DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, SEATTLE DISTRICT
4735 EAST MARGINAL WAY SOUTH, BLDG 1202
SEATTLE, WA 98134-2388
Regulatory Branch September 02, 2025
Ms. Wendy Christensen Bureau of Reclamation, Columbia-Cascades Office 1917 March Road Yakima, Washington 98901
Reference: NWS-2025-271 Bureau of Reclamation
(Speelyi Beach Shoreline Protection)
Dear Ms. Christensen:
We have received your application for a Department of the Army (DA) permit to discharge up to 11,054 cubic yards (cy) of fill materials along 1,720 linear feet of shoreline, or within up to 38,434 square feet, for the purpose of bank stabilization in the Cle Elum Reservoir at/near Ronald, Kittitas County, Washington. Based on the information you provided to us, Nationwide Permit (NWP) 13, Bank Stabilization (Federal Register December 27, 2021 Vol. 86, No. 245), authorizes your proposal as depicted on the enclosed drawings dated November 1, 2024.
In order for this authorization to be valid, you must ensure the work is performed in accordance with the enclosed NWP 13, Terms and Conditions and the following special conditions:
a. In order to protect the listed threatened and endangered species in the project area, you may conduct the authorized activities in the work window as agreed to and documented in writing through consultation by the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service (Services) in any year this permit is valid. If changes to the originally authorized work window are proposed, you must re-coordinate these changes with the Services and receive written concurrence on the changes. Copies of the concurrence(s) must be sent to the U.S. Army Corps of Engineers, Seattle District, Regulatory Branch, within 10 days of the date of the revised concurrence.
b. You must implement and abide by the Endangered Species Act (ESA) requirements and/or agreements set forth in the Cle Elum Dam Pool Raise Project Biological Assessment, dated May 2015, and received August 22, 2024, in its entirety. The U.S.
Fish and Wildlife Service (USFWS) provided the enclosed Letter of Concurrence (LOC) with a finding of “may affect, not likely to adversely affect” based on this document on
-2-
June 5, 2015 (USFWS Reference Number 01EWFW00-2015-I-0650). The National Marine Fisheries Service (NMFS) provided the enclosed LOC with a finding of “may affect, not likely to adversely affect” based on this document on June 9, 2015 (NMFS Reference Number WCRO-2015-2698). Both agencies will be informed of this permit issuance. Failure to comply with the commitments made in this consultation constitutes non-compliance with the ESA and your U.S. Army Corps of Engineers permit. The USFWS/NMFS is the appropriate authority to determine compliance with ESA.
The Bureau of Reclamation completed National Historic Preservation Act, Section 7 Endangered Species Act (ESA) consultation and Magnuson Stevens Act, Essential Fish Habitat (EFH) consultation for the proposed activity [National Marine Fisheries Service reference WCRO-2015-2698, U.S. Fish and Wildlife Service reference 01EWFW00- 2015-I-0650 (collectively called the Services)]. For the purpose of this Department of the Army authorization, we have determined this project will comply with the requirements of these laws provided you comply with all of the permit conditions. We have determined the permit action is sufficiently addressed in their ESA and EFH consultation documents. By this letter we are advising you and the Services, in accordance with 50 CFR 402.07 and 50 CFR 600.920(b), that this agency has served as the lead Federal agency for the ESA and EFH consultation responsibilities for the activity described above.
Please note that National General Condition 21, Discovery of Previously Unknown Remains and Artifacts, found in the Nationwide Permit Terms and Conditions enclosure, details procedures that must be followed should an inadvertent discovery occur. You must ensure that you comply with this condition during the construction of your project.
The authorized work complies with the Washington State Department of Ecology’s (Ecology) Water Quality Certification (WQC) requirements for this NWP. No further coordination with Ecology for WQC is required.
A conditioned Water Quality Certification (WQC) (Order Number: 24079, dated
August 25, 2025) has been issued by the Washington State Department of Ecology for your project and is enclosed. You must comply with the conditions specified in the WQC for this NWP authorization to be valid.
You have not requested a jurisdictional determination for this proposed project. If you believe the U.S. Army Corps of Engineers does not have jurisdiction over all or portions of your project you may request a preliminary or approved jurisdictional determination (JD). If one is requested, please be aware that we may require the submittal of additional information to complete the JD and work authorized in this letter may not occur until the JD has been completed.
-3-
Our verification of this NWP authorization is valid until March 14, 2026, unless the
NWP is modified, reissued, or revoked prior to that date. If the authorized work for the NWP authorization has not been completed by that date and you have commenced or are under contract to commence this activity before March 14, 2026, you will have until March 14, 2027, to complete the activity under the enclosed terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP verification invalidates this authorization and could result in a violation of Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all local, State, and other Federal permits that apply to this project.
Upon completing the authorized work, you must fill out and return the enclosed Certificate of Compliance with Department of the Army Permit. All compliance reports should be submitted to the U.S. Army Corps of Engineers, Seattle District, Regulatory Branch electronically at nws.compliance@usace.army.mil. Thank you for your cooperation during the permitting process. We are interested in your experience with our Regulatory Program and encourage you to complete a customer service survey.
Referenced documents and information about our program are available on our website at www.nws.usace.army.mil, select “Regulatory Permit Information”. A copy of this letter with enclosures will be furnished to Ms. Amy Cook at ACook@usbr.gov. If you have any questions, please contact me at Shannon.C.Flannigan@usace.army.mil or (509) 559- 9932.
Sincerely, Shannon Flannigan, Project Manager Regulatory Branch
Enclosures cc:
Ecology (ecyrefedpermits@ecy.wa.gov)
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Central Region Office
1250 West Alder St., Union Gap, WA 98903-0009 • 509-575-2490
August 25, 2025
United States Bureau of Reclamation
Attn: Amy Cook
1917 Marsh Road
Yakima WA 98901
Re: Water Quality Certification Order No. 24079 (Corps No. NWS-2025-271), Cle Elum Pool Raise: Speelyi Beach Shoreline Protection, Kittitas County, Washington
Dear Amy Cook:
On 3/26/2025, United States Bureau of Reclamation submitted a request for a Section 401 Water Quality Certification (WQC) under the federal Clean Water Act for the Cle Elum Pool Raise: Speelyi Beach Shoreline Protection, Kittitas County, Washington.
On behalf of the state of Washington, the Department of Ecology certifies with conditions that the work described in the Water Quality Certification Request and supplemental documents complies with applicable provisions of Sections 301, 302, 303, 306, and 307 of the Clean Water Act, as amended, and applicable state laws. This certification is subject to the enclosed Water Quality Certification Order (WQC Order).
Please ensure that anyone doing work under this WQC Order has read, is familiar with, and is able to follow all of the provisions within the attached WQC Order.
If you have any questions about this decision, please contact Ryan Anderson at (509) 379-1917.
The enclosed WQC Order may be appealed by following the procedures described within.
Sincerely, Lori White, Section Manager Central Region Office Shorelands and Environmental Assistance Program
Enclosure (1)
Version 3-2022
WQC Order No. 24079, Corps No. NWS-2025-271 Aquatics ID No. 144218 August 25, 2025
By certified mail: [9214 8901 9403 8328 7569 26]
Sent via e-mail: acook@usbr.gov
E-cc: Shannon Flannigan, U.S. Army Corps of Engineers Wade Warner, United States Bureau of Reclamation Erin Hanlon Brown, Ecology Ryan Anderson, Ecology ecyrefedpermits@ecy.wa.gov mailto:acook@usbr.gov mailto:ecyrefedpermits@ecy.wa.gov
In The Matter of Granting a Water Quality Certification with Conditions to the United States Bureau of
Reclamation pursuant to 33 U.S.C. 1341 (FWPCA § 401), RCW 90.48.120, RCW
90.48.260 and Chapter 173-201A WAC
United States Bureau of Reclamation Attn: Amy Cook 1917 Marsh Road Yakima, WA 98901
WQC Order No. 24079
Corps Reference No. NWS-2025-271
Site Location Cle Elum Pool Raise: Speelyi Beach Shoreline Protection located within Lake Cle Elum, near Ronald, Kittitas County, Washington.
United States Bureau of Reclamation submitted a request for a Section 401 Water Quality Certification (WQC) under the federal Clean Water Act for the Cle Elum Pool Raise: Speelyi Beach Shoreline Protection, Kittitas County, Washington. The required processing dates are listed below:
• On 8/1/2024, the United States Bureau of Reclamation submitted a pre-filing meeting request.
• On 3/26/2025, Ecology received a request for Clean Water Section 401 Water Quality Certification.
• On 6/24/2025, United States Bureau of Reclamation submitted additional information, and the Department of Ecology (Ecology) considered the Request valid on this date.
• On 6/24/2025, the U.S. Army Corps of Engineers (Corps) sent an email notification to Ecology that they are reviewing the project for authorization under the Nationwide Permit (NWP) Program.
• On 7/8/2025, Ecology issued a public notice for the project.
• Ecology’s “Reasonable Period of Time” for this project has been established as 10/22/2025.
This project proposes to stabilize the shoreline within the Cle Elum reservoir that may otherwise be inundated with water during high water years as a result of the increase in pool level. The project proposes to place riprap on the outer slope of the reservoir to the existing ground surface, place 20 wood structures to increase habitat function, and extend a culvert at
Aquatics ID No. 144218
August 25, 2025 the site and re-grade to ensure stormwater is able to flow past the structures on the property into the reservoir. Additionally, a “perched beach” will be constructed to protect the parcel from wave action in the reservoir.
The project site is located at 831 S Lake Cabins Road, Lake Cle Elum, Kittitas County, Washington, Section 2, Township 20 N., Range 14 E., within Water Resource Inventory Area (WRIA) 39, the Upper Yakima River Watershed.
With this WQC Order, Ecology is granting with conditions United States Bureau of Reclamation’s request for a Section 401 Water Quality Certification for the Cle Elum Pool Raise:
Speelyi Beach Shoreline Protection project, provided that the activity is conducted in accordance with the Section 401 Water Quality Certification request and attachments Ecology received on 3/26/2025, and the following supporting documentation:
1. Draft Water Quality Management Plan Framework Cle Elum Dam Pool Raise Project: Speelyi Shoreline Protection Project submitted on 7/10/2025.
Based on the information submitted, Ecology has determined that the discharge from the project will comply with state water quality requirements. Prior to undertaking any changes that materially alter the project, United States Bureau of Reclamation must contact Ecology to determine whether a new Section 401 Water Quality Certification is required.
Issuance of this Section 401 Water Quality Certification for this proposal does not authorize United States Bureau of Reclamation to exceed applicable state water quality standards (Chapter 173-201A WAC), ground water quality standards (Chapter 173-200 WAC), or sediment quality standards (Chapter 173-204 WAC). Furthermore, nothing in this Section 401 Water Quality Certification absolves United States Bureau of Reclamation from liability for contamination and any subsequent cleanup of surface waters, ground waters, or sediments resulting from project construction or operations.
1. This Certification is not effective until the U.S. Corps of Engineers (Corps) Seattle District issues a Department of the Army (DA) permit for this project. WQC Order No. 24079 will remain valid until January 1, 2031.
• Justification – Certifications are required for any license or permit that authorizes an activity that may result in a discharge or fill material into waters. This WQC Order is not valid until the Federal agency issues a permit. Additionally, Ecology needs to be able to specify how long the WQC Order will be in effect.
• Citation – Chapter 90.48 RCW, Chapter 173-201A WAC, and WAC 173-225-010.
August 25, 2025
2. United States Bureau of Reclamation shall send a copy of the final Federal permit via e-mail to fednotification@ecy.wa.gov and cc to ryan.anderson@ecy.wa.gov prior to the starting of any work authorized by this WQC Order. If the Federal Agency determines the proposed project does not require a Federal permit, the United States Bureau of Reclamation shall immediately inform Ecology.
• Justification - This condition is needed to ensure that the federal permit has been issued and all the conditions of the WQC Order have been included into the federal permit.
• Citation - 40 CFR 121.10, 40 CFR 121.11, and Chapter 90.48 RCW.
3. To transfer this WQC Order to a new owner or operator United States Bureau of Reclamation shall:
a. Complete a Request for Transfer of Order with a specific transfer date of the WQC
Order’s obligations, coverage, and liability and submit it to Ecology at fednotification@ecy.wa.gov and cc to ryan.anderson@ecy.wa.gov. Link to form:
https://apps.ecology.wa.gov/publications/SummaryPages/ECY070695.html.
b. Provide a copy of this WQC Order to the new owner or operator; and
c. The transfer is not considered valid until the United States Bureau of Reclamation receives written notification from Ecology that the transfer has been approved.
• Justification – Ecology has independent state authority to ensure protection of state water quality. Ecology needs to ensure that anyone conducting work at the project, including any new owners or operators, are aware of and understand the required conditions of this WQC Order to ensure compliance with the water quality standards and other applicable state laws.
• Citation – 40 CFR 121.5, Chapter 90.48 RCW, RCW 90.48.030, Chapter 173-201A WAC, and WAC 173-225-010.
4. Any work that causes distressed or dying fish or discharges of oil, fuel, or other chemicals into state waters or onto land with a potential for entry into state waters is prohibited. If such work, conditions, or discharges occur, immediately notify Ecology’s Regional Spill Response Office at 360-407-6300 and the Washington State Department of Fish & Wildlife with the nature and details of the problem, any actions taken to correct the problem, and any proposed changes in operation to prevent further problems. You will also need to notify the Washington Emergency Management Division at 1-800-258-5990, for spills to water only. This condition is necessary to prevent oil and other hazardous materials spills from mailto:fednotification@ecy.wa.gov mailto:ryan.anderson@ecy.wa.gov mailto:fednotification@ecy.wa.gov mailto:ryan.anderson@ecy.wa.gov https://apps.ecology.wa.gov/publications/SummaryPages/ECY070695.html
August 25, 2025 causing environmental damage and to ensure compliance with water quality requirements.
The sooner a spill is reported, the quicker it can be addressed, resulting in less harm.
• Justification - This condition is necessary to prevent oil and hazardous materials spills from causing environmental damage and to ensure compliance with water quality requirements. The sooner a spill is reported, the quicker it can be addressed, resulting in less harm. Ecology must protect waters of the state from all discharges and potential discharges of pollution that can affect water quality to protect aquatic life and beneficial uses.
• Citation - Chapter 90.48 RCW, RCW 90.48.030, RCW 90.48.080, Chapter 90.56 RCW, RCW 90.56.280, Chapter 173-201A WAC, WAC 173-201A-300 - 330, WAC 173-204-
120, WAC 173-225-010, and WAC 173-303-145.
In view of the foregoing and in accordance with 33 U.S.C. §1341, RCW 90.48.120, RCW
90.48.260 Chapter 173-200 WAC and Chapter 173-201A WAC, this WQC is granted with conditions to the United States Bureau of Reclamation for the Cle Elum Pool Raise: Speelyi Beach Shoreline Protection.
Your right to appeal
You have a right to appeal this Order to the Pollution Control Hearings Board (PCHB) within 30 days of the date of receipt. The appeal process is governed by Chapter 43.21B RCW and Chapter 371-08 WAC. “Date of receipt” is defined in RCW 43.21B.001(2).
To appeal, you must do all of the following within 30 days of the date of receipt of this Order:
• File your notice of appeal and a copy of this Order with the PCHB (see filing information below). “Filing” means actual receipt by the PCHB during regular business hours as defined in WAC 371-08-305 and -335. “Notice of appeal” is defined in WAC 371-08-340.
• Serve a copy of your notice of appeal and this Order on the Department of Ecology by mail, in person, or by email (see addresses below).
You must also comply with other applicable requirements in Chapter 43.21B RCW and Chapter
371-08 WAC.
Address and Location Information
Filing with the PCHB
For the most current information regarding filing with the PCHB, visit: https://eluho.wa.gov/ or call: 360-664-9160.
August 25, 2025
Service on Ecology
Street Address:
Department of Ecology
Attn: Appeals Processing Desk
300 Desmond Drive SE
Lacey, WA 98503
Mailing Address:
Department of Ecology
Attn: Appeals Processing Desk
PO Box 47608
Olympia, WA 98504-7608
E-Mail Address:
ecologyappeals@ecy.wa.gov
Americans with Disabilities Act Information
Accommodation Requests
To request ADA accommodation including materials in a format for the visually impaired, call Ecology at 360-407-6831 or visit https://ecology.wa.gov/accessibility. People with impaired hearing may call Washington Relay Service at 711. People with speech disability may call TTY at 877-833-6341.
Contact Information
Please direct all questions about this WQC Order to:
Ryan Anderson
Department of Ecology
(509)379-1917
Ryan.anderson@ecy.wa.gov
More Information
• Pollution Control Hearings Board Website https://eluho.wa.gov mailto:ecologyappeals@ecy.wa.gov mailto:Ryan.anderson@ecy.wa.gov https://eluho.wa.gov/
August 25, 2025
• Chapter 43.21B RCW - Environmental and Land Use Hearings Office – Pollution Control Hearings Board http://app.leg.wa.gov/RCW/default.aspx?cite=43.21B
• Chapter 371-08 WAC – Practice And Procedure http://app.leg.wa.gov/WAC/default.aspx?cite=371-08
• Chapter 34.05 RCW – Administrative Procedure Act http://app.leg.wa.gov/RCW/default.aspx?cite=34.05
• Chapter 90.48 RCW – Water Pollution Control http://app.leg.wa.gov/RCW/default.aspx?cite=90.48
• Chapter 173.204 WAC – Sediment Management Standards http://apps.leg.wa.gov/WAC/default.aspx?cite=173-204
• Chapter 173-200 WAC – Water Quality Standards for Ground Waters of the State of Washington http://apps.leg.wa.gov/WAC/default.aspx?cite=173-200
• Chapter 173-201A WAC – Water Quality Standards for Surface Waters of the State of Washington http://apps.leg.wa.gov/WAC/default.aspx?cite=173-201A
Signature
Dated this 25th day of August 2025 at the Department of Ecology, Union Gap, Washington.
Lori White, Section Manager
Central Region Office
Shorelands and Environmental Assistance Program http://app.leg.wa.gov/RCW/default.aspx?cite=43.21B http://app.leg.wa.gov/RCW/default.aspx?cite=43.21B http://app.leg.wa.gov/WAC/default.aspx?cite=371-08 http://app.leg.wa.gov/RCW/default.aspx?cite=34.05 http://app.leg.wa.gov/RCW/default.aspx?cite=90.48 http://apps.leg.wa.gov/WAC/default.aspx?cite=173-204 http://apps.leg.wa.gov/WAC/default.aspx?cite=173-200 http://apps.leg.wa.gov/WAC/default.aspx?cite=173-200 http://apps.leg.wa.gov/WAC/default.aspx?cite=173-201A http://apps.leg.wa.gov/WAC/default.aspx?cite=173-201A
NATIONWIDE PERMIT 13
Terms and Conditions
2021 NWPs - Final 41; Effective Date: February 25, 2022 amended with RGCs 10-14 June 28, 2024
A. Description of Authorized Activities B. U.S. Army Corps of Engineers (Corps) National General Conditions for All Final 41 NWPs C. Seattle District Regional General Conditions D. Seattle District Regional Specific Conditions for this Nationwide Permit (NWP) E. 401 Water Quality Certification (401 WQC) for this NWP F. Coastal Zone Management Consistency Response for this NWP
In addition to any special condition that may be required on a case-by-case basis by the District Engineer, the following terms and conditions must be met, as applicable, for a Nationwide Permit (NWP) authorization to be valid in Washington State.
A. DESCRIPTION OF AUTHORIZED ACTIVITIES
13. Bank Stabilization. Bank stabilization activities necessary for erosion control or prevention, such as vegetative stabilization, bioengineering, sills, rip rap, revetment, gabion baskets, stream barbs, and bulkheads, or combinations of bank stabilization techniques, provided the activity meets all of the following criteria:
(a) No material is placed in excess of the minimum needed for erosion protection;
(b) The activity is no more than 500 feet in length along the bank, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse environmental effects (an exception is for bulkheads – the district engineer cannot issue a waiver for a bulkhead that is greater than 1,000 feet in length along the bank);
(c) The activity will not exceed an average of one cubic yard per running foot, as measured along the length of the treated bank, below the plane of the ordinary high water mark or the high tide line, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse environmental effects;
(d) The activity does not involve discharges of dredged or fill material into special aquatic sites, unless the district engineer waives this criterion by making a written determination concluding that the discharge of dredged or fill material will result in no more than minimal adverse environmental effects;
(e) No material is of a type, or is placed in any location, or in any manner, that will impair surface water flow into or out of any waters of the United States;
(f) No material is placed in a manner that will be eroded by normal or expected high flows (properly anchored native trees and treetops may be used in low energy areas);
(g) Native plants appropriate for current site conditions, including salinity, must be used for bioengineering or vegetative bank stabilization;
(h) The activity is not a stream channelization activity; and
(i) The activity must be properly maintained, which may require repairing it after severe storms or erosion events. This NWP authorizes those maintenance and repair activities if they require authorization.
This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to construct the bank stabilization activity. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges of dredged or fill material, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. After construction, temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate.
Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if the bank stabilization activity: (1) involves discharges of dredged or fill material into special aquatic sites; or (2) is in excess of 500 feet in length; or (3) will involve the discharge of dredged or fill material of greater than an average of one cubic yard per running foot as measured along the length of the treated bank, below the plane of the ordinary high water mark or the high tide line. (See general condition 32.) (Authorities: Sections 10 and 404)
Note: In coastal waters and the Great Lakes, living shorelines may be an appropriate option for bank stabilization, and may be authorized by NWP 54.
B. CORPS NATIONAL GENERAL CONDITIONS FOR ALL 2021 NWPs - FINAL 41
Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific conditions imposed by the division engineer or district engineer. Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR
330.5 relating to the modification, suspension, or revocation of any NWP authorization.
1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his or her authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.).
Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization.
8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre-construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides.
13. Removal of Temporary Structures and Fills. Temporary structures must be removed, to the maximum extent practicable, after their use has been discontinued. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project.
16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre-construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river. Permittees shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service).
Information on these rivers is also available at: http://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify designated critical habitat or critical habitat proposed for such designation. No activity is authorized under any NWP which “may affect” a listed species or critical habitat, unless ESA section 7 consultation addressing the consequences of the proposed activity on listed species or critical habitat has been completed. See 50 CFR 402.02 for the definition of “effects of the action” for the purposes of ESA section 7 consultation, as well as 50 CFR 402.17, which provides further explanation under ESA section 7 regarding “activities that are reasonably certain to occur” and “consequences caused by the proposed action.”
(b) Federal agencies should follow their own procedures for complying with the requirements of the ESA (see 33 CFR 330.4(f)(1)). If pre-construction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional ESA section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under section 7 of the ESA.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if any listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed such designation) might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat or critical habitat proposed for such designation, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation), the pre-construction notification must include the name(s) of the endangered or threatened species (or species proposed for listing) that might be affected by the proposed activity or that utilize the designated critical habitat (or critical habitat proposed for such designation) that might be affected by the proposed activity. The district engineer will determine whether the proposed activity “may affect” or will have “no effect” to listed species and designated critical habitat and will notify the non-Federal applicant of the Corps’ determination within 45 days of receipt of a complete pre-construction notification. For activities where the non-Federal applicant has identified listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation) that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have “no effect” on listed species (or species proposed for listing or designated critical habitat (or critical habitat proposed for such designation), or until
ESA section 7 consultation or conference has been completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(d) As a result of formal or informal consultation or conference with the FWS or NMFS the district engineer may add species-specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the “take” of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take” provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word “harm” in the definition of “take'' means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP activity, the non-federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA section 7 consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7 consultation is required.
(g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/ respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring that an action authorized by an NWP complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting the appropriate local office of the U.S. Fish and Wildlife Service to determine what measures, if any, are necessary or appropriate to reduce adverse effects to migratory birds or eagles, including whether "incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity.
20. Historic Properties. (a) No activity is authorized under any NWP which may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied.
(b) Federal permittees should follow their own procedures for complying with the requirements of section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)(1)). If pre-construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section 106.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the pre-construction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply with the current procedures for addressing the requirements of section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts commensurate with potential impacts, which may include background research, consultation, oral history interviews, sample field investigation, and/or field survey. Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect.
(d) Where the non-Federal applicant has identified historic properties on which the proposed NWP activity might have the potential to cause effects and has so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA section 106 consultation has been completed. For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre-construction notification whether NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district engineer will notify the non-Federal applicant that he or she cannot begin the activity until section 106 consultation is completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. Permittees that discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by an NWP, they must immediately notify the district engineer of what they have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-managed marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may designate, after notice and opportunity for public comment, additional waters officially designated by a state as having particular environmental or ecological significance, such as outstanding national resource waters or state natural heritage sites. The district engineer may also designate additional critical resource waters after notice and opportunity for public comment.
(a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52, 57 and 58 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters.
(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54, notification is required in accordance with general condition 32, for any activity proposed by permittees in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after she or he determines that the impacts to the critical resource waters will be no more than minimal.
23. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal:
(a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site).
(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that exceed 1/10-acre and require pre-construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity-specific waiver of this requirement. For wetland losses of 1/10-acre or less that require pre-construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in only minimal adverse environmental effects.
(d) Compensatory mitigation at a minimum one-for-one ratio will be required for all losses of stream bed that exceed 3/100-acre and require pre-construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity-specific waiver of this requirement. This compensatory mitigation requirement may be satisfied through the restoration or enhancement of riparian areas next to streams in accordance with paragraph
(e) of this general condition. For losses of stream bed of 3/100-acre or less…