C05_03_-_Solicitation_140R1026B0002_Final.pdf

PDF 1 MB Posted

Attached to
Speelyi Shoreline protection
Solicitation number
140R1026B0002
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation March 2026 Columbia Pacific Northwest Interior Region 9 Boise, Idaho

Speelyi Beach Shoreline Final Specification

Cle Elum Dam and Reservoir, Yakima Project, Washington

Solicitation Number: 140R1026B0002

This solicitation issued by Contracting Officer

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

SPEELYI BEACH SHORELINE PROTECTION

YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT - INTEGRATED PLAN

YAKIMA PROJECT - WASHINGTON

FOREWORD

Work is located on Cle Elum Reservoir, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County. Work is located near the Speelyi Beach Day Use Area. Work is constructing shoreline protection along the edge of the reservoir. Principal components of the work include earthwork, clearing and grubbing, removal and hauling of trees, construction of a temporary access road, trench excavation, installation of geotextile fabric, culvert installation, site grading, riprap placement, selective demolition of structures, in-kind replacement of a fence, and removal of the temporary access road upon completion.

SITE VISIT: SEE SECTION L FOR SITE VISIT INFORMATION. OFFERORS ARE

STRONGLY URGED TO PARTICIPATE IN THE SITE VISIT. FAILURE BY

OFFERORS TO INSPECT THE SITE WILL NOT RELIEVE THEM OF THE

RESPONSIBILITY OF PROPERLY ESTIMATING THE DIFFICULTY OR COST OF

SUCCESSFULLY PERFORMING THE WORK IN ACCORDANCE WITH THE

SPECIFICATIONS AND WITHIN THE ALLOWED TIME. ATTENDEES ARE TO

PROVIDE AND WEAR SAFETY GLASSES, BOOTS, HARD HATS, SAFETY VESTS.

FOR PROPOSAL DELIVERY INFORMATION, SEE "SOLICITATION, OFFER, AND

AWARD," STANDARD FORM 1442.

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION

"RECLAMATION SAFETY AND HEALTH STANDARDS" INCLUDING REVISIONS

AT https://www.usbr.gov/safety/rshs/index.html WHICH IS APPLICABLE TO WORK

UNDER THIS CONTRACT, SEE CLAUSE AT "WBR 1452.223-81 SAFETY AND

HEALTH."

END OF SECTION

This page intentionally left blank.

Speelyi Beach Shoreline Protection Solicitation No.140R1026B0002 i

PART I THE SCHEDULE..................................................................................................... A-1

SECTION A SOLICITATION/CONTRACT FORM ........................................................ A-2

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ..................................... B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................ C-1

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 10 Use of Site 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 90 Preservation of Historical and Archeological Data 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS

02 41 13 Selective Site Demolition

DIVISION 13 – SPECIAL CONSTRUCTION

13 00 10 Fish Habitat Log Structures

DIVISION 31 - EARTHWORK

31 11 00 Clearing and Grubbing 31 23 02 Compacting Earth Materials ii

31 23 11 Earthwork 31 23 39 Disposal of Excavated Materials 31 32 32 Geotextile 31 37 00 Riprap

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 14 40 Stone Paths 32 31 29 Wood Fence 32 92 20 Seeding and Soil Supplements

DIVISION 33 – UTILITIES

33 42 30 Corrugated Metal Pipe Culverts

DIVISION 51 – INFORMATION AVAILABLE TO BIDDERS

51 00 50 Electronic Media Release 51 10 20 Hydrographs, Exceedance Curves, and Reservoir Time History

DIVISION 52 - DRAWINGS

52 00 00 Drawings

SECTION D PACKAGING AND MARKING .................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ............................................................ E-1

E.1. 52.246-12 Inspection of Construction (Aug 1996) .................................................... E-1

SECTION F DELIVERIES AND PERFORMANCE ......................................................... F-1

F.1. 52.211-12 Liquidated Damages — Construction (Sep 2000) (DEVIATION Jan 2026).. ................................................................................................................................... F-1

F.2. 52.242-14 Suspension of Work (Apr 1984) .............................................................. F-1

SECTION G CONTRACT ADMINISTRATION .............................................................. G-1

G.1. Government Point of Contact ................................................................................... G-1

G.2. 1452.201-70 Authorities and Delegations (Sep 2011) ............................................. G-1

G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021) ................................................................................. G-2

G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018) .............................................................. G-3 iii

SECTION H SPECIAL CONTRACT REQUIREMENTS ................................................ H-1

H.1. WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (Mar 2022) .. H-1 H.2. Contractor Performance Assessment Reporting System (Dec 2015) ....................... H-1

H.3. Commencement, Prosecution, and Completion of Work (Apr 1984) ...................... H-3

H.4. Variation in Estimated Quantity (Apr 1984) ............................................................ H-3

H.5. Preconstruction Conference (Feb 1995) ................................................................... H-3

H.6. Additional Liability Insurance Requirements ........................................................... H-3

PART II CONTRACT CLAUSES .......................................................................................... I-1

SECTION I CONTRACT CLAUSES ................................................................................. I-1

I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) .......................................... I-1

I.2. 52.202-1 Definitions (Jun 2020) ................................................................................. I-1

I.3. 52.203-3 Gratuities (Apr 1984) .................................................................................. I-1

I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ......................................... I-1

I.5. 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) ........... I-1

I.6. 52.203-7 Anti-Kickback Procedures (Jun 2020) ........................................................ I-1

I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .............................................................................................................. I-1

I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ..... I-1

I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Transactions (Jun 2020).. .................................................................................................................................... I-1

I.10. 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) ..................... I-1

I.11. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) ............................................................................................................ I-1

I.12. 1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996)….. ................................................................................................................................ I-1

I.13. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) .............................................................................................................................. I-1

I.14. 52.204-13 System for Award Management Maintenance (Oct 2018) .................... I-1

I.15. 52.204-14 Service Contract Reporting Requirements (Oct 2016) .......................... I-1

I.16. 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014)….. ................................................................................................................................ I-2

I.17. 1452.204-70 Release of Claims – Department of the Interior (Jul 1996) ............... I-2

I.18. 52.204-91 Contractor Identification (DEVIATION Mar 2026) ............................. I-2 iv

I.19. 52.209-6 Protecting the Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Jan 2025)….. ................................................................................................................................ I-2

I.20. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)................................................................................................................. I-2

I.21. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)….. ................................................................................................................................ I-2

I.22. 52.214-26 Audit and Records-Sealed Bidding (Jun 2020) ..................................... I-2

I.23. 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data Modifications-Sealed Bidding (Jun 2020) ............................................................................. I-2

I.24. 52.214-28 Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding (Jun 2020) ................................................................................................................ I-2

I.25. 52.214-29 Order of Precedence-Sealed Bidding (Jan 1986) .................................. I-2

I.26. 52.219-8 Utilization of Small Business Concerns (Jan 2025) (DEVIATION Jan 2026)….. ................................................................................................................................ I-2

I.27. 52.219-14 Limitations on Subcontracting (Oct 2022) (DEVIATION Jan 2026) ... I-2

I.28. 52.219-28 Postaward Small Business Program Rerepresentation (Jan 2025) (DEVIATION Jan 2026) ....................................................................................................... I-5

I.29. 52.222-3 Convict Labor (Jun 2003) ........................................................................ I-5

I.30. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (May 2018) ............................................................................................................................ I-5

I.31. 52.222-6 Construction Wage Rate Requirements (Aug 2018) ............................... I-5

I.32. 52.222-7 Withholding of Funds (May 2014) .......................................................... I-5

I.33. 52.222-8 Payrolls and Basic Records (Jul 2021) .................................................... I-5

I.34. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) ................... I-5

I.35. 52.222-11 Subcontracts (Labor Standards) (May 2014)......................................... I-5

I.36. 52.222-12 Contract Termination – Debarment (May 2014) ................................... I-5

I.37. 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) ........................................................................................................ I-5

I.38. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) ................................ I-5

I.39. 52.222-15 Certification of Eligibility (May 2014) ................................................. I-5

I.40. 52.222-35 Equal Opportunity for Veterans (Jun 2020) .......................................... I-5

I.41. 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) ............... I-5

I.42. 52.222-37 Employment Reports on Veterans (Jun 2020) ....................................... I-5 v

I.43. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ...................................................................................................................... I-5

I.44. 52.222-50 Combating Trafficking of Persons (Nov 2021) ..................................... I-5

I.45. 52.222-54 Employment Eligibility Verification (Jan 2025) ................................... I-5

I.46. 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) .............................................................................................................................. I-5

I.47. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) .................. I-5

I.48. 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026)a .. I-5

I.49. 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (May 2024) (DEVIATION FEB 2025) ................................................................. I-6

I.50. 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021), Alternate I (Jul 1995) ............................................................................................................. I-6

I.51. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) ........ I-6

I.52. 52.223-20 Aerosols (May 2024) ............................................................................. I-6

I.53. 52.223-21 Foams (May 2024)................................................................................. I-6

I.54. 52.223-23 Sustainable Products and Services (May 2024) (DEVIATION FEB 2025)….. ................................................................................................................................ I-6

I.55. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Aug 2021)….. ................................................................................................................................ I-6

I.56. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Oct 2022) ......... I-6

I.57. WBR 1452.223-82 Ensuring Adequate COVID-19 Protocols in Federal Buildings and Federally Controlled Facilities-Bureau of Reclamation ................................................. I-7

I.58. 52.225-9 Buy American – Construction Materials (Oct 2022) ............................... I-7

I.59. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) ....................... I-13

I.60. 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises (June 2000) (DEVIATION Mar 2026) ............................................................. I-13

I.61. 52.226-7 Drug-Free Workplace (May 2024) ........................................................ I-13

I.62. 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) .......................................................................................................................... I-13

I.63. 52.227-1 Authorization and Consent (Jun 2020) .................................................. I-13

I.64. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020)….. .............................................................................................................................. I-13

I.65. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) ........................ I-13

I.66. 52.227-17 Rights in Data – Special Works (Dec 2007)........................................ I-13 vi

I.67. 52.228-2 Additional Bond Security (Oct 1997) .................................................... I-13

I.68. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) ................. I-13

I.69. 52.228-11 Individual Surety—Pledge of Assets (Feb 2021) ................................ I-13

I.70. 52.228-12 Prospective Subcontract Requests for Bonds (Dec 2022) ................... I-13

I.71. 52.228-14 Irrevocable Letter of Credit (Nov 2014) .............................................. I-13

I.72. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020) ............. I-13

I.73. 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996) ........... I-13

I.74. 52.229-3 Federal, State, and Local Taxes (Feb 2013) (DEVIATION Jan 2026) . I-14

I.75. 52.229-11 Tax on Certain Foreign Procurements-Notice and Representation (Jun 2020) (DEVIATION Jan 2026) ........................................................................................... I-14

I.76. 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) (DEVIATION Jan 2026)….. .............................................................................................................................. I-14

I.77. Notice of Washington State Sales and Use Tax – Bureau of Reclamation – C-PN Region (Feb 1995) ............................................................................................................... I-14

I.78. 52.232-5 Payment under Fixed-Price Construction Contracts (May 2014) ......... I-14

I.79. 52.232-17 Interest (May 2014) ............................................................................. I-14

I.80. 52.232-23 Assignment of Claims (May 2014) ..................................................... I-14

I.81. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) ..................... I-14

I.82. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ...................................................................................................... I-14

I.83. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ................. I-14

I.84. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)….. .............................................................................................................................. I-14

I.85. WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (Mar 2022) ... I-14

I.86. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Mar 2022), Alternate I (Mar 2022) ............................................................... I-16

I.87. 52.233-1 Disputes (May 2014), Alternate I (Dec 1991) ....................................... I-19

I.88. 52.233-3 Protest After Award (Aug 1996) ........................................................... I-19

I.89. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ................... I-19

I.90. 52.236-2 Differing Site Conditions (Apr 1984) (DEVIATION Jan 2026) ........... I-19

I.91. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) (DEVIATION Jan 2026) ..................................................................................................... I-19

I.92. 52.236-5 Material and Workmanship (Apr 1984) (DEVIATION Jan 2026) ....... I-19 vii

I.93. 52.236-6 Superintendence by the Contractor (Apr 1984) (DEVIATION Jan 2026)….. .............................................................................................................................. I-19

I.94. 52.236-7 Permits and Responsibilities (Nov 1991) (DEVIATION Jan 2026) ..... I-19

I.95. 52.236-8 Other Contracts (Apr 1984) (DEVIATION Jan 2026) .......................... I-19

I.96. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) (DEVIATION Jan 2026) .......................................................... I-19

I.97. 52.236-10 Operation and Storage Areas (Apr 1984) (DEVIATION Jan 2026) ... I-19

I.98. 52.236-11 Use and Possession Prior to Completion (Apr 1984) (DEVIATION Jan 2026)….. .............................................................................................................................. I-19

I.99. 52.236-12 Cleaning Up (Apr 1984) (DEVIATION Jan 2026) ............................. I-19

I.100. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) (DEVIATION Jan 2026).............................................................................................................................. I-19

I.101. 52.236-14 Availability and Use of Utility Services (Apr 1984) (DEVIATION Jan 2026)….. .............................................................................................................................. I-19

I.102. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) (DEVIATION Jan 2026)….. .............................................................................................................................. I-19

I.103. 52.236-17 Layout of Work (Apr 1984) (DEVIATION Jan 2026) ........................ I-19

I.104. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate I (Apr 1984) (DEVIATION Jan 2026) .................................................................................. I-19

I.105. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Mar 2022) ........................................................................................................................... I-19

I.106. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Mar 2022)….. .............................................................................................................................. I-21

I.107. Implementation of Security Requirements – Construction Contract – Bureau of Reclamation – C-PN Region (Aug 2010) ............................................................................ I-27

I.108. 52.240-91 Security Prohibitions and Exclusions (DEVIATION Mar 2026) ........ I-28

I.109. 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (DEVIATION Mar 2026) .................................................................................................... I-28

I.110. 52.242-13 Bankruptcy (Jul 1995) ......................................................................... I-28

I.111. 52.243-4 Changes (Jun 2007) (DEVIATION Jan 2026) ...................................... I-28

I.112. 52.243-6 Change Order Accounting (Apr 1984) (DEVIATION Jan 2026) ......... I-28

I.113. WBR 1452.243-80, Modification Proposals – Bureau of Reclamation (Mar 2022) – Alternate II (Mar 2022) ....................................................................................................... I-28

I.114. 52.244-2 Subcontracts (Jun 2020) ........................................................................ I-29

I.115. 52.244-5 Competition in Subcontracting (Dec 1996) ........................................... I-29 viii

I.116. 52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan 2025) (DEVIATION FEB 2025) ......................................................................................... I-29

I.117. 52.246-21 Warranty of Construction (Mar 1994) (Apr 1984) .............................. I-32

I.118. 52.248-3 Value Engineering – Construction (Oct 2020), Alternate I (Apr 1984) I-32

I.119. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) .............................................................................................. I-32

I.120. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) .................................. I-32

I.121. 52.252-6 Authorized Deviation in Clauses (Nov 2020) ....................................... I-32

I.122. 52.253-1 Computer Generated Forms (Jan 1991)................................................. I-32

I.123. Contract Document Management System (CDMS)-CPN Region (Apr 2021) ..... I-32

I.124. 1452.280-3 Indian Economic Enterprise Subcontracting Limitations (Feb 2021)….. .............................................................................................................................. I-33

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ............ J-1

SECTION J LIST OF ATTACHMENTS ........................................................................... J-1

J.1. Wage DOL No. WA20260049 Kittitas County 05.18.26 (8 pages) .......................... J-1

J.2. Bid Bond SF-24 (4pages) .......................................................................................... J-1

J.3. Drawing Binder 11x17 (30 pages)............................................................................. J-1

J.4. Permits Combined (66 pages) .................................................................................... J-1

J.5. Specifications (206 pages) ......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS ................................................... K-1

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF BIDDERS K-1

K.1. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) .............................. K-1

K.2. 52.204-90 Offeror Identification (DEVIATION Mar 2026) .................................... K-1

K.3. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) ...................... K-4

K.4. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Nov 2021)… ................................................................................................................................ K-6

K.5. 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (DEVIATION Mar 2026) .................................................................................................... K-8

K.6. 1452.280-4 Indian Economic Enterprise Representation (Feb 2021) ...................... K-8

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS ............ L-1

L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) ................. L-1 ix

L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) ............................... L-1

L.3. 52.204-7 System for Award Management - Registration (Nov 2024) (DEVIATION Mar 2026) ............................................................................................................................. L-1

L.4. 52.214-3 Amendments to Invitations for Bids (Dec 2016) ....................................... L-1

L.5. 52.214-4 False Statements in Bids (Apr 1984) .......................................................... L-1

L.6. 52.214-5 Submission of Bids (Dec 2016) ................................................................. L-1

L.7. 52.214-6 Explanation to Prospective Bidders (Apr 1984) ........................................ L-1

L.8. 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) .. L-1

L.9. 52.214-12 Preparation of Bids (Apr 1994) ................................................................ L-1

L.10. 52.214-18 Preparation of Bids-Construction (Apr 1984) ...................................... L-1

L.11. 52.214-19 Contract Award-Sealed Bidding Construction (Aug 1996) ................. L-1

L.12. 52.214-34 Submission of Offers in the English Language (Apr 1991) ................. L-1

L.13. 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) ............................. L-1

L.14. Email Acknowledgement of Amendments, Modifications to Offers, and Withdrawals of Offers C-PN Region (Apr 2022) ................................................................. L-1

L.15. 52.216-1 Type of Contract (Apr 1984) .................................................................. L-2

L.16. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014)….. ............................................................................................................................... L-3

L.17. 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020)….. ............................................................................................................................... L-3

L.18. 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014)….. ............................................................................................................................... L-3

L.19. 52.228-1 Bid Guarantee (Sep 1996) ...................................................................... L-3

L.20. 52.232-13 Notice of Progress Payments (Apr 1984) ............................................. L-3

L.21. 1452.233-2 Service of Protest – Department of the Interior (Deviation) (Jul 1996)….. ............................................................................................................................... L-3

L.22. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (Mar 2022) .................................................................. L-3

L.23. Site Visit Attendance Restriction – Bureau of Reclamation – C-PN Region (May 2004)….. ............................................................................................................................... L-3

L.24. 52.252-3 Alterations in Solicitation (Apr 1984) .................................................... L-4

L.25. 52.252-5 Authorized Deviation in Provisions (Nov 2020) .................................... L-4 x

L.26. 1452.280-1 Notice of Indian Small Business Economic Enterprise Set-Aside (Feb 2021)….. ............................................................................................................................... L-4

SECTION M EVALUATION FACTORS FOR AWARD ................................................ M-1

M.1. Price Reasonableness Determination (May 2010) ............................................... M-1

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140R1026B0002

Bureau of Reclamation Pacific Northwest Region Regional Office Acquisition Management Division 1150 N. Curtis Road, Ste. 100 Boise ID 83706-1234

Bureau of Reclamation Attn: Jared Detton 1150 N Curtis Road, Ste 100 Boise, ID 83706

0044036056

R10

Jared Detton 2089861025

06/22/2026

07/22/2026

10 365 H.3 Commencement, Prosecution

Project Title: Cle Elum Reservoir, WA - Speelyi Beach Shoreline Protection.

This solicitation is issued as a total set-aside for Indian Small Business Economic Enterprises

(ISBEE).

The construction cost magnitude for this work is between $1,000,000 and $5,000,000.

The contractor shall complete the work in accordance with H.3 Commencement, Prosecution, and Completion of Work (Apr 1984).

Establish contractor Question and Answer (Q&A) cut-off date. The final date for contractor Q&A is 2:00

PM Mountain Daylight Time (MDT), on July 8th, 2026. No contractor questions will be accepted after this date and time. Please direct all questions to the Contracting Officer Michael Naseath at michael_naseath@ios.doi.gov and the Contract Specialist Jared Detton at jared_detton@ios.doi.gov.

A site visit has been scheduled for July 1st, 2026, at 10:00 AM Pacific Daylight Time (PDT).

Continued...

1 3

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

Bureau of Reclamation Pacific Northwest Region Regional Office Acquisition Management Division 1150 N. Curtis Road, Ste. 100 Boise ID 83706-1234

R10

Michael Naseath

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140R1026B0002

Participants must register with Wade Warner at wwarner@usbr.gov. Participants will meet at the

Speelyi Day Use Area, 831 Lake Cabins Rd., Ronald, WA 98940. To attend the site visit interested offers must adhere to the provision requirements located in L.23, Site Visit

Attendance Restriction. Preregistration will close June 30th, 2026, at 2:00 PM PDT.

Attendees be advised there is limited parking at this site. However, there is additional parking attendees can utilize alongside Lake

Cabins Rd.

Please ensure company UEI number is reflected on the bid cover sheet.

*** System updates may lag policy updates. The

System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals Representation, and paragraph (t) of 52.212-3, Offeror

Representations and Certifications of

Commercial Products and Commercial Services.

Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in

SAM. ***

00010 Cle Elum Reservoir, WA - Speelyi Beach

Shoreline Protection (Primary Price Schedule

ClINS 1-9 & Optional Price Schedule CLINS

(1A-7A).

Product/Service Code: Y1PZ

Product/Service Description: CONSTRUCTION OF

OTHER NON-BUILDING FACILITIES

Period of Performance: 08/14/2026 to

08/14/2027

Speelyi Beach Shoreline Protection Cle Elum Dam and Reservoir, Yakima Project Solicitation No. 140R1026B0002

Price Schedule

B - 1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES

CLE ELUM DAM AND RESERVOIR

SPEELYI BEACH SHORELINE STABILIZATION

YAKIMA PROJECT, WASHINGTON

B.1 PRICE SCHEDULE

(a) Bids will be considered for award on the following Price Schedule, but no bid will be considered for award on only a part of the Price Schedule.

(b) Bids are subject to the terms and conditions of this solicitation.

(c) Quantities in the Price Schedule are estimated quantities for comparison of bids only.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) Definitions:

(1) CLIN – Contract Line Item Number

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1 WBR

1452.232 -81

Mobilization and Preparatory Work

For the lump sum of $

2 02 41 13 Selective Demolition For the lump sum of $

3 13 00 10 Log Structures For the lump sum of $

4 31 11 00 Clearing and Grubbing For the lump sum of $

5 31 23 11 Earthwork For the lump sum of $

6 31 37 00 Riprap For the lump sum of $

7 32 14 40 Stone Paths For the lump sum of $

8 32 92 20 Seeding and Soil Supplements

For the lump sum of $

Price Schedule

B - 2

PRICE SCHEDULE

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

9 33 42 30 CMP Culvert For the lump sum of

TOTAL FOR PRICE SCHEDULE $_________________

B.2 OPTIONAL PRICE SCHEDULE A

(a) The Government reserves the right to award or not award Optional Price Schedule A.

(b) The Optional Price Schedule A items are for work as shown on the Drawings within the boundary marking “Optional Site A” site work.

(c) Quantities in the Price Schedule are estimated quantities for comparison of bids only.

(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.

(e) The Optional Price Schedule A may be exercised at any point during the Contract period of performance.

Price Schedule B - 3

OPTIONAL PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and Unit

Unit Price

Amount

1A 02 41 13 Selective Demolition For the lump sum of $

2A 31 11 00 Clearing and Grubbing For the lump sum of $

3A 31 23 11 Earthwork For the lump sum of $

4A 31 37 00 Riprap For the lump sum of $

5A 32 31 29 Wood Fence 60 LF $ $

6A 32 92 20 Seeding and Soil Supplements

For the lump sum of $

7A 33 42 30 CMP Culvert For the lump sum of $

TOTAL FOR OPTIONAL PRICE SCHEDULE A $_________________

GRAND TOTAL FOR PRICE SCHEDULE AND OPTIONAL PRICE SCHEDULE A

END OF SUPPLIES OR SERVICES AND PRICES

C-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

See Section J. Section C Specifications are included as a separate attachement.

D-1

SECTION D PACKAGING AND MARKING

Section not used.

E-1

SECTION E INSPECTION AND ACCEPTANCE

E.1. 52.246-12 Inspection of Construction (Aug 1996)

F-1

SECTION F DELIVERIES AND PERFORMANCE

F.1. 52.211-12 Liquidated Damages — Construction (Sep 2000) (DEVIATION Jan 2026)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,605.99 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F.2. 52.242-14 Suspension of Work (Apr 1984)

G-1

SECTION G CONTRACT ADMINISTRATION

G.1. Government Point of Contact

The contracting office’s point of contact for this contract is :

Name: Jared Detton

Title: Contract Specialist

Address: Bureau of Reclamation, Suite 100, 1150 North Curtis Road, Boise ID 83706-1234

Phone: (208) 986-1025

FAX: (208) 378-5108

E-Mail: jared_detton@ios.doi.gov

G.2. 1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction mailto:jared_detton@ios.doi.gov

G-2

(written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the

COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (Feb 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury’s Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice : None.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

G-3

G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018)

(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer’s Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the

Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract;

therefore, the COR does not have the authority to, and may not, issue any technical direction that

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor’s right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (e)(1) through (e)(5) of this clause, the

G-4

Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor’s letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

H-1

SECTION H SPECIAL CONTRACT REQUIREMENTS

H.1. WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (Mar 2022)

(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The conference will be held at TBD.

(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.

(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.

H.2. Contractor Performance Assessment Reporting System (Dec 2015)

1)…

This is the start of the file's text. The full file is on GovTribe.