J-2 Performance Work Statement NAPL-016-26.pdf

PDF 391 KB Posted

Attached to
Voyage Repair for USS SHIP
Solicitation number
N6817126QN002
Issued by

About this file

This document is a Specification for Work to be Accomplished for the USS Roosevelt (DDG 80), a naval vessel undergoing maintenance at the FDRMC Naples facility. The specification includes multiple work items covering various technical and maintenance tasks, including bonding and grounding discrepancies, infrared transmitter swing bolt repair, low pressure piping repair, bulkhead and piping insulation replacement, scaffolding provision, and rigging and crane services.

Key work items include: replacing bonding and grounding straps at multiple deck locations, repairing infrared transmitter swing bolts, conducting low pressure piping repairs, replacing insulation and lagging in multiple ship compartments, providing scaffolding on forward and aft stacks, and supplying daily crane and rigging services throughout the ship's availability period. The work is to be conducted under the supervision of a designated government representative, with specific requirements for inspection, testing, and documentation. The specification covers work locations throughout the ship, including various deck levels, machinery rooms, passageways, and structural areas, with a focus on maintaining and improving the vessel's technical and operational capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

FDRMC NAPLES

FPO, AE

USS ROOSEVELT (DDG 80)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: NAPL-016-26

SHIP CHARACTERISTICS

FEET INCHES 509 0LENGTH OVERALL

FEET INCHES 0 0MAX. BEAM AT DESIGN WATERLINE

FEET INCHESEXTREME BEAM INCLUDING APPENDAGES

FEET INCHES 29 0DRAFT (MAX. NAVIGABLE) (FWD.)

FEET INCHES 31 0DRAFT (MAX. NAVIGABLE) (AFT.)

LONG TON 8,600LIGHT DISPLACEMENT

9,200 LONG TONFULL LOAD DISPLACEMENT

INCHESFEET 0 0HEIGHT OF MAST ABOVE DESIGN WATERLINE

0 0

INCLUDES ALL CHANGES THROUGH 10/15/2025

INDEX

SHIP: USS ROOSEVELT (DDG 80) NAPL-016-26

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-26 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-001 General Criteria; accomplish 09/04/2024 Original

009-002 Environmental Compliance Report for Material Usage; accomplish 07/22/2024 Original

009-003 Toxic and Hazardous Substance; control 07/22/2024 Original

009-004 Quality Management System; provide 09/16/2024 Original

009-005 Temporary Access; accomplish 11/18/2024 CH-1

009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/22/2024 Original

009-007 Confined Space Entry, and Certification; accomplish 09/04/2024 Original

009-008 Shipboard Fire Protection and Fire Prevention; accomplish 09/30/2024 Original

009-010 Asbestos-Containing Material (ACM); control 09/16/2024 Original

009-018 Mine Warfare Ships Magnetic Material; control 09/04/2024 Original

009-019 Provisioning Technical Documentation (PTD); provide 07/22/2024 Original

009-020 Government Property; control 07/22/2024 Original

009-021 Alteration Verification, Logistic and Technical Data; provide 07/22/2024 Original

009-023 Interference; remove and install 11/18/2024 CH-1

009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/16/2024 Original

009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 07/22/2024 Original

009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

07/22/2024 Original

009-040 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

07/22/2024 Original

009-060 Schedule and Associated Report for CNO Availability; provide and manage 09/16/2024 Original

009-061 Shipboard Use of Fluorocarbons; control 09/16/2024 Original

009-067 Integrated Total Ship Testing; manage 09/16/2024 Original

009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)

Availabilities; provide

09/16/2024 Original

009-069 Heavy Weather/Mooring Plan; provide 09/16/2024 Original

009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/16/2024 Original

009-072 Physical Security at a Private Contractor Facility; accomplish 09/16/2024 Original

009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/16/2024 Original

009-074 Occupational, Safety and Health Plan; accomplish 09/16/2024 Original

009-080 Ship Facility; maintain 09/16/2024 Original

009-081 Compartment Closeout; accomplish 09/16/2024 Original

009-082 Installation of Equal Component Vice Specified Component; report 07/22/2024 Original

009-084 Threaded Fastener Requirement; accomplish 07/22/2024 Original

009-088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify

09/16/2024 Original

009-093 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

07/22/2024 Original

Page 1 of 4 PLANNED WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-099 Ship Departure Report; provide 09/16/2024 Original

009-100 Ship's Stability; maintain 09/16/2024 Original

009-101 Ship Transit and Berthing; accomplish 09/16/2024 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/16/2024 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 07/22/2024 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 07/22/2024 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 09/16/2024 Original

009-117 Combat Systems, Light-Off Suport; provide 09/17/2024 Original

009-118 CG Deck Loading; accomplish 07/22/2024 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/17/2024 Original

009-122 Temporary Padeye; install and remove 11/18/2024 CH-1

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH-1

009-126 Schedule Model Review (SMR); accomplish 09/17/2024 Original

Page 2 of 4 PLANNED WORK

CATEGORY II. FY-26 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-011 Insulation and Lagging; accomplish 09/16/2024 Original

009-012 Weld, Fabricate, and Inspect; accomplish 09/16/2024 Original

009-032 Cleaning and Painting Requirements; accomplish 09/25/2024 Original

009-071 Piping System; test 09/16/2024 Original

Page 3 of 4 PLANNED WORK

ITEM NO. TITLE

Bonding and Grounding Discrepancies; accomplish406-11-002

AN/SAT-2 Infrared Transmitter Swing Bolt Repair; accomplish443-00-001

Low Pressure Piping Repair; accomplish551-11-001

Bulkhead and Piping Insulation and Lagging Replacement; accomplish635-11-001

Scaffolding for Ship's Force Use; provide991-12-001

Rigging and Crane Service; provide993-11-001

Page 4 of 4 PLANNED WORK

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 406-11-002

COAR: 26 PCN: OT01-WA36

CC01-WB45

OT01-WA35

CE01-L004

OT01-WA30

CMP: NONE

PLANNER: KRIEGER, DANIEL

ARELLANES-VIDRIO,

ANGEL

JONES, DOUGLAS

NICHOLAS, JARED

SSP: NAPL-016-26 1 of 3 ITEM NO: 406-11-002

1. SCOPE:

1.1 Title: Bonding and Grounding Discrepancies; accomplish

1.2 Location of Work:

1.2.1 Weather Deck 05 Level, Frame 215, Centerline

1.2.2 Weather Deck 09 Level, Frame 171, Starboard

1.2.3 Weather Deck 02 Level, Frame 390, Centerline (02-388-S)

1.2.4 Weather Deck 02 Level, Frame 312, Starboard

1.2.5 Weather Deck 05 Level, Frame 148, Starboard

1.3 Identification:

1.3.1 Quantity (One EA), CU-2416A/SRC, Matching Network Assembly

1.3.2 Quantity (One EA), OA-9242 Starboard HFRG Receiver Antenna Group

1.3.3 Quantity (10 EA), Generator 3 Stack Life lines Bosses

1.3.4 Quantity (9 EA), FAS Stanchion Bosses

1.3.5 Quantity (One EA), Antenna EMC Cert / OE-566 TV-DTS

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY26 CH-1)

2.2 407-8436450 Rev 8, Topside Electromagnetic (EM) Control Measures Fleet Drawing

2.3 MIL-DTL-24749D, Grounding Straps and Studs, Electrical Bonding

2.4 MIL-STD-1310H, SHIPBOARD BONDING, GROUNDING, AND OTHER TECHNIQUES

FOR ELECTROMAGNETIC COMPATIBILITY,ELECTROMAGNETIC PULSE (EMP) MITIGATION,

AND SAFETY

2.5 407-8436455 Rev 5, TOPSIDE ELECTROMAGNETIC CONTROL MEASURES DRAWING

3. REQUIREMENTS:

3.1 Remove existing and install new each bonding and grounding strap and boss, for the equipment listed in 1.3 and located in 1.2, in accordance with 2.2, using 2.3 for guidance.

3.1.1 Chip and grind each surface flush in way of repair.

(I)(G) "WELDING INSPECTION "

3.2 Accomplish the requirements of 009-012 of 2.1, including Table 2, SHIP: USS ROOSEVELT (DDG 80)

SSP: NAPL-016-26 2 of 3 ITEM NO: 406-11-002

Columns A, C, and D, Lines One through 6.

(V)(G) "NON-DESTRUCTIVE TEST - VISUAL INSPECTION"

3.2.1 Accomplish the requirements of 009-012 of 2.1, Table 2, line 7.

(V)(G) "RESISTANCE TEST"

3.3 Accomplish a functional test and inspection of EMI bonding straps, studs, fasteners and connectors installed in 3.1. Maximum resistance allowed between bonded equipment and hull ground point: 0.1 ohms.

(V)(G) "COMPARTMENT CLOSEOUT"

3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1 Accomplishment of this Work Item will satisfy the requirements to clear the following DFS:

1.) DDG-80-0070-2024

4.2 Ships Force provide GFM listed in 5.1

4.3 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.4 Ships force will accomplish preservation of new and disturbed areas.

4.5 (Material) will be turned over to the KTR via coordination with Ship's Force and the SUPERVISOR. Custody turnover will be documented using form 1149 provided by Ship's Force.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 2 EA Bi-Metallic Boss 2.2 3.1

2. 2 EA

Bi-Metallic Strips 2.2 3.1

3. 26 EA CRES Bolts 2.2 3.1

4. 13 EA

Type 1 Bond Strap 2.2 3.1

5. 21 EA CRES Boss 2.2 3.1

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-016-26 3 of 3 ITEM NO: 406-11-002

5.3 KITTED MATERIAL:

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 443-00-001

COAR: 26 PCN: NN01-0802

NN01-0801

CMP: NONE

PLANNER: KRIEGER, DANIEL

ARELLANES-VIDRIO,

ANGEL

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-016-26 1 of 2 ITEM NO: 443-00-001

1. SCOPE:

1.1 Title: AN/SAT-2 Infrared Transmitter Swing Bolt Repair; accomplish

1.2 Location of Work:

1.2.1 Main Mast, Lower Yardarm, 08 Level, Starboard (08-168-1-Y)

1.2.2 Main Mast, Lower Yardarm, 08 Level, Port (08-168-2-Y)

1.3 Identification:

1.3.1 Quantity (One EA), Infrared Transmitting Set, AN/SAT-2, NSN:

5850-00-872-1568

1.3.2 Quantity (One EA), Infrared Transmitting Set, AN/SAT-2, NSN:

5850-00-872-1568

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY26 CH-1)

2.2 EE810-AA-OMI-010 Rev 00, Infrared Transmitting Sets AN/SAT-2, AN/SAT-2A, AN/SAT-2B

2.3 171-6218960 Rev AA, DDG51 Class Unit Strl Arr Dwg Ass Unit 4260

3. REQUIREMENTS:

3.1 Remove existing and replace with new the Port and Starboard light cover fasteners provided in 5.1.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish an operational test of the Infrared Transmitting Set in accordance with ship's operating procedure, using 2.2 as guidance.

(V)(G) "COMPARTMENT CLOSEOUT"

3.3 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1 Ships Force will provide Swing Bolts.

4.2 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the

SSP: NAPL-016-26 2 of 2 ITEM NO: 443-00-001

SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.3 Ships force will accomplish preservation of new and disturbed areas.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 12 EA Swing Bolt 1 2.2 40063-13 3.1

5.2 PUSH MATERIAL:

1. None.

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 551-11-001

COAR: 26 PCN: SS01-L005

CMP: NONE

PLANNER: NICHOLAS, JARED

ARELLANES-VIDRIO,

ANGEL

KRIEGER, DANIEL

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-016-26 1 of 2 ITEM NO: 551-11-001

1. SCOPE:

1.1 Title: Low Pressure Piping Repair; accomplish

1.2 Location of Work:

1.2.1 Passage (2-370-4-L)

1.3 Identification:

1.3.1 Quantity (3 LF) Piping, Seamless 1-1/4 Inch, CNA 90/10 TYPE 1, Class 200 MIL-T-16420

1.3.2 Quantity (One EA) Tail Piece, 1 1/4 inch IPS

1.3.3 Quantity (One EA) Globe Valve, 1 1/4 IPS, Valve Number ALP-V-

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY26 CH-1)

2.2 551-7059606 Rev D, Compressed Air Systems, Plan (Port). Zone 3340, Sheet 4B, Section 4-D

2.3 802-5959353 Rev BT, MIL-STD-777D, Modified for DDG-51 Class, Schedule of Piping, Valves, Fittings, and Associated Piping Components

3. REQUIREMENTS:

3.1 Remove existing equipment identified in 1.3, located in 1.2.1, and install new material provided in 5.1, using 2.1 through 2.3 for guidance.

3.1.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.

3.1.2 Chip and grind each surface flush in way of each repair.

3.1.3 Each new material must conform to 2.3, including Category and Group J-5.

3.2 Accomplish the requirements of 009-012 of 2.1, including Table One, Column A or B, Lines One through 9.

(I)(G) "NONDESTRUCTIVE TESTING"

3.2.1 Accomplish the requirements of 009-012 of 2.1, including Table One, Column A or B, Line 10, to align with welding method used in 3.2.

3.2.2 Submit in English, one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.2.1 to the SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

SSP: NAPL-016-26 2 of 2 ITEM NO: 551-11-001

3.3 Accomplish an operational test at normal shipboard operating pressure for new and disturbed piping. Allowable leakage: None.

3.3.1 Submit in English, one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT"

3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1 Ships crew will operate ships equipment in support of operational test.

4.2 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.3 Ships force will accomplish preservation of new and disturbed areas.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA

Globe Valve 1- 1/4 inch 3.1

2. 1 EA

Tail Piece, 1 1/4 inch IPS, Silver Braze 3.1

3. 3 LF

Piping, 90/10, 1-1/4 IPS 3.1

5.2 PUSH MATERIAL:

1. None.

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 635-11-001

COAR: 26 PCN: See Attachment A

CMP: NONE

PLANNER: KRIEGER, DANIEL

SSP: NAPL-016-26 1 of 3 ITEM NO: 635-11-001

1. SCOPE:

1.1 Title: Bulkhead and Piping Insulation and Lagging Replacement;

accomplish

1.2 Location of Work:

1.2.1 AC Machinery and Pump Room, (5-300-01-E)

1.2.2 Engine Room Number 2, (4-254-0-E)

1.2.3 Passage Way, (2-442-2-L)

1.2.4 Hangar Number One Structure, (1-338-3-Q)

1.2.5 Hangar Number 2 Structure, (1-338-3-Q)

1.2.6 Stowage Locker-Structure, (01-110-2-A)

1.2.7 Aviation Repair Shop, (1-381-0-Q)

1.2.8 Hangar Number 2, (1-338-8-Q)

1.2.9 Passage Way, (1-174-01-L)

1.3 Identification:

1.3.1 Quantity (30 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.1.

1.3.2 Quantity (4 LF), Piping Insulation, Located in 1.2.1.

1.3.3 Quantity (50 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.2.

1.3.4 Quantity (20 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.3.

1.3.5 Quantity (4 LF), Piping Insulation, Located in 1.2.4.

1.3.6 Quantity (One LF), Piping Insulation, Located in 1.2.5.

1.3.7 Quantity (48 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.6.

1.3.8 Quantity (10 LF), Piping Insulation, Located in 1.2.7.

1.3.9 Quantity (8 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.8.

1.3.10 Quantity (80 SQ FT), Compartment Bulkhead Insulation, Located in 1.2.9.

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY26 CH-1)

2.2 804-5959214 Rev C, Piping Insulation - Installation Details

2.3 508-6218533 Rev V, Piping & Machinery Insulation Schedule

2.4 635-6221262 Rev AA, Thrm & Acst Insul Arr Below 01 Lvl Fwd of Frame 126 Z

2.5 635-6219445 Rev AA, THRM & ACST INSUL DETS ZONES 1,2,3 & 4

SSP: NAPL-016-26 2 of 3 ITEM NO: 635-11-001

2.6 MIL-STD-769K CHG 1, Insulation Requirements for U.S. Naval Vessels

2.7 S9086-RK-STM-010/CH-505 Rev 6, Piping Systems

3. REQUIREMENTS:

3.1 Record and document any compartment designations, equipment labeling, and system markings affected by the accomplishment of this work specification.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, in English, of a report listing the results of

3.1 to the SUPERVISOR.

3.2 Remove and dispose existing, and install new the equipment listed in 1.3, located in 1.2, using 2.2 through 2.7 as guidance, as designated by the SUPERVISOR.

3.3 Accomplish the requirements of 009-011 of 2.1 for the installation of new insulation and lagging removed in 3.2, using 2.2 through 2.7 as guidance.

(V)(G) "COMPARTMENT CLOSEOUT"

3.4 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1 Ships Force will accomplish the painting requirement for 3.2 of 009- 011, for new insulation, lagging, and reusable covers to match surrounding areas.

4.2 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-016-26 3 of 3 ITEM NO: 635-11-001

Attachment A

PCN Identification

EM02-7712 ANGLE IRON LAGGING

ER04-L009 BULKHEAD LAGGING

ES01-NALT INSULATION ISSUE-STIFFENERS

OD01-3265 REPLACE LAGGING ON THE CEILING

ES01-NALW INSULATION ISSUE-STIFFENERS

SS02-2651 DEGRADED LAGGING

OD01-3337 DEGRADED LAGGING

OI01-3413 DAMAGED BULKHEAD LAGGING

EA01-4485 TORN BULKHEAD LAGGING S/A

EA01-L055 TORN BULKHEAD LAGG PIPE

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 991-12-001

COAR: 26 PCN: ES01-L005

CMP: NONE

PLANNER: NICHOLAS, JARED

ARELLANES-VIDRIO,

ANGEL

KRIEGER, DANIEL

SSP: NAPL-016-26 1 of 2 ITEM NO: 991-12-001

1. SCOPE:

1.1 Title: Scaffolding for Ship's Force Use; provide

1.2 Location of Work:

1.2.1 Weather Deck, Forward Stack, 02 and 03 Level, Frame 185 to 220, Port and Starboard

1.2.2 Weather Deck, Aft Stack, 01 and 02 Level, Frame 240 to 315, Port and Starboard

1.3 Identification:

1.3.1 Quantity (One Set), Steel tube and clamp type scaffolding built to surround the forward stack, from frame 185 to 220, 02 and 03 level weather decks, port and starboard, to the uppermost point of the stack, including transverse bulkheads at frame 185 and 220.

1.3.2 Quantity (One Set), Steel tube and clamp type scaffolding built to surround the aft stack, from frame 240 to 315, port and starboard, 01 and 02 Level Weather Decks, to Uppermost Point of stack, to include the transverse bulkhead at frame 240.

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY26 CH-1)

2.2 29 CFR Part 1915, Occupational Safety and Health Standards for Shipyard Employment

2.3 OSHA, Safe Work Practices for Marine Hanging Staging

2.4 801-7059985 Rev L, Booklet of General Plans, DDG 51 Class

3. REQUIREMENTS:

3.1 Notify the Ship's Duty Officer, via the SUPERVISOR, in writing, 24-hours in advance of intention to send personnel aloft to accomplish work required by this Work Item.

3.1.1 No scaffold shall be erected, moved, dismantled or altered except under the supervision of competent persons.

3.2 Install steel tube and clamp type scaffold in location listed in

1.2.1 as identified in 1.3.1 and location listed in 1.2.2 as Identified in 1.3.2 in accordance with 2.2 and 2.3 with sufficient levels and projections to safely reach and preserve ships structure.

3.2.1 Ensure scaffold is capable of sustaining a working load of 750 pounds at any point or level on each working surface.

3.2.2 Ensure each end of tubing resting on deck structure and transmitting weight of the scaffold shall terminate on framing immediately below and utilize a steel sole plate of at least 300 MM x 300 MM x 6 MM (12 INCH x 12 INCH x 1/4 INCH) to stabilize and distribute the weight of the scaffold.

SSP: NAPL-016-26 2 of 2 ITEM NO: 991-12-001

3.2.3 Ensure planking is secured (cleated) to preclude shifting or coming loose during high winds.

3.2.3.1 Planking and wood shall be fire retardant.

3.2.3.2 Ensure Toe Boards are installed in accordance with

reference 2.3

3.2.4 Ensure scaffold is tagged to inform workers of the status and condition of the staging in a manner similar to Appendix C of 2.3.

3.2.5 Scaffolding shall be inspected daily and certified safe for use.

3.3 Conduct safety inspection with the Ship's designated safety inspector, Contractor Safety inspector, and the SUPERVISOR. DO not install scaffolding in a manner that blocks or inhibits the use ship's fire stations or emergency egresses.

3.4 Disassemble and remove staging when when directed by the SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT"

3.5 Accomplish a compartment inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, Inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1. Compartment shall be left in "as good or better" condition than the compartment was in prior to work being accomplished.

4. NOTES:

4.1 OSHA information is on the website:

https://www.osha.gov/etools/shipyard/general-requirements/scaffolds/hanging-staging/use-of

4.2 The Word "SUPERVISOR" in all capital letters means the Designated Representative of The United States Government. It is either the Shipbuilding Specialist or Project Manager working directly for Forward Deployed Regional Maintenance Center. The SUPERVISOR will be onsite for all work being accomplished. Direct any and all questions to the SUPERVISOR. Do not take direction from anyone other than the SUPERVISOR.

4.3 Ships force will accomplish preservation of new and disturbed areas.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS ROOSEVELT (DDG 80) ITEM NO: 993-11-001

COAR: 26 PCN: SERV-L032

CMP: NONE

PLANNER: NICHOLAS, JARED

ARELLANES-VIDRIO,

ANGEL

JONES, DOUGLAS

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-016-26 1 of 2 ITEM NO: 993-11-001

1. SCOPE:

1.1 Title: Rigging and Crane Service; provide

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 NAVSEA Standard items, (FY26 CH-1)

3. REQUIREMENTS:

3.1 Provide a qualified crane, operator, man basket, and a 4 person rigging crew, on a daily basis, during the production day, for the duration of the availability period to support ship's force work and to load and off-load ship's force materials, supplies and equipment throughout the availability.

3.1.1 Accomplish crane lifts at 10,000 pounds maximum per lift and crane must be capable of handling material from the top of the mast to the furthest outboard point of the ship.

3.1.2 An authorized Ship's Force representative will approve and coordinate rigging request for services via the SUPERVISOR.

(V)(G) "CRANE AND RIGGING GEAR INSPECTION"

3.2 Inspect all rigging gear being utilized daily and ensure it is certified for use. All rigging equipment shall be within calibration for dates work is to be accomplished. Provide certification and calibration records for all rigging gear used on site upon request by the SUPERVISOR.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-016-26 2 of 2 ITEM NO: 993-11-001