J-2 SN SING-017-26 USS HIGGINS Price Proposal Breakdown Sheet (1).xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- USS HIGGINS (DDG 76) CMAV
- Solicitation number
- N6264926RR007
About this file
This is a Price Proposal Breakdown Sheet template for labor and material costs associated with ship maintenance and repair work on the USS HIGGINS (DDG 76). The spreadsheet is designed to capture detailed pricing information organized by specific skilled labor categories and associated costs, serving as Attachment J-2 to a formal price proposal submission.
The template includes columns for capturing labor hours across 23 distinct trade classifications including welders, pipefitters, electricians, machinists, painters, riggers, shipfitters, and various other maritime skilled trades, along with corresponding labor pricing in U.S. dollars. Additional columns accommodate material pricing (identified as CFM pricing), other costs with specification space, and total pricing calculations. The form is structured to allow multiple work items (identified by work item numbers) to be priced individually, with total labor hours and costs rolled up at the bottom. A remarks section is provided for additional context or explanations, with space for supplementary documentation on separate pages if needed. The template currently contains no populated data, presenting all entries at zero values, indicating this is a blank form awaiting contractor completion for the USS HIGGINS CMAV contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
000000
J-2 Price Proposal Breakdown Sheet(s) - Attachment J-2
| DO NOT CHANGE THE FORMAT OF THIS BREAKDOWN SHEET | ||||||||||||||||||||||||||
| Labor hours | ||||||||||||||||||||||||||
| Work Item | ||||||||||||||||||||||||||
| No. | Blacksmith | Boilermaker | Burner | Staging | Chipper | Electrician | Electronics | Engineer Services | Firewatch | General Labor | Joiners | Laggers | Machinist Inside | Machinist Outside | NDT | New Trade | Painters | Pipefitters | QA/Supervision | Riggers | Sheet Metal | Shipfitters | Welders | Subcontractor | Manhours | Labor |
Price US$ Materal Price
(CFM)
US$ Other (specify in Remarks) US$ Total Price
US$
| 001 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| Total | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Remarks: | (provide the information in space below. Use separate sheet of paper if necessary.) |