This solicitation requests proposals for a tarmac maintenance and repair project at the Missoula Aerial Fire Depot. The project scope includes asphalt crack sealing, concrete edge and joint sealing, asphalt seal coat, stormwater drain restoration, and pavement marking and repair. The work will be completed in two phases according to FAA and USFS standards. The solicitation is issued by the USDA Forest Service Northern Region and proposals are due by an unspecified date. Pricing, award date, and other contractual terms are not provided in the document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
AFD TARMAC
PAVEMENT MAINTENANCE PROJECT
All Contract Documents provided by the U.S. Forest Service
SECTION TITLE
SECTION C Description/Specifications/Statement of Work
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 01041 Coordination and Site Conditions SECTION 01050 Construction Survey and Staking SECTION 01300 Submittals SECTION 01400 Quality Control SECTION 01500 Construction Facilities and Temporary Controls SECTION 01560 Environmental Quality Control SECTION 01570 Traffic Control SECTION 01720 Record Drawings
Technical specifications follow Federal Aviation Administration (FAA) technical specifications standards, 2018. The following parts are included for this project.
PART TITLE
P-101 Preparation/Removal of Existing Pavements P-154 Subbase Course P-208 Aggregate Base Course P-401 Asphalt Mix Pavement P-603 Emulsified Asphalt Tack Coat P-605 Joint Sealants for Pavements P-607(a) Paving Fabric P-608-R Rapid Cure Seal Coat P-620 Runway and Taxiway Painting
DRAWINGS
7 SHEET DRAWING SET BOUND IN THE BACK OF THIS MANUAL
END OF TABLE OF CONTENTS
SECTION 01041
COORDINATION AND
DIVISION 1 - GENERAL REQUIREMENTS SITE CONDITIONS
01041 Coordination and Site Conditions 1 of 15 Pages
AFD Tarmac Pavement Maintenance Project
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Requirements for coordinating and sequencing the work under the Contract, and requirements regarding existing site conditions.
B. Requirements for cutting and patching of new and existing work.
1.02 RELATED SECTIONS
A. Section 01500, CONSTRUCTION FACILITIES AND TEMPORARY
CONTROLS.
B. Section 01570, ENVIRONMENTAL QUALITY CONTROL.
1.03 JOBSITE COORDINATION
A. Project Site Coordination: All project site coordination (i.e. equipment staging, storage, site access) should be discussed and coordinated with Michael Lucas (Contracting Officer), USFS Region One, 24 Fort Missoula Road, Missoula, MT 59804, 406-329-3979.
B. If any part of Contractor's work depends on proper execution or results from the work of any such other contractor (or Owner), Contractor shall inspect and promptly report to Owner and Contracting Officer (CO) in writing any defects or deficiencies in such work that renders it unsuitable for such proper execution and results. Contractor’s failure to so report shall constitute an acceptance of the other work as fit and proper for the relationship of his work except as to defects and deficiencies which may appear in the other work after the execution of his work.
C. Contractor shall do all cutting, fitting, and patching of their work that may be required to make its several parts come together properly and fit it to receive or be received by such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of the CO and of the other contractors whose work will be affected.
D. If the performance of additional work by other contractors or Owner is not noted in the Contract Documents prior to the execution of the Contract, written notice thereof shall be given to Contractor prior to starting any such additional work. If Contractor believes that the performance of such additional work by Owner or others involves them in additional expense or
01041 Coordination and Site Conditions 2 of 15 Pages entitles them to an extension of the contract time, Contractor may make a claim therefore.
E. Contractor shall be responsible for all areas of the site used by them and all Subcontractors in performance of the work. Contractor shall exert full control over the actions of all employees and other persons with respect to the use and preservation of property and existing facilities, except such controls as may be specifically reserved to Owner or others.
F. Contractor and all Subcontractors shall cooperate in the coordination of their separate activities in a manner that will provide the least interference with the Owner's operations and utility companies working in the area, and in the interfacing and connection of the separate elements of the overall project work. If any difficulty or dispute should arise in the accomplishment of the above, the problem shall be brought immediately to the attention of the Owner and Engineer. All Contractors working on this site are subject to this requirement for cooperation, and all shall abide by the CO’s decision in resolving project coordination problems without additional cost to the Owner.
G. The Contractor shall have a designated job superintendent on site at all times during construction operations. The superintendent shall be capable of project level decisions, manpower authorization, and equipment utilization. Contractor will provide twenty-four (24) hour response through an after-hours phone number where some responsible local Contractor representative, foreman level or higher, can respond to after-hours complaints concerning the project during the course of the construction operations.
1.04 SUBMITTALS
A. Contractor shall submit the following information as applicable to coordination activities:
1. Subsurface Information and Utilities:
a. Records or logs of borings or test holes made by Contractor, if any.
b. Results of exploratory excavations made to verify locations and nature, shape, dimensions, etc., of existing utilities and facilities; where possible, indicate this information on clean copy of Contract Drawings.
01041 Coordination and Site Conditions 3 of 15 Pages
2. Field Relocation: Clearly show proposed relocations of new or existing facilities, or related work affected by the relocation, on clean copy of the Contract Drawings submitted prior to performing the relocation.
3. Easements: Copy of easements and other agreements obtained from utilities and property owners as required to carry out the work.
Note this only applies to easements executed by the Contractor.
4. Connecting Work: Proposed methods of connecting new work to existing facilities, where not shown or specified.
5. Cutting and Patching:
a. Written notice requesting consent to perform cutting which may affect structural safety or normal functioning of existing facilities.
b. Recommendations indicating changed conditions, alternative materials or methods, time when uncovered work may be observed, and other information necessary to evaluate substitutions when work conditions necessitate change of materials or methods.
6. Detailed schedule of proposed sequence of work meeting the requirements of this section and Section 01300, SUBMITTALS.
Schedule shall clearly identify all interfacing work and dates that existing facilities must be modified, connected to, and/or taken out of service.
1.05 SITE CONDITIONS
A. Information on Site Conditions:
1. General: Information obtained by the Owner regarding site conditions, topography, subsurface information, groundwater elevations, existing construction of site facilities as applicable, and similar data is included in the Contract Documents or will be available for inspection at the office of the CO or Owner upon request. Such information is offered as supplementary information only. Neither the CO nor the Owner assumes any responsibility for its accuracy or completeness or for the Contractor's interpretation of such information.
01041 Coordination and Site Conditions 4 of 15 Pages
2. Subsurface Information: Subsurface investigations at the site have been performed. However, it shall be the responsibility of the Contractor to verify subsurface conditions prior to bidding on the work. This information is not part of this Contract and is offered as “Technical Data” information only. Neither the CO nor the Owner assumes any responsibility for its accuracy or completeness or for the Contractor’s interpretation of such information, as specified in the Standard General Conditions.
3. Control Points: Contractor shall check existing and establish new (if desired) vertical and horizontal survey control points on structures and improvements located in the vicinity of the work prior to beginning work. Contractor shall check the points for movements when directed by the CO. Furnish CO with copies of survey notes for each survey and a copy of the layout of survey control points.
B. Existing Utilities:
1. Location:
a. Known utilities and facilities adjacent to or within the work area are shown on the Drawings. The locations shown are taken from existing records and the best information available from existing utility plans; however, it is expected that there may be some discrepancies and omissions in the locations and quantities shown. Contractor's request for additional compensation or Contract time resulting from encountering utilities not shown will be considered as set forth in the General Conditions.
b. Contractor shall exercise reasonable care to verify locations of utilities and facilities shown on the Drawings and to determine the presence of those not shown. Immediate and adjacent areas where excavations are to be made shall be thoroughly checked by visual examination for indications of underground facilities and also checked with electronic metal and pipe detection equipment. Where there is reasonable cause to verify the presence or absence of an underground facility, make exploratory excavations prior to proceeding with major excavation in the area. Where information on buried facilities is required to verify their nature, shape, configuration, dimensions, materials, or other properties, make exploratory excavations as acceptable to the Owner and CO.
01041 Coordination and Site Conditions 5 of 15 Pages
c. The Contractor is advised that there is a one-call utility locate number in use for utility location requests within the State of Montana for buried gas and electrical lines and buried telecommunication lines. The one call number is 1-800-424- 5555. MCA 69-4-501 through 69-4-506 specifies the requirements to use this system before any excavation work in Montana.
2. Contractor's Responsibilities:
a. Where Contractor's operations could cause damage or inconvenience to telephone, television, power, oil, gas, water, sewer, irrigation systems, or other similar utilities, the Contractor shall make arrangements necessary for the protection of these utilities and services. Replace existing utilities removed or damaged during construction with equal or better materials, unless otherwise provided for in these Contract Documents.
b. Notify utility offices that are affected by construction operations at least 48 hours in advance. Under no circumstances shall Contractor expose any utility without first obtaining permission from the appropriate agency and utility owner. Once permission has been granted, locate, expose, and provide temporary support for the utilities.
c. Contractor shall be solely and directly responsible to owner and operator of such properties for damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character brought because of injuries or damage which may result from construction operations under this Contract.
d. Neither Owner nor its officers or agents shall be responsible to Contractor for damages as a result of Contractor's failure to protect utilities or associated facilities encountered in the work.
e. In event of interruption to domestic water, sewer, storm drain, or other utility services as a result of accidental damage due to construction operations, promptly notify the Owner and/or proper authority. Cooperate with Owner and said authority in
01041 Coordination and Site Conditions 6 of 15 Pages restoration as promptly as possible and pay for repair. Prevent interruption of utility service unless granted by the utility owner.
f. Contractor shall maintain a legible log of all utility crossings showing type, depth, date of crossing. Location referenced to project stationing, and a notation if the utility was damaged, type of repair, and who made the repair. The Contractor will work with CO to maintain an accurate and complete log that will become part of the as-construction contract drawings.
3. Names of Known Utilities: Notify the following applicable utilities if conflicts or emergencies arise during the work:
a. Electric Company: Northwestern Energy Telephone: 1-888-467-2669 (emergencies)
b. Missoula Airport Authority (water, sewer, and storm drain utilities) Telephone: 1-406-370-2206 (operations)
c. Fiber Optic Cable Company: 1-877-744-4416 (emergencies)
C. Interfering Structures:
1. Take necessary precautions to prevent damage to existing structures whether on the surface, above ground, or underground.
An attempt has been made to show major structures on the Drawings. While the information has been compiled from the best available sources, its completeness and accuracy cannot be guaranteed.
2. Protect existing structures from damage, whether or not they lie within limits of easements obtained by the Owner. Where existing fences, gates, sheds, buildings, or other structures must be removed to properly carry out work, or are damaged during work, restore them to original, or better, condition than present prior to construction.
3. Contractor may remove and replace in equal or better than original condition, small structures such as fences, mailboxes, and signposts that interfere with Contractor's operations.
D. Field Relocation:
01041 Coordination and Site Conditions 7 of 15 Pages
1. During construction, it is expected that minor relocations of proposed facilities will be necessary. Make such relocations only by direction of the Owner or CO. If existing structures are encountered that prevent construction as shown, notify the CO before continuing with work so CO may make necessary field revisions.
2. Where shown or directed by and acceptable to the CO and Owner, provide relocation of existing facilities to include piping, utilities, equipment, structures, electrical conduit wiring, electrical duct bank, and other miscellaneous items. Use only new materials for relocation of existing facilities. Match materials of existing facilities unless otherwise shown or specified. Perform relocations to minimize downtime of existing facilities. Install new portions of existing facilities in their relocated position prior to removing existing facilities, unless otherwise accepted by CO.
E. Monuments and Markers:
1. Preserve and protect survey monuments and markers throughout construction. If damage occurs or removal becomes necessary, immediately notify Engineer and restore monument or marker to original condition.
2. Preserve private and public monuments that are found. If monument must be removed, replace at original locations using registered land surveyor. Notify CO when monuments are encountered. If government monuments are encountered, reference the monument for later replacement and provide 10-day advance notification to CO who will notify the proper authority.
F. Easements:
1. Where portions of work will be located on public or private property, easements and permits for rights-of-way will be obtained by Owner.
Easements and permits for rights-of-way will provide for use of property for construction purposes only to the extent indicated on easements and permits. Copies of these easements and permits will be available from Owner for inspection. Contractor shall review the easements and permits obtained and abide by easement and permit provisions. Confine construction operations to within easement and permit limits or make special arrangements with property owners or appropriate public agency for additional area required.
2. Before final payment will be authorized, Contractor shall furnish the Owner written releases from property owners or public agencies
01041 Coordination and Site Conditions 8 of 15 Pages where side agreements or special easements have been made, or where Contractor's operations have not been kept within the Owner's property.
3. In the event Contractor is unable to secure written releases, inform the Owner of the reasons:
a. Owner or its representatives will examine the site, and Owner will direct Contractor to complete work that may be necessary to satisfy terms of the easements.
b. Should Contractor refuse to do this work, Owner reserves the right to have it done by separate contract and deduct the cost of same from the Contract amount, or require the Contractor to furnish a satisfactory bond in a sum to cover legal claims for damages.
c. When Owner is satisfied that work has been completed in agreement with the Contract Documents and terms of easements, the right is reserved to waive the requirement for written release if Contractor's failure to obtain such statement is due to the grantor's refusal to sign, and this refusal is not based upon any legitimate claims that Contractor has failed to fulfill the terms of the easement or Contractor is unable to contact or has had undue hardship in contacting the grantor.
G. Connecting to Existing Facilities: Unless otherwise shown or specified, determine methods of connecting new work to existing facilities, and obtain CO’s review and acceptance of connections:
1. Determine location, elevation, nature, materials, dimensions, and configurations of existing facilities where necessary for connecting new work.
2. Inspect existing record drawings and shop drawings, conduct exploratory excavations and field inspections, and conduct similar activities as needed.
3. Shutdown of Owner's existing facility prior to connection, if necessary, shall be by Owner as specified hereinafter. Provide notice to Owner of a planned shutdown as specified hereinafter.
H. Erosion and Dust Control On-Site:
01041 Coordination and Site Conditions 9 of 15 Pages
1. The Contractor shall be responsible for reducing soil erosion and dust due to wind or water to a level meeting federal, state, and local regulations at the construction site. Control measures that may be required include, but may not be necessarily limited to, the following:
a. Suspending excavation during high winds or rain.
b. Minimizing land exposure in area and time.
c. Covering erodible areas as quickly as possible with gravel landscaping or by compaction.
d. Retaining existing vegetation where possible.
e. Prohibiting clearing or grubbing until a firm construction schedule is known.
f. Stabilizing construction site soils.
g. Controlling dust during construction by use of water spray.
h. On-site burning of waste materials is not allowed.
2. Also see Section 01570, ENVIRONMENTAL QUALITY CONTROLS.
1.06 PROJECT MEETINGS OR REPORTS
A. Preconstruction Conference: A preconstruction conference will be scheduled after the Notice of Award. The Contractor and their major Subcontractors shall attend the meeting.
B. Progress Meetings: The Owner or CO may schedule regular progress meetings approximately every one to two weeks to review work progress, schedules, and other matters needing discussion and resolution.
C. Progress Reports: A monthly progress report shall be provided with an updated schedule by the Contractor prior to the submission of the application for progress payment. If the work falls behind schedule, Contractor shall submit progress reports at such intervals as the Owner or CO may request. Each progress report shall include sufficient narrative to describe current and anticipated delaying factors, their effect on the construction schedule, and proposed corrective actions. Any work reported complete, but which is not readily apparent to the CO must be substantiated with satisfactory evidence.
01041 Coordination and Site Conditions 10 of 15 Pages
D. Purpose of Meetings and Reports: The purpose of the meetings or reports will be to review the general progress of work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems which develop. At a minimum, each meeting must be attended by the Contractor’s Project Manager or Resident Project Superintendent and representatives of major Subcontractors.
1.07 SEQUENCE OF WORK
A. Modifications to Existing Facilities:
1. Where existing facilities are to be modified during the course of work, obtain Owner's and CO’s review and acceptance of submittals for temporary shutdown, demolition, modification, connections between new and existing work, and other related work. Conform to other sections as applicable.
2. Connections to existing services or utilities, or other work that requires the temporary shutdown of any existing operations of utilities shall be planned in detail with appropriate scheduling of the work and coordinated with the Owner and CO. The schedule for shutdown or restart shall be given by written advance notice in order that the Owner or CO may witness the shutdown, tie-in, and startup.
3. All materials and equipment (including emergency equipment) necessary to expedite the tie-in shall be on hand prior to the shutdown of existing services or utilities. Where bypass pumping is required, the Contractor shall have equipment of adequate capacity to meet maximum anticipated flow rates with one “unit” in standby mode.
4. Unless otherwise specified or indicated, Contractor shall make all necessary connections to existing facilities including structures, pipelines, and utilities such as water, telephone, gas, and electric. In each case, Contractor shall obtain permission from the Owner or the owning utility prior to undertaking connections. Contractor shall protect facilities against deleterious substances and damage.
5. Connections to existing facilities which are in service shall be thoroughly planned in advance, and all required equipment, materials, and labor shall be on hand at the time of undertaking the connections. All equipment, materials, and labor that the Contractor plans to have available shall be coordinated with the Owner and CO in order to ensure the work is done in the minimum amount of time.
01041 Coordination and Site Conditions 11 of 15
B. Time of Work:
1. No work shall be done between 7:00 p.m. and 7:00 a.m., nor on Saturdays, Sundays or legal holidays, without the written permission of the Owner. However, maintenance or emergency work during these hours may be done without prior permission. The Contractor’s work shall not exceed 10 hours per day unless authorize by the Owner and CO.
2. Overtime Notice: If Contractor for convenience, or as required by project circumstances, should desire to carry on work at night or outside regular working hours between 8:00 a.m. to 5:00 p.m., submit written notice to the Owner and CO and allow ample time for satisfactory arrangements to be made for observing work in progress as specified in the Supplementary Conditions. Contractor shall pay the CO’s expenses and salary to the CO at a rate as specified in the Bid Form per person for onsite observation required when the Contractor's onsite operations exceed 40 hours per week. The CO will be the sole judge of whether onsite observation is required.
3. Onsite observation will be required during critical construction activities. The Contractor's payment to the Owner for observation services exceeding 40 hours per week will be at the overtime rates specified.
1.08 REQUESTS FOR INTERPRETATIONS (RFI)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at a Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor’s work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:
1. Project name.
2. Date.
01041 Coordination and Site Conditions 12 of 15
3. Name of Contractor.
4. Name of Contracting Officer.
5. RFI number, numbered sequentially.
6. Specification Section number and title and related paragraphs, as appropriate.
7. Drawing number and detail references, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor’s suggested solution(s). If Contractor’s solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
10. Contractor’s signature.
11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation.
a. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments.
C. Contracting Officer’s Action: CO will review each RFI, determine action required, and return it. Allow seven working days for Engineer’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions not provided within the normal submittal process.
c. Requests for coordination information already indicated in the
Contract Documents.
d. Requests for adjustments in the Contract Time or the Contract
Sum.
e. Requests for interpretation of CO’s actions or submittals.
f. Incomplete RFIs or RFIs with numerous errors.
01041 Coordination and Site Conditions 13 of 15
2. CO’s action may include a request for additional information, in which case CO’s time for response will start again.
3. CO’s action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to the General Conditions.
a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify COin writing within seven working days of receipt of the RFI response.
D. On receipt of CO’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Engineer within seven working days if Contractor disagrees with response.
E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log monthly, include the following:
1. Project name.
2. Name and address of Contractor.
3. Name and address of Contracting Officer.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date CO’s response was received.
8. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate.
9. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 CUTTING AND PATCHING
A. General:
01041 Coordination and Site Conditions 14 of 15
1. Execute cutting (including excavating), fitting, or patching of work, required to:
a. Make the several parts fit properly.
b. Uncover work to provide for installation of specified work.
c. Remove and replace defective work or work not conforming to requirements of Contract Documents.
d. Install specified work in existing construction.
2. Perform the following upon written instruction of Engineer:
a. Uncover work to provide for CO’s observation of covered
b. Remove work to provide for alteration of existing work.
3. Contractor shall not, without written consent of Owner or CO:
a. Cut or alter work of another contractor.
b. Cut structural or reinforcing steel.
c. Endanger existing or new structures or facilities.
d. Shut down or disrupt existing operations.
4. Materials for replacement of work removed shall comply with applicable sections of these Specifications for corresponding type of work to be done.
5. Provide all tools and equipment required to accomplish cutting and patching.
B. Inspection and Preparation:
1. Inspect existing conditions of work, including elements subject to movement or damage during cutting, patching, excavating, and backfilling.
2. After uncovering work, inspect conditions affecting installation of new products.
01041 Coordination and Site Conditions 15 of 15
3. Prior to cutting, provide safety protection.
C. Procedures:
1. Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances and finishes.
2. Restore work which has been cut or removed; install new products and provide completed work in accordance with specified requirements.
3. Restore structures and surfaces damaged that are to remain in the completed work including concrete- embedded piping, conduit, and other utilities.
4. Make restorations with new materials and appropriate methods as specified for new work of similar nature; if not specified, use best recommended practice of manufacturer or appropriate trade association.
5. Restore damaged work so there is a secure and intimate bond or fastening between new and old work. Finish restored surfaces to such planes, shapes, and textures that no transition between new and old work is evident in finished surfaces.
3.02 REMOVAL/RELOCATION/REPLACEMENT OF EXTRANEOUS ITEMS
A. Contractor shall be responsible to other items in conflict with construction.
Contractor shall notify owner or utility company of such items prior to construction and shall coordinate with owner as to methodology required.
Unless a specific bid item is identified and the removal is approved by the CO, the cost for this work will be considered incidental to all other items.
END OF SECTION 01041
SECTION 01050
CONSTRUCTION
DIVISION 1 – GENERAL REQUIREMENTS SURVEY AND STAKING
01050 Construction Survey and Staking 1 of 3 Pages
A. Requirements for furnishing qualified personnel and necessary equipment and material to survey, stake, calculate and record data for the control of
1.02 RELATED SECTIONS
A. See FAR Clause 52.236-17 Layout of Work for additional requirements.
1.03 GENERAL
A. Include staking activities in the construction schedule.
B. Preserve all initial reference and control points. After beginning construction, replace all destroyed or disturbed initial reference or control points necessary to the work.
C. Prior to surveying or staking, discuss and coordinate the following with the
CO:
1. Surveying and staking methods;
2. Stake marking;
3. Grade control for courses of material;
4. Referencing;
5. Structure control; and,
6. Any other procedures and controls necessary for the work.
D. Prepare field notes in an approved format. Furnish all survey notes to the
CO weekly. All field notes and supporting documentation become the property of the Government upon completion of the work.
E. Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete.
DIVISION 1 – GENERAL REQUIREMENTS SURVEY AND STAKING
01050 Construction Survey and Staking 2 of 3 Pages
1.04 PERSONNEL, EQUIPMENT AND MATERIAL
A. Furnish technically qualified survey crews experienced in construction survey and staking. Provide personnel capable of performing in a timely and accurate manner. An acceptable crew supervisor shall be on the project whenever surveying/staking is in progress.
B. Furnish survey instruments and supporting equipment capable of achieving the specified tolerances.
C. Furnish acceptable tools, supplies, and stakes of the type and quality normally used in highway survey work and suitable for the intended use.
Furnish stakes and hubs of sufficient length to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.01 GENERAL
A. Perform all survey, staking, recording of data, and calculations as necessary to construct the project from the initial layout to final completion. Reset stakes as many times as necessary to construct the
3.02 WORK ELEMENTS
A. Control points. Relocate initial horizontal and vertical control points in conflict with construction to areas that will not be disturbed by construction operations. Furnish the coordinates and elevations for the relocated points before the initial points are disturbed.
B. Slope stakes and references. Set slope stakes and references on both sides of centerline at the cross-section locations. Establish slope stakes in the field as the actual point of intersection of the design slope with the natural ground line. Set slope stake references outside the clearing limits.
Include all reference point and slope stake information on the reference stakes. When initial references are provided, slope stakes may be set from these points with verification of the slope stake location with field measurements. Set additional references even when initial references are provided.
DIVISION 1 – GENERAL REQUIREMENTS SURVEY AND STAKING
01050 Construction Survey and Staking 3 of 3 Pages
C. Clearing and grubbing limits. Set clearing and grubbing limits on both sides of centerline along roadway alignments.
D. Grade finishing stakes. Set grade finishing stakes, for grade elevations and horizontal alignment. Set stakes at the top of subgrade and the top of each aggregate course. Stakes shall be set in a grid pattern with maximum spacing of 20 feet.
3.03 STAKING TOLERANCES
A. The following table lists the applicable tolerances for field staking for various phases of the work.
Staking Phase Horizontal Vertical
Existing Government network control points ±0.06 ft ±0.035 ft ×√M
Local supplemental control points set from existing Government network points
±0.03 ft ±0.01 ft ×√N
Clearing and grubbing limits ±2.00 ft NA
Slope stake references ±0.16 ft ±0.16 ft
Centerline points – PC, PT, POT and POC ±0.03 ft ±0.03 ft
Minor drainage structures ±0.16 ft ±0.06 ft
Subgrade finish stakes ±0.16 ft ±0.03 ft
Finish Grade Stakes ±0.16 ft ±0.03 ft Where: M is the distance in miles and N is the number of instrument setups.
END OF SECTION 01050
SECTION 01300
DIVISION 01 00 00 - GENERAL REQUIREMENTS SUBMITTALS
01300 Submittals Page 1 of 12
A. Submittal procedures.
B. Substitutions.
C. Construction progress schedules.
D. Proposed products list.
E. Shop drawings.
F. Product data.
G. Samples and test specimens.
H. Quality control submittals.
I. Manufacturers' instructions.
J. Manufacturers' certificates.
1.02 RELATED SECTIONS
A. Section 01 04 01, COORDINATION AND SITE CONDITIONS: Requests for Interpretation.
B. Section 01 40 00, QUALITY CONTROL: Manufacturer’s field services and reports.
C. Individual specification sections in these Contract Documents contain additional and special submittal requirements. Individual sections shall take precedence in the event of a conflict with this section.
1.03 SUBMITTAL PROCEDURES
A. Submittal Register: The Contractor shall submit to the Contracting Officer (CO) a register indicating the required submittal data and Contractor’s proposed submittal dates for all equipment and materials for which a submittal is required by individual specifications. It is the Contractor’s responsibility to ensure that the register is complete. The completed register shall be submitted to the CO by the Contractor within fifteen (15) working days after the date of the Notice of Award.
B. General Procedures:
01300 Submittals Page 2 of 12
1. Procedures and requirements for submittals are specified herein.
Owner reserves the right to modify the procedures and requirements for submittals, as necessary to accomplish the specific purpose of each submittal. Direct all inquiries to CO regarding the procedure, purpose, or extent of any submittal.
2. Review, acceptance, or approval of substitutions, schedules, shop drawings, lists of materials, and procedures submitted or requested by Contractor shall not add to the Contract Price amount, and additional costs which may result therefrom shall be solely the obligation of Contractor. Where Contractor suggests use of a substitution, he must demonstrate why the substitution is in the Owner’s best interest and pay all associated costs for re-engineering, as required.
3. Owner is not precluded, by virtue of review, acceptance, or approval, from obtaining a credit for construction savings resulting from allowed concessions in the work or materials therefore.
4. Owner is not responsible to provide Engineering or other services to protect Contractor from additional costs accruing from submittals.
5. Submittals processed by CO do not become Contract Documents and are not Change Orders; the purpose of submittal review is to establish a reporting procedure and is intended for Contractor's convenience in organizing the work and to permit CO to monitor Contractor's progress and understanding of the design.
6. Submittals will be acted on by the CO as promptly as possible and returned to the Contractor not later than the time allowed for review in the Paragraph entitled SPECIFIC SUBMITTAL PROCEDURES.
Delays caused by the need for resubmittal shall not constitute basis for claim or for an extension of contract time.
7. After checking and verifying all field measurements, make submittals to CO, in accordance with the submittal register for review.
a. Submittals shall bear a stamp or specific written indication that Contractor has satisfied its responsibilities under the Contract Documents with respect to the review of the submittal.
b. Data shown shall be complete with respect to quantities, dimensions, specified performance and redesign criteria, materials, and similar data to enable Engineer to review the information.
c. Submitted data shall be fully sufficient in detail for determination of compliance with the Contract Documents.
01300 Submittals Page 3 of 12
8. Before submission of each submittal, determine and verify quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar data with respect thereto; review and coordinate each submittal with other submittals, requirements of the work, and Contract Documents.
9. At the time of each submission, provide mark-ups of the technical specification indicating each variation that the submittal may have from the requirements of the Contract Documents; if variations are not listed, it is assumed that the submitted equipment meets the specification. In addition, make specific notation on each shop drawing submitted to CO for review and approval of each such variation.
10. CO’s review will be only for conformance with the design concept of the project and for compliance with the information given in the Contract Documents, not extending to means, methods, techniques, sequences, or procedures of construction (except where a specific means, method, technique, sequence, or procedure of construction is indicated in or required by the Contract Documents) nor to safety precautions or programs incident thereto. The review of a separate item as such will not indicate review of the assembly in which the item functions.
11. CO’s review of submittals shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has in writing called CO’s attention to each such variation at the time of submission, and CO has given written approval of each such variation by a specific written notation thereof incorporated in or accompanying the shop drawing or sample approval; nor will any approval by CO relieve Contractor from responsibility for errors or omissions in the shop drawings or from responsibility for having complied with the provisions therein.
12. Where a shop drawing or sample is required by the Specifications, related work performed prior to CO’s review and approval of the pertinent submission shall be the sole expense and responsibility of Contractor.
13. Should the Contractor propose any item on his shop drawings, or incorporate an item into the work, and that item should subsequently prove to be defective or otherwise unsatisfactory, (regardless of the CO's preliminary review), the Contractor shall, at his own expense, replace the item with another item that will perform satisfactorily.
01300 Submittals Page 4 of 12
14. Review of first submittal and one resubmittal will be performed by the CO at no cost to the Contractor. Subsequent submittals will be reviewed by the CO; however, the CO will document the work-hours and other expenses required for such review(s) and the Contractor shall reimburse the Owner for the charges of the CO with a deduction from the Contractor's monthly pay estimate.
C. Specific Submittal Procedures:
1. Contractor may choose to use an Internet-based submittal service such as Procore or ConDoc. Use of such a service shall not relieve the Contractor from complying with the submittal procedures specified herein.
2. Submittals by Contractor shall be transmitted as a PDF file (as defined below).
a. If an Internet-based submittal service is not used, for large shop drawing files greater than 20MB, submittals shall be made to an FTP site.
b. Review comments and resubmittals are to be provided electronically, after which a minimum of two hard copies of the final and approved shop drawings are submitted for distribution. Distribution would be to the CO and Owner.
c. Submittals shall be an electronic file in Adobe Acrobat Portable Document File (PDF) format created directly to PDF (preferred) or via scans of the hard copy. Scans must be legible.
d. Electronic files that contain more than 10 pages in PDF format shall contain internal bookmarks linked from an index page to major sections of the document.
e. General submittal information shall be added to each PDF file, including project, subject, submittal number, supplier, and keywords.
f. PDF files shall be set up to print legibly at 8.5-inch by 11-inch, 11-inch by 17-inch, or 22-inch by 34-inch. No other paper sizes will be accepted.
g. New electronic files shall be submitted for each resubmittal, i.e., resubmit entire submittal when individual pages or portions thereof are modified.
3. Combine submittals specified in each Specification section into a single package. Partial packages will not be reviewed until all submittals required for the section have been received. If Contractor requests review of a partial submittal and CO accepts to assist the Contractor, all subsequent submittals shall will be treated as re-
01300 Submittals Page 5 of 12 submittals and the Contractor will be charged for review of the second and any subsequent re-submittals.
4. The shop drawings shall be accurate, distinct, and complete, and shall contain all required information, including satisfactory identification of items, units, and assemblies in relation to the Contract Drawings and Specifications, and as specified further hereinafter.
5. Transmit each submittal with a CO accepted form signed and dated by the Contractor.
6. Number the transmittal forms by specification number with a sequential suffix for each resubmittal.
7. Identify project, Contractor, subcontractor or supplier; pertinent Drawing sheet and detail number(s), and Specification section number, as appropriate.
8. Apply Contractor's stamp, signed or initialed certifying that review, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
9. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of the completed work.
10. Revise and resubmit submittals as required, identify all changes made since previous submittal.
11. Distribute copies of reviewed submittals to concerned parties.
Instruct parties to promptly report any inability to comply with provisions.
12. Submittals will be acted upon by CO and transmitted to Contractor not later than 21 regular working days after receipt by CO. Shop drawings shall be submitted in sufficient time to allow the CO not less than 21 regular working days for examining the shop drawings.
13. When shop drawings have been reviewed by the CO, one PDF copy will be returned to the Contractor appropriately annotated.
a. If major changes or corrections are necessary, shop drawing may be rejected and PDF will be returned to the Contractor with such changes or corrections indicated.
01300 Submittals Page 6 of 12
b. Correct and resubmit the shop drawings in the same manner and quantity as specified for the original submittal, unless otherwise directed by the CO. If changes are made by the Contractor (in addition to those requested by the CO) on the resubmitted shop drawings, such changes shall be clearly explained in a transmittal letter accompanying the resubmitted shop drawings.
1.04 SUBSTITUTIONS
A. Where items of equipment and materials are identified herein by a manufacturer’s name, model, or catalog number followed by the words “or equal” or “or approved equal,” Contractor must obtain CO’s approval.
B. Note that use of an “or equal” item shall not increase the cost to the Owner or increase contract times.
C. If using a “substitute,” note that Contractor shall be responsible for any costs resulting from a change in Contract Documents, design change, CO’s review and evaluation.
1.05 CONSTRUCTION PROGRESS SCHEDULES
A. Submit initial progress schedule in duplicate within 15 days after date of Owner's Notice of Award for the CO’s review.
B. Submit revised schedules with each Application for Payment, identifying changes since previous version.
C. Submit a Critical Path Method (CPM) chart with separate line for each major section of work or operation, identifying first work day of each week.
D. Show complete sequence of construction by activity, identifying work of separate stages and other logically grouped activities. Indicate the early and late start, early and late finish, float dates, critical path, and duration.
E. Indicate estimated percentage of completion for each item of work at each submission.
F. Indicate submittal dates required for shop drawings, product data, samples, and product delivery dates.
1.06 PROPOSED PRODUCTS LIST
A. Within 14 calendar days after date of Owners Notice of Award, submit complete list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.
01300 Submittals Page 7 of 12
B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.
C. Should the Contractor elect to substitute a proposed equivalent material to an “or equal” or "or approved equal" specification, the Contractor shall submit to the CO adequate documentation allowing the CO to determine the equivalency of the material.
1.07 SHOP DRAWINGS
A. General:
1. The Contractor shall submit shop drawings, equipment and materials data as required in the Technical Provisions of these specifications concerning the specific item as soon as practical. The Contractor may proceed, only at his own risk, with manufacture or installation of any equipment or work covered by said drawings, etc. until they are approved, and no claim, by the Contractor, for extension of the contract time will be granted by reason of his failure in this respect.
2. Shop drawings, as defined herein, consist of all drawings, diagrams, illustrations, schedules, and other data which are specifically prepared by or for Contractor to illustrate some portion of the work;
and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams, and other information prepared by a manufacturer and submitted by Contractor to illustrate material or equipment for distinct portions of the work.
3. Submittal of incomplete or unchecked shop drawings will not be acceptable. Shop drawing submittals which do not clearly show Contractor's review stamp or specific written indication of Contractor review will be returned to Contractor for resubmission.
4. Submittal of shop drawings not required under these Contract Documents and not shown on the Submittal Register will be returned to the Contractor unreviewed and unstamped by the CO.
B. Stamp of Approval: All drawings, equipment, materials, and other submitted data shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the CO. Each submittal shall be dated, signed, and certified by the Contractor, as being correct and in strict conformance with the Contract Documents. No consideration for review by the CO of any Contractor submittals will be made for any items which have not been so certified by the Contractor. All non-certified submittals will be returned to the Contractor without action taken by the CO, and any delays caused thereby shall be the total responsibility of the Contractor.
01300 Submittals Page 8 of 12
C. Shop Drawing Contents:
1. Shop drawings referred to herein shall include shop drawings and other submittals for both shop and field-fabricated items. The Contractor shall submit, as applicable, the following for all prefabricated or manufactured structural, mechanical, electrical, plumbing, process systems, and equipment:
a. Shop drawings or equipment drawings, including dimensions, size and location of connections to other work, and weight of equipment.
b. Catalog information and cuts.
c. Installation and/or placing drawings for equipment, drives, and bases.
d. Supporting calculations for equipment and associated supports specified to be designed by equipment manufacturers or suppliers.
e. Wiring and control diagrams of systems and equipment.
f. Complete manufacturer's specifications, including materials description and paint systems.
g. Complete motor rating for all motors 5 horsepower and larger, including motor no-load, starting, and full-load current at rated voltage; full-load speed and current at 110 percent voltage;
motor efficiency and power factor at 1/2, 3/4, and full-load at rated voltage.
h. List of special motor features being provided (i.e. space heater, altitude corrections, thermal protectors, etc.).
i. Performance data and pump or mixer performance curves.
j. Suggested spare parts list with current price information.
k. List of special tools required for checking, testing, parts replacement, and maintenance (special tools are those which have been specially designed or adapted for use on parts of the equipment, and which are not customarily and routinely…