J-2 Project Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 1240LU21R0003
About this file
This solicitation requests proposals for tarmac and apron maintenance and repair services at the Missoula Aerial Fire Depot. Services include asphalt crack sealing, concrete edge and joint sealing, asphalt seal coating, stormwater drain restoration, and pavement marking to FAA and USFS standards. Limited partial and full-depth asphalt repair is also required. The work will be completed in two phases by the Department of Agriculture Forest Service Northern Region under solicitation number 1240LU21R0003. Proposals are due on the response date specified in the solicitation document. The selected offeror will be awarded a contract to complete the maintenance and repair work.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MISSOULA
HAMILTON
WISDOM
WISE RIVER
ANACONDA
PHILIPSBURG
DRUMMOND
DEER LODGE
100% ISSUED FOR CONSTRUCTION
REGION ONE
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
MTID
VICINITY MAP
SEC.35, T.14 N., R. 20 W.
SOUTHWESTERN MONTANA
SCALE: NO SCALE
SCALE: NO SCALE
T. 14 N.
T. 13 N.
R
W
R
W
U.S. DEPARTMENT OF AGRICULTURE FOREST SERVICE, REGION ONE
PROPOSED TARMAC PLANS FOR:
AFD TARMAC MAINTENANCE
MISSOULA COUNTY, MONTANA
THIS
PROJECT
THIS
PROJECT
M
U
S F
S
Y
E A
R
C
O N
T R
A C
T
A
F D
T
A R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
C
O V
E R
D
W G
P
L O
T T
B
T
O B
Y
M
C C
L U
E
O
N
F e b
INDEX TO SHEETS
No. DESCRIPTION
-- COVER SHEET
1 SUMMARY OF ESTIMATED QUANTITIES
2 GENERAL NOTES AND ABBREVIATIONS
3 EXISTING SITE CONDITIONS AND CONTROL
4 CONSTRUCTION SAFETY & PHASING PLAN
5 CRACK SEAL & SEAL COAT PLAN
6 STRIPING & TIE-DOWN PLAN
7 DETAILS
05/05/2020
VERIFY COLOR!
THIS SHEET IS INTENDED TO
BE IN COLOR. RED, GREEN
AND BLUE WILL BE VISIBLE IF
REPRODUCED CORRECTLY.
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text No. 14789
AutoCAD SHX Text
TOBY
AutoCAD SHX Text McCLUE
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text I
SUMMARY OF ESTIMATED QUANTITIES
PAY ITEM DESCRIPTION UNIT
QUANTITY
GENERAL REQUIREMENTS
LS 1
102 MOBILIZATION/DEMOBILIZATION LS 1
103 CONSTRUCTION STAGING & PHASING LS
104 CRACK SEALING*
LF
36685
105 PCCP TO ASPHALT PAVEMENT EDGE SEALING* LF 1700
ASPHALT SURFACE TREATMENT (SEAL COAT)*
SY 37405
107 EXISTING MARKINGS REMOVAL* LF 3930
108 PCC PAVEMENT JOINT REPAIR*
LF
109 EXISTING METAL SURFACE RESTORATION LS
TEMPORARY PAVEMENT MARKING WHITE - 50% REFLECTIVE MEDIA*
LF 225
111 TEMPORARY PAVEMENT MARKING YELLOW - 50% REFLECTIVE MEDIA* LF 3705
112 PAVEMENT MARKING WHITE - 100% REFLECTIVE MEDIA* LF 225
113 PAVEMENT MARKING YELLOW - 100% REFLECTIVE MEDIA*
LF
PARTIAL AC PAVEMENT SECTION REPAIR SF 8415
115 FULL DEPTH AC PAVEMENT SECTION REPAIR SF 8415
Sheet: 1 of 7
Drawn By:KDK
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
SUMMARY OF ESTIMATED QUANTITIES
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
M
M A
R
O
E
S T
I M
A T
Q
A
N T
I T
I E
S D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
PROJECT NAME: AFD TARMAC MAINTENANCE
*NOTE: ALL ITEMS DETAILED IN THE SCHEDULE OF ITEMS ABOVE ARE ACTUAL QUANTITIES OTHER THAN THOSE DENOTED WITH A *.
THESE ITEMS ARE CONTRACT QUANTITIES. CONTRACT QUANTITIES WILL BE ADJUSTED ONLY WHEN THERE ARE ERRORS IN THE ORIGINAL DESIGN OF 15%
OR MORE.
100% ISSUED FOR CONSTRUCTION
05/05/2020
Sheet: 2 of 7
Drawn By:CD
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
GENERAL NOTES AND ABBREVIATIONS
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
N
E R
N
T
N
B
R E
V I A
T I O
N S
D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
100% ISSUED FOR CONSTRUCTION
(OR SAME DRAWING)
GENERAL DESIGN DESIGNATIONS
SECTION (LETTER) OR
DETAIL (NUMERAL)
DRAWING NUMBER
DESIGNATION
ON DRAWING WHERE SECTION
OR DETAIL IS TAKEN:
DRAWING NUMBER
WHERE SHOWN
ON DRAWING WHERE SECTION
OR DETAIL IS SHOWN:
DRAWING NUMBER(S)
WHERE TAKEN
A
PLYWOOD
PRECAST
PANEL
PROPERTY
PRESSURE SWITCH, PIPE SUPPORT
PRESSURE REDUCING VALVE
PREPARE, PREPARATION
PRELIMINARY
PREFABRICATED
PLANT MONITORING PANEL
PLATE, PROPERTY LINE
RADIUS
PAVEMENT
REDUCER
REQUIRED
REINFORCE
REFERENCE
SIDEWALK
SCHEDULE
SANITARY
RIGHT-OF-WAY
REINFORCING STEEL
RELOCATE, RELOCATION
REINFORCEMENT BAR
ROAD, ROOF DRAIN
REINFORCED-CONCRETE PIPE
REINFORCED CONCRETE
POLYVINYL CHLORIDE
POINT OF TANGENCY
SLOPE
SIMILAR
SHEET
SECTION
SQUARE
SUPPORT
SPACING
STEEL
STIFFENER
STANDARD
STATION
STAINLESS STEEL
SQUARE INCH
SQUARE FOOT
SPECIFICATION
SPACE, SPACED
SANITARY SEWER
THROUGH
THICK
TOP FACE
TYPICAL
ULTIMATE
UTILITY
TOP OF
UNDERGROUND
UNIFORM BUILDING CODE
TOP OF WALL
TOP OF STEEL
TOP OF CONCRETE, TOP OF CURB
TEMPORARY, TEMPERATURE
TOP AND BOTTOM
SYMMETRICAL
THRUST BLOCK
TOP BACK OF CURB
VERIFY
VOLUME
VERTICAL
VALVE BOX
WITH
WOOD
WIDTH
WATERLINE
WATER
WEIGHT
WITHOUT
WELDED WIRE FABRIC
WELDED STEEL, WROUGHT STEEL
WATERSTOP, WATER SURFACE
WIRE MESH, WATER MAIN
VENT THROUGH ROOF
WATER VALVE
VALVE, VOLT
YARD
TRANSFORMER
WELDED WIRE MESH
STRUCTURE
NOTE:
GENERAL NOTES
OUTSIDE TOP OF PIPE
1. THE CONTRACTOR SHALL RESTORE ALL ROADWAY SURFACES TO EQUAL OR BETTER
PRE-CONSTRUCTION CONDITION, AS DETERMINED BY CONTRACTING OFFICER AND
ENGINEER.
2. A PRE-CONSTRUCTION WALK-THRU SHALL BE CONDUCTED TO DOCUMENT
CONDITIONS OF ALL HAUL ROUTES, LAYDOWN AREAS, MILLINGS WASTE AREAS,
STAGING AREAS, AND AREAS ADJACENT TO WORK AREAS. DOCUMENTATION SHALL BE
A LIST IN WORD FORMAT ACCOMPANIED BY PHOTOGRAPHS AND SHALL BE AGREED TO
BY CONTRACTOR AND CONTRACTING OFFICER PRIOR TO WORK COMMENCING.
3. THE LOCATION, DEPTH AND SIZE OF EXISTING UTILITIES SHOWN ON THESE PLANS IS
APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTENCE, LOCATION,
DEPTH, SIZE, LINE AND GRADE OF EXISTING UTILITIES CONNECTIONS PRIOR TO
CONSTRUCTION, BY POTHOLING, IF NECESSARY. THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR ANY DAMAGE TO THE EXISTING FACILITIES DUE TO FAILURE TO
LOCATE OR PROVIDE PROPER PROTECTION WHEN LOCATION IS KNOWN.
4. THE CONTRACTOR SHALL NOTIFY ONE CALL @ 1-800-424-5555 FOR ONSITE UTILITY
LOCATION. ALL EXISTING UTILITIES SHALL BE MARKED BEFORE DIGGING.
5. THE CONTRACTOR SHALL MAINTAIN SERVICE OF ALL EXISTING UTILITIES UNLESS
OTHERWISE COORDINATED. IF SAID SERVICE IS DAMAGED, THE CONTRACTOR SHALL
IMMEDIATELY REPAIR THE DAMAGE AT THE CONTRACTOR'S EXPENSE.
6. A LIST OF REPRESENTATIVES TO CONTACT FOR INFORMATION REGARDING FACILITIES
IS AS FOLLOWS:
NORTHWESTERN ENERGY EMERGENCIES 888-467-2669
MISSOULA AIRPORT NATE COLE 406-370-2206
CENTURYLINK BURIED SERVICES 877-744-4416
MISSOULA WATER EMERGENCIES 406-552-6700
MISSOULA WASTEWATER EMERGENCIES 406-552-6600
7. THE CONTRACTOR SHALL ADJUST ALL VALVE BOXES, CURB BOXES, STORM WATER
INLETS, AND MANHOLES TO FINAL GRADE UPON COMPLETION OF ALL CONSTRUCTION.
ANY BOXES OR MANHOLES DAMAGED OR OTHERWISE DISTURBED BY THE
CONTRACTOR OR ANY SUBCONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF
THE CONTRACTOR. ADJUSTMENT OF ALL ITEMS SHALL BE CONSIDERED INCIDENTAL
UNLESS OTHERWISE NOTED IN THE PLANS.
8. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST AND EROSION DURING
CONSTRUCTION AT THEIR EXPENSE. ROADS SHALL BE WATERED AS NECESSARY TO
CONTROL DUST, IN ACCORDANCE WITH PERMIT, AND WHEN DIRECTED BY THE
CONTRACTING OFFICER AND OWNER.
9. CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS.
DIMENSIONS AND CONDITIONS OF EXISTING CONSTRUCTION ARE TO BE VERIFIED IN
THE FIELD AND ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER OF ALL DISCREPANCIES WHICH REQUIRE A
SIGNIFICANT CHANGE IN THE DESIGN AND/OR CONSTRUCTION FROM THAT SHOWN ON
THE DRAWINGS.
10. CONTRACTOR SHALL RETURN ALL AREAS OF DISTURBANCE TO PRE-CONSTRUCTION
CONDITION, INCLUDING STAGING AREAS.
11. ANY EXISTING ITEMS THAT ARE NECESSARY TO REMOVE TO FACILITATE THE PROJECT
SHALL BE SALVAGED TO THE OWNER AS DIRECTED. ANY ITEMS NOT DESIRED TO BE
RETAINED BY THE OWNER SHALL BE DISPOSED OF OFFSITE AT THE CONTRACTORS
EXPENSE.
12. TRAFFIC CONTROL PLANS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE VERIFIED AND APPROVED BY CONTRACTING OFFICER AND MISSOULA AIRPORT
MANAGEMENT. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH CITY OF
MISSOULA TRAFFIC CONTROL STANDARDS AND AIRPORT MANAGEMENT.
13. ALL IMPROVEMENT ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH
THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 5TH EDITION DATED APRIL
2010 (MPWSS), FEDERAL AVIATION ADMINISTRATION (FAA) STANDARDS, AND THE
PROJECT SPECIFICATIONS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND
PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS. ALL
COSTS FOR PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS
SHALL BE BORNE SOLELY BY THE CONTRACTOR.
15. THE CONTRACTOR SHALL UTILIZE COMPACTION EQUIPMENT SUITABLE FOR THE SOIL
TYPES AND SURFACE MATERIALS ENCOUNTERED FOR THE PROJECT.
RIGHT
X-X
CENTER TO CENTER
CONTINUE, CONTINUED, CONTINUOUS
EACH FACE, EXHAUST FAN
DUCTILE-IRON MECHANICAL JOINT
DUCTILE IRON, DRAIN INLET
DEFORMED BAR ANCHOR
EXTENSION, EXTERIOR
EDGE OF PAVEMENT
ELECTRIC, ELECTRICAL
EP
EW
EQUIV
EQUIP
EQL SP
EQL
ENGR
FAB
EXT
EXST
EXP JT
EXP
EXH
EXC
F
EXHAUST
FABRICATE
FLANGE
EXISTING
EXPANSION JOINT
EXPANSION
EXCAVATE
EACH WAY
EQUIVALENT
EQUIPMENT
EQUALLY SPACED
EQUAL, EQUALLY
ENGINEER
DIMJ
DIM
DIAG
DIA
DET
DBL
DN
DR
EA
ELEC
ELB
EL, ELEV
DWG
DIR
ENCL
EF
DI
DOWN
DOOR
ELBOW
EACH
ELEVATION
DRAWING
ENCLOSE
DETAIL
DIRECTION
DIMENSION
DIAGONAL
DIAMETER
DOUBLE
CP
CPLG
CORR
COORD
CONTR
CONT
CU
CU YD
CULV
CU IN
CU FT
CTSK
CTR
C TO C
DBA
d
D
COUNTERSINK
CUBIC
DRAIN
CUBIC YARD
CULVERT
CUBIC INCH
CUBIC FEET
PENNY (NAIL SIZE)
CENTER
COUPLING
CONTROL PANEL
CORRUGATED
COORDINATE
CONTRACTOR
ABOVE FINISHED FLOOR
ADJACENT, ADJUST
ARCHITECTURE, ARCHITECTURAL
CONCRETE MASONRY UNITS
CORRUGATED METAL PIPE
CLEAR, CLEARANCE
CEMENT LINED DUCTILE IRON
CONSTRUCTION JOINT, CONTROL JOINT
CAST-IN-PLACE CONCRETE
CAST-IRON PIPE FLANGED JOINT
CAST-IRON PIPE MECHANICAL JOINT
AMERICAN NATIONAL STANDARDS INSTITUTE
ASPHALTIC CONCRETE, ALTERNATING CURRENT
CONNECT, CONNECTION
CONCRETE OR CONCENTRIC
CL
CIRC
CIPC
CIP
CO
COMB
COL
CMU
CMP
CLR
CLG
COB
CLDI
CONSTR
CONN
CONC
CJ
COMBINATION
COLUMN
CLEANOUT
CITY OF BELGRADE
CONSTRUCTION
CEILING
CIRCULAR
CENTER LINE
BD
BFVLV
AVG
BF
BM
BRKT
BRG
BOT
BLW
BLK
BLDG
BETW
CIMJ
CHK
CHAN
CI
BELOW
BRACKET
BEARING
BOTTOM
BEAM, BENCHMARK
CHECK
CAST IRON
CHANNEL
BOARD
BLOCK
BUILDING
BOTTOM FACE
BETWEEN
BUTTERFLY VALVE
AVERAGE
AT
AB
ABDN
AC
ALT
ALUM
AHR
AFF
ADPTR
ADJ
ADDL
ABV
ASPH
ARCH
APVD
APPROX
ANSI
ALTERNATE
ALUMINUM
ANCHOR
ASPHALT
APPROVED
APPROXIMATE
ABOVE
ADAPTER
ADDITIONAL
ABANDON
ANCHOR BOLT TB
XFMR
YD
VERT
WS
WSTL
WM
WT
WTR
WV
WWF
WWM
VRFY
VOL
W
VTR
W/
WD
WL
W/O
TW
TYP
UG
UBC
UTIL
ULT
VB
V
TBC
TF
TEMP
THRU
THK
TST
TOC
T.O.
RC
SLP
SS
STD
STL
STIF
STA
T&B
SYM
STRUCT
SPEC
SQ
SPRT
SPG
SP
SQ IN
SQ FT
SST
R/W
SDWK
SCHED
SAN
RST
SHT
SECT
SIM
RD
RCP
REBAR
RDCR
REINF
REF
REQD
RELOC
PROP
PREP
PS
PRV
PT
PVC
RAD
PVMT
PL
PLYWD
PNL
PMP
PREFAB
PRCST
PRELIM
T.P.
RT
IE
IN.
INVERT ELEVATION
INCH
GALVANIZED STEEL
GALVANIZED
GAGE, GAUGE
FACE TO FACE
FOOTING, FITTING
FOOT, FEET
FABRICATED STEEL
FIBERGLASS REINFORCED PLASTIC
FACE OF CONCRETE
HEATING, VENTILATING, AND AIR CONDITIONING
HOSE VALVE
HEIGHT, HEAT TRACE
HOSE RACK, HOUR
HORSEPOWER
HORIZONTAL
HOLLOW METAL
HEADED ANCHOR STUD
GYPSUM WALLBOARD
GALVANIZED STEEL PIPE
INSIDE FACE
INSIDE DIAMETER
HP
HVAC
HWY
HYD
ID
IF
HR
HV
HT
HIGHWAY
HYDRANT
HDR
HM
HORIZ
HK
HAS
HD
HB
HDW
HEADER
HOOK
HARDWARE
HUB DRAIN
HOSE BIB
GALLONGAL
GRTG
GSP
GWB
GVL
GSKT
GALV
GND
GALVS
GRATING
GRAVEL
GASKET
GROUND
FTG
GA
F TO F
FT
FOC
FLR
FSTL
FRP
FLOOR
FINISH GRADE
FINISHED FLOOR
FIRE EXTINGUISHER
FOUNDATION
FLOOR DRAIN
FLANGE COUPLING ADAPTER
FLEXIBLE COUPLING
FLAT BAR, FACE BRICK
FIRE HYDRANT
FLARED END SECTION
FLARED END TERMINAL
FLOOR, FLOW
F. EXT
FL
FLG
FLEX
FIN.
FLL
FF
FHYD
FG
FINISH
FLANGE
FLEXIBLE
FLOW LINE
FDN
FD
FES
FET
FC
FB
FCA
ABBREVIATIONS
PIPE HANGER
PERPENDICULAR
PENETRATION
PLANT CONTROL PANEL
POINT OF CURVE
PROCESS AND INSTRUMENTATION DIAGRAM
OUTSIDE FACE
OUTSIDE DIAMETER
ON CENTER
NOT TO SCALE
OVERHEAD POWER
PRESSURE INDICATOR, POINT OF INTERSECTION
PCP
PE
PERP
PEN
PH
PLAIN END
OHP
P&ID
OPNG
PC
NTS
OD
OC
OF
OPENING
LONGITUDINAL
LINEAR FEET
JUNCTION BOX
INSTRUMENT
INSTALL, INSTALLATION
NOT IN CONTRACT
MECHANICAL JOINT
MISCELLANEOUS
MANUFACTURE, MANUFACTURER
MANUFACTURED
MECHANICAL
MOTOR CONTROL PANEL
MOTOR CONTROL CENTER
MACHINE BOLT
LONG RADIUS
LOCAL PANEL
MFD
NO
NIC
MJ
NOM
MH
MFR
MISC
MIN
NUMBER
NOMINAL
MANHOLE
MINIMUM
MB
MCP
MCC
MECH
LVR
LVL
MAX
MATL
LOUVER
LEVEL
MAXIMUM
MATERIAL
JOISTJST
LONG
LNTL
LR
LP
JT
LF
LBS
L
LINTEL
JOINT
POUNDS
ANGLE
INT
INSUL
JB
INSTL
INFL
INSTR
INTERIOR
INSULATE
INFLUENT
LEFTLT
MONTANA PUBLIC WORKS STANDARD SPECIFICATIONSMPWSS
PROFILE GRADE LINEPGL
PI
1. FOR ABBREVIATIONS NOT LISTED, SEE "ABBREVIATIONS FOR
USE ON DRAWINGS AND TEXT", PUBLISHED BY THE
AMERICAN NATIONAL STANDARDS INSTITUTE INC. (ANSI)
OR CONTACT THE ENGINEER.
2. THIS IS A STANDARD ABBREVIATION LIST. THEREFORE, NOT
ALL ABBREVIATIONS ARE USED ON THE PLANS.
05/05/2020
I
D
C O
CO
CO
CO
CO
CO
CO
C O
C O
CO
CO
C O
P
P
P
P
E
P
P
P
D
Y
H
I
I
I
D
D
T
T E
P
WV
W
V
WV
WV
WV
W
V
T
D
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
T
D
TD
TD
TD
TD
TD
T
D
TD
TD
TD
TD
TD
TD
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
P L
PLPL
PLPL
P L
P L
P L
P L
P L
P L
W W W
W W
W
W
W
CO
B
H
B
H
B
H
B
H
B
H
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T O
F A
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T O
F A
T
O
F
A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA
B
H
PL PL
EXISTING BUILDING
EXISTING PARCEL BOUNDARY
EXISTING CONCRETE
EXISTING CURB
EXISTING FENCE
EXISTING DITCH
EXISTING ASPHALT
EXISTING GRAVEL
EXISTING STORM DRAIN
EXISTING YELLOW TRAFFIC STRIPE
W W
EXISTING BURIED POWER
EXISTING BURIED TELEPHONE
EXISTING WATER MAIN
EXISTING BUSH
EXISTING CLEANOUT
EXISTING CONTROL POINT
EXISTING CURB STOP
GEOTECHNICAL BORE HOLE
EXISTING JUNCTION BOX
EXISTING ELECTRIC PEDESTAL
EXISTING ELECTRIC METER
EXISTING FROST FREE HYDRANT
EXISTING FIRE HYDRANT
EXISTING GROUND LIGHT
EXISTING IRRIGATION CONTROL VALVE
EXISTING MANHOLE - STORM SEWER
EXISTING MANHOLE - UNKNOWN
EXISTING PINDOWN CURB
EXISTING STORM DRAIN INLET
EXISTING SIGN POST
EXISTING CONIFEROUS TREE
EXISTING TELEPHONE VAULT
EXISTING TELEPHONE PEDESTAL
EXISTING TAXIWAY LIGHT
EXISTING WATER VALVE
I
T
WV
CO
P
E
W
D
Y
H
D
T
EXISTING FENCE
Control Point Table
Point #
Description
PK
PK
NAIL
PK
NAIL
PK
PK
PK
PK
PK
PK
PK
PK
Northing
19950.51
19827.64
19675.67
19726.29
19452.60
19241.63
20070.68
20222.83
20104.93
19952.75
19904.75
19513.99
19618.71
Easting
19297.38
19463.77
19662.66
19847.08
19780.19
20031.38
19386.81
19538.60
19711.76
19894.91
19652.11
20029.45
20171.60
Elevation
3202.10
3199.68
3195.72
3197.45
3194.94
3196.62
3202.44
3202.20
3199.71
3198.52
3198.68
3197.27
3198.93
Sheet: 3 of 7
Drawn By:MDH
Designed By:DAJ
Drawing Checked:RDL
Design Checked:RDL
AFD TARMAC MAINTENANCE
EXISTING SITE CONDITIONS AND
CONTROL
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
X I S
T I N
G
S
I T
E
C
O N
D I T
I O
N S
D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
SCALE IN FEET
100500
HORIZONTAL SCALE
LEGEND
BASIS OF BEARING:
HORIZONTAL COORDINATES ARE BASED ON THE
MISSOULA COUNTY AIRPORT LOW DISTORTION
PROJECTION (LDP). ALL COORDINATES ARE
GROUND COORDINATES.
PROJECTION:
TRANSVERSE MERCATOR, NAD 83
CENTRAL LATITUDE: 46°55'27.86732" N
CENTRAL LONGITUDE: 114° 05' 24.64353" W
FALSE NORTHING (M): 6096
FALSE EASTING (M): 6096
SCALE FACTOR: 1.00152
VERTICAL DATUM:
ELEVATIONS ARE NAVD88, BASED ON MSOL AND
COMPUTED USING GEOID 12A. VERTICAL UNITS ARE
US SURVEY FEET.
SURVEYORS NOTES:
1. PROJECT LOCATION LIES IN THE SOUTH 1/2 OF SECTION 35, TOWNSHIP 14 N, RANGE 20 W.
2. BURIED UTILITIES ARE SHOWN AS INDICATED BY FIELD LOCATES PERFORMED BY THE WATERMAN, LLC.
MORRISON-MAIERLE ASSUMES NO LIABILITY FOR THE ACCURACY OR COMPLETENESS OF THOSE LOCATIONS. FOR THE
PRECISE LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL TO DESIGN CONTACT THE UTILITY OWNER/AGENCY.
3. FIELD SURVEY FOR THIS PROJECT WAS COMPLETED ON APRIL 18, 2019. FEATURES AND IMPROVEMENTS DEPICTED
HEREON ARE AS OBSERVED DURING THE FIELD SURVEY.
100% ISSUED FOR CONSTRUCTION
05/05/2020
NATIONAL WEATHER
SERVICE BUILDING
USFS SMOKE JUMPER
FACILITY
STORM INLET
RIM = 3197.15
INV. (S) = 3193.18
TIE DOWN (TYP.)
STORM MH
RIM=3197.39
STORM INLET
RIM = 3201.41
INV. (E) = 3197.86
INV. (S) = 3197.81
STORM INLET
RIM = 3200.98
INV. (SW) = 3197.71
USFS AIRCRAFT HANGAR
HEADGATE
TRENCH DRAIN
STORM MH
RIM = 3196.81
INV (SE) = 3192.51
STORM MH
RIM = 3196.46
INV. (NE) = 3189.81
INV. (SE) = 3190.61
TAXIWAY EASEMENT
BK 611 MICRO PAGE 2055
BK 615 MICRO PAGE 947
USFS
PROPERTY
BOUNDARY
FIRE
DEPOT
BLDG
SAN. SEWER SVC.
CLEANOUTS
8" RCP
STORM DRAIN
STEEL PLATE
CLEANOUTS
CULVERT
(TYP.)
CULVERT
(TYP.)
12" HDPE
30" CMP
ASPHALT
PATCH
30" PIPE TO DRAIN
12" PVC
30" CMP
AIRFIELD
GUIDANCE
SIGN
AIRFIELD
GUIDANCE
SIGN
ELEC
DUCT (1-2)
CLEANOUTS
SD MH
ABOVE-GRND
WAT/RET PIPE
2" ABOVE-GRND
WAT/RET PIPE
300' WIDE TAXIWAY
EASEMENT PER COS 621
EASEMENT PRESERVED FOR
USFS USE BK 98 PAGE 688
MISSOULA COUNTY
AIRPORT AUTHORITY
TRACT 3
COS 621
USFS
TRACT 2
COS 621
MISSOULA COUNTY
AIRPORT AUTHORITY
TRACT A
COS 5502 MISSOULA COUNTY
AIRPORT AUTHORITY
PARCEL B1
COS 5502
EASEMENT AGREEMENT
BK 646 PAGE 587
CORRECTED EASEMENT
BK 654 PAGE 17
EASEMENT TERMINATION
BK 738 PAGE 600
MISSOULA COUNTY
AIRPORT AUTHORITY
USFS
MISSOULA COUNTY
AIRPORT AUTHORITY
PROPERTY BOUNDARY
PAINT STRIPE
(TYP.)
I
D
CO
C O
C O
CO
C O
C O
C O
CO
C O
C O
C O
CO
P
P
P
P
E
P
P
P
D
Y
H
I
I
I
D
D
T
T E
P
WV
W
V
WV
WV
WV
WV
TD
T
D
TD
TD
TD
T
D
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
W
C O
B
H
B
H
B
H
B
H
B
H
TOFA
TOFA TOFA TOFA TOFA TOFA
TOFA
T O
F A
T O
F A
T O
F A
TOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA
TOFA TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA
B
H
TOFA
TOFA TOFA TOFA TOFA TOFA
TOFA
T O
F A
T O
F A
T O
F A
TOFATOFATOFATOFATOFATOFATOFA
TOFA TOFA TOFA TOFA
TOFA TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA
COCOCO
CO
CO
CO
P
D
W
TOFA
TOFA
TOFA TOFA
TOFA
TOFA
TOFA
TOFA TOFA
TOFA
TOFA TOFA
TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFA
TOFA
TOFA
TOFA
TOFATOFA
TOFA
TOFA
TOFA
TOFATOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA TOFA
TOFA
TOFA
TOFA
TOFA TOFA
TOFA
TOFA TOFA
TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFA
TOFA
TOFA
TOFA
TOFATOFA
TOFA
TOFA
TOFA
TOFATOFA
TOFA
TOFA
TOFA
Sheet: 4 of 7
Drawn By:CD
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
CONSTRUCTION SAFETY & PHASING PLAN
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
LEGEND:
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
C
N
S T
R U
C T
I O
N
S
A F
E T
H A
S I N
G
P
L A
N D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
SCALE IN FEET
2001000
HORIZONTAL SCALE
CONTRACTOR STAGING AREA
100% ISSUED FOR CONSTRUCTION
USFS SMOKE JUMPER
FACILITY
USFS AIRCRAFT HANGAR
FIRE
DEPOT
05/05/2020
NATIONAL WEATHER
SERVICE
CRACK SEAL, SEAL COAT, AND STRIPING AREA
CONSTRUCTION ACCESS
ROUTE
U.S. HIGHWAY 10
CONSTRUCTION SEQUENCING REQUIREMENTS:
PROJECT CLOSURE PROCEDURE:
1. PLACE LOW-LEVEL BARRICADES AND ALL OTHER SAFETY DEVICES PER PROJECT REQUIREMENTS.
2. SET UP CONSTRUCTION STAGING AREA PER PROJECT REQUIREMENTS.
3. FOLLOWING OFFICIAL NOTICE TO PROCEED, CONTRACTOR WILL HAVE 14 OF DAYS TO COMPLETE WORK.
PROJECT OPENING PROCEDURE:
1. ALL PAVEMENT WITHIN THE CONSTRUCTION LIMITS SHALL BE CLEARED OF ALL WASTE, LOOSE MATERIAL, DUST, DEBRIS, AND ANY OTHER FOD PRIOR TO OPENING THE TAXIWAYS AND APRONS UP TO AIR TRAFFIC.
2. TEMPORARY PAVEMENT MARKINGS HAVE BEEN COMPLETED.
3. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER AND AIRPORT MANAGER FOR AIRFIELD
PAVEMENT INSPECTION TO VERIFY THEY ARE READY FOR AIR TRAFFIC.
4. REMOVE LOW-LEVEL BARRICADES AND ALL OTHER SAFETY DEVICES.
PROJECT FINAL STRIPING PROCEDURE:
1. SCHEDULING AND COORDINATION FOR FINAL STRIPING WITH CONTRACTING OFFICER IS REQUIRED. FINAL
STRIPING SHALL BE CONDUCTED ONCE SEAL COAT HAS CURED.
2. PRIOR TO COMMENCING, 72-HOURS NOTICE WILL BE NECESSARY FOR THE CONTRACTING OFFICER TO ISSUE
NOTAM FOR TEMPORARY CLOSURE OF APRON. CLOSURE AND OPENING SHALL FOLLOW SAME PROCEDURES.
3. FOLLOWING OFFICIAL NOTICE TO PROCEED FOR FINAL STRIPING, CONTRACTOR WILL HAVE ONE (1) DAY TO
COMPLETE THE WORK.
WORK STAGING & CONSTRUCTION OPERATION NOTES:
1. PRIOR TO THE START OF CONSTRUCTION, A PRE-CONSTRUCTION MEETING WILL BE CONDUCTED ON SITE BY THE
CONTRACTING OFFICER, OWNER, MISSOULA AIRPORT AUTHORITY AND WITH THE CONTRACTOR'S SUPERINTENDENT
AND OTHER DESIGNATED PERSONNEL. THE PURPOSE OF THIS MEETING WILL BE TO DISCUSS THE AIRPORT
OPERATIONS ASSOCIATED WITH CONSTRUCTION IMPROVEMENTS AND TO ASSESS THE CONTRACTOR'S
UNDERSTANDING OF AIRPORT OPERATIONS DURING CONSTRUCTION.
2. PRIOR TO ANY CONTRACTOR OR SUBCONTRACTOR PERSONNEL WORKING ON SITE, THEY MUST HAVE GONE
THROUGH THE AIRPORT'S SECURITY BADGING PROCESS.
3. THE PRIME CONTRACTOR'S SUPERINTENDENT MUST BE ON-SITE AT ALL TIMES DURING CONSTRUCTION REGARDLESS
OF THE DAY'S CONSTRUCTION OPERATIONS. WITHOUT THE SUPERINTENDENT ON-SITE, CONSTRUCTION OPERATIONS
WILL NOT BE ALLOWED TO PROCEED. THE CONTRACTING OFFICER WILL VERIFY THIS REQUIREMENT IS MET ON A
DAILY BASIS.
4. ANY DAMAGE TO THE USFS AIRPORT ACCESS OR ANY AIRPORT FACILITY CAUSED BY THE CONTRACTOR SHALL BE
REPAIRED IMMEDIATELY TO THE SATISFACTION OF THE CONTRACTING OFFICER AND OWNER AT THE CONTRACTOR'S
EXPENSE.
5. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER 72-HOURS PRIOR TO BEGINNING CONSTRUCTION.
6. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL HAVE ALL NECESSARY SAFETY DEVICES IN PLACE.
THIS INCLUDES (AT A MINIMUM) FLAGGING OR FLASHING BEACONS ON ALL CONSTRUCTION VEHICLES. COORDINATE
USE OF ANY LIGHT PLANTS WITH CONTRACTING OFFICER.
7. CONTRACTOR STAGING AREA WILL BE LOCATED AS SHOWN ON THIS DRAWING. CONTRACTOR SHALL COORDINATE
ACTUAL LIMITS OF STAGING AREA WITH CONTRACTING OFFICER. ONCE THESE LIMITS ARE ESTABLISHED, THE
CONTRACTOR MUST KEEP ALL EQUIPMENT AND MATERIALS WITHIN THE LIMITS IN A TIDY MANNER. DUST CONTROL
WILL BE REQUIRED.
8. ALL LOCATIONS WITHIN THE PROJECT EXTENTS SHALL BE KEPT CLEAR OF WASTE AND LOOSE MATERIAL AT ALL TIMES
BY THE CONTRACTOR. COST TO CLEAN AND SWEEP AT THE CONTRACTING OFFICER'S REQUEST SHALL BE INCIDENTAL
TO THE PROJECT.
9. PERSONAL VEHICLE PARKING IS NOT ALLOWED ON ANY AIRPORT PAVEMENTS OR ANY OTHER LOCATIONS OTHER
THAN THE DESIGNATED STAGING AREA SHOWN ON THE DRAWINGS. DO NOT BLOCK ACCESS THROUGH THE GATE.
10. CONTRACTOR EQUIPMENT MUST USE THE DESIGNATED ACCESS ROUTE SHOWN. CONTRACTOR TO INSPECT ACCESS
ROUTE WITH OWNER AND CONTRACTING OFFICER PRIOR TO CONSTRUCTION, DOCUMENT WITH PHOTOS, AND REPAIR
TO PRE-CONSTRUCTION CONDITION.
11. AT NO TIME DURING CONSTRUCTION SHALL THE CONTRACTOR HAVE AN EMPLOYEE OUTSIDE THE CONSTRUCTION
AREAS WITHOUT THE EXPRESS PERMISSION OF THE CONTRACTING OFFICER. VIOLATION OF THIS REQUIREMENT MAY
RESULT IN THE IMMEDIATE AND PERMANENT REMOVAL OF THAT EMPLOYEE FROM THE SITE.
12. CONTRACTOR MUST ENSURE GATE AT ENTRANCE IS CLOSED IMMEDIATELY AFTER ENTERING OR EXISTING THE
AIRFIELD. IF THE GATE NEEDS TO REMAIN OPEN DURING CONSTRUCTION FOR ANY REASON, A CONTINUAL GATE
GUARD WILL BE REQUIRED TO PREVENT UNAUTHORIZED ACCESS OF PERSONS OR WILDLIFE.
13. ALL CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE MARKED WITH
CONTRACTOR'S NAME OR LOGO.
14. ALL BARRICADES SHALL BE MAINTAINED BY THE CONTRACTOR THROUGHOUT
THE CONTRACTED CONSTRUCTION PERIOD. BARRICADES SHALL BE CHECKED
ON A DAILY BASIS TO ENSURE THEY ARE FUNCTIONING AS INTENDED.
15. CONTRACTOR TO VERIFY WITH CONTRACTING OFFICER EXACT LOCATION OF
LOW LEVEL BARRICADES. BARRICADES SHALL BE PLACED NO GREATER THAN 4'
SPACING BETWEEN BARRICADES.
16. CONTRACTOR SHALL COVER TAXIWAY LIGHTS AND SIGNS AT LOCATIONS
SHOWN.
17. CONTRACTOR SHALL INSTALL WARNING SIGNS ALONG HIGHWAY 10 TO ALERT
POTENTIAL TRAFFIC OF CONSTRUCTION ACTIVITY, TRUCK ACCESS, AND
EQUIPMENT ACTIVITY. ALL SIGNS SHALL CONFORM TO THE LATEST EDITION OF
MUTCD.
18. CONTRACTOR IS RESPONSIBLE FOR CREATING, FILING, AND ABIDING BY A
STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND NOTICE OF INTENT
(NOI) APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY
(MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATE.
19. THE REQUIREMENTS OF THE CONTRACTOR OPERATIONS ON THE AIRPORT
NOTED IN THE PLANS AND SPECIFICATIONS WILL BE STRICTLY ADHERED TO.
VIOLATIONS OF THE REQUIREMENTS WILL BE NOTED BY THE CONTRACTING
OFFICER IN WRITING TO BOTH THE CONTRACTOR AND OWNER. OWNER CAN
ORDER WORK TO HALT IF THE CONTRACTOR'S OPERATIONS JEOPARDIZE
AIRPORT OPERATIONS.
APRON
TW-G
COVER LIGHT/SIGN
AIRFIELD ACCESS
GATE
COVER ONLY AIRFIELD
TANKER BASE PORTION
OF SIGN
COVER ONLY AIRFIELD
TANKER BASE PORTION
OF SIGN
9.14'
ACCESS AND HAUL ROUTE
130.40'
130.59'
50.60'
INSTALL LOW LEVEL
BARRICADES
INSTALL LOW LEVEL
BARRICADES
INSTALL LOW LEVEL
BARRICADE
SEE DETAIL A,
THIS SHEET
DETAIL A
NOT TO SCALE
PROVIDE LOW-LEVEL DELINEATORS AND LIGHTS SIMILAR TO
NEUBERT AERO CORP. (PRODUCT NUMBER: PC9670) FOR USE ON
PROJECT. CONTRACTOR TO PLACE AND MAINTAIN RED SOLAR
BARRICADE LIGHTS FOR BARRICADES. BARRICADE SHALL BE
SECURED (I.E. FILLED WITH WATER) TO AVOID BEING MOVED BY
JET BLAST OR WIND. BARRICADES TO BE MARKED WITH
REFLECTIVE, DIAGONAL, ALTERNATING ORANGE AND WHITE
STRIPES. LOW PROFILE BARRICADES TO BE SET 4' END TO END
MAXIMUM OR AS DIRECTED BY THE CONTRACTING OFFICER IN
ACCORDANCE WITH AC 150-5370-2G OR MOST CURRENT VERSION
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION
SPECIFICATION.
8' AIRPORT LOW-PROFILE BARRICADES
SCALE: N.T.S.
D
CO
CO
CO
CO
CO
CO
C O
C O
CO
C O
C O
P
P
P
P
E
P
P
P
D
Y
H
I
I
I
D
D
T
T
E
P
WV
WV
WV
WV
W
V
TD
TD
TD
TD
TD
TD
T
D
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
T
D
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
T
D
TD
W
W
W
CO
B
H
B
H
B
H
B
H
B
H
TOFA TOFA
TOFA TOFA
TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
B
H
Sheet: 5 of 7
Drawn By:KDK
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
CRACK SEAL & SEAL COAT PLAN
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
LEGEND:
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
R A
K
A
A
L
C
O A
T
P
L A
N D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
SCALE IN FEET
2001000
HORIZONTAL SCALE
CONTRACTOR STAGING AREA
100% ISSUED FOR CONSTRUCTION
USFS SMOKE JUMPER
FACILITY
USFS AIRCRAFT HANGAR
FIRE
DEPOT
05/05/2020
CRACK SEAL, SEAL COAT, AND STRIPING AREA
NOTES:
1. CONTRACTOR MUST PERFORM SEAL COAT "TEST STRIPS" IN AN INCONSPICUOUS LOCATION ON THE APRON PRIOR TO
BEGINNING FULL SEAL COAT OPERATIONS. DURING THIS PROCESS THE APPLICATION RATE WILL BE ADJUSTED IF
NECESSARY. ALL EFFORTS ASSOCIATED WITH THE TEST STRIPS ARE INCIDENTAL TO OTHER BID ITEMS. TEST STRIPS MUST
BE APPROVED BY CONTRACTING OFFICER BEFORE ANY OTHER SEAL COATING CAN BE PERFORMED.
2. CRACK SEALING SHALL BE COMPLETED PRIOR TO SEAL COAT.
3. CRACKS AROUND EXISTING TRENCH DRAIN, STORM DRAIN INLETS, CONCRETE CURB, AND CONCRETE PADS SHALL BE
SEALED PER DETAILS, THIS SHEET.
4. CONTRACTOR SHALL PROTECT ALL NON-ASPHALT AIRFIELD INFRASTRUCTURE (I.E. LIGHTS, STORM DRAIN INLETS, ETC.).
ANY DAMAGE SHALL BE CONSIDERED INCIDENTAL TO THIS ITEM AND REPAIRED TO THE SATISFACTION OF THE
CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE.
5. ANY CRACKS ROUTED SHALL BE CLEANED AND SEALED IN THE SAME DAY.
6. PRIOR TO APPLICATION OF SEAL COAT, ALL CRACKS SEALED SHALL BE CURED AND APPROVED BY CONTRACTING OFFICER.
7. PRIOR TO APPLICATION OF SEAL COAT, ALL PAINT SHALL BE REMOVED BY THE CONTRACTOR. REMOVAL SHALL BE DONE IN
A MANNER WHICH DOES NOT DAMAGE PAVEMENT SURFACES. DAMAGE TO PAVEMENT SURFACES BY THE CONTRACTOR
SHALL BE REPAIRED PROMPTLY BY THE CONTRACTOR AT THEIR EXPENSE TO THE CONTRACTING OFFICER'S SATISFACTION.
8. IMMEDIATELY BEFORE APPLYING SEAL COAT, THE SURFACE TO BE TREATED SHALL BE SWEPT WITH A DRIVABLE POWER
BROOM WITH VACUUM TO REMOVE ALL LOOSE DIRT AND OTHER OBJECTIONABLE MATERIAL TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
9. STRIPING OF PAVEMENT AFTER SEAL COAT SHALL BE PROVIDED AND PLACE PER MANUFACTURER'S RECOMMENDATION.
10. CONTRACTOR IS HEREBY MADE AWARE THAT PARTIAL OR FULL DEPTH AC PAVEMENT MAY BE REQUIRED IN AREAS.
CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER TO DETERMINE WHEN PARTIAL OR FULL DEPTH REPAIR IS
REQUIRED.
11. IN THE EVENT PARTIAL OR FULL DEPTH AC PAVEMENT REPAIR IS REQUIRED, CONTRACTOR SHOULD INSTALL PER DETAILS, SHEET 6.
12. PROTECT ALL SURFACE STRUCTURES IN PLACE AND SEAL JOINTS TO ADJACENT
MATERIAL.
APRON
TW-G
NATIONAL WEATHER
SERVICE
APRON MAINTENANCE 326,311 SF
PROTECT EXISTING
CONCRETE SLABS
SEAL AROUND PER
DETAIL, THIS SHEET
PROTECT EXISTING
TRENCH DRAIN
SEAL AROUND PER
DETAIL, THIS SHEET
EXISTING SURFACE
LESS THAN 1/2"
3/8"
1/8"
1/2" TO 1-1/2"
3/8"
1/8"
EXISTING SURFACE
CRACK SEAL
MATERIAL, P-605-2.1
BACKER ROD AS
NECESSARY, P605-2.2
FOR CRACKS 1/2" TO 1-1/2"
SCALE: N.T.S.
FOR CRACKS LESS THAN 1/2"
SCALE: N.T.S.
NOTES:
1. CRACKS GREATER THAN 1/2" SHALL NOT BE ROUTED.
2. CONTRACTOR MAY USE BACKER ROD IN CRACKS WITH WIDTH GREATER
THAN 1/2".
3. CONTRACTOR TO VERIFY QUANTITY/NEED FOR BACKER ROD.
PROTECT EXISTING
CURB & GUTTER
SEAL AROUND PER
DETAIL, THIS SHEET
PROTECT EXISTING
STORM DRAIN
SEAL AROUND PER
DETAIL, THIS SHEET
PROTECT EXISTING
STORM DRAIN
SEAL AROUND PER
DETAIL, THIS SHEET
1/8"
3/8"
VARIES
EXISTING AC
PAVEMENT SURFACE
CRACK SEAL
MATERIAL PER P-605-2.1
BACKER ROD AS
NECESSARY, PER
P-605-2.2
EXISTING PCC
PAVEMENT SURFACE
CONCRETE TO ASPHALT CRACK SEAL
SCALE: N.T.S.
1/8"
3/8"
VARIES
EXISTING AC
PAVEMENT SURFACE
CRACK SEAL
MATERIAL PER P-605-2.1
BACKER ROD AS
NECESSARY, PER
P-605-2.2
EXISTING METAL
GRATE SURFACE
METAL TO ASPHALT CRACK SEAL
SCALE: N.T.S.
NOTES:
1. EXISTING CRACK SEAL MATERIAL SHALL REMAIN IN PLACE.
2. CONTRACTOR TO PROTECT EXISTING CONCRETE EDGE. IF CONCRETE
EDGE IS DAMAGED, CONTRACTOR TO PROVIDE CLEAN EDGE AND
EPOXY AS NECESSARY. COORDINATE WITH CONTRACTING OFFICER.
3. EXISTING METAL GRATES INCLUDE TRENCH DRAIN, STORM DRAIN
INLETS, AND SUMPS. METAL GRATES SHALL BE CLEANED AND
REGALVANIZED AS NECESSARY, COORDINATE WITH CONTRACTING
OFFICER.
REPAIR EXISTING PCCP JOINTS
PER DETAIL, SHEET 6
REPAIR EXISTING PCCP JOINTS
PER DETAIL, SHEET 6
CRACK SEAL
MATERIAL, P-605-2.1
130.40'
130.59'
131.05'
40.60'
9.23'
PROTECT EXISTING
STEEL PLATE
SEAL AROUND PER
DETAIL, THIS SHEET
PROTECT EXISTING
CONCRETE, SEAL AROUND
PER DETAIL, THIS SHEET
PROTECT EXISTING
CURB & GUTTER
SEAL AROUND PER
DETAIL, THIS SHEET
SEAL AROUND
TIE DOWN (TYP.)
I
D
C O
C O
C O
C O
C O
C O
C O
CO
CO
C O
CO
CO
P
P
P
P
E
P
P
P
D
Y
H
I
I
I
D
D
T
T E
P
W
V
WV
WV
WV
W
V
WV
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
T
D
TD
TD
TD
TD
TD
TD
TD
TD
TD
TD
T
D
TD
T
D
TD
TD
W
W
W
C O
B
H
B
H
B
H
B
H
B
H
TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA
TOFA TOFA
TOFA TOFA TOFA
TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFATOFA
TOFA
TOFA
TOFA TOFA TOFA
TOFA
TOFA TOFA TOFA
TOFA
TOFA TOFA TOFA TOFA
TOFA
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
T O
F A
TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA
B
H
Sheet: 6 of 7
Drawn By:KDK
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
STRIPING & TIE-DOWN PLAN
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
NOTES:
1. PROJECT CONSISTS OF TWO APPLICATIONS OF PAVEMENT MARKINGS. THE FIRST SHALL BE REFERRED TO AS TEMPORARY PAVEMENT
MARKINGS AND SHALL BE APPLIED FOLLOWING COMPLETION OF PAVING. THE SECOND SHALL BE REFERRED TO AS FINAL PAVEMENT MARKINGS
AND SHALL BE APPLIED AFTER ASPHALT HAS PROPERLY CURED. TIMING OF FINAL PAVEMENT MARKING SHALL BE COORDINATED WITH THE
CONTRACTING OFFICER.
2. APRON SHALL REMAIN CLOSED TO TRAFFIC UNTIL TEMPORARY PAVEMENT MARKINGS HAVE BEEN INSTALLED. SEE CONSTRUCTION SAFETY &
PHASING PLAN FOR MORE INFORMATION ON OPENING AND CLOSING OF APRON.
3. TEMPORARY PAVEMENT MARKINGS SHALL BE WATER BASED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND SHALL BE APPLIED AT A
MINIMUM 50% APPLICATION RATE WITH GLASS BEADS.
4. FINAL PAVEMENT MARKINGS SHALL BE EPOXY BASED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND SHALL BE APPLIED AT A 100%
APPLICATION RATE WITH GLASS BEADS.
5. PAVEMENT MARKINGS SHALL BE 6" WIDE, UNLESS OTHERWISE DIRECTED BY CONTRACTING OFFICER.
6. CONTRACTOR SHALL VERIFY STRIPING AND TIE-DOWN LAYOUT WITH THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION.
7. UPON ESTABLISHMENT OF STRIPING AND TIE-DOWN LAYOUT, CONTRACTOR SHALL STRIPE BASED ON LAYOUT PROVIDED BY A 3RD PARTY
PROFESSIONALLY LICENSED SURVEYOR IN THE STATE OF MONTANA AT CONTRACTOR'S EXPENSE.
8. DIMENSIONS SHOWN FOR STRIPING ON THIS SHEET ARE APPROXIMATE AND MAY VARY SLIGHTLY FROM WAHT ACTUALLY EXISTS IN THE FIELD.
CONTRACTOR IS MADE AWARE THAT A NEW STRIPING LAYOUT MAY BE PROVIDED AND MAY VARY IN QUANTITY FROM EXISTING PAVEMENT
MARKINGS BY UP TO 15%.
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
R
I P
I N
E
D
O W
N
P
L A
N D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
SCALE IN FEET
100500
HORIZONTAL SCALE
100% ISSUED FOR CONSTRUCTION
05/05/2020
676.4'
130.8'
329.4'
169.8' 98.5'
170.7'
98.3'
67.0'
79.6'
71.0'
72.7'
69.1'
46.3'
57.4'
R= ~75'
R= ~75'
R= ~40'
R= ~40'
22.0'
12.5'
R= ~175'
R= ~10'
R= ~20'
R= ~12'
TIE DOWN (TYP.)
TIE DOWN (TYP.)
223.3'
DELPATCH OR APPROVED EQUAL
2" MIN
SEE NOTE 3
SAWCUT
REMOVE EX. CONCRETE
CLEAN SURFACE AFTER CONCRETE
REMOVAL BY SAND BLASTING PER
MANUFACTURER'S RECOMMENDATIONS
PREFORMED COMPRESSION JOINT SEAL
EX. CONCRETE
Sheet: 7 of 7
Drawn By:KDK
Designed By:WEH
Drawing Checked:TBM
Design Checked:DAJ
AFD TARMAC MAINTENANCE
DETAILS
©COPYRIGHT
MORRISON-MAIERLE, INC.
engineers surveyors planners scientists
Morrison
Maierle
1055 Mount Avenue Missoula, MT 59801
Phone: 406.542.8880 Fax: 406.542.4801
NOTES:
1. CONTRACTOR SHALL VERIFY EXISTING AC PAVEMENT AREA FOR PARTIAL SECTION REPAIR WITH CONTRACTING
OFFICER.
2. MILL 2" OF EXISTING ASPHALT IN AREA DEFINED FOR PARTIAL SECTION REPAIR.
3. PLACE MILLINGS IN DESIGNATED AREAS LOCATED WITHIN THE USFS BOUNDARY OR MISSOULA AIRPORT BOUNDARY.
COORDINATE WITH CONTRACTING OFFICER PRIOR TO MILLING FOR PLACEMENT LOCATIONS.
4. CLEAN SURFACE AND INSTALL PAVING FABRIC IN AREA PRIOR TO 2" PAVEMENT OVERLAY.
5. WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
M
S F
A
R
C
O N
T R
A C
T
A
R
M A
C
R
E C
O N
A
C A
D S
H E
E T
S M
A I N
T E
N A
N C
E
P
R O
J E
C T
T
A I L
S D
O
T T
T
O B
Y
M
C C
L U
E
O
N
F e b
100% ISSUED FOR CONSTRUCTION
05/05/2020
2"
NEW AC PAVEMENT P-401 (TYP.)
EXISTING AC PAVEMENT
EXISTING AC PAVEMENT (TYP.)
PAVING FABRIC
P-607(A) (TYP.)
EXISTING BASECOURSE (TYP.)
PARTIAL AC PAVEMENT SECTION REPAIR
SCALE: N.T.S.
VARIES
VARIES
SEPARATION GEOTEXTILE (TYP.)
NEW AC PAVEMENT P-401 (TYP.)
BASE COURSE P-208 (TYP.)
COMPACT TO 100% OF ASTM D698
8" MIN.
MATCH EXISTING WHERE
THICKER SECTION EXISTS
VARIES, MATCH EXISTING
ADJUST AS NECESSARY
PER ASPHALT THICKNESS
GEOGRID (TYP.)
NOTES:
1. CONTRACTOR TO VERIFY EXISTING AC PAVEMENT AREA FOR FULL SECTION REPAIR WITH CONTRACTING OFFICER.
2. CONTRACTOR SHALL REMOVE ALL MATERIAL FROM AREA DESIGNATED FOR FULL SECTION REPAIR AND OVER EXCAVATE 12" PAST EXISTING GRAVEL SECTION.
3. PLACE MILLINGS IN DESIGNATED AREAS LOCATED WITHIN THE USFS BOUNDARY OR MISSOULA AIRPORT BOUNDARY. COORDINATE WITH CONTRACTING OFFICER PRIOR
TO MILLING FOR PLACEMENT LOCATIONS.
4. ASPHALT THICKNESS SHALL BE A MINIMUM OF 8". IF EXISTING SECTION IS GREATER, MATCH EXISTING ASPHALT THICKNESS. ADJUST P-208 GRAVEL SECTION AS
NECESSARY WHEN ASPHALT THICKNESS INCREASES FROM EXISTING.
5. REPLACE EXCAVATED MATERIAL WITH BASE COURSE (P-208) TO FULL DEPTH OF EXCAVATION.
6. UPON EXCAVATION, IF GRAVEL LARGER THAN P-208 IS OBSERVED, CONTRACTOR MAY PROPOSE TO REPLACE MATCHING DEPTH OF MATERIAL WITH SUBBASE COURSE
(P-154) PER APPROVAL BY CONTRACTING OFFICER.
7. GEOTEXTILE SHALL BE PER SPECIFICATION 154-2.3. GEOGRID SHALL BE PER SPECIFICATION 154-2.4.
8. GEOTEXTILE AND GEOGRID TO BE OVERLAPPED PER MANUFACTURER'S RECOMMENDATION.
FULL ASPHALT SECTION REPAIR
SCALE: N.T.S.
EXISTING SUBGRADE (TYP.)
12"
1/4"
1/2" SAWCUT MIN. (WIDTH TO
MATCH EXISTING CONSTRUCTION
AND MANUFACTURER RECOMMENDATION)
DEPTH AS RECOMMENDED
BY JOINT SEALANT
MANUFACTURER
1/4" CHAMFER
(BOTH SIDES)
1/8" SAWCUT
PREFORMED
ELASTOMERIC
JOINT
4"
NOTE:
1. CONTRACTOR SHALL REMOVE EXISTING JOINT SEALANT, AS
NECESSARY. COORDINATE WITH CONTRACTING OFFICER.
2. CONTRACTOR SHALL PROTECT EXISTING CONCRETE
CHAMFER. IF CONCRETE EDGE IS DAMAGED, CONTRACTOR
TO REPAIR IN ACCORDANCE WITH CONCRETE SPALL REPAIR
DETAIL, THIS SHEET.
EXISTING PCCP JOINT REPAIR
SCALE: N.T.S.
APPLY TACK COAT, P-603 (TYP.)
EXISTING AC PAVEMENT
APPLY TACK COAT, P-603 (TYP.)
EXISTING PCC PAVEMENT
OR CONCRETE STRUCTURE
APPLY TACK COAT
P-603 (TYP.)
VARIES
NEW AC PAVEMENT
P-401 (TYP.)
NOTE:
1. CONTRACTOR SHALL APPLY TACK COAT ALONG ENTIRE FACE OF CONCRETE AND
EXISTING AC PAVEMENT WHERE NEW AC PAVEMENT TIES IN.
PCCP TO AC PAVEMENT CONNECTION
SCALE: N.T.S.
EXISTING METAL GRATE
SEE NOTE 2
APPLY TACK COAT
P-603 (TYP.)
VARIES
NEW AC PAVEMENT
P-401 (TYP.)
NOTE:
1. CONTRACTOR SHALL APPLY TACK COAT ALONG ENTIRE FACE OF METAL WHERE
NEW AC PAVEMENT TIES IN.
2. EXISTING METAL GRATES INCLUDE TRENCH DRAIN, STORM DRAIN INLETS, PLATES,
AND SUMPS. COORDINATE WITH CONTRACTING OFFICER FOR DETERMINATION OF
METAL GRATES TO BE CLEANED AND REFINISHED. CLEANING AND REFINISHING
SHALL BE PER THE SOCIETY FOR PROTECTIVE COATINGS WHITE METAL BLAST
SPECIFICATION, SSPC-SP5.
METAL TO AC PAVEMENT CONNECTION
SCALE: N.T.S.
NOTES:
1. REPAIR MATERIAL SHALL BE PLACED TO ALLOW FOR INSTALLATION OF COMPRESSION SEAL.
2. SAWCUT SHALL EXTEND THROUGH THE CORNER TO ALLOW A MINIMUM 2" DEPTH IN THE CORNER. OVER
CUT BY SAW BLADE SHALL BE FILLED WITH DELPATCH OR OTHER APPROVED EQUAL SEALANT,
CONSIDERED INCIDENTAL TO SPALL REPAIR.
3. THE MINIMUM REMOVAL DEPTH IS 2". SOME LOCATIONS MAY REQUIRE DEEPER REMOVAL TO SOUND
CONCRETE.
CONCRETE SPALL REPAIR
SCALE: N.T.S.
EXISTING AC PAVEMENT
P-401 (TYP.)
PAVING FABRIC
P-607(A) (TYP.)
JOINT SEALANT P-605-2.1
SEAL AS NECESSARY
PAVING FABRIC
P-607(A) (TYP.)
JOINT SEALANT P-605-2.1
SEAL AS NECESSARY
EXISTING AC PAVEMENT
P-401 (TYP.)
HELIPAD ROAD, PARKING LOT, AND ACCESS
MILLINGS PLACEMENT DETAIL
SCALE: N.T.S.
3" ASPHALT
MILLINGS
EXISTING MATERIAL
NOTE:
1. PRIOR TO PLACEMENT CONTRACTOR SHALL PROVIDE TEST PATCH AND OBTAIN
APPROVAL FROM CONTRACTING OFFICER PER SPECIFICATION.
2. CONTRACTOR SHALL SHAPE GRAVEL BASE TO A UNIFORM SURFACE WITH
CONSISTENT GRADES DRAINING AWAY FROM STRUCTURES.
3. CONTRACTOR SHALL WORK WITH THE C.O. TO DEVELOP DRAINAGE TOWARDS
EXISTING FLOW PATHS AS NECESSARY BASED ON HOW THE EXISTING AREA
CURRENTLY FUNCTIONS.
4. CONTRACTOR SHALL EXCAVATE AS NECESSARY TO PROVIDE SMOOTH TRANSITIONS
ON TO AND OFF OF MILLINGS.
5. ASPHALT MILLINGS SHALL BE MAXIMUM SIZE IN ACCORDANCE WITH P-101.
6. ASPHALT MILLINGS SHALL BE MIXED WITH CHEMICAL REJUVENATING AGENT PRIOR
TO PLACEMENT. ADDITIONAL REJUVENATING AGENT WILL BE REQUIRED ONCE
MILLINGS ARE COMPACTED IN PLACE.
7. ASPHALT MILLINGS SHALL BE COMPACTED TO 95% PER ASTM D698.
PROVIDE MINIMUM 1% GRADE TO
DRAIN AWAY FROM STRUCTURE
| Sheets and Views |
| COVER SHEET |
| 1 SUMMARY OF ESTIMATED QUANTITIES |
| 2 GENERAL NOTES AND ABBREVIATIONS |
| 3 EXISTING SITE CONDITIONS AND CONTROL |
| 4 CONSTRUCTION SAFETY & PHASING PLAN |
| 5 CRACK SEAL & SEAL COAT PLAN |
| 6 STRIPING & TIE-DOWN PLAN |
| 7 DETAILS |
File details come from the government source that posted it. Updated .