J-4 Price Proposal - QVH ASRS HVAC.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 697DCK-20-R-00336
About this file
This document includes a federal contract opportunity notice and a related HVAC cost proposal spreadsheet. The Federal Aviation Administration (FAA) is soliciting proposals for the QVH Air Route Surveillance Radar HVAC Replacement/Upgrade located in Riverhead, NY. Offerors must have a valid SAM registration. Proposals are due by July 6, 2020 and must comply with Sections L and M of the solicitation. An optional site visit is not available, but photos and a virtual walkthrough will be provided. Questions are due by June 26, 2020. The cost proposal spreadsheet provides unit pricing for mechanical, electrical, controls and general site work for the HVAC system replacement. Material, labor, equipment and total costs are included for each line item. Overhead, profit and bond are also accounted for in the total proposed costs.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC
| COST PROPOSAL | DATE | SHEET 1 OF 1 | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||||
| HVAC System Replacement | STANDARD DESIGN | ||||||||
| LOCATION | DRAWING REF. NO. | PROJECT DESIGN | |||||||
| Riverhead, NY | OTHER (SPECIFY) | ||||||||
| PREPARING ORGANIZATION UNIT | SPEC. REF. NO. | ||||||||
| AJW-2E15K | |||||||||
| CLASS OF WORK | ESTIMATOR | CHECKED BY | |||||||
| HVAC & Electrical | |||||||||
| ITEM | QUANTITY | MATERIAL COST ($) | LABOR COST ($) | EQUIPMENT COST ($) | TOTAL | ||||
| UNIT | NO. | PER | PER | PER | ITEM | ||||
| MEAS. | UNITS | UNIT | TOTAL | UNIT | TOTAL | UNIT | TOTAL | COST ($) | |
| Mechanical | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Civil | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Electrical | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Controls | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| General / Site Conditions | |||||||||
| Mobilization / Demobilization | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Site Cleanup | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Misc. Utility Relocations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Site Supervision/PM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| ACM & Lead Testing | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CAEG Services | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| SUBTOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| Overhead | 0% | $0.00 | $0.00 | $0.00 | $0.00 |
| Profit | 0% | $0.00 | $0.00 | $0.00 | $0.00 |
| Bond | $0.00 | $0.00 | $0.00 | $0.00 |
TOTAL COSTS $0.00 $0.00 $0.00 $0.00
File details come from the government source that posted it. Updated .