The file's text, extracted by GovTribe without its formatting.
Sheet1
GFK QUESTIONS AND ANSWERS
| 1 | Is it expected to return this entire Solicitation 89 pages filled in where indicated. Documents as instructed in Section “K” Would the completion of the above be considered a completed Proposal or do you need a separate “Technical Plan” as well? Your comments how we can streamline our proposal for continuity would be helpful. Example, a Table of Contents. |
| FAA Response: The requirement is for an Offerer to fill box 14, enter amount in box 14, acknowledge all amendments in box 19 (if applicable), fill in boxes 20A, 20B and 20C, complete fill-in clauses in Section K, and provide all necessary documents in accordance with Section L. |
| 2 | Location of Grand Rapids is listed in the Statement of Work. Is this the correct location? |
| FAA Response: Page 5 of J-1 Statement of Work is hereby corrected to reflect the correct location as: 2715 Airport Drive, Grand Forks, ND 58203. |
| 3 | Section L – Instructions to Offerors, Volume II, Factor 1: Past Performance states, “Offerors must provide three (3) completed Past Performance Questionnaires (PPQs) for contracts that are “recent” and “relevant” as defined in this Solicitation.” “Recent” appears to be defined as projects completed within the last five years. Please confirm. The definition of “relevant” does not appear to be specified in the solicitation. Please advise what solicitation section, sub-paragraph, and/or page the “relevant” definition is located. |
| FAA Response: The following definitions will be added as an amendment to the request for proposal. |
| Recent: Contracts completed or substantially completed within the last ten (10) years from the date of this Solicitation. |
| Relevant: Completed or substantially completed contracts that are similar in terms of size and complexity to the subject requirement. |
| 4 | Section L – Instructions to Offerors, Volume II, Factor 1: Past Performance states, “Offerors may re-use PPQs completed for other solicitations so long as the project itself is relevant and was completed within the last five years.” Prime Contractor Offeror requests the FAA consider substantially complete projects of 80% complete or greater as acceptable past performance where the projects meet all relevancy requirements and submission of PPQs, but have not yet reached final completion. This will enable greater competition amongst Prime Contractors with recent, relevant past performance where only fit-out and close-out activities remain. Please note that there is only one FAA project with NAICS code 236220 completed in the past 5 years $60M or greater, and only five FAA projects with NAICS code 236220 completed by 3 Prime Contractors in the past 5 years $25M or greater |
| FAA Response:The FAA will accept substantially complete projects of 80% complete or greater. |
| 5 | Section L – Instructions to Offerors, Volume II, Factor 6: Major Subcontracting Plan states, “For each major subcontractor, provide relevant experience within the last fifteen (15) years having a total project dollar value of $10M or more in commercial, industrial, or non-resident building construction.” Please confirm the $10M or more total project dollar value relates to the complete, full project cost by the Prime Contractor, and not a subcontract value of $10M or more by the major subcontractor. Please note that there has only been one subcontract greater than $10M on a FAA project in the last 15 years. Considering this fact, the Prime Contract only being $60M - $70M, and Grand Forks, ND being a rural location, Prime Contractor Offeror requests the FAA consider the $10M or more total project dollar value be related to the Prime Contract which the major subcontractor was a part of. |
| FAA Response: Yes, confirmed, the $10M total project dollar value may be related to the Prime Contract which the major subcontractor was a part of. |
| 6 | The drawings (Attachment J-2a) provided by the FAA appear to have integral security/certifications that prevent the use of software to markup the drawings or perform takeoffs. Please consider reissuing the drawings without this security so that Subcontractors may perform takeoffs. |
| FAA Response: Will provide drawings without the securities. |
| 7 | Please supply the Geotechnical report for this project. |
| FAA Response: Geotechnical report to be provided. |
| 8 | Please confirm is the Storm Sewer PVC piping shown on GFK-E-ATCT-C301 between Column Lines 10-11 and H-I is new or existing piping. |
| FAA Response:I think the pipe that is being referred to is the PVC underdrain. If so, it is proposed (new). |
| 9 | GFK-E-ATCT-C020 states that existing fuel lines will be removed by CHS for a cost of $50,000. As the quote was solicited directly by the FAA without Proposing Contractors having the opportunity to review scope, please confirm that this is an allowance, and any cost overruns will be compensable. |
| FAA Response: Yes, Contractor to include an allowance of $50,000 for this item. Contractor will be reimbursed for the actual cost of work. |
| 10 | The control cab details on sheets A671 and A672 show curtainwall framing installed at the cab glass units in reverse. The exterior pressure plate that both holds lateral load of the glazing and keeps air and water out of the curtain wall system and ATCT cab space is located on the interior. This cannot be constructed as shown and will need to be reversed in order to deliver a structurally sound, weatherproof, and warrantable system. Please confirm reversing this framing and locating the curtain wall pressure plate to the exterior of the building is acceptable. |
| FAA Response: Details to remain as shown. Exp will review and coordinate detail with successful bidder after award. |
| 11 | The ornamental specification 057000 section 2.1 provides products and manufacturers for the SCR-02 aluminum screen assembly but does not provide a manufacturer for SCR-01. Please confirm basis of design for SCR-01. |
| FAA Response: Fabricators for SCR-01 and SCR-02 listed in 2.1.C. |
| 12 | Please provide a detailed list of what is included in the $325,000 allowance for Furnishings shown on the Price Proposal Spreadsheet. |
| FAA Response: This is to cover the furniture that is called out on A721 as OFOI |
| 13 | The RFO document dated 1/7/2026 requires bidders to comply with the requirements of Volume II, Factor 5: Quality Assurance on page 87. These requirements include the exterior metal panel system. Is the 057000 SCR-01 and SCR-02 cladding considered an "exterior metal panel system" for the purposes of this requirement? |
| FAA Response: Yes, the quality assurance requirement applies to both specification sections 074213.23 and 057000 for the purposes of this requirement. |
| 15 | Base building elevations, sections, and details (ref, A642) call for a 15' tall storefront system with a single intermediate horizontal mullion but detail 1 on A642 describe the sunshade attaching back to the "pressure bar" of the glazing system. Pressure bars are a curtain wall component (storefront have glass stops and glass stops cannot be penetrated without voiding the warranty) and the rule of thumb for storefront systems is not to exceed 10' in height. Is it acceptable to provide a 15' curtain wall with an integrated sun shading system at the base building ILO of oversized/custom storefront and independent sun shading system? The manufacturers listed in section 2.2 of spec 084113 can all provide a curtain wall with integrated sunshade. |
| FAA Response: Yes, it is acceptable to provide a curtainwall system with integrated sun shading system. Notes on sheets A104, A112-113, A201-A203, A404, A481-A486, A531, A551-A552, A556-A557, A611-A612, A631, A641-A646, A682, A751-A752 should be revised to replace "storefront" with "curtainwall". Per A642, system is an aluminum curtainwall. |
| 16 | On GFK-E-ATCT-C020, Keynotes 3B, 6A, 7A and 8A/B/C are all not shown on the demolition layout. Please clarify if these keynotes are required, and if so, issue a revised drawing. |
| FAA Response: Keynote 3B is for valve and valve box removal. There is a gate valve and box to be removed at grid 3C, however it is not labeled with the keynote, but rather a callout stating to remove the valve. |
Keynote 6A is remove natural gas line. There are natural gas line removals but are not called out with the keynote, but rather with a label.
Keynote 7A is fuel pipeline removal. There is a labeled callout showing the location and length of fuel pipeline removal to be removed by CHS.
Keynotes 8A, 8B, and 8C are related to bollards, card reader, and signs. The bollard removal is called out specifically without the use of the key note.
| 17 | Note 15 on sheet GFK-E-ATCT-S100 calls for 3 lb/cy synthetic macro fiber reinforcement whereas specification section 03 3000-2.10-C8 calls for a minimum of 5 lb/cy dosage rate. Which application rate is correct for the interior slab-on-grade? |
| FAA Response: Use specification requirement 5pcf. Values provided are a range, to be reviewed against final submitted mix designs. |
| 18 | Foundation note 3/GFK-E-ATCT-S001 states that all exterior or perimeter foundations shall bear at a minimum depth of 72 inches below the outside finished grade. Sheets S101 and S102 state the top of exterior or perimeter building foundations is at -4'-6" typical. Please clarify the top of the perimeter building foundations. |
| FAA Response: Bottom of footing depth per geotechnical report requirements and details on S611 should be a minimum of 72" below outside finished final grade. Finished grade roughly 6" below finish floor adjacent to building (thus t/ftg approx -5'-0" from finish floor, to be verified with final grading). |
| 19 | General Note 6/S101 states the top of interior column foundations elevation is at -1'-0" UNO. Please confirm this note should read -3'-6" typical to match the plan note at interior column location B2. |
| FAA Response: Note should read -3'-6" typical to match plan elevation callout. Minimum bottom of footing bearing 60" below finish floor in heated areas per geotechnical report. |
| 20 | Foundation note 13/GFK-E-ATCT-S001 notifies the bidder that results of the soluble sulfate testing indicate the presence of severe soil sulfate concentrations. Concrete elements in permanent contact with the soil shall have modified mix designs meeting the requirements and recommendations of the geotechnical report, ACI 318 and the project specifications. Meeting project specifications with use of a Type V or Type IL(HS) is not considered a modification. Does the geotechnical report require concrete with greater sulfate resistance than what is outlined in current specification? |
| FAA Response: Geotechnical report does not require any greater resistance than currently outlined in specification. Geotechnical report to be provided. |
| 21 | Specification 03 3000-2.2-F7 calls for permeability reducing admixture capable of reducing water absorption of concrete exposed to hydrostatic pressure (PRAH). |
| FAA Response: Permeability reducing admixture is not required, section 2.9.C.4 notes to use where indicated. No locations were specifically indicated to be required within the concrete mixtures. |
| 22 | 1) Please confirm the Owners testing agency will conduct all associated testing. |
| FAA Response: Confirmed. |
| 23 | 2) Please provide admixture dosage rates for various foundation mixes utilizing Type V or Type IL (HS) cement. |
| FAA Response: Admixture dosage rates determined by batch plant to ensure compatibility of materials, mix design and performance with local source availability and site installation demands. |
| 24 | 3) Please provide geotechnical data for reference to water table elevations and dewatering recommendations |
| FAA Response: Geotecnhical report included with Addendum 01. |
| 25 | Specification 03 3000-3.10-C2 says to cure concrete containing color pigments in accordance with the color pigment manufacturer's instructions. Please confirm the project does not include integrally colored or stained cast-in-place concrete. |
| FAA Response: No integral concrete color pigmentation in project. |
| 26 | Specification 07 1900-2.1 calls for a colored film-forming water repellent to match the architect's sample. Please specify a color for bidding purposes. Reference sheet GFK-E-ATCT-A201 and details 7/A613, 2/A645, 3/A661, 11/A752. |
| FAA Response: Color will be a custom white color to match Architect's sample, not a manufacturer's standard color. Architect will provide sample of color to successful bidder. |
| 27 | The west jamb at the south fire rated glass assembly shown in detail 5/A655 illustrates steel framing members color matched to the concrete wall. Please clarify the color of the concrete wall and whether the color is integral to the concrete mix. |
| FAA Response: Reference spec section 07 1900 for pigmented water repellant to be applied to the concrete. Color will be a custom white color to match Architect's sample, not a manufacturer's standard color. Architect will provide sample of color to successful bidder. |
| 28 | The finish schedule on sheet A531 (Note 2) indicates concrete moisture tests are required on all slabs where finish materials are scheduled. Record passing moisture levels prior to the start of installation. Passing moisture levels are not referenced in plan or spec. Please specify acceptable moisture levels for concrete surfaces and confirm testing is completed by Owner testing agency. |
| FAA Response: Reference specifications for moisture testing requirements where applicable. Moisture testing is by the Contractor. |
| 29 | The vehicle barrier specification section 34 7113-3.2-A states that bollards shall terminate a minimum of 60" below finished grade and continue 48 inches above finish grade. Details on C403 are in alignment with the specification. However, detail 3/A752 is not. Please clarify if the architectural bollard details can be followed when they fall short of the specification requirements. |
| FAA Response: Bollards to extend a minimum of 60" below finished grade per specification section 34 7113 and details on C403. |
| 30 | Wind stabilization anchors are required at the face of the concrete core wall per detail 1/A696. This detail references detail 23/A281 for anchor locations. Sheet A281 was not issued with the bid documents; please provide it. Please confirm anchors can be accurately quantified on the exterior maintenance elevation prints at levels 3,5, 7 & 9. Please confirm anchors are not required at levels 2, 8 & 11 as referenced in detail 1/A696. |
| FAA Response: Note revised to read "Reference A211-A214 for locations." Remove "detail 23/A218" and replace with "A211-A214". |
| 31 | Please provide specifications for the wind stabilization anchors used as part of the Exterior Maintenance System (reference A-696). |
| FAA Response: Reference specification 11 0806 Exterior Building Maintenance System. Wind stabilization anchors to be delegated design per specification section 110806 2.2.A. |
| 32 | Drawing GFK-E-ATCT-S101 notes the top of the foundation wall at -1'-0". Foundation wall details 5+6/S611 show the top of the foundation wall at 0'-0". Please confirm the top of wall is at elevation 0'-0". |
| FAA Response: Top of foundation wall to be at 0'-0" in accordance with details 5 and 6/S611 |
| 33 | Please confirm the slab-on-grade in Area D is 7-inches thick. Reference 2/S103. |
| FAA Response: Slab-on-grade in Area D to be 7in thick. |
| 34 | Please provide an asphalt spec for the replacing of Asphalt Pavement shown on sheet GFK-E-ATCT-C402. |
| FAA Response: HMA shall be in accordance with FAA 40, 42, 43, or 45; PG58-28; and ordinary compaction in accordance with the 2025 North Dakota Department of Transportion Standard Specifications for Road and Bridge Construction. |
| 35 | Please provide a spec for the interior fire rated curtain wall, ref. GFK-E-ATCT-A655. |
| FAA Response: Basis of design product TGP Firelite Plus, or approved equal. |
| 36 | In the curtain wall spec 084413, there is reference to Windborne-Debris-Impact-Resistance Performance and Large/Small missile testing however, insulated glass units are required to be 1" thick not 1-5/16" thick required for impact systems. Please confirm if glass shall be impact resistant and 1-5/16" thick or 1" thick and non-impact resistant. |
| FAA Response: Windborne debris impact resistance performance is not applicable. Remove 084413 1.7.E. |
| 37 | Drawing FP001, Fire Protection Note 18 mentions Seismic bracing. Please confirm that seismic bracing is required as project is not located in a seismic zone. |
| FAA Response: Confirmed. Seismic bracing is not required. |
| 38 | Reference specification 084113, please confirm stamped calcs can be provided after design approval. There are conflicting requirements in division 8 specifications. |
| FAA Response: Calculations should be provided with shop drawing submittal. Stamp can be provided after final shop drawing approval. |
| 39 | General performance section of spec 084113 requires a full-size lab performance mock-up. The manufacturers and products listed are Prested Systems. Please confirm if the lab mock-up requirement can be waived if existing testing reports are provided. |
| FAA Response: Yes, mockup requirement can be waived if existing test reports are provided. |
| 40 | Please remove the performance requirement language stating that the owner will not be responsible for costs incurred if the structural design is inadequate within spec 084413. Bidders cannot be held responsible for inadequate design costs on a fully designed plan/spec bid. |
| FAA Response: Revise first sentence of 1.7A. to read "Changes to Building Structural Frame: If required by delegated engineering, submit request for changes to building structural frame to Architect, including any costs associated with modifications to structural frame." Remove "Construction cost associated with change shall be at no additional cost to Owner." |
| 41 | Please confirm if an alternate round metal chamber system would be acceptable ILO a plastic chamber system shown on C303. Additionally, please provide the following information, regardless of the answer to the first part of this question. |
| FAA Response: Metal chambers are not approved equal due to corrosive properties of soil. |
| 42 | Is there a specific storage volume that needs to be stored below the outlet? |
| FAA Response: The minimum has been provided. |
| 43 | Is the water below the outlet intended to infiltrate? If infiltration is not intended, is there a min. thickness of stone required? |
| FAA Response: Infiltration is required. |
| 44 | Does the stone provide a water quality benefit? |
| FAA Response: No. Water quality was included in the stormwater pond. |
| 45 | Is there a minimum footprint required? |
| FAA Response: Yes, minimum footprint has been identified on the drawings. |
| 46 | Are there any site constraints or design requirements that have not been identified for this system? |
| FAA Response: No. |
| 47 | Sound transmission mitigation seems to be required at exterior glazing systems but no specifics are given. What STC rating is required at exterior glazing systems? |
| FAA Response: Sound transmission at exterior glazing is not required. Remove 1.7.L from 08 44 13. |
| 48 | The special NiS warranty in Specification 088000 is only available on tempered/heat-soaked glass but the glass makeups do not specify tempered/heat-soaked glass.. Please clarify requirement and glass type. |
| FAA Response: Remove 1.11.B.2 from 088000. |
| 49 | Per the cleaning and protection section in Specification 088000, it is not advised to install streamers on the exterior of the glass. Will signs on the interior be sufficient to meet this requirement? |
| FAA Response: Cleaning and protection is considered means and methods. |
| 50 | Per the cleaning and protection section in Specification 088000, please define protection of glass. Does a film need to be installed on the exterior and interior? |
| FAA Response: Protection of glass is considered means and methods. |
| 51 | Please consider removing the construction procedure submission in Specification 084300, as Contractors will only be selecting from approved off-the-shelf productions already in the specification. |
| FAA Response: Please clarify. Specification 084300 does not exist in our issuance. |
| 52 | Please confirm what "VSS" stands for on the fire alarm riser diagram shown on F600 and confirm if this is to be monitored by the fire alarm panel? |
| FAA Response: This stands for Valve Supervisory Switch and needs to be monitored by the fire alarm panel per the riser diagram on F600. |
| 53 | Please confirm who is to provide the tamper/flow annunciator for the sprinkler system. |
| FAA Response: The general contractor is responsible for the complete system. Tamper/Flow switches are typically provided by the Fire Alarm contractor. |
| 54 | Please clarify who is to provide the smoke control panel for the stair pressurization. |
| FAA Response: The General contractor provides control panel with gateway to Building automation system. |
| 55 | Please confirm that the elevator pressurization is to be included on the smoke control panel. |
| FAA Response: Correct. Elevator pressurization will be included on the stair pressurization panel. |
| 56 | Please clarify whether the firefighter telephones or the ERCES system are required. |
| FAA Response: Radio coverage is required. ERCES is required if radio coverage is not adequate after building evaluation according to specification 28 0537. Firefighter telephones are not required when radio coverage per NFPA 72 and 1221 is met. |
| 57 | The Fire Alarm spec requires the fire alarm system to be standard notification. Drawing F000 states that when no subscript is shown, the specifications apply; however, Drawing F600 indicates that the fire alarm panel shall include voice capability. Please clarify whether a standard system or a voice system is required. |
| FAA Response: The fire alarm system shall include voice capability. |
| 58 | Please confirm who is responsible for providing the Knoxbox and if it needs to be monitored. |
| FAA Response: The General contractor provides the knox box; the fire alarm contractor connects the knox box to the fire alarm system as shown on F600 FIRE ALARM RISER DIAGRAM. |
| 59 | Please confirm the maximum temperature of in-place mass concrete is 160 degrees Fahrenheit, reference S001 Concrete Note 21D and specification 03 3000-3.10-B-1a. |
| FAA Response: "Maximum temperature in concrete after placement shall not exceed 160F" |
"Maximum temperature difference between center and surface of placement shall not exceed 35F" per ACI 301-20, Section 8.
| 60 | Specification 03 3000-3.10-D-2c provides instruction for curing polished concrete floors. The finish schedule on A531 does not denote any polished concrete surfaces. Please confirm polished concrete floor surface is not required. |
| FAA Response: Polished concrete floor surface is not required. Remove 03 3000 3.10.D.2.c. |
| 61 | The ATCT contains two elevated 36-inch mat slabs. Per the Finish Schedule (A531), most of the 9th and 10th level flooring requires moist cure per specification 03 3000-3.10-D for finish flooring. ACI 207-4.4 states mass concrete should not be saturated when it is exposed to freezing temperatures. Please confirm that mass concrete does not require wet/moist cure. |
| FAA Response: By ACI 207.1-21, section 5.4, we will recommend use of a liquid membrance curing compound for curing of mass concrete. |
| 62 | Concrete Note 21F on sheet S001 states concrete mixes with a cement content exceeding 600 LBS/CY qualify as mass concrete. Please clarify if cement content is limited to various types of Portland Cement or if it is inclusive of all supplementary cementitious materials. |
| FAA Response: Inclusive of all SCM. |
| 63 | Please consider extending the maturity date of mass concrete mix designs to 56 or 90 days. This will allow for a lower cementitious heat profile while meeting structural requirements. |
| FAA Response: Accepted for mass concrete per section 1.1 of ACI 201.1-21 |
| 64 | Please confirm all FOC duct bank from EX-HH-26 to CON-2 is to be removed per the 'Removal Duck Bank, Remove Cable, & Duct Bank to Remain' demarcation line on drawing GFK-E-ATCT-E-107 at 7I. |
| FAA Response: On sheet GFK-E-ATCT-E-107, the duct bank on the north side of the road indicated in red is to be removed. The duct banks on the east side of Airport Drive (indicated in orange and green) is to remain. |
| 65 | Please extend the Solicitation Question deadline by two weeks to February 20th, 2026. |
| FAA Response: N/A |
| 66 | Contract Documents dated October 18th 2024 are labeled “Issued for Bid.” Please advise if the FAA will be issuing the “For Construction” set prior to the bid due date. |
| FAA Response: No. Issue for Construction set will be issued to the successful bidder. |
| 67 | Please advise if a formal Bid Guarantee / Bid Bond is required for the project as stated in the Solicitation Cover Page section 13 B or if just a letter from the Surety providing adequate bonding capability in an equal amount to or exceeding the estimated price range disclosed in the Solicitation per Volume 1: Business Proposal is all that is needed. |
| FAA Response: A letter from the Surety demonstracting adequate bonding capability and Offeror agrees to honor their proposal for the 90 days as listed in the Solicitation. |
| 68 | Specification - Summary of work: 01 1000 1.10 Permits and Fees Paragraph A: states “Contractor shall be responsible for obtaining all required permits and pay for all associated costs for this project.” |
| FAA Response: Correct. |
| 69 | Please define what the costs are for the local or FAA permits associated with the project. |
| FAA Response: No FAA permits are required. Excavation Permit 2 X $50 (One for sanitary sewer and one for watermain). Stormwater Pollution Permit: $150 base fee and $20/acre) |
| 70 | Please provide Geotechnical Report referenced in the Structural Drawings utilized to determine the sub-surface conditions of the site and verify installation requirements for the Structural Foundation System. |
| FAA Response: Geotecnhical report included with Addendum 01. |
| 71 | Please advise if there was an Environmental Assessment performed at the existing site and if any known contamination were found that would need to be removed / abated prior to standard construction efforts beginning. |
| FAA Response: Yes, an EA was performed. See Section 1.5, Paragraph I of the Statement of Work for handling of PFAS contaminated top soil and groundwater. |
| 72 | Bid schedule shows a Pre-Populated $325,000.00 for the Division 12 Furnishings. Please advise if this value is to cover the Furniture that is called out on A721 as OFOI or if this allowance is scheduled for any other portion of work in the contract documents. |
| FAA Response: Confirmed. |
| 73 | Specification “Summary of Work 01 1000: 1.2 A states “All work shall be performed in accordance with the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines and covered by a Manufacturers minimum 20-year No Dollar Limit (NDL) system warranty. Work consists of, but is not limited to, the following….” |
| It is not typical to have this type of 20-year warranty on a project in its entirety but appears to be a typo from a typical roofing warranty. |
| Please verify this section is in error and that the warranty period in the other specifications (ie Spec 01 0300 “Special Provisions” and Spec 01 6000 “Product Requirements”) should be followed for appropriate warranty terms. |
| FAA Response: Revise specification 01 1000 section 1.2.A to remove "20-year" and replace with "1-year". Add "unless specified otherwise". |
| 74 | On the solicitation Cover Pages, specifically Continuation Sheet 3 of 89 lists 00001 – 00008 as separate line items. There are no instructions provided to break out costs between these CLIN / Item numbers and some of the Item Numbers don’t appear to be specific to this project (ie 00005 East RTR shelter). Please verify this pricing continuation sheet should be ignored and the Excel File J-4 “Price Proposal Sheet” should be the format utilized for submitting pricing. |
| FAA Response: 00001 - 00008 line items listed on page 4 of the solicitation are for internal funding lines of accounting only. No costs are required to be documented on these line items. Attachment J-4 is to be used for pricing proposal. |
| 75 | Both the specifications and notes on the structural drawings direct reference to the Geotech report. However, there is no Geotech report in the bidding documents to reference. Will the soil report be released as an addendum? |
| FAA Response: Geotecnhical report included with Addendum 01. |
| 76 | At the pre con meeting it was stated that all ground water is to be pumped into the proposed storm water holding pond does this included surface water as well? Also, there is no reference of this in writing in the spec, will this fact be stated via an addendum? |
| FAA Response: See Section 1.5, Paragraph I of the Statement of Work for handling of PFAS contaminated top soil and groundwater |
| 77 | Regarding the removal of existing 8” AC (assuming asbestos concrete or asbestos containing) watermain called out on C010 and C020 is it the responsibility of the earthwork contractor to hire an asbestos abatement company for the removal of said pipe or will the owner be responsible for the abatement? |
| FAA Response: Contractor is responsible for the abatement. |
| 78 | At the pre con meeting it was stated that all excess native soils not used for the project are to be retained on the airport’s property. If so, where will the designated dump site be located? Also, there is no reference of this in writing in the spec, will this fact be stated via an addendum? |
| FAA Response: Yes, an EA was performed. See Section 1.5, Paragraph I of the Statement of Work for handling of PFAS contaminated top soil and groundwater. |
| 79 | On Sheets C301 and C302 there is a red hatching around the ends of the underground chamber system. I can’t seem to find any notes on what this might be. Please clarify. |
| FAA Response: This is the rock aggregate around the chambers. The aggregate was masked in the middle of the chambers so the draintile was more apparent, however the rock is around all of the chambers. |
| 80 | Sheet S601 shows compacted engineered base under the pile cap. Is there a required thickness on this? I’m assuming the geotechnical report might answer this but the Geotech report was not provided with the bidding documents. |
| FAA Response: Refer to sheet general note 5 on S051, 12" to 18" approximately. Geotecnhical report included with Addendum 01. |
| 81 | Can on-site excavated material be used as fill in the building area up to the prescribed granular base shown on S611? This might also be answered in the geotech report that is missing from the bidding documents. |
| FAA Response: Reuse of existing on-site fill within the building footprint is not allowed. Refer to Foundation general notes 8-13 on S001. Geotecnhical report included with Addendum 01. |
| 82 | Which specifications should the tamper/flow annunciator system be submitted on and what contractor should be responsible for said tamper/flow annunciator system related to the sprinkler system? |
| FAA Response: The general contractor is responsible for the complete system. Tamper/Flow switches are typically submitted with the fire alarm system by by the Fire Alarm contractor. |
| 83 | Please clarify who is providing the smoke control panel for the stair pressurization and what specification should it be submitted under? |
| FAA Response: The General contractor provides control panel with gateway to Building automation system. |
| 84 | Is the elevator pressurization supposed to be included on the smoke control panel? |
| FAA Response: Correct. Elevator pressurization will be included on the stair pressurization panel |
| 85 | On page F600, what is the VSS stand for on the fire alarm riser diagram? Is it to be monitored by the fire alarm panel? |
| FAA Response: This stands for Valve Supervisory Switch and needs to be monitored by the fire alarm panel per the riser diagram on F600. |
| 86 | Are the fire fighter telephones and the ERCES system both required, or one of them? If you have the radio enhancement system, you don’t need the fire fighter telephone. Please clarify. |
| FAA Response: Radio coverage is required according to specification 28 0537. Firefighter telephones are not required when radio coverage per NFPA 72 and 1221 is met. |
| 87 | Please clarify the fire alarm spec. The spec states that the fire alarm system has standard notification, and page F000 states that if no subscript, follow spec, but on page F600 on the riser it says fire alarm panel shall have voice functionality. Please clarify if the system should be Standard or voice? |
| FAA Response: The fire alarm system shall include voice capability. |
| 88 | Who is supplying / what specification should the Knoxbox be submitted under. |
| FAA Response: The General contractor provides the knox box. |
| 89 | Are the Knoxbox’s required to be monitored from the Fire Alarm System? |
| FAA Response: The fire alarm contractor connects the knox box to the fire alarm system as shown on F600 FIRE ALARM RISER DIAGRAM. |
| 90 | Can we get an electronic set of drawings from the Architect with permissions to add markups so I can perform my takeoffs electronically? |
| FAA Response: Will provide drawings without the securities. |
| 91 | Please provide a copy of the Pre-Bid Sign in Sheet |
| FAA Response: Site visit attendee list will be added to SAM.gov posting. |
| 94 | Specification - Summary of work: 01 1000 1.10 Permits and Fees Paragraph A: states “Contractor shall be responsible for obtaining all required permits and pay for all associated costs for this project.” |
| Please define what the costs are for the local or FAA permits associated with the project. |
| FAA Response: No FAA permits are required. Excavation Permit 2 X $50 (One for sanitary sewer and one for watermain). Stormwater Pollution Permit: $150 base fee and $20/acre) |
| 95 | Please provide Geotechnical Report referenced in the Structural Drawings utilized to determine the sub-surface conditions of the site and verify installation requirements for the Structural Foundation System. |
| FAA Response: Geotecnhical report included with Addendum 01. |
| 96 | Please advise if there was an Environmental Assessment performed at the existing site and if any known contamination were found that would need to be removed / abated prior to standard construction efforts beginning. |
| FAA Response: Yes, an EA was performed. See Section 1.5, Paragraph I of the Statement of Work for handling of PFAS contaminated top soil and groundwater. |
| 97 | Bid schedule shows a Pre-Populated $325,000.00 for the Division 12 Furnishings. Please advise if this value is to cover the Furniture that is called out on A721 as OFOI or if this allowance is scheduled for any other portion of work in the contract documents. |
| FAA Response: Confirmed. |
| 98 | Specification “Summary of Work 01 1000: 1.2 A states “All work shall be performed in accordance with the specifications and drawings and shall be completed in strict accordance with the manufacturer’s guidelines and covered by a Manufacturers minimum 20-year No Dollar Limit (NDL) system warranty. Work consists of, but is not limited to, the following….” |
| It is not typical to have this type of 20-year warranty on a project in its entirety but appears to be a typo from a typical roofing warranty. |
| Please verify this section is in error and that the warranty period in the other specifications (ie Spec 01 0300 “Special Provisions” and Spec 01 6000 “Product Requirements”) should be followed for appropriate warranty terms. |
| FAA Response: Revise specification 01 1000 section 1.2.A to remove "20-year" and replace with "1-year". Add "unless specified otherwise". |
| 99 | How do you plan to handle the high-performance KVM extension between the Base Building and the Tower Cab without it becoming a massive headache. |
| Usually, engineers tell me that keeping latency near zero while managing that distance is the single most frustrating part of these builds, so I’m wondering if you have already completely solved that challenge? |
| FAA Response: The design is not calling for the use of KVM. |
100 Attached is a substitution request for Allegion’s equivalent door hardware for Grand Forks Airport Traffic Control & Base.
Approval of Allegion’s equal products will provide a more competitive bid.
We have local distributors in the area looking to bid this project with Allegion.
FAA Response: Only manufacturers listed in specification 087100 will be permitted.
| 101 | Please provide the airspace study alluded to in Note 19 on G200 |
| FAA Response: There is not mention of an airspace study in Note 19 |
| 102 | Please confirm no construction can begin until the rerouting of the fiber optics from HH20 to the existing ATCT on C020 is complete. |
| FAA Response: Schedule sequencing is to be determined by the contractor. |
| 103 | Please provide the environmental report or confirm that all existing materials and soils on site are not contaminated. |
| FAA Response: An EA was performed. See Section 1.5, Paragraph I of the Statement of Work for handling of PFAS contaminated top soil and groundwater.. |
| 104 | Foundations Note 8 on S001 states that an estimated 2 to 9 feet of overexcavation is expected. Please clarify a depth of overexcavation to be used for bidding purposes. |
| FAA Response: Removal of unsuitable fill and recommendations for subgrade preparation provided in geotechnical report. Geotecnhical report included with Addendum 01. Final depth of over-excavation will be confirmed by project geotechnical engineer. |
| 105 | Due to the make-ready work associated with the fiber optic reroute, please confirm that a schedule in excess of 730 calendar days will not deem the Offeror as non-responsive or Technically Unacceptable. |
| FAA Response: Refer to Section L - Volume II, Factor 3: Construction Schedule |
| 106 | 1.8.A/093013 requires installer qualifications for ceramic tile that are extremely limiting for this size of a scope of work. Please advise if these requirements are necessary or if they may be waived. |
| Price Proposal spreadsheet J-4 includes an allowance of $325,000 for Division 12 Furnishings. Please clarify what is intended to be included in this allowance. |
| FAA Response: Revise 1.8.A.1 to say "Engage an experienced installer who has successfully completed tile installations similar in material, design, and extent to that indicated for the Project." Add 1.8.A.2 "Installer must be a Ceramic Tile Education Foundation Certified Tile Installer or Installer is recognized by the US Department of Labor as Journeyman Tile Layers Installer." Reference specification section 120501 and A721 for furnishings to be included in allowance. |
| 107 | The precast specification 03 45 00 describes requirements for a mockup and to reference the drawings for size/location but there is none shown. 1) please confirm there is a precast mockup requirement. 2) If so, please provide mock-up drawings. |
| FAA Response: Precast mock-up is not required. Remove 1.9.H from specification section 03 45 00. |
| 108 | The precast spec lists a variety of steel hardware types. Are connections to be plain steel with shop coat, galvanized, or stainless steel? Please confirm. |
| FAA Response: Galvanized |
| 109 | Please confirm that the glass for the CAB should be 9/16” Laminated – ?” Air – ?” Clear Annealed – Overall thickness 1 1/8” (Per the 08 88 58 ATCT Cab Glass Spec). If pulling the dimension off the CAB glass drawings, it shows a solid 2” piece of glass. |
| FAA Response: The laminated-insulated cab glazing is a delegated design item. Total thickness of assembly must be determined by glazing manufacturer/designer. Performance criteria provided in specification and on structural drawings. |
| 110 | Please confirm manufacturers not explicitly listed in the specification section12 24 12 2.1A and 12 24 13 2.1A will be considered acceptable, provided they meet all requirements and performance criteria outlined in the specification section. |
| FAA Response: No, manufacturer's must comply with those listed. |
| 111 | Are both the Base Building and Tower to be sprayed fire resistance type (IB) or only the tower? |
| FAA Response: Yes, the base building and tower are Type 1B construction. |
| 112 | A specification section for Cathodic Protection has not been provided. Please confirm that Cathodic Protection is not required. |
| FAA Response: Confirmed, not required. |
| 113 | Please confirm sizing requirements for extinguishers not provided in 10 44 16. |
| FAA Response: See specification 10 44 16 for capacity. Size of fire extinguisher determined by manufacturer. Must comply with all accessibility requirements. |
| 114 | Section 2.4 A. lists acceptable manufacturers but Russ Bassett is not included, despite appearing to be the basis of design in the Construction Documents. Please confirm Russ Bassett is an acceptable manufacturer for the slatwall consoles. |
| FAA Response: Yes, Russ Bassett is an acceptable manufacturer. 2.4.A. states "provide products by one of the following available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:" |
| 115 | Per 2.3.A.2/09 51 13, ACP-1 and ACP-2 are to have a 9/16" suprafine suspension system. The basis of design products listed, Armstrong 3252 and 3354, respectively, have a 15/16" suspension system. Please advise which should be provided. |
| FAA Response: Revise 095113 2.3.2.a. Replace 3252 with 3257. Revise 095113 2.3.2.b. Replace 3354 with 3355. Provide 9/16" suprafine suspension system per 09 51 13 2.3.2.a and b. |
| 116 | Please provide a complete list of equipment to be mounted within the consoles. Sheet 11/15 identifies optional accessories; however, a consolidated list of required equipment and the intended mounting locations for both the perimeter consoles and the center consoles is requested to ensure proper coordination. |
| FAA Response: Consolidated list will be provided to the contractor after award. |
| 117 | Drawing M101 does not show any motor operated dampers for the screenwall air intake or the screenwall generator ducted exhaust. Please provide information if they will be required. |
| FAA Response: Motorized damper is required at all intake and exhaust louvers to outdoors. The size will be same as louver size. Refer to temperature control drawing. |
| 118 | Detail 1 on sheet G107 has a callout note requiring intumescent fireproofing on the underside of the cab floor. Is this intumescent only required on steel beams at the underside of the floor? Please note there is no UL design for the application of intumescent fireproofing at metal decking in order to achieve a fire rated floor assembly. The fire rating will need to be achieved with concrete topping or cementitious spray applied material at the decking. Please advise. |
| FAA Response: Intumescent fire protection is only required on the steel beams at the underside of the floor. Provide spray on fireproofing at the metal deck. See fireproofing schedule on G102. |
| 119 | 078100 refers to the use of high-density materials. 1.) Please confirm whether all framing receiving cementitious fireproofing in both the base building and the tower is to receive high-density material? 2.) Confirm if high-density material required in the tower due to its height? If so, will standard-density material be permitted in the base building? |
| FAA Response: Density requirements shall comply with the UL design but not less than the FAA minimum requirements. FAA minimum density requirements: exposed - min 40pcf, semi-exposed - min 22 pcf, concealed - min 15 pcf. |
| 120 | Please clarify the roof system design that should be included. According to plan detail 1/A615, the roof assembly involves a concrete deck, vapor barrier, rigid insulation, coverboard, and a TPO membrane. However, in specifications section 07 5423, it mentions the inclusion of a substrate board over the concrete decking prior to the build-up design outlined on the referenced plan page. Please refer to section 2.3 Materials (E) for further details. |
| FAA Response: Substrate board over concrete not required. Remove 07 5423 2.3.E. |
| 121 | Please clarify some conflicts within the specifications outlined in section 07 5423-13, specifically section 3.4: field quality and testing requirements. |
| a. The hose test is acceptable, provided that it is not a flood test. However, the specific requirements for this test are unclear. Please provide clarification and parameters to follow. |
| b. The bubble test is not an approved testing method according to NRCA guidelines.If the concern is about adhesion, please note that the manufacturer's No Dollar Limit (NDL) warranty covers all issues that arise. If there are concerns about water infiltration into the system before completion, would an infrared (IR) scan prior turning over the roofing system suffice? |
| FAA Response: Hose test and bubble test is by Owner. |
| 122 | Foundations Note 11 on S001 notes that backfill shall be placed in 9 inch lifts. Please confirm this requirement is waived if engineered fill is used. |
| FAA Response: Lift recommendations provided in Geotechnical report, including 9in lift for engineered fill. Geotecnhical report included with Addendum 01. |
| 123 | The PSG testing and commissioning schedule in Specification 23 21 13 references a Critical Power Distribution System, however no systems are specified as CPDS, and no correlation to the Emergency Power Components is provided. Please clarify which, if any, systems are Critical Power Distribution Systems. |
| FAA Response: Refer to sheet E000 for the equipment naming designation for clarification on which parts of the power system are considered Critical. |
| 124 | Temporary facade access scaffolding will require that additional steel members be added to cab area of the tower. Please confirm adding steel and abandoning that steel within the structure but hidden from view either enclosed in walls or behind cladding is acceptable? |
| FAA Response: Not acceptable. |
| 125 | There are no louver tags or cut sections behind the ornamental screen at the generator room. Please confirm no louver is required here and the ornamental screen will provide sufficient air pass through for the generator operations. Please also note that louvers are designed to drain water out of the structure, the ornamental screen will allow water into building footprint. |
| FAA Response: Reference M102 for air intake and exhaust louvers. Reference A484 and A646 for details at ornamental screen at engine generator room. |
1. North Wall of EG Room: Provide insulated blank-off panels (min R-15.2ci) at ornamental metal screen at locations without louvers. Blank-off panels to be fastened to ornamental screen HSS framing.
2. West Wall: Provide mineral wool board insulation (min R-15.2ci), 3 5/8" metal stud and 5/8" GWB along entirety of wall around ducted louvers.
3. Remove wet sprinkler system currently indicated in the Engine Generator Room and replace with dry pipe system with dry valve cabinet/nitrogen generator located in the Fire Pump Room.
4. Add heat trace piping on water lines and thermostatic mixing valve serving emergency eyewash shower.
5. Revise electrical equipment and devices in this room to be NEMA 3R rated.
6. Coordinate heating options required for generator with the FAA (generator is GFE).
7. Veeder Root and Heat Trace panel located on North wall to be relocated within the room.
| 126 | Are all the roofs structurally slope? |
| FAA Response: Base building roof steel and composite deck are sloped. Tower cab roof steel and deck are flat. |
| 127 | Is there a separate wage scale for site work than building work? |
| FAA Response: The solicitation incorporates the applicable Department of Labor Wage Determination. There is not a separate wage scale for "site work" versus "building work". Contractors shall compensate in accordance with the labor classifications and wage rates contained in the incorporated wage determination. |
| 128 | Is the project located in the city limit? |
| FAA Response: Yes |
| 129 | Does the work related to Division 27 require the Electrician wage scale? |
| FAA Response: The solicitation incorporates the applicable Department of Labor Davis-Bacon Wage Determination. Labor classifications are not determined by the specification divisions. Contractors are responsible for selecting the appropriate labor classifications from the WD based on the nature of the work being performed. |
| 130 | Is there a requirement for OSHA 10 or 30 certified workers? |
| FAA Response: The specifications do not require OSHA 10-hour or OSHA 30-hour certification. Contractors are required to comply with all applicable OSHA regulations. |
| 131 | Please confirm that plans sheets GFK-E-ATCT-T111 & GFK-E-ATCT-T112 are the only 2 areas requiring aluminum ladder tray and the rest of the building is wire-mesh cable tray (270528 2.10). |
| FAA Response: All T-series tray is aluminum ladder tray as shown in drawings. Do not utilized wire mesh cable tray. |
| 132 | Spec 271300 2.3, Cat6 is not available in “high-count” configurations. |
| FAA Response: Not applicable. None shown in design drawings. |
| 133 | Dose the contractor need to provide patch cords for the horizontal communication cabling for the workstation end and the patch panel end? (271500 2.5 H) Detail 1 sheet T601 |
| FAA Response: No, patch cords on both ends to be provided by FAA. |
134 Please provide specifications for the fiber and copper cables listed in the EC sheets.
FAA Response: Specifications provided. FAA E-2761d, FAA STD-061A and NS-152 for fiber / L-108, FAA GL-918D, and FAA STD 061A for copper
135 Are the FAA specifications and standards listed in this note available for review?
FAA Response: Specifications provided. FAA E-2761d, FAA STD-061A and NS-152 for fiber
| 136 | Sheet T502 detail 5 calls for Cat6A cable to the wall phone, the other details call for cat6 cable, please confirm all cabling is Cat6. (detail note1) |
| FAA Response: Correct, all cabling is Cat 6. Conflicting note in detail for Cat 6A is incorrect. |
| 137 | What are the fiber and cat6 cable requirements for the EPMS system sheets E623 & E624? |
| FAA Response: As indicated in cable schedule on each sheet. Government to clarify with provided detailed wiring diagram for GFE. |
| 138 | Please verify the FAA will grant a reasonable proposal due date extension to allow for all RFIs to be answered and analyzed by the contractor in order to submit the most qualified proposal possible. |
| FAA Response: A proposal extension will be issued to allow sufficient time for contractors to review Q&A responses. |
| 139 | Confirm all elevator entrances are to be #4 stainless steel |