
It e m s
C ir c u it P ro te c ti o n a n d
W ir e S iz in g
T e s t
P ro g ra m
S S
E
M
F T
A
T L
O
F M
In s p e c ti o n
F u n c ti o n a l
B u rn -I n
W e a r-in /R u n
-i n
L if e
B a k e o u t (P
P /C
C
T h e rm a l V a c
T h e rm a l C y c le
C lim a ti c
P re s s u re
L a u n c h
D e c a y
M a rs
R e p re s s
L e a k
P ro o f
S tr u c tu ra l T e s t
M u lt ip a c ti n g /I o n iz a ti o n B re a k d o w n
S p in B a la n c e n d
S ta g e
O n ly
M a s s M e a s u re m e n ts
V ib ra ti o n
S h o c k
E D
L
L a n d in g
V
E C
T O je tt is o n s t
S ta g e
I g n it io n
Q u a s i-
S ta ti c A c c e le ra ti o n c o u s ti c N o is e
E M
I/ E
M C
G ro u n d /B o n d
S u b s y te m T e s ts
S e p a ra ti o n
B o lt C u tt e r
S e p a ra ti o n -B o lt C u tt e r
R e
-T e s t
S e p a ra ti o n -R
U A
G P u lle y T e s t
A m b ie n t/
T h e rm a l V a c
S e p a ra ti o n -N
E A
P u lle y T e s t
A m b ie n t/
T h e rm a l V a c
S ta g e
U m b ili c a l D is c o n n e c t
T e s t
B e llv ill e W a s h e r
S e p a ra ti o n -F la t
F lo o r
L if e c y c le
S ta ti c L o a d s
P lu m e
I n d u c e d a c o u s ti c s
L if to ff a c o u s ti c s
Ig n it io n O v e rp re s s u re
M o d a l S u rv e y
R C
S T h e m a l
A v io n ic s T h e rm a l
T P
S D e v e lo p m e n t
C o a ti n g D e v e lo p m e n t
T V
C P ro to ty p e T e s ts
T V
C C o m p o n e n t
A c c e p ta n c e
T e s ts
T V
C C o m p o n e n t
Q u a lif ic a ti o n T e s ts
T V
C A c c e p ta n c e
T e s ts
T V
C Q u a lif ic a ti o n T e s t
S R
M I n s u la ti o n L o t
A c c e p ta n
T s ts
M e c h a n ic a l)
S R
M I n s u la ti o n M a te ri a l
C h a ra c te ri z a ti o n T e s ts
M e c h a n ic a l a n d T h e rm a l)
S R
M I n s u la ti o n E ro s io n T e s t
S R
M P
L I
L o t A c c e p ta n c e
T e s t
S R
M P
L I
M a te ri a l C h a ra c te ri z a ti te s t
S R
M S u b s c a le B a lli s ti c L o t
A c c e p ta n c e
T e s ts
S R
M S u b s c a le B a lli s ti
C h a ra c te ri z a ti o n T e s ts
S R
M I g n it e r P ro o f T e s t
S R
M I g n it e r S tr u c tu ra l T e s ts
S R
M I g n it e r B u rs t T e s t
S R
M C a s e
P ro o f
T e s t
S R
M C a s e
S tr u c tu ra l T e s t
S R
M C a s e
B u rs t
T e s t
S R
M S tr u c tu ra l T e s t
A rt ic le
S R
M I g n it e r O p e n A ir T e ts
S
M P y ro te c h n ic
C h a rg e
B K
N O
T e s ti n g
S R
M O
-R in g R e s ili e n c y T e s ts
S R
M F u ll-
S c a le S ta ti c T e ts
S
M S ta ti c I m b a la n c e
T e s t
T ri s o n ic
F o rc e a n d M o m e n t W in d u n n e l te s t
U n s te a d y A e ro
T e s ti n g
L a
R C o r
A R
C
M a c h
A e ro /R
C S
T e s t
(L a
R C
U n it a ry P la n
W in d T u n n e l (U
P W
T
F o rc e
/M o m e n t
T e s t
(L a
R C
H y p e rv e lo c it y F re e
F lig h t
A e ro d y n a m ic F a c ili ty
H F
F A
F
F re
F lig h t
T e s t
(A R
C
T ri s o n ic
W in d T u n n e l T e s t
(M S
F C
G ro u n d A c o u s ti c s T e s t
S o ft w a re
I n te g ra ti o n T e s ti n g
S o ft w a re
-F o rm a l Q u a lif ic a ti s ti n g
H a rd w a re
/S o ft w a re
I n te g ra ti s ti n g
S
IL
S o ft w a re
-F u n c ti o n a l C h e c k o u t w it h
I&
T
V ib e -2 n d s ta g e a v io n ic s b o x e s
V ib e -A v io n ic s S h e lf A s s e m b ly
INTEGRATED MAV VEHICLES
Engineering Model (EM) Unit Y Y Y Y Y Y Y Y ? Y Y Y Y Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - .
Flight Test (FT) Unit Y Y Y Y Y Y Y Y ? Y Y Y ? Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - - ACTION: 2nd Stage + Interstage Only
Flight Model (FM) Unit Y Y Y - Y Y Y Y ? - Y Y - Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - AT Thermal vac will be done before shipment to JPL. At KSC, ATLO
Assembly, Test, Launch Operations Y Y - - - Y Y Y ? - Y Y - Y Y Y Y Y Y Y Y Y Y - - ? - - - - - - - - - - - - - - - - - - - - ? - - Y - - Analysis and test activies identified will occur before hardware is sent
INTERSTAGE AVIONICS DV
Avionics Instrumentation Sensors (TBR) Y Y Y - - - Y Y - Y - - - - Y**** Y Y Y - - Y Y Y - - Y - Y Y - - - - - - - - Y - Y Y Y Y Y Y Y Y
Command & Data Handling Coyote Flight Computer Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - - - - - Y - - - - - - - - - - - - - - - - - Y Thermal cycling included with vac
IMU Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y Extended environmental testing, Ground Testing of Nav FSW
RCS Controller Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y Thermal cycling included with vac, acoustic noise included with vibe.
MUC Board Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y
Pyro Controller Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y - - Y - - - - - - - - - - - - - - - - - Y What about Radiation/Plasma testing?
Avionics Shelf Avionics Mounting Plate A - - - - Y Y Y - - - - Y - - Y Y Y Y Y Y Y
Avionics Board Chassis Y - - - - Y Y - Y** - - Y - - Y Y Y Y Y Y Y Thermal cycling included with vac, acoustic noise included with vibe
Transmitter Y Y Y - - Y Y Y - Y - - - Y - Y Y Y Y Y Y Y Thermal cycling included with vac
Power System -
Batteries Y Y - - - Y Y - Y - - - - Y**** Y Y Y Y Y Y Y
Power Cabling Y Y Y - - Y Y Y - Y - - - - Y**** Y Y Y Y Y Y Y
Power Umbilical Y Y Y - - Y Y Y - Y - - - - Y**** Y Y Y Y Y Y ?
Power Distribution Board Y Y Y - - Y Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y Tantalum capacitors may require Leak testing, or may be covered by
Cables and Harnesses (from AV Y Y -
Umbilical Connector Y Y - - - Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y
Cables and Harnesses Y Y - - - Y Y Y - Y - - - Y Y**** Y Y Y Y Y Y Y
FORWARD STRUCTURE AVIONICS
Antenna Y Y - - - Y Y Y - Y - - Y Y Y Y Y Y Y Y Y Y FQT in lab with at least EDU; AT in SIL
Beacon Box Heater Y Y Y - - Y Y - Y - - - Y Y Y Y Y Y Y Y Y
Beacon Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
FSA Avionics Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
FSA Batteries Y Y - - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
FSA Timer Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
FSA Cabling Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
FSA Power Umbilical Y Y - - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
RF Switch Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
RF Switch Heater Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
Timer Heater Y Y Y - - Y Y Y - Y - - - Y Y Y Y Y Y Y Y Y
PROPULSION
First Stage Solid Rocket Motor Q Q A
Aero Ramp QA - - - Q? - - - - - QA Q Q - - Y QA? Q? Q? Y*** - QA
SRM 1 Aft Dome Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****
SRM 1 Barrel Heaters Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****
SRM 1 Case QA Q - - Q? - - - - Y QA - Y - - Y Q? Q? Q? Y*** - QA A A? MV Q Functional verified by analysis, validated by full-scale qualification
SRM 1 Aft Closure Y Y - - - - - - - Y - - Y Y Y*** Y*** Y*** Y*** - - A A? MV Q
SRM 1 EDL Bracket Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - -
SRM 1 Forward Dome Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****
SRM 1 MLP Attach QA - - - Q? - - - - - QA Q Q - - Y QA? Q? Q? Y*** - QA A? Q
SRM 1 Nozzle QA Q - QA Q? - - - - - QA - Q - - Y QA? Q? Q? Y*** - QA Functional verified by analysis, validated by full-scale qualification
SRM 1 Nozzle Boss Heater Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - -
SRM 1 Igniter 1 QA Q - - Q? - - - - Y - QA Q - - Y Q? Q? Q? Y*** - QA A A? MV Q MV Functional verified by analysis, validated by open air igniter tests.
SRM 1 Igniter 2 Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y***** A A? MV Q MV
SRM 1 Initiator 1 Q Y - - - - - Q - Y - - - - - Y Q Q Y*** Y*** - Y***** DV DV DV
SRM 1 Initiator 2 Q Y - - - - - Q - Y - - - - - Y Q Q Y*** Y*** - Y***** DV DV DV
SRM 1 Propellant Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - - A MV A MV
SRM 1 Insulation Y Y - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y A MV MV
Joint Seals (O-Rings, etc) A - - - - - - - - Y - - - - - Y Y*** Y*** Y*** Y*** - - MV Validation Tests
First Stage Thrust Vector Control A Q MV
TVC Controllers>>>TVC Y Y Y - Y Y Y - - Y - - - - - Y Y Y Y Y*** Y Y MV A Q
TVC Actuators Y Y Y Y Y - Y - - Y - - Y*** - - Y Y Y Y Y*** Y Y MV A Q
TVC Controller Heater Y Y Y - - Y*** - - Y - - - - - Y Y*** Y*** Y*** Y*** - Y*****
TVC Thermal Battery Y Y - - Y - Y - - Y Y - - - - Y Y Y Y Y*** Y Y MV A Q
TVC Thermal Battery Initiator Y Y - - - Y - - Y - - - - - Y Y*** Y*** Y*** Y*** Y Y*****
TVC Thermal Battery Initiator Y Y - - - Y - - Y - - - - - Y Y*** Y*** Y*** Y*** Y Y*****
Second Stage Solid Rocket Motor Aft Skirt Structure Y - - - Y - - - - - Y Y Y - Y Y Y Y Y Y*** - Y
SRM 2 AFT Dome Heater Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
SRM 2 Barrel Heater Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
SRM 2 Case Y Y - - Y - - - - Y Y - Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by full-scale qualification
SRM 2 Forward Dome Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
SRM 2 Igniter Y Y - - Y - - - - Y - Y Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by open air igniter tests.
SRM 2 Initiator 1 Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
SRM 2 Initiator 2 Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
SRM 2 MLP Attach Y - - - Y - - - - Y Y Y Y - Y Y Y Y Y Y*** - Y
SRM 2 Nozzle Y Y - Y Y - - - - - Y - Y - Y Y Y Y Y Y*** - Y Functional verified by analysis, validated by full-scale qualification
SRM 2 Propellant Y Y - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - -
Joint Seals (O-Rings, etc) Y - - - - - - - - Y - - - - Y Y Y*** Y*** Y*** Y*** - -
Despin Motor Assembly Despin Motor 1 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y
Despin Motor 1 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
Despin Motor 1 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Despin Motor 1 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Despin Motor 2 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y
Despin Motor 2 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
Despin Motor 2 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Despin Motor 2 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Spin Motor Assembly Spin Motor 1 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y
Spin Motor 1 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
Spin Motor 1 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Spin Motor 1 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Spin Motor 2 Y Y - - Y - Y ? - Y Y Y Y - Y Y Y Y Y Y*** Y Y
Spin Motor 2 Heater Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** - Y*****
Spin Motor 2 Initiator 1 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
Spin Motor 2 Initiator 2 Y Y - - - - Y ? - Y - - - - Y Y Y*** Y*** Y*** Y*** Y Y*****
ISA Reaction Control System (RCS) Y Y -
Non-wetted Prop Line Y Y - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - ?
Pyro Valve Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y
Pyro Valve Heater Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - Y*****
Pyro Valve Initiator 1 Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y*****
Pyro Valve Initiator 2 Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y Y Y*****
RCS Filter Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - - RCS team proposed SMC-S-016 as the appropriate controlling spec.
RCS Service Panel Y Y* - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -
Service Valve Y Y* - - - - Y Y - Y Y Y - - - Y Y Y Y Y - -
RCS Tank (MMH) Y Y* - - - - Y Y - Y Y* Y* Y*** - - Y Y Y Y Y - Y Pressure vessel random vibe is required for Q, ER for A. Designated
RCS Tank Heaters Y Y* - - - - Y Y - Y Y Y - - - Y Y Y Y Y - Y*****
RCS Thruster Heaters Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - Y*****
RCS Thrusters (5N / 22N ) Y Y* - Y Y - Y Y - Y Y* Y* Y*** - - Y Y Y Y Y Y Y
RCS Structures & Mounting Y - - - - - Y Y - Y - - Y*** - - Y Y Y Y Y - Y
RCS Lines - - - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -
Venturi Flowmeter Y - - - - - Y Y - Y Y Y Y*** - - Y Y Y Y Y - -
Wetted Prop Line Heaters Y Y* - - - - Y Y - Y - - - - - Y Y Y Y Y - ?
STRUCTURES
Primary Structure Interstage Structure Y - - - - - Y Y - Y - - Y - Y Y Y Y Y Y - Y
Forward Structure Y - - - - - Y Y - Y - - Y - Y Y Y Y Y Y - Y
Separation System Y Y -
RUAG/NEAs Y Y - - - - Y Y - Y - - Y*** - - Y Y Y Y Y Y Y
Spring Assembly Y Y - - - - Y Y - Y - - Y*** - - Y Y Y Y Y - Y
Thermal Control System (TCS) -
Heaters Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y - Y***** Assumes one heater per zone
Temperature Sensors Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y Y Y***** Assumes 2 PRTs per zone
Multi-Layer Insulation (MLI), Y Y - - Y - Y Y - Y - - - - Y Y Y Y Y Y - Y
Paints & Tapes Y - - - Y Y Y Y - Y - - - - Y Y Y Y Y Y - - Includes visibility paint on 2nd stage
Insulators (G10, etc.) Y - - - Y Y Y Y - Y - - - - Y Y Y Y Y Y - Y
File details come from the government source that posted it. Updated .