J-4 Price Proposal Spreadsheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Construction of New Airport Traffic Control Tower (ATCT) - Grand Forks, ND
Solicitation number
697DCK-26-R-00034
Issued by

About this file

The document is a Price Proposal Spreadsheet for the GFK Airport Traffic Control Tower (ATCT) Replacement Project located in Grand Forks, North Dakota. The spreadsheet provides a detailed pricing breakdown by construction division, with a total allowance of $325,000 covering materials, labor, overhead, profit, and bonding. The line items span typical construction categories including general requirements, concrete, masonry, structural steel, architectural elements, mechanical systems, electrical work, site preparation, and utilities.

This pricing document corresponds to FAA Solicitation Number 697DCK-26-R-00034, which seeks construction of a new Airport Traffic Control Tower and Base Building at Grand Forks International Airport. The Federal Aviation Administration's Southwestern Region is managing the procurement, with the solicitation posted under FAA Acquisition Management Policy. Potential bidders are required to review all attachments and can request additional documentation by contacting Erin M. Crabtree via email. The government emphasizes that this announcement does not guarantee procurement and will not reimburse vendors for proposal preparation costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL SPREADSHEET

GFK ATCT Replacment Project
Grand Forks, North Dakota
Pricing Breakdown Form
The Contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever to construct an Airport Traffic Control Tower located at the Grand Forks International Airport (GFK) in strict conformance with the solicitation/contract at the following prices (including OH & P):
ATCT Costs
ItemDivisionDescription$ Materials$ Labor$ Material & Labor
101General Requirements
201Permits
303Concrete - Cast In Place
403Concrete - Pre-Cast
504Masonry
605Structural Steel
705Cold Form Metal Framing
805Misc. Metals
906Rough Carpentry
1007Waterproofing Dampproofing Sealants
1107Cladding/Composite Panels
1207Roofing
1307Fire Proofing
1408Doors Frames Hardware
1508Entrances Storefronts
1608Windows
1708Louvers And Vents
1809Drywall
1909Tile & Stone
2009Acoustical Ceilings
2109Carpet Resilient Flooring
2209Wall Finishes
2309Painting And Wallcovering
2410Misc. Specialties Signage
2510Specialties
2610Lockers
2711Equipment
2812Window Treatment
2912Casework
3012Furnishings--$325,000* Allowance
3114Elevators Conveying
3221Fire Protection
3322Plumbing
3423HVAC
3526Electrical
3626Security
3731Site Prep
3832Site Improvements
3932Ductbank
4033Site Utilities
Subtotal$ 325,000.00
Overhead
Profit
Bond
Total