J-2a Drawings.pdf
PDF 4 MB Posted
- Attached to
- Chiller Replacement - Hector International Airport (FAR) Airport Traffic Control Tower (ATCT)
- Solicitation number
- 697DCK-26-R-00368
About this file
Summary of 100% Design Drawings for Air Cooled Chiller Replacement
This document is a comprehensive set of 100% design drawings for an air-cooled chiller replacement project at Hector International Airport's FAA Air Traffic Control Tower (ATCT) in Fargo, North Dakota. The project is managed by the Federal Aviation Administration (FAA) under Department of Transportation authority, with project number 21003455 and drawing package reference FAR-21003455. The design drawings were issued September 25, 2025, and represent final construction documents for the chilled water system upgrade.
The scope of work includes removal of the existing chiller and installation of a new air-cooled water chiller (CH-1), two chilled water pumps (P-1 and P-2), expansion tank, air separator, and chemical feeder tank. The chilled water system operates on a 55% propylene glycol solution (Dowtherm HD product). Contractor responsibilities encompass furnishing and installing new chilled water piping to specified connection points, reconfiguring existing piping connections, modifying electrical circuits and disconnects, reattaching lightning protection systems, installing strainers and gauges, integrating controls into the existing building automation system, and engaging a certified TAB (Test, Adjust, Balance) contractor to commission the hydronic system. Construction must maintain continuous facility operations during the phased equipment replacement, with the contractor providing temporary heating and cooling equipment to maintain 72-78 degrees Fahrenheit. The contractor must also provide training, final cleaning, operation and maintenance manuals in binder and electronic formats, and conduct final inspections witnessed by the FAA Contracting Officer Representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/04/2025
MGR: ENGINEERING
FARGO
FAR-21003455-G001
ATCT
COVER SHEET
fa r- -g
.d w g
SURVEILLANCE SVCS
AIR TRAFFIC SYSTEMS
ATO - PROGRAM MANAGEMENT ORG HEADQUARTERS
C O
N S
T R
U C
T
IO
N
HECTOR INTL AIRPORT
PROJECT ENGINEER
21003455
ND
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:3
:4
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
fa r- -g
.d w g
8 234567
H
G
F
E
D
C
A
B
IS
S
U E
D F
O R
E D
M
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
SEPTEMBER 25, 2025
100% DESIGN DRAWINGS
AIR COOLED CHILLER REPLACEMENT
FARGO, NORTH DAKOTA
HECTOR INTERNATIONAL AIRPORT
FAA ATCT
A
T OF TRANSPO
R T A T
IO
N
M
E R
IC
A
OF
STATES
U N
IT
E D
D E P A R
TM
EN
AVIA
T
IO
N
LA
R
E
D E
F
TRAT
IO
N
SI
NI
M
D A
FAR-21003455-G002
DRAWING INDEX
-g
.d
ATO - PROGRAM MANAGEMENT ORG HEADQUARTERS
C O
N S
T R
U C
T
IO
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:3
:0
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
fa r- -g
.d w g
8 234567
H
G
F
E
D
C
A
B
IS
S
U E
D F
O R
E D
M
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
SHEET TITLE
FAR-21003455-M004
FAR-21003455-M003
FAR-21003455-M002
FAR-21003455-M001
MECHANICAL
FAR-21003455-G003
FAR-21003455-G002
FAR-21003455-G001
GENERAL
CHILLER PIPING LAYOUT
SCHEMATIC DETAILS
EQUIPMENT SCHEDULES
FIRST FLOOR PLAN AND GENERAL NOTES
CONSTRUCTION GENERAL NOTES
INDEX OF DRAWINGS
COVER SHEET
DRAWING INDEX
SITE MAP
FAR-21003455-G003
CONSTRUCTION GENERAL NOTES
-g
.d
ATO - PROGRAM MANAGEMENT ORG HEADQUARTERS
C O
N S
T R
U C
T
IO
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:3
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
fa r- -g
.d w g
8 234567
H
G
F
E
D
C
A
B
IS
S
U E
D F
O R
E D
M
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
UL FIRE RATED SYSTEM SHALL UTILIZE WALL SLEEVES.
WITH UL LISTED FIRE RATED SYSTEM TO MEET OR EXCEED FIRE RATING OF AFFECTED CONSTRUCTION OR SYSTEM. WHERE APPLICABLE,
19. ANY CUTTING AND/OR PATCHING OF RATED WALLS, AND/OR DISTURBANCE OF RATED FIREPROOF CONSTRUCTION SHALL BE REPAIRED
SHALL BE REPAIRED OR REPLACED AT THEIR OWN EXPENSE.
DURING CONSTRUCTION WORK FOR THIS PROJECT. ANY DAMAGE CAUSED TO THE BUILDING OR EQUIPMENT BY THE CONTRACTOR
18. THE CONTRACTOR SHALL PROTECT ALL EXISTING BUILDING STRUCTURE, SURFACES, EQUIPMENT, AND FIXTURES FROM DAMAGE
COST TO THE GOVERNMENT.
TO COME TRUE AND LINE UP WITH EXISTING CONNECTED WORK. THE CONTRACTOR SHALL ACCOMMODATE SUCH WORK AT NO ADDITIONAL
AND/OR THE STRUCTURE, TAKE MEASUREMENTS IN THE FIELD, WORK OUT SPACE CONDITIONS AND MAKE NECESSARY ADJUSTMENTS
17. WHERE THERE IS EVIDENCE THAT PARTS OF THE WORK WILL INTERFERE WITH OTHER WORK (PIPING, EQUIPMENT, CONDUITS, ETC.)
AND WIRING. TESTING AND BALANCING (TAB) REPORTS FOR ALL EQUIPMENT UNDER THIS CONTRACT.
WHERE EXISTING HVAC SYSTEMS ARE TO BE REPLACED, THE CONTRACTOR MAY DISCONNECT AND REINSTALL EXISTING BAS CONTROLS
16. CONTRACTOR SHALL PROVIDE BUILDING AUTOMATION SYSTEM (BAS) CONTROL WIRING AS REQUIRED FOR NEWLY F&I EQUIPMENT.
OR NOT THEY ARE SPECIFICALLY CALLED FOR BY THE SPECIFICATIONS OR DRAWINGS.
PROPER INSTALLATION AND OPERATION OF ANY SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR FOR SUCH SYSTEM WHETHER
15. MINOR MATERIALS, EQUIPMENT, ACCESSORIES AND/OR DEVICES REASONABLY INFERABLE AS NECESSARY FOR THE COMPLETE AND
AND OPERATING INSTALLATION.
HEREINAFTER SPECIFIED, COMPLETE WITH ALL NECESSARY FITTINGS, SUPPORTS, TRIM, PIPING, INSULATION AS REQUIRED FOR A COMPLETE
14. UNLESS EXPLICITLY STATED TO THE CONTRARY, THE CONTRACTOR SHALL FURNISH AND INSTALL EACH ITEM OF EQUIPMENT OR MATERIAL
AS REQUIRED TO MATCH EXISTING.
13. WHERE REPLACEMENT OF EQUIPMENT OR SYSTEMS EXPOSES OR DAMAGES STRUCTURE, PATCH, REPAIR, AND PAINT WALL/CEILING/FLOORS
OR SYSTEMS HAVE ACTUALLY ARRIVED AT THE PROJECT SITE AND ARE READY FOR INSTALLATION AND VERIFIED AS SUCH BY THE FAA COR.
12. EXISTING EQUIPMENT OR SYSTEMS SPECIFIED TO BE REPLACED SHALL NOT BE REMOVED FROM SERVICE UNTIL THE NEW EQUIPMENT
AND SAFETY DEVICES FOR ALL NEW EQUIPMENT AND MATERIALS BEING INSTALLED.
11. THE CONTRACTOR SHALL COMPLY WITH ALL SPECIFICATIONS FOR STANDARDS OF WORKMANSHIP REQUIRED, METHODS OF CONTROL, COST TO THE GOVERNMENT.
10. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL TRADES, MAKING ANY NECESSARY ADJUSTMENTS AT NO ADDITIONAL
THESE PLANS NEED TO BE DETAILED AND APPROVED WELL IN ADVANCE OF PROCEEDING WITH ANY OF THE WORK.
EQUIPMENT UNDER THIS CONTRACT IS KEY TO KEEPING THE FACILITY OPERATIONAL AND TO KEEPING THE NAS AND FLYING PUBLIC SAFE.
THIS FACILITY PLAYS IN KEEPING THE NATIONAL AIR SPACE (NAS) "THE FLYING PUBLIC" SAFE, THE FACILITY NEEDS TO REMAIN OPERATIONAL 24-7.
EQUIPMENT PHASING PLAN (SCHEDULED INSTRUCTIONS TO REMOVE EQUIPMENT IN PHASES, NOT ALL AT ONCE). DUE TO THE CRITICAL ROLE
9. PRIOR TO THE NOTICE TO PROCEED (NTP), THE CONTRACTOR SHALL PREPARE AND SUBMIT A PROJECT SCHEDULE INCLUDING A DETAILED
AS SPECIFIED OR SCHEDULED. SHOP DRAWING PLANS SHALL BE MINIMUM 1/4" SCALE.
8. SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND/OR SAFETY DATA SHEETS (SDS) SHALL BE SUBMITTED FOR ALL EQUIPMENT AND SYSTEMS
EQUIPMENT, MATERIALS OR BEFORE STARTING ANY RELATED WORK.
TO THE FAA CONTRACTING OFFICER (CO) OR CONTRACTING OFFICER'S REPRESENTATIVE (COR) FOR GUIDANCE BEFORE ORDERING ANY
7. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS INCLUDING DETAILED SKETCHES FOR ANY DISCREPANCIES OR QUESTIONS OF INTENT
THE BEST CONDITIONS AND RESULTS SHALL BE DETERMINED AT THE SITE, SUBJECT TO FAA COR REVIEW AND APPROVAL.
6. LOCATION OF ITEMS NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY AND EXACT LOCATIONS NECESSARY TO SECURE
ALL TRADES PRIOR TO SUBMITTING SHOP DRAWINGS, FABRICATING OR PURCHASING EQUIPMENT, MATERIALS OR ASSEMBLIES.
ALL DIMENSIONS, SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS, AND COORDINATE BETWEEN
(DO NOT SCALE FOR LOCATIONS). THE CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT DOCUMENTS, FIELD VERIFY
5. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW "AS-BUILT" CONDITIONS OR LOCATIONS OF EQUIPMENT
EXTENT THAT IT'S IMMEDIATE USE IS QUESTIONABLE, OR THAT IT'S NORMAL LIFE EXPECTANCY IS CURTAILED.
AND REPLACEMENT IF, IN THE OPINION OF THE FAA COR, OR MANUFACTURER, THE EQUIPMENT HAS DETERIORATED OR BEEN DAMAGED TO THE
OTHERWISE REFURBISHED TO LIKE-NEW CONDITION AT THE DISCRETION OF THE FAA COR. EQUIPMENT AND MATERIAL IS SUBJECT TO REJECTION
OR RACKS, AND COVERED WITH TARPAULINS. EQUIPMENT AND MATERIAL, IF LEFT OUT IN THE OPEN AND DAMAGED, SHALL BE REPAINTED OR
IF STORED ON-SITE IN OPEN OR UNPROTECTED AREAS, ALL EQUIPMENT AND MATERIAL SHALL BE KEPT OFF THE GROUND BY MEANS OF PALLETS
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO STORE HIS MATERIALS IN A MANNER THAT WILL MAINTAIN AN ORDERLY CLEAN APPEARANCE.
BY FEDERAL CODES AND STANDARDS.
3. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH APPLICABLE FEDERAL CODES AND STANDARDS. PROVIDE ALL TESTS REQUIRED
OF SALVAGED MATERIALS AND ANY OTHER ITEM DEEMED OF MUTUAL INTEREST TO COMPLETE THIS WORK.
HOURS, MATERIAL/EQUIPMENT STAGING, REFUSE DISPOSAL, SECURITY, INTERRUPTIONS TO BUILDING UTILITIES OR SERVICES, OWNERSHIP
2. THE CONTRACTOR SHALL COORDINATE AND MAKE ALL ARRANGEMENTS WITH THE FAA COR, INCLUDING, BUT NOT LIMITED TO; WORKING
OF ALL SYSTEMS AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED.
SERVICES, MATERIALS AND EQUIPMENT AND PERFORMANCE OF ALL REQUIRED WORK FOR THE COMPLETE OPERATIONAL INSTALLATION
1. THE CONTRACTOR SHALL PERFORM ALL WORK UNDER THIS CONTRACT. WORK UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, CONSTRUCTION GENERAL NOTES:
26. VOLTAGE FOR ALL EQUIPMENT IS TO BE VERIFIED BY MECHANICAL CONTRACTOR.
25. FOR ADDITIONAL DETAIL, SEE EQUIPMENT SCHEDULES, SEE M002.
APPARATUS PROVIDED UNDER THIS CONTRACT.
CUT-SHEETS, WIRING DIAGRAMS, SDS'S AND MAINTENANCE AND OPERATION MANUALS OF ALL EQUIPMENT AND
USB FLASH DRIVE OF OPERATION AND MAINTENANCE MANUALS CONTAINING DATA COVERING EQUIPMENT
24. CONTRACTOR SHALL PROVIDE THE FAA WITH TWO (2) 3-RING BINDER SETS AND ONE (1) ELECTRONIC COPY ON
WAS PERFORMED. THE FINAL CLEANING IS SUBJECT TO FAA COR APPROVAL.
OF THE EXTERIOR SURFACE OF EQUIPMENT INSTALLED UNDER THIS CONTRACT AND IN THE AREAS WORK
23. AFTER COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE A FINAL THOROUGH CLEANING
DATES WITH FAA COR AT LEAST TWO (2) WEEKS IN ADVANCE OF PROPOSED TRAINING.
FACILITATE REQUIRED TRAINING, SUBJECT TO FAA COR APPROVAL. CONTRACTOR SHALL SCHEDULE TRAINING
INSTALLED EQUIPMENT. THE CONTRACTOR SHALL ENLIST A COMPETENT MANUFACTURER'S REPRESENTATIVE TO
22. CONTRACTOR SHALL PROVIDE INSTRUCTION AND TRAINING IN THE OPERATION AND MAINTENANCE OF NEWLY
SUPPLY ALL LABOR, MATERIALS, INSTRUMENTS, AND MISCELLANEOUS EQUIPMENT REQUIRED FOR TESTS.
ADJUSTED, (AS REQUIRED) AND WITNESSED TO OPERATE SATISFACTORILY BY THE FAA COR. CONTRACTOR SHALL
SUBCONTRACTOR RESPONSIBLE FOR THE INSTALLATION AND/OR TEST. ALL NEW EQUIPMENT SHALL BE CLEANED,
21. FINAL INSPECTION AND TESTS SHALL BE MADE IN THE PRESENCE OF THE FAA COR, CONTRACTOR BY THE
AND LOCAL FAA APPROVAL AFTER EACH SHIFT.
PATHWAYS NEED TO BE FREE AND CLEAR OF PROJECT MATERIALS, WASTE, AND DEBRIS. SUBJECT TO FAA COR
ACTIVITIES ARE TAKING PLACE IN AN ACTIVE NATIONAL AIRSPACE (NAS) FACILITY. CONSTRUCTION AREAS AND
THE CONTRACTOR. COORDINATE DUMPSTER LOCATION AND WASTE REMOVAL WITH FAA COR. CONSTRUCTION
20. ALL PROJECT DEBRIS AND WASTE SHALL BE CLEARED AFTER EVERY WORK SHIFT AND PROPERLY DISPOSED OF BY
SCALE: 1/4" = 1'-0"
FIRST FLOOR PLAN
UH-3
UH-2
M004
M003
S
24X5
8X6
T
4"
FOR DETAIL
SEE FAR-21003455-M004
08/13/2025
AFAR-21003455-M001
FIRST FLOOR PLAN AND GENERAL NOTES
-m
.d
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U C
T
IO
N
HECTOR INTL AIRPORT ND
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
A 12/18/2025 FAR CHILLER REPLACEMENT 21003455 07/30/2025
THIS PROJECT COPY IS BASED ON DRAWING
FAR-GL-D-2106-M04, REVISION B, DATED 03/01/2012
T
S
A
A
A
A
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:0
:1
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
fa r- -m
.d w g
8 234567
H
G
F
E
D
C
A
B
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
MECH ROOM
ELEVATOR
EQUIPMENT
ROOM
MAINTENANCE
SHOP
ENGINE
GENERATOR
ROOM
ENTRY
CORRIDOR
CABLE
PIT ELEVATOR
ELEVATOR
LOBBY
EF-1
ENGINE
GENERATOR
T-1
CFM
CFM
UP
CFM
AHU-1
CFM
DF-1
1 1/4"
UH-1
IS
S
U E
D F
O R
E D
M
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
1. THE CHILLED WATER SYSTEM AT THE FARGO ATCT USES 55%
PROPYLENE GLYCOL SOLUTION. THIS DESIGN IS BASED ON
DOWTHERM HD PRODUCT.
2. CHILLED WATER PIPES ARE INSULATED WITH HARD PACK GLASS
INSULATION.
3. CONTRACTOR PROVIDED TEMPORARY HEATING AND/OR
COOLING EQUIPMENT TO MAINTAIN THE SUITABLE ENVIRONMENT
(72 TO 78 DEGREE F) FOR CONTINUING OPERATION OF THIS
FACILITY. CONTRACTOR COORDINATED WITH THE RESIDENT ENGINEER
SO THAT THE WORK WILL CAUSE LEAST AMOUNT OF INTERRUPTION
TO THE FACILITY EQUIPMENT AND PERSONNEL.
4. THE CHILLED WATER PIPES REPLACED IN THE MAIN
PROJECT WAS LIMITED TO THE BRANCH PIPES AND ASSOCIATED
VALVES FOR EACH AHU. THE NEW WORK CONNECTION POINTS
ARE SHOWN IN THE "COOLING COIL PIPING DETAILS" IN SHEET M004.
5. TESTED, ADJUSTED AND BALANCED THE WATER AND AIR SYSTEMS AFTER
THE COMPLETION OF ALL THE SYSTEMS.
6. VERIFY, FORM, FIT, AND FUNCTION OF NEW EQUIPMENT TO THE EXISTING
CONDITION.
GENERAL NOTES:
1. CLEAR DEBRIS FROM THE CONCRETE PAD AND LOCATE
THE NEW CHILLER (CH-1) ON THE EXISTING PAD. SUPPORT
THE NEW UNIT AT THE RECOMMENDED SUPPORT LOCATIONS
AS INSTRUCTED BY THE CHILLER MANUFACTURER REP.
2. FURNISH AND INSTALL CHILLED WATER PIPING TO THE
INDICATED NEW CONNECTION POINTS.
3. FURNISH AND INSTALL P-1 AND P-2.
FIRST FLOOR NOTES:
NOTE: REFER M002, M003 AND M004 FOR CONSTRUCTION DETAIL.
UH
S.A.
R.A.
O.A.
N.O.
N.C.
MCD
M.A.
H.W.
FC
EF
EDH
E.A.
DDC
CW
CHWS
CHWR
CC
BAS
AHU
UNIT HEATER
SUPPLY AIR
RETURN AIR
OUTSIDE AIR
NORMALLY OPENED
NORMALLY CLOSED
MOTORIZED CONTROL DAMPER
MIXED AIR
HOT DOMESTIC WATER
FAN COIL UNIT
EXHAUST FAN
ELECTRIC DUCT HEATER
EXHAUST AIR
DIRCT DIGITAL CONTROL
COLD DOMESTIC WATER
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COOLING COIL
BUILDING AUTOMATION SYSTEM
AIR HANDLING UNITS
T-X
H-X
SYMBOLS:
ABBREVIATIONS:
HUMIDISTAT #X
THERMOSTAT / THERMOSTAT #X
NEW CONNECTION POINT
UNIT HEATER
MANUAL DAMPER
SWITCH
THERMOMETER
PRESSURE GAGE
ONLY CLOUDED
ITEMS APPLY TO
THIS CONTRACT
08/13/2025
AFAR-21003455-M003
KN
KN
SCHEMATIC DETAILS
-m
.d
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U C
T
IO
N
HECTOR INTL AIRPORT ND
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
A 12/18/2025 FAR CHILLER REPLACEMENT 21003455 07/30/2025
THIS PROJECT COPY IS BASED ON DRAWING
FAR-GL-D-2106-M10, REVISION B, DATED 03/01/2012
A
A
A
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:3
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
fa r- -m
.d w g
8 234567
H
G
F
E
D
C
A
B
CHWR
CHWS
NOT TO SCALE
CHILLER CHILLED WATER PIPING DETAILS
NOT TO SCALE
NEW WORK
EXISTING
NEW WORK
EXISTING
FLEXIBLE
CONNECTORS
STRAINER
CHWR
CHWS
GATE
VALVES
FLOW SWITCH
DRAIN
VALVE
AIR VENT
CHILLER
GATE
VALVES
3-WAY
MIXING
VALVE
AIR VENT
STRAINER
DRAIN
VALVE
BALANCING
VALVES
COOLIN
G
COI
L
NOT TO SCALE
STEAM HUMIDIFIER DETAILS
TO STEAM MANIFOLD
CW LINE
MAKE-UP
1/2"
TO DRAIN LINE
VALVE
SHUTOFF
DRAIN LINE
AIR GAP
1" MIN.
TO THE DRAIN
DRAINAGE TUBING
HOSE
NOTES:
1. DIRECT DRIVE FAN WITH GRAVITY DAMPER.
PROPELLER EXHAUST FAN SCHEMATIC
NOT TO SCALE
LOUVER EXHAUST
WITH BIRDSCREEN
WALL
OSHA APPROVED
PERSONNEL
GUARD BY FAN
MANUFACTURER
EXHAUST FAN
WALL MOUNT COLLAR BY
FAN MANUFACTURER
BACKDRAFT DAMPER BY
FAN MANUFACTURER
DUCT
NO SCALE
WALL OR FLOOR
EXPANSION CLEARANCE
FIRE DAMPER
1-1/2" MTG ANGLE FRAME
ATTACHED TO DUCT
ACCESS DOOR
INSTALL COLLAR
DAMPER INSTALLATIONNOTE:
MUST MEET UL & NFPA
REQUIREMENTS
1" FLANGE
& HEM
BOLT ON 4" CENTER
1" BAND IRON
ALTERNATE
POSITION
OF BOLT
WASHER
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
FLEXIBLE CONNECTOR
NOT TO SCALE
FLANGED
CONNECTION
ON FAN
SIDE
1" POCKET
SLIP DUCTWORK
FLEXIBLE
MATERIAL
SPECIFIED
SHEET METAL AS
SPECIFIED FOR
DUCTWORK1" MIN. TO 3" MAX.
INSTALLED 6" NORMAL
W/ MATERIAL TAUT
EXISTING LOUVER
INDOOR
NO SCALE
OUTDOOR
DAMPER
BALANCED GRAVITY
4" DEEP COUNTER-
MOTION OF DAMPER
SPACE FOR FULL
PROVIDE AMPLE
AIR
AIRFLOW
FIRE DAMPER INSTALLATION
2" FOAM INSULATION
GALVANIZED SHEETMETAL
(FOR REDUCING
OPENING SIZE)
(FOR REDUCING
OPENING SIZE)
ACCESSMETAL DUCT
DOOR
SCHEDULE
40 PIPE
BRANCH OFF TO
OTHER AHUs
DIELECTRIC
UNIONS (2X)
EXISTING LOUVER
GALVANIZED SHEETMETAL
NO SCALE
(FOR REDUCING
2" FOAM INSULATION
OPENING SIZE)
METAL
DUCT
INDOOR
ACCESS
DOOR
OUTDOOR
AIR
(FOR REDUCING
OPENING SIZE)
BLANKET INSULATION
2" X 10" MINIMUM (INSULATION)
FASTERNERS MAXIMUM 8" O.C.
METAL COUNTERFLASHING
- FASTENERS 8" O.C.
SPECIFIED BASE FLASHING
BASE SHEET
WOOD CANT NAILED TO
NAILER AND CURB
INSULATION
RUBER MEMBRANE
STEEL DECK
FASTEN TO DECK WITH
MECHANICAL FASTENERS
STEEL ANGLE SUPPORT
OUTSIDE AIR DUCT DETAIL
EXHAUST HOOD CURB DETAIL
NO SCALE
11 12
M003
M003
M003
M003
M003
M003
M003
M003
M003
NOTE: NEW WORK SHALL USE
BE TYPE L COPPER WITH
AUTOMATIC
DUCT LINER
(ALL SIDES)
TO DRAIN
HUMIDIFIER
FROM
STEAM
MANIFOLD
GRAVITY DAMPER
(EXISTING)
COOLLING COIL PIPING DETAILS
ELASTOMERIC INSULATION
VALVE
GRATE
VALVE
DRAIN
IS
S
U E
D F
O R
E D
M
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
1. REMOVE EXISTING AND INSTALL NEW CHILLER CH-1, CHILLER WATER PUMPS P-1 AND P-2, EXPANSION TANK, AIR SEPARATORS AND CHEMICAL FEEDER.
2. ANCHOR CHILLERS AND PIPING TO MEET SEISMIC CODES AND SPECIFICATIONS.
3. DURING CHILLER REPLACEMENT, RENTAL CHILLER TO BE IN OPERATION ALL TIMES.
4. RECONFIGURE CHILLED WATER PIPING TO CONNECT TO NEW CHILLERS AND SUPPORT AS REQUIRED.
5. MODIFY ELECTRICAL CIRCUIT, CONDUIT, ETC BETWEEN EXISTING DISCONNECT/STARTES AND NEW CHILLER
EQUIPMENT. PROVIDE AND INSTALL CORRECT SIZE AND TYPE OF FUSES FOR NEW CHILLER. SIMILAR
MODIFICATION IS REQUIRED FOR CHILLER PUMPS.
6. REATTACH EXISTING LIGHTING PROTECTION AND GROUND WIRES TO NEW CHILLERS.
7. INSTALL STRAINERS, GAUGES, AND OTHER DEVICES AS REQUIRED OR RECOMMENDED BY THE
MANUFACTURER AND AS SHOWN ON THE CONSTRUCTION DRAWINGS. INSTALL TEMPERATURE SENSORS AND
OTHER NECESSARY INPUT AND OUTPUT DEVICES.
8. INTEGRATE NEW CHILLER CONTROLS INTO THE EXISTING BUILDING AUTOMATION SYSTEM.
9. HYDRONIC CHILLED WATER CIRCULATION SYSTEM ADJUSTMENT, ENGAGE A CERTIFIED TAB CONTRACTOR TO
MEASURE AND ADJUST CHILLED WATER FLOW FOR THIS SYSTEM TO MATCH THE EXISTING CONDITIONS AND
NEW CHILLER REQUI9REMENTS AFTER THE CHILLERS HAVE BEEN INSTALLED.
10. SUPPLY AND REPLACE NECESSARY GLYCOL/WATER SOLUTION TO BRING CHILLED WATER CIRCULATION
SYSTEM TO 50%.
11. INSTALL NEW INSULATION ON NEW CHILLED WATER PIPING AND REPLACE INSULATION IN THE DAMAGED
AREA OF THE CHILLED WATER SYSTEM.
12. CHILLED WATER PUMPS OPERATE IN LEAD/STANDBY CONFIGURATION, WHILE ONE PUMP OPERATES, THE
SECOND PUMP STAYS IN STANDBY CONFIGURATION. INTEGRATE CHILLER PUMPS INTO THE EXISTING
BUILDING AUTOMATION SYSTEM.
13. THE CHILLED WATER SYSTEM SHALL BE 55% ETHYLENE GLYCOL SOLUTION. THE GLYCOL FEEDER SHALL
OPERATE ITS INTEGRAL PUMP TO SUPPLY SOLUTION TO THE SYSTEM AS CONTROLLED BY ITS INTEGRAL
PRESSURE SWITCH. INTEGRATE GLYCOL FEEDER INTO THE EXISTING BUILDING AUTOMATION SYSTEM FOR
CONTINUOUS MONITORING.
CONSTRUCTION NOTES:
FIRST MEMBRANE: SHALL HAVE NON-WOVEN POLYESTER REINFORCEMENT AND THEROFUSIBLE ELASTOMETRIC ASPHALT.
1. COAT THE VERTICAL SURFACE RECEIVING THE BASE PLY FLASHING. PRIMER BE TACKY BEFORE APPLICATION OF THE
BASE SHEET FLASHING.
2. LAY BASE PLY FLASHING IN STRIPS 3 FEET WIDE TO THE VERTICAL SURFACE EXTENDING ONTO THE FLAT SURFACE
OF THE ROOF A MINIMUM OF 4 INCHES. SIDE LAPS SHALL BE 3 INCHES AND SHALL BE STAGGERED A MINIMUM OF
WITH THE LAPS OF THE BASE PLY.
3. TORCH WELD BASE PLY FLASHING DIRECTLY ON ITS SUPPORT FROM BOTTOM FOLLOWED BY THE TORCHING OF THE
ROOF TIE-IN.
4. CHECK ALL LAP SEAMS ON THE FLASHING BY RUNNING A HEATED TROWEL THE EDGE OF THE SEAMS. THOROUGHLY
SEAL ALL VOIDS IN THE CORNERS.
CAP MEMBRANE: SHALL HAVE NON-WOVEN POLYESTER REINFORCEMENT AND THEROFUSIBLE ELASTOMETRIC ASPHALT.
1. LAY TOP PLY FLASHING IN STRIPS 3 FEET WIDE. SIDE LAPS SHALL BE 3. IT SHALL BE STAGGERED A MIN OF 4 INCHES
FROM TOP PLY LAPS.
2. LAYOUT A STRAIGHT LINE ON THE TOP PLY SURFACE, PARALLEL TO THE ROOF 6 INCHES INSIDE THE ROOF FROM THE
BASE OF THE CANT STRIP OR RIGHT BE FLASHED.
3. USE TORCH AND HEATED FLAT TROWEL, EMBED THE SURFACE GRANULES IN AND SOFT BITUMEN FROM THE CHALK
LINE TO THE EDGE OF THE FIELD CANT PLY, AND TO THE TOP OF THE CANT OR RIGHT ANGLE.
4. EXTEND CAP MEMBRANE FLASHING PLY DOWN THE VERTICAL SURFACE ONTO AT THE ROOF 6 INCHES MINIMUM, SEALING OVER THE AREA EMBEDDED GRAN FIELD CAP MEMBRANE PLY. TORCH WELD TOP PLY FLASHING IN
ACCORDANCE TO RECOMMENDATION BY MFGR, DIRECTLY ON ITS BASE PLY, PROCEEDING FROM TO TOP FOLLOWED
BY THE TORCHING OF THE ROOF TIE-IN. FIRMLY PRESS INTO POSITION USING A DAMP SPONGE.
5. THOROUGHLY SEAL ALL VOIDS IN THE CORNERS AND SEAMS.
6. INSPECT FOR A SMOOTH SURFACE AND FREE OF AIR POCKETS AND WRINKLES.
ONLY CLOUDED
ITEMS APPLY TO
THIS CONTRACT
| far-21003455-g001 |
| far-21003455-g002.pdf |
| far-21003455-g002 |
| far-21003455-g003.pdf |
| far-21003455-g003 |
| far-21003455-m001.pdf |
| far-21003455-m001 |
| far-21003455-m002.pdf |
| far-21003455-m002 |
| far-21003455-m003.pdf |
| far-21003455-m003 |
| far-21003455-m004.pdf |
| far-21003455-m004 |
File details come from the government source that posted it. Updated .