This document is a memorandum from the U.S. Naval Ship Repair Facility (SRF) Detachment Singapore establishing six Fiscal Year 2026 Local Standard Items (LSIs) as mandatory contract requirements for all procurements issued and ongoing from the effective date of October 6, 2025. The LSIs apply to ship repair and maintenance work performed at the Singapore facility and include: 099-201SI (Calibration Intervals for Contractor Measuring and Test Equipment), 099-202SI (Work Authorization Form coordination), 099-203SI (Naval Supervisory Authority notifications), 099-204SI (Heavy Weather Plan provision), 099-205SI (Contractor Cranes provision), and 099-206SI (Interference reporting and testing). Each LSI establishes specific technical and procedural requirements that contractors must comply with throughout contract performance. Requests for deviations require written submission to SRF Det Singapore with full justification explaining necessity and impact on planning and availability.
The detailed LSI specifications include contractor responsibilities for equipment calibration at specified intervals aligned with Navy standards, designation and coordination of Work Authorization Form Coordinators (WAFCOR) with written supervisor approval, supervisor approval before conducting maintenance on energized equipment or systems with reduced sea protection, submission of written Heavy Weather Plans for availabilities exceeding 14 calendar days with defined weather response protocols, provision of cranes with maximum 10,000-pound lift capacity including daily pre-use inspections and anti-two-block devices, and identification and testing of system interferences with detailed reporting three days prior to removal. All requirements are Category I (mandatory) and do not authorize contract price, schedule, or term changes; contractors claiming equitable adjustment must notify the Contracting Officer before proceeding. The point of contact is Mr. Sean Jermyn, Deputy Maintenance Officer, at +65-6422-3642.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
U.S. NAVAL SHIP REPAIR FACILITY
DETACHMENT SINGAPORE
PSC 470 BOX 2500
FPO AP 96534-0001
CUI
SG100/Ser 050
6 Oct 25
From: Officer in Charge, U.S. Naval Ship Repair Facility, Detachment Singapore
To: Director, Singapore Contracting Division, Fleet Logistics Center Yokosuka
Subj: SRF DET SINGAPORE LOCAL STANDARD ITEMS
Ref: (a) COMUSFLTFORCOMINST 4790.3
Encl: (1) SRF Det Singapore Local Standard Item Numerical Index
1. Per reference (a), the Fiscal Year 2026 (FY26) Local Standard Items (LSIs) are contained in
Enclosure (1) and are available on the one drive at: TECHNICAL LIBRARY (Engineering – US
Navy FlankSpeed).
2. The FY-26 LSIs shall be contract requirements in all procurements issued and ongoing from the effective date of this letter. The FY-26 Local Standard Items are:
• 099-201SI Calibration Intervals for Contractor Measuring and Test Equipment; accomplish
• 099-202SI Work Authorization Form(s); coordinate
• 099-203SI Naval Supervisory Authority (NSA) notifications; accomplish
• 099-204SI Heavy Weather Plan, provide
• 099-205SI Contractor Cranes, provide
• 099-206SI Interference; report and test
3. Requests for deviations from this requirement must be submitted in writing and routed to SRF
Det Singapore for adjudication and approval, and must fully explain the reason(s) for the deviation (i.e., why deviation is required, how planning would be affected, how availability would be impacted, etc.).
4. The requirements of this letter do not authorize any change in terms, conditions, delivery schedule, price, or amount of any Government contract. In the event you consider the requirements represent a change for which an equitable adjustment is in order, you are to advise the Contracting Officer of the particular technical or contractual requirements regarded as changed, and take no action with regard to such changed requirements until notified in writing of the Contracting Officer’s response.
5. Point of Contact for further information is Mr. Sean Jermyn, Deputy Maintenance Officer at
+65-6422-3642 or sean.p.jermyn.civ@us.navy.mil.
E. L. VONWELLER
Officer in Charge
CUI Enclosure (1)
Controlled by: DEPARTMENT OF THE NAVY
Controlled by: NAVSHIPREPFAC DET SINGAPORE CUI Category: PRVCY
Distribution/Dissemination: FEDCON
POC: CDR Elliott L. VonWeller, OIC
Elliott.l.vonweller.mil@us.navy.mil
SRF DET SINGAPORE
LOCAL STANDARD ITEM
NUMERICAL INDEX
FY-26
ITEM NO. TITLE UTILIZATION
CATEGORY
DATE
099-201SI Calibration Intervals for Contractor
Measuring and Test Equipment;
accomplish
I 01 MAY 2022
099-202SI Work Authorization Form(s);
coordinate
I 01 MAY 2022
099-203SI Naval Supervisory Authority (NSA) notifications; accomplish
I 01 MAY 2022
099-204SI Heavy Weather Plan; provide I 02 AUG 2024
099-205SI Contractor Crane; provide I 02 AUG 2024
099-206SI Interference; report and test I 01 OCT 2025
SRF DET SINGAPORE
LOCAL STANDARD ITEM
FY-26
ITEM NO: 099-201SI
DATE: 01MAY2022
CATEGORY: I i
1. SCOPE:
1.1 Title: Calibration Intervals for Contractor Measuring and Test
Equipment; accomplish
2. REFERENCES:
2.1 NAVSEA Standard Items
2.2 ISO/IEC 17025, General Requirements for the Competence of testing and Calibration Laboratories
2.3 NAVSEA 04-4734, Navy and Marine Corps Calibration Laboratory
Audit/Certification
2.4 NAVSEA OD 45845, Metrology Requirements List (METRL)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 to ensure calibration
laboratories meet the requirements of 2.2 or certified in accordance with 2.3.
3.1.1 Objective Quality Evidence supporting accreditation of
calibration laboratories used, and certification of Measuring and Test
Equipment used, must be provided to the SUPERVISOR, when requested.
3.2 Calibration intervals assigned to Measuring and Test Equipment used by the contractor for acceptance testing must meet those specified in Attachment A. Intervals listed in 2.4 are used if contractor equipment is calibrated by a Navy calibration laboratory.
See Note 4.1.
3.2.1 The intervals specified in Attachment A are maximum
allowable intervals which must not be exceeded unless calibrated by a
Navy calibration laboratory. Intervals shorter than those specified are acceptable for use without further approval by the SUPERVISOR.
3.3 When calibration intervals do not meet the requirements of
Attachment A, the contractor must perform the following:
3.3.1 Submit one legible copy in ENGLISH, in hard copy or
approved transferrable media to the SUPERVISOR for acceptance, of recommended calibration intervals for instruments not listed in
Attachment A.
3.3.1.1 Approval by the SUPERVISOR shall be obtained for
all intervals not specified in Attachment A prior to conducting acceptance testing.
3.4 The contractor must ensure that the Measuring and Test Equipment resources provided:
3.4.1 Are suitable for the specific type of Measuring and Testing activities being undertaken.
3.4.2 Are maintained to ensure their continuing fitness for their purpose.
3.5 The contractor must ensure Measuring and Test Equipment are safeguarded from adjustments, damage, or deterioration that would invalidate the calibration status and subsequent measurement results.
3.6 When Measuring and Test Equipment is found to be unfit for its intended purpose, the contractor must determine if the validity of previous measurement results has been adversely affected.
3.6.1 When the validity of any previous measurement has been
adversely affected, submit one legible copy, in ENGLISH, in hard copy or approved transferrable media, a report listing the results of 3.6.
Include in the report the contractor’s determination, any previous measurement(s) adversely affected, and recommendation(s) for corrective action.
3.7 Reports providing results utilizing Measuring and Test Equipment must be documented with the units of measurement achieved by the device, and provide the unit conversion (as necessary) to certify that the requirements are met in the units specified by the work specification.
4. NOTES:
4.1 Reference 2.4 is not available for public release. This LSI is intended to meet the intent of the calibration interval requirements of NSI 009-04 for contracted work OCONUS.
ATTACHMENT A: GENERIC CALIBRATION INTERVALS
Max. Cal.
Interval
(Months)
Equipment Description
---- -A-
18 ANALYZER, DEW POINT – TEMPERATURE, HUMIDITY
5 ANALYZER, GAS, ALL TYPES WITH REPLACEABLE SENSORS
5 ANALYZER, GAS COMBUSTIBLE
5 ANALYZER, GAS COMBUSTIBLE AND OXYGEN
5 ANALYZER, GAS, MULTI
11 ANALYZER, NOISE
5 ANALYZER, OXYGEN
24 ANALYZER, POWER
33 ANALYZER, SERVO
24 ANALYZER, SIGNAL
5 ANALYZER, SINGLE GAS
---- -B-
12 BALLS, PRECISION, WORKING
36 BAR, SINE
12 BAROMETER, DIGITAL
12 BAROMETER, MERCURY
24 BLOCK, GAGE
NCR BLOCK, HARDNESS TEST
36 BLOCK, SINE
36 BLOCK, ULTRASONIC
24 BLOCK, VEE, MATCHED PAIR
NCR BLOCK, VEE, UNMATCHED
12 BORESIGHT
21 BRIDGE, RESISTANCE / CONDUCTIVITY
---- -C-
11 CALIBRATOR, TEMPERATURE
24 CALIPER, DIAL
36 CALIPER, VERNIER
NCR CHARGER, BATTERY
36 COMPARATOR, GAGE
NOTE: “NCR” IDENTIFIES EQUIPMENT WITH “NO CALIBRATION REQUIRED”
ATTACHMENT A (CONT.): GENERIC CALIBRATION INTERVALS
(Months)
Equipment Description
---- -C- (CONT.)
6 COMPARATOR, SIGNAL
---- -F-
22 FURNACE, THERMOCOUPLE
---- -G-
24 GAGE, BORE
36 GAGE, DEPTH
12 GAGE, ELECTRONIC
48 GAGE, FEELER
24 GAGE, HEIGHT
NCR GAGE, SURFACE
48 GAGE, TAPER
12 GAUSSMETER
36 GENERATOR, SIGNAL
36 GENERATOR, SIGNAL, SWEEP
---- -H-
36 HYDROMETER, ASTM
24 HYDROMETER, OTHER
---- -I-
24 INDICATOR, DIAL
18 INDICATOR, FLOW
---- -L-
12 LASER
36 LEVEL
24 LOAD CELL
---- -M-
12 MANOMETER, CAPACITANCE, INDICATOR
12 MANOMETER, DIAL
21 MEASUREMENT SYSTEM, RESISTANCE
36 METER, AMMETER
36 METER, AMMETER, ANALOG, MEGA
(Months)
Equipment Description
---- -M- (CONT.)
36 METER, AMMETER, CLAMP-ON
8 METER, CAPACITANCE
22 METER, DIFFERENTIAL VOLTMETER
15 METER, DIGITAL VOLTMETER
9 METER, FIELD INTENSITY / RADHAZ / RIFI
48 METER, FREQUENCY, COAXIAL
12 METER, GAUSS
27 METER, IMPEDANCE
24 METER, IMPEDANCE, RF
10 METER, LIGHT
24 METER, MULTIMETER, DIGITAL
36 METER, MULTIMETER, DIGITAL, HAND HELD
26 METER, MULTIMETER, ANALOG
22 METER, NOISE
32 METER, OHMMETER, ANALOG
31 METER, OHMMETER, DIGITAL
36 METER, PH
36 METER, PHASE
27 METER, PHASE ANGLE VOLTMETER
36 METER, POWER
12 METER, SOUND LEVEL
6 METER, VIBRATION
36 METER, VOLTAMMETER
16 METER, VOLTMETER, ANALOG
36 METER, VOLTMETER,ELECTROSTATIC
8 METER, VOLTMETER, RF
11 METER, VOLTMETER, SELECTIVE
13 METER, VOLTMETER, VECTOR
20 METER, WATTMETER, AC
12 METER, WATTMETER, RF
(Months)
Equipment Description
---- -M- (CONT.)
36 MICROMETER
24 MULTIMETER
---- -O-
36 OSCILLOSCOPE, DIGITAL
34 OSCILLOSCOPE, PLUG-IN
16 OSCILLOSCOPE, PORTABLE
---- -P-
36 PARALLEL
36 PLATE, SINE
NCR PLATE, SURFACE
12 PRESSURE GAUGE, BOURDON TUBE, TEST
24 PRESSURE GAUGE, BOURDON TUBE, WORKING
12 PRESSURE GAUGE, DIAPHRAGM
12 PRESSURE GAUGE, DIGITAL, TEST
24 PRESSURE GAUGE, DIGITAL, WORKING
18 PRESSURE GAUGE, MAGNEHELIC
06 PRESSURE INDICATING DEVICE, MCLEOD
31 PROTRACTOR
31 PYROMETER
---- -R-
16 RECORDER
12 RECORDER, STRIP CHART
NCR RULE
---- -S-
18 SENSOR, DEW-POINT-TEMPERATURE
24 SQUARE
36 SQUARE, CYLINDRICAL
24 STRAIGHTEDGE
---- -T-
24 TABLE, OPTICAL
(Months)
Equipment Description
---- -T- (CONT.)
24 TACHOMETER, MECHANICAL
15 TENSIOMETER
12 TEST SET, FIBER OPTIC
18 TEST SET, FUEL FLOW
24 TEST SET, VOLTAGE
6 TEST STAND, ENGINE
9 TEST STAND, GENERATOR
5 TEST STAND, OXYGEN
24 TESTER, CIRCUIT
36 TESTER, FLOWMETER
24 THERMOCOUPLE
36 THERMOMETER, BIMETAL
31 THERMOMETER, DIGITAL
24 THERMOMETER, INFRARED
36 TIMER, DIGITAL
12 TIMER, PRECISION
21 TORQUE GAGE
15 TORQUE MULTIPLIER
24 TORQUE SCREWDRIVER, DIAL
15 TORQUE SCREWDRIVER, SNAP ACTION
15 TORQUE SCREWDRIVER, SNAP ACTION, PRESET
21 TORQUE WATCH
36 TORQUE WRENCH, BEAM, FLAT
24 TORQUE WRENCH, BEAM, ROUND
24 TORQUE WRENCH, DIAL
12 TORQUE WRENCH, DIGITAL
NCR TORQUE WRENCH, IMPACT
15 TORQUE WRENCH, SNAP ACTION
18 TORQUE WRENCH, SNAP ACTION, PRESET
12 TRANSDUCER, PRESSURE
(Months)
Equipment Description
---- -T- (CONT.)
6 TRANSDUCER, VELOCITY
6 TRANSDUCER, VIBRATION
---- -V-
NCR VALVE, METERING
NCR VALVE, REGULATED
NCR VALVE, RELIEF
36 VERNIER
14 VISCOMETER
---- -W-
36 WEIGHT
36 WIRE, MEASURING
ITEM NO: 099-202SI
LOCAL STANDARD ITEM
FY-26
ITEM NO: 099-202SI
DATE: 01 MAY 2022
1.1 Title: Work Authorization Form (s); coordinate
2. REFERENCES:
2.1 NAVSEA Standard Items
3. REQUIREMENTS:
3.1 When it is determined that a Work Authorization Form (WAF) in accordance with 009-24 of 2.1 is required prior to commencement of work, the contractor must verify their responsibilities for the overall execution of the WAF coordinator (WAFCOR) duties in accordance with
009-106 of 2.1 and the Performance Work Statement.
3.1.1 The contractor must verify what responsibilities exist as
WAFCOR with the SUPERVISOR. WAFCOR duties will not be the responsibility of a non-US contractor, unless directed otherwise by the
SUPERVISOR.
3.1.2 The contractor must know and understand the potential
hazards associated with the work, as briefed by the WAFCOR and the ship’s force, prior to commencement.
3.2 There shall never be more than one designated WAFCOR.
3.2.1 The contractor must obtain written approval from the
SUPERVISOR when requesting to be relinquished of WAFCOR duties.
3.3 The contractor must clearly designate WAFCOR personnel
assignments.
3.3.1 The contractor must never assign the same WAFCOR personnel to more than one ship concurrently.
3.3.2 The contractor must ensure the turnover of any WAFCOR
personnel assignment is comprehensive and communicated to the
SUPERVISOR and ship’s force.
4. NOTES:
4.1 This LSI directly relates to and supplements 009-24 and 009-106 of 2.1.
4.2 When ship’s force performs WAFCOR duties, the SUPERVISOR will act as the intermediary to ensure contract compliance.
ITEM NO: 099-204SI
LOCAL STANDARD ITEM
FY-26
ITEM NO: 099-203SI
DATE: 01 MAY 2022
1.1 Title: Naval Supervisory Authority (NSA) notifications;
accomplish
2. REFERENCES:
2.1 NAVSEA Standard Items
3. REQUIREMENTS:
3.1 Obtain approval from the SUPERVISOR for the following activities prior to taking any action.
3.1.1 The conduct of maintenance on energized or operating
equipment.
3.1.2 Recommencing equipment operation after suspected tampering is discovered.
3.1.3 Conducting maintenance on any system that would allow only single-barrier protection to the sea.
3.1.4 Conducting corrective or preventive maintenance during
fueling operations.
3.1.5 Operating equipment with a “yellow” tag (CAUTION tag) in order to accomplish maintenance.
3.1.6 Conducting inspection and/or maintenance on equipment with a "red" tag (DANGER tag).
4. NOTES:
4.1 None
LOCAL STANDARD ITEM
FY-26
ITEM NO: 099-204SI
DATE: 22 MAY 2024
1.1 Title: Heavy Weather Plan; provide
2. REFERENCES:
2.1 NAVSEA Standard Items
3. REQUIREMENTS:
3.1 For availabilities with a period of performance scheduled for greater than 14 calendar days, provide and maintain a written Heavy
Weather Plan that will be put in effect in the event of gales, storms, hurricanes, and destructive weather. The plan shall contain specific responsibilities and detailed actions to be taken during the conditions listed in Table 1 (Weather Conditions). For availabilities scheduled for 14 calendar days and less, actions for heavy weather conditions will be as directed by the Supervisor. See 3.1.1.3.
3.1.1 Minimum inclusions: Ensure the plan contains, at a minimum, the following information as dictated by conditions listed in Table 1
(Weather Conditions).
3.1.1.1 Steps to be taken to remove or secure staging items
or equipment on vessel decks, pier or dry dock, including cranes that could become windborne and provisions for removal of temporary hoses, welding lines, air lines, etc., extending through watertight closures.
3.1.1.2 If the vessel is at the contractor’s facility and
unable to get underway, the Heavy Weather Plan must also contain methods for protection of vessel from damage from floating equipment, such as barges, doughnuts, work floats and other vessels.
3.1.1.3 The name and telephone number (and back up name and
telephone number) of the Contractor’s Point of Contact, who has the authority to commit the contractor to take necessary actions as directed by the SUPERVISOR.
3.1.1.4 Steps to be taken to secure and safeguard all other
Government properties and equipment and material in custody of the contractor from damage by pierside flooding.
LOCAL STANDARD ITEM
FY-26
ITEM NO: 099-205SI
DATE: 02 Apr 2024
1.1 Title: Contractor Crane, Multi-Purpose Machine and Material
Handling Equipment utilized for SRF Detachment Singapore Availability, in the 7th Fleet AOR, provide.
2. REFERENCES:
2.1 NAVSEA Standard Items
2.2 NAVFAC P-307, Management of Weight Handling Equipment
3. REQUIREMENTS:
3.1 Comply with the requirements of 009-40 of 2.1 and Paragraph
11.1.b of 2.2 prior to bringing any cranes, multi-purpose machines, material handling equipment, or construction equipment that may be used in a crane-like application to lift suspended loads during the availability.
3.1.1 For cranes not certified as listed in 3.1, contractor must provide certification to local requirements for evaluation by the
SUPERVISOR.
3.1.1.1 Submit one legible copy of the requirements of
3.1.1 in hard copy or approved media to the SUPEVISOR for evaluation prior to operation.
3.1.2 Notify the SUPERVISOR one day prior to delivering the crane per 3.1.
3.2 Crane must be capable of handling materials from the top of the mast to the farthest outboard point of the ship.
3.2.1 Maximum crane lift must not exceed 10,000 pounds.
3.2.2 Ensure inspections are performed in accordance with
reference 2.1 and 2.2 or local requirements for the country where work is being performed. Retain the current documentation of inspections on site.
3.2.2.1 Perform daily pre-use inspections and testing on
all load hoisting and lowering mechanisms, boom hoisting and lowering mechanisms, swinging mechanisms, traveling mechanisms (if to be used that day), and safety devices.
FY-26 2 of 2
3.2.2.2 Use of rerated cranes is not authorized.
3.2.2.3 Cranes must have an operational anti-two-block
device or a two-block damage prevention feature for all points of two-blocking.
3.2.2.4 Have a boom hoist disconnect, shutoff, or hydraulic
relief to automatically stop the boom hoist when the boom reaches a predetermined high angle.
3.2.3 Submit one legible copy, in approved transferrable media, of result of the inspection conducted in 3.2.2 to the SUPERVISOR within 24-hr of the inspection.
4. NOTES:
4.1 None.
FY-26 2 of 2
3.1.2 Submit a copy of the plan to the SUPERVISOR within seven days after contract award or within three days of the start of the availability, whichever comes first. Submit updated or changed plan to the SUPERVISOR as they occur.
TABLE 1 - WEATHER
CONDITIONS
WEATHER
(The Vessel
CO will set all conditions)
ANTICIPATED
WINDS > 74 MPH
ACTION
GALE STORM/
HURRICANE/ TYPHOON
IV >>74 hrs Review hazardous/destructive weather implementation plan.
III >>48 hrs Take preliminary precautions.
II >>24 hrs
Take precautions to permit establishing an appropriate state of readiness on short notice.
I >>12 hrs Take appropriate precautions to minimize damage.
THUNDERSTORMS
II <<6 hrs
Take precautions to permit establishing an appropriate state of readiness on short notice.
I <<0** Take appropriate precautions to minimize damage.
>> Trend indicates a possible threat of destructive winds within the number of hours shown.
<< Destructive winds accompanying the phenomenon exceeding 40 MPH are reported or expected in the general area within number of hours shown.
**IMMINENT
LOCAL STANDARD ITEM
ITEM NO: 099-206SI
DATE: 1 OCT 2025
CATEGORY: _I_
1.1 Title: Interference; report and test
2. REFERENCES:
2.1 NAVSEA Standard Items
3. REQUIREMENTS:
3.1 Identify each interference required for removal and
installation. See Note 4.2 for definition of interference.
3.2 Report each interference.
3.2.1 Submit one legible copy, in approved transferrable media, of a report of components of the systems identified in 3.1 that must be removed as interferences which the Work Items does not identify, to the SUPERVISOR, three days prior to removal. The report must list the following information of each interference to be removed or disturbed:
3.2.1.1 Location/Space.
3.2.1.2 Item description (e.g. piping size, valve number, cable identification, gauge number, etc.)
3.3.1.3 System.
3.2.1.4 Necessity for the action.
3.2.1.5 Testing required to include details for each test
that will be accomplished to verify acceptability after installation including testing parameters and acceptance criteria.
3.2.1.6 Protective measures which will be taken to protect
removed interferences from damage or contamination.
3.2.1.7 Procedures as required to accomplish reinstallation
or testing of each interference identified on 3.1.
(V)(G) “STRENGTH AND OPERATION TEST”
3.3 Align and accomplish appropriate strength, system cleanliness, and operation tests for each interference installed and ensure that each installed interference performs its normal function within the system.
3.4 Each test must be incorporated into the contractor’s Test and
Inspection Plan IAW reference 2.1, 009-04.
3.5 Each test must be included into the contractor’s Process Control
Procedure (PCP) as part of initial submission of the PCP IAW reference
2.1, 009-09.
4. NOTES:
4.1 This Local Standard Item (LSI) is in addition to the
reporting requirements of reference 2.1, 009-23.
4.2 Definition: An interference, as it relates to this LSI, is any part of a ship, whether installed or portable, that must be moved or disturbed in the accomplishment of work specified in the Work Item to include system components outside the scope of work that require additional testing parameters beyond a system operation test.
File details come from the government source that posted it. Updated .