J- 3 Seed TO 3 Little Snowies Mod 1.pdf

PDF 73 KB Posted

Attached to
USFS Region One/Region Four Mechanical Thinning IDIQ
Solicitation number
1284LM22R0006
Issued by

About this file

This document includes a task order and related federal contract opportunity solicitation. The task order is for mastication services on approximately 232 acres located 40 miles northwest of Roundup, Montana. Work must be completed in accordance with contract specifications and land preservation requirements. Performance will be assessed based on meeting work activity standards, specifications, and requirements. Incentives or deductions may apply.

The related federal contract opportunity is a solicitation for multiple award indefinite delivery indefinite quantity contracts for mechanical thinning, tree removal, processing, mastication, and other fuels treatment services on National Forest lands within Forest Service Regions 1 and 4. Contractors will provide all necessary labor, equipment, supervision, and other resources to complete work ordered under the contract. The base contract term is one year with four optional one-year renewals.

View the file

Other files

File Type Posted
Seed TO 2_LostLakeFuelsRxSummary.pdf PDF
J-3 6-1M Plot Photos.zip ZIP file
J- 3 6-3M Plot Photos.zip ZIP file
J- 3 6-2M Plot Photos.zip ZIP file
J- 2 FrankLakeAlkaliLostLake_UnitMap.pdf PDF
J- 2 RabbitTracksVicinityMap.pdf PDF
J- 2 Schedule of Items.pdf PDF
J- 2 Rabbit Tracks RxSummary.pdf PDF
J- 2 RabbitTracksUnitMap.pdf PDF
J-2 Item2_3_4_5_VicinityMap.pdf PDF
J- 2 Summary_Info_Chart.pdf PDF
J-2 HagadoreFrassUnitMap.pdf PDF
J-2 KootenaiFoodStorageOrder.pdf PDF
J-2 AlkaliFuelsRxSummary.pdf PDF
J-2 FrankLakeRoad213RxSummary.pdf PDF
J-2 HagadoreFrassRxSummary.pdf PDF
J- 3 Little Snowy HLF-08 Amended.pdf PDF
J-2 Schedule of Items Amended.pdf PDF
J-1 Seed TO 1 Crestline Amended.pdf PDF
J- 1 Crestline2022.pdf PDF
J- 1 Crestline QASP.pdf PDF
J-1 Seed TO 1 Crestline.pdf PDF
J-3 Food Storage Order.pdf PDF
J-11 WD 1977-0030 Rev 62 03152022 UT.pdf PDF
J-3 MAP.pdf PDF
J-6 Sample Forest Camping Permit.pdf PDF
J-13 WD 1976-1342 Rev 69 03_15_2022 MT.pdf PDF
J-8 WD 1995-0228 Rev 53 03152022 ID.pdf PDF
J-7 Equipment Evaluation Form.pdf PDF
J- 3 Seed TO 3 Little Snowies.pdf PDF
J-10 WD 1969-0113 Rev 67 03152022 NV.pdf PDF
J- 3 LittleSnowiesRx_Summary.pdf PDF
Seed TO 3.pdf PDF
J-3 LittleSnowy HLF 08 Mechanical vicinity map.pdf PDF
J- 3 Little Snowy HLF-08 Mechanical Treatment Units.pdf PDF
J-4 Thinning Inspection Plot Form.pdf PDF
1284LM22R0006 Final.pdf PDF
J-5 Sample Thinning Inspection Plot Form.pdf PDF
J-12 WD 77-0727 (Rev 66 03_15_2022 CA.pdf PDF
J-3 Summary Information Chart.pdf PDF
J-9 WD 1979-0948 Rev 61 03152022 WY.pdf PDF
sf-30_amendment_1.pdf PDF
TO KNF01 Pictures Item 4.pdf PDF
TO KNF01 Pictures Item 3.pdf PDF
TO KNF01 Pictures Item 1.pdf PDF
TO KNF01 Pictures Item 2.pdf PDF
TO KNF01 Pictures Item 5.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R1/R4 Mechanical Fuels Treatment IDIQ, Seed Task Order 3

Little Snowies

Schedule of Items

Item

No.

Sub-

Item Unit Name

Est.

Quantity

Unit of

Measure Unit Price Total

01-1 Unit 6-1M-Mastication 17 AC $_________ $___________

01-2 Unit 6-2M-Mastication 38 AC $_________ $___________

01-3 Unit 6-3M-Mastication 177 AC $_________ $___________

Total Price Quote $_________

1. Description of Work: Mastication in accordance with the requirements in the R1/R4

Mechanical Thinning IDIQ. The requirements outlined in this Task Order are specific to this Task

Order, and supplemental to the requirements of the parent contract. The specifications in this Task

Order may supersede or replace contract specifications in the parent contract, when allowed by the parent contract.

2. Project Location(s). NW of Roundup, MT approx. 40 miles, access Highway 87 north out of

Roundup to Snowy Mt. Road to Forest Road 271.

3. Government-Furnished Property. None

4. Performance Requirements Summary

Work Activity Performance Standard

Government

Method of

Assessment

Incentive/Deduction

Mastication

100% of the unit acres treated

Meets work activity specification & requirements.

Meets Task Order

(Prescription/Work

Description) requirements.

Meets requirements of Section

H (Landscape Preservation

Erosion Prevention and Soil

Protection, Slope Limitations, Erosion Control Seeding, Protection of Existing

Vegetation, Structures, Equipment, Utilities and

COR or

Inspector conduct periodic monitoring.

• Rework is required if Contractor fails to meet standard.

• If quality does not meet standard, pay deduction (Section G) and/or additional costs to the Government will be assessed.

• If the Contractor fails or refuses to repair any damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the

Contractor.

• The Contractor’s quality will be reflected in the performance assessment either positive or negative.

File details come from the government source that posted it. Updated .