J-1a Drawings.pdf
PDF 2 MB Posted
- Attached to
- Elevator Refurbishment and Preventive Service Maintenance Agreement at BGR ATCT in Bangor, ME
- Solicitation number
- 697DCK-22-R-00574
About this file
This solicitation requests proposals for an elevator refurbishment and maintenance agreement at the Bangor International Airport Air Traffic Control Tower in Bangor, Maine. The Federal Aviation Administration requires refurbishing the existing tower elevator, including replacing the controller, cab finishes, and providing full-service maintenance and inspection for one year. Interested vendors must have a current SAM registration and submit a proposal in accordance with the instructions in Sections L and M by the response date. The successful offeror will refurbish the elevator to meet all applicable ASME and FAA safety standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Set 1.pdf | ||
| 697DCK-22-R-00574 Amend 0003.pdf | ||
| 697DCK-22-R-00574 Amend 0002.pdf | ||
| Amendment 697DCK-22-R-00574 0001.pdf | ||
| J-3 SCA Wage Rates.pdf | ||
| J-1 BGR Elevator Refurbishment SPECS Final (1).pdf | ||
| J-5 Past Performance Evaluation Survey.doc | DOC document | |
| J-4 - Standardized Proposal Breakdown.xls | XLS spreadsheet | |
| J-2 Davis Bacon Wage Rates.pdf | ||
| 697DCK-22-R-00574 (Final).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
ENGINEERING SERVICES
TERMINAL
ATCT
LIGHTING PLAN
BASEMENT LEVEL FLOOR PLAN
ELEVATOR RENOVATION PROJECT
MEBANGOR INTERNATIONAL AIRPORTBANGOR
ED
BGR
PROJECT ENGINEER MGR: ENGINEERING CENTER
06/06/2022 22003895
BGR-22003895-E002 A
04/06/202222003895CONSTRUCTION, WR #1980206/06/2022A
b g r- -e
.d n
THIS DRAWING PRODUCED ON NEW ENGLAND REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
KS
3S
TL
J 3
TJ
ELPTA-1,3
CAR LTS
FOR ELEV
FIXTURE AT ROOM G04
ELPTA-5 UP TO LIGHT
KEY SWITCH, MOUNTED +60"AFF
TA
LPTA-1
3S
KS
TO BE REPLACED WITH NEW LED
FLORESCENT LIGHT FIXTURE
EXISTING SUSPENDED
TO REMAIN
FLORESCENT LIGHT FIXTURE
EXISTING WALL MOUNTED
TO BE REPLACED WITH NEW LED
INCANDESCENT LIGHT FIXTURE
EXISTING WALL MOUNTED
SWITCH
3-WAY SWITCH
KEY SWITCH
LEGEND:
GROUND LEVEL
NLPTA-1 UP TO
SEE POWER PLAN DWG E001
TO RECEPTACLE,
AT 7'-6" AFF
TYPE TA FIXTURES
PENDANT MOUNTED
NOTES:
B04
B01
B03
B02
ROOM ROOM NAME
MACHINE ROOM
ELEVATOR PIT
FIRE PROTECTION
EQUIPMENT RM
STAIR
r-
/0
/2
:2
:5
A
M P lo tt e d y
V
-C
E
G -E
D
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
01' 2' 5'
SCALE: 1/2" = 1'-0"
1'
E002 SCALE: 1/2"=1'-0"
BASEMENT LEVEL LIGHTING PLAN
BREAKER ARE ADEQUATELY SIZED.
THE EXISITNG LIGHTING CIRCUIT, LPTA-1, MAY BE REUSED IF FEEDERS AND CIRCUIT
BE SUITABLE WHERE DUST, DIRT, HUMIDITY AND CORROSIVE ELEMENTS ARE PRESENT.
FIXTURES, AS MANUFACTURED BY METALUX OR PHOENIX LIGHTING. FIXTURES SHALL
FIXTURES (3 TOTAL) SHALL BE REMOVE AND REPLACED WITH NEW LED VAPOR TIGHT
4. ELEVATOR MACHINE ROOM LIGHTING; SHOWN AS TYPE TA. EXISTING FLUORESCENT
ADEQUATELY SIZED..
CIRCUIT, ELPTA-1,3 MAY BE REUSED IF FEEDERS AND CIRCUIT BREAKER ARE
CAR TO REPLACE EXISTING FLUORESCENT LIGHTING. THE EXISTING LIGHTING
3. ELEVATOR CAR LIGHTING: PROVIDE NEW OVERHEAD LED LIGHTING IN THE
BREAKER ARE ADEQUATELY SIZED.
EXISTING LIGHTING CIRCUIT, ELPTA-1,3 MAY BE REUSED IF FEEDERS AND CIRCUIT
DETERMINED BY THE COR. WIRE TO THE EXISTING LIGHTING CIRCUIT, THE
PROVIDE ONE NEW ADDITIONAL LIGHT FIXTURE IN THE PIT IN A LOCATION
HUMIDITY, EXTREME TEMPERATURES OR CORROSIVE ELEMENTS ARE PRESENT.
OLVTWM OR EQUAL.) FIXTURES SHALL BE SUITABLE FOR USE WHERE DUST, DIRT,
WITH NEW WALL-MOUNTED LED UTILITY LIGHTS (LITHONIA UTILITY VAPOR TIGHT
2. PIT AND HOISTWAY LIGHTING: SHOWN AS TYPE TJ. REPLACE EXISTING LIGHTING
SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
CONSTRUCTION THAT IS DAMAGED OR ALTERED BY THE CONTRACTOR
1. ALL INTERIOR WALLS, CEILINGS, FLOORS, DOORS OR OTHER FINISHED
IS
bgr-22003895-e002
2022-06-06T09:52:00-0400
PAUL T KIRBY
2022-06-06T09:40:20-0400
ELISE M DAUDIER
TAMPERING MONITORING
APMM FOR VALVE
BASEMENT LEVEL FIRE ALARM FLOOR PLAN
BGR-22003895-F001
04/06/202222003895CONSTRUCTION, WR #1980206/06/2022
r- -f
CM CM CM
SECONDARY RECALL AND FLASHING HAT)
CONTROL INTERFACE (PRIMARY AND
FIRE ALARM CONTROL MODULES FOR ELEVATOR
CM
MM
SHUNT TRIP
ELEVATOR POWER
EXISTING
PHOTO ELECTRIC SMOKE DETECTOR
HEAT DETECTOR
FIRE ALARM PULL STATION
HORN STROBE
LEGEND:
r- -f
:3 lo tt e
E001 SCALE: 1/2"=1'-0"
BASEMENT LEVEL FIRE ALARM PLAN
INPUTS
SYSTEM
SYSTEM OUTPUTS
MANUAL FIRE ALARM BOX
SPRINKLER WATERFLOW
DETECTOR
ELEVATOR LOBBY SMOKE
SHAFT SMOKE DETECTOR
ELEVATOR MACHINE ROOM OR
SUPERVISORY SIGNALS
ALARM SIGNALS
DUCT SMOKE DETECTOR
OPEN CIRCUIT
CIRCUIT GROUND FAULT
AC POWER FAILURE
IN
IC
IA
IB
LE
/V
Y
IT
E S
LA
IG
L
R S E
IR
S S U
IZ
IV
LL
C
E
ANNUNCIATION/INDICATION ANCILLARY FUNCTIONS
E/G RUNNING OR TROUBLE
TAMPER SWITCH (INCL. PIV)
T
STAIRWAY SMOKE DETECTOR
R S E
E S
IF
P
LI
IL
LL
PRESSURE SWITCH
PREACTION SPRINKLER SYSTEM
IT
(S
(S
S
S
E C
W
A F F E C T E D A
SHAFT HEAT DETECTOR
ELEVATOR MACHINE ROOM OR
IP
LOW AIR PRESSURE
PRE-ACTION SPRINKLER SYSTEM
MANUAL FIRE ALARM BOX
CAB SMOKE DETECTOR OR CAB
-A
ID
OR HEAT DETECTOR
AREA SMOKE DETECTOR AND /
LD
-O
E
ELEVATOR POWER SHUNT TRIP
DUCT SMOKE DETECTOR
STAIR PRESSURIZATION SYSTEM
LINK, AND THE GENERATOR ROOM BUILDING.
SHALL OPERATE THE NOTIFICATION APPLIANCES THROUGHOUT THE ATCT, BASE BUILDING,
MANUAL FIRE ALARM SYSTEM INITIATING DEVICE IN THE ATCT, BASE BUILDING OR LINK
AUTOMATIC OR FIRE ALARM SYSTEM SHALL BE PROGRAMMED SUCH THAT ACTUATION OF AN 2.
OPERATE THE NOTIFICATION APPLIANCES ONLY IN THE GENERATOR ROOM BUILDING.
MANUAL FIRE ALARM SYSTEM INITIATING DEVICE IN THE GENERATOR ROOM BUILDING SHALL
AUTOMATIC OR FIRE ALARM SYSTEM SHALL BE PROGRAMMED SUCH THAT ACTUATION OF AN 1.
SEQUENCE OF OPERATIONS MATRIX
TROUBLE SIGNALS
E
A
F
P
ABOVE)
HEAT DETECTOR (IN ADDITION TO
ELEVATOR SHAFT SMOKE OR
RECEIVED BY THE COR.
FUNCTIONALITY UNLESS EXPLICIT WRITTEN DIRECTION IS
INTERFACE. THE CONTRACTOR SHALL MAINTAIN THIS
OPERATIONS FOR THE FIRE ALARM SYSTEM AND ELEVATOR
4. THE MATRIX ABOVE SUMMARIZES THE EXISTING SEQUENCE OF
(207)842-6440.
BY A CERTIFIED REPRESENTATIVE OF TYCO SIMPLEXGRINNELL
ALL WORK ON THE FIRE ALARM SYSTEM SHALL BE PERFORMED
SIMPLEXGRINNELL AND EXISTING DEVICES SHOULD REMAIN.
3. THE EXISTING FIRE ALARM SYSTEM IS THE PRODUCT OF TYCO
THE EXTENT PRACTICABLE.
FIRE ALARM CIRCUITS SHOWN ARE EXISTING AND SHALL BE REMAIN TO
2. LOCATIONS SHOWN FOR EXISTING CONSTRUCTION ARE APPROXIMATE. ALL
EXPENSE.
SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S
1. ALL INTERIOR WALLS, CEILINGS, FLOORS, DOORS AND OTHER FINISHED
bgr-22003895-f001
2022-06-06T09:52:14-0400
PAUL T KIRBY
2022-06-06T09:40:36-0400
ELISE M DAUDIER
COVER AND INDEX SHEET
BGR-22003895-G001 A
r-
-g
DRAWING TITLE
DRAWING LIST
DRAWING NUMBER
BANGOR, MAINE
BANGOR INTERNATIONAL AIRPORT
AIRPORT TRAFFIC CONTROL TOWER (ATCT)
AVIA
I
TRAT
SI
NI
T OF TRANSPO
T A
OF
STATES
TM
EN
BGR-22003895-M001
BGR-22003895-F001
BGR-22003895-E002
BGR-22003895-E001
BGR-22003895-A002
BGR-22003895-A001
BGR-22003895-G001
MECHANICAL FLOOR PLAN
BASEMENT LEVEL FIRE ALARM FLOOR PLAN
BASEMENT LEVEL LIGHTING PLAN
BASEMENT LEVEL POWER FLOOR PLAN
TOWER ELEVATION - SOUTH
COVER AND INDEX SHEET
r-
-g
:3 lo tt e bgr-22003895-g001
2022-06-06T09:50:44-0400
PAUL T KIRBY
2022-06-06T09:39:07-0400
ELISE M DAUDIER
24'-4"
1'-0"
8'-8" 8'-10" 6'-10"
5'-2 1/4"6'-11 7/8"6'-11 3/4"5'-2 1/4"
MECHANICAL FLOOR PLAN
BGR-22003895-M001
04/06/202222003895CONSTRUCTION, WR #1980206/06/2022
r-
-m
CLEAR HOISTWAY
r-
-m
:4 lo tt e
A001 SCALE: 1/2"=1'-0"
MACHINE
ELEVATOR
STEEL GRATING COVER
EXISTING SUMP PIT W/
CONTROLLER
NEW
EQUIPMENT ROOM
FOR A PERIOD OF ONE YEAR,
AND TESTING OF THE ELEVATOR AS REQUIRED BY ASME A17.1
4. THE CONTRACTOR SHALL PROVIDE FULL-SERVICE MAINTENANCE, INSPECTION
ITEMS WITH HIS BID AS A BID ALTERNATE.
ARE RECOMMENDED TO MEET ASME A17.1, HE SHALL ITEMIZE THOSE ADDTIONAL WORK
OPINION ADDITIONAL WORK BEYOND THE REQUIREMENTS OF THE SCOPE OF WORK
SAFETY CODE FOR ELEVATORS AND ESCALATORS. IF IN THE CONTRACTOR'S
IN ACCORDANCE WITH THE LATEST EDITION OF ASME A17.1,
ASSESSMENT OF THE EXISTING ELEVATOR AND ELEVATOR COMPONENTS
DESCRIPTION OF WORK TO BE PERFORMED. THE CONTRACTOR SHALL PERFORM AN
3. REFER TO SCOPE OF WORK IN THE TECHNICAL SPECIFICATIONS FOR COMPLETE
CONDITIONS PRIOR TO THE START OF WORK.
THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL EXISTING
2. LOCATION SHOWN FOR NEW ELEVATOR CONTROLLER IS APPROXIMATE.
1. ALL INTERIOR WALLS, CEILINGS, FLOORS, DOORS OR OTHER FINISHED
FOR ELEVATOR REFURBISHMENT.
I REFER TO APPENDIX A OF THE SPECIFICATION FOR A COMPLETE SCOPE OF WORK
LIMITED TO, BEARING REPLACEMENT, GEAR REALIGNMENT AND SEALS REPLACEMENT.
H EXISTING ELEVATOR MACHINE SHALL BE RECONDITIONED INCLUDING, BUT NOT
ON ELECTRICAL DRAWINGS.
G FURNISH AND INSTALL NEW ATS AND NEW ENCLOSED CIRCUIT BREAKER AS SHOWN
F EXISTING FIRE ALARM EQUIPMENT SHALL BE PROTECTED IN PLACE. (TYP)
E EXISITNG CONDUIT AND WIREWAY TO BE REUSED TO THE EXTENT PRACTICABLE.
350FPM IN ACCORDANCE WITH ASME 17.1.
SHEAVE. GOVERNOR SETTING SHALL CONFORM TO AN ELEVATOR SPEED OF
D FURNISH AND INSTALL NEW CETRIFUGAL SPEED GOVERNOR, ROPE AND TAIL
LOSS OF POWER.
REDUCED SPEED) TO THE NEAREST FLOOR AND OPEN THE DOOR IF THERE IS A
DEVICE. RESCUE DEVICE SHALL BE ABLE TO POWER THE ELEVATOR (AT
C WHEN NOT INTEGRATED IN THE CONTROLLER, PROVIDE AN EMERGENCY RESCUE
BE A STANDARD PRODUCT OF MIRUS INTERNATIONAL, INC. OR APPROVED EQUAL.
DISTRIBUTION SYSTEM SERVING THE FACILITY. THE HARMONIC FILTER SHALL
TO ELIMINATE TRASNMISSION OF HARMONICS BACK INTO THE ELECTRICAL
MAIN LINE HARMONIC FILTER. IT SHALL BE PROPERLY SIZED AND SELECTED
B WHEN NOT INTEGRATED IN THE CONTROLLER, FURNISH AND INSTALL A NEW
OR EXCEED THE REQUIREMENTS OF ASME17.1 (MOST RECENT VERSION).
PANEL, AND CAR-TOP INSPECTION SYSTEM. CONTROL SYSTEM SHALL MEET
LEVELING SYSTEM, TAPE READER FLOOR SELECTOR SYSTEM, CAR OPERATOR
SYSTEM FOR THE EXISTING TOWER ELEVATOR, COMPLETE WITH NEW
A FURNISH AND INSTALL NEW MICROPROCESSOR BASED TRACTION CONTROL
INSTALLATION NOTES:
B C D
TO BE REPLACED
ENCLOSED CIRCUIT BREAKER
NEW ATS ABOVE
E G
GENERAL NOTES:
CLR
UP
TOC EL
-8'-0"
-9'-0" bgr-22003895-m001
2022-06-06T09:52:29-0400
PAUL T KIRBY
2022-06-06T09:40:52-0400
ELISE M DAUDIER
REMOVED. SEE NOTE 6.
FAN COIL UNIT TO BE
OVERHEAD ABANDONED
24'-4"
8'-8" 8'-10" 6'-10"
5'-2 1/4"6'-11 7/8"6'-11 3/4"5'-2 1/4"
BGR-22003895-A001 A
r-
-a
CLEAR HOISTWAY
A001
2 HR FIRE RATED ASSEMBLY
PARTITION TYPE A
3"=1'-0"
(NON-RATED SIM.)
1 HR FIRE RATED ASSEMBLY
PARTITION TYPE B
r-
:0 lo tt e
STEEL GRATING COVER
EXISTING SUMP PIT W/
EQUIPMENT ROOM
A001 SCALE: 1/2"=1'-0"
BASEMENT LEVEL EXISTING FLOOR PLAN
TO INCLUDE NEW CEILING AND LIGHTING, FLOORING AND HANGING WALL PROTECTION BLANKETS.
7. FURNISH AND INSTALL NEW ELEVATOR CAR INTERIOR FINISHES IN ACCORDANCE WITH APPENDIX A, DISPOSITION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
PIPING, CONDUIT AND WIRING. POWER FEED SHALL BE REMOVED BACK TO CIRCUIT BREAKER. LEGAL
6. EXISTING ABANDONED OVERHEAD FAN COIL UNIT TO BE REMOVED, INCLUSIVE OF THERMOSTAT, ELEVATOR AS REQUIRED BY ASME A17.1 FOR A PERIOD OF ONE YEAR,
5. THE CONTRACTOR SHALL PROVIDE FULL-SERVICE MAINTENANCE, INSPECTION AND TESTING OF THE
REQUIREMENTS OF SECTION 2.27 "EMERGENCY OPERATION AND SIGNALING DEVICES".
MANDATORY REQUIREMENTS FOR THE MODERNIZATION THE CONTRACTOR SHALL COMPLY WITH ALL
HOISTWAY AND PIT; AND UPGRADE OF CAR FINISHES. IN ADDITION TO THE ASME A17.1
CONTROLLER, DOOR OPERATOR AND CABLES; UPGRADE LIGHTING IN THE ELEVATOR CAR,
4. AT A MINIMUM, THE ELEVATOR MODERNIZATION SHALL INCLUDE REPLACEMENT OF THE ELEVATOR
HIS BID AS A BID ALTERNATE.
RECOMMENDED TO MEET ASME A17.1, HE SHALL ITEMIZE THOSE ADDTIONAL WORK ITEMS WITH
OPINION ADDITIONAL WORK BEYOND THE REQUIREMENTS OF THE SCOPE OF WORK ARE
OF ASME A17.1, SAFETY CODE FOR ELEVATORS AND ESCALATORS. IF IN THE CONTRACTOR'S
EXISTING ELEVATOR AND ELEVATOR COMPONENTS IN ACCORDANCE WITH THE LATEST EDITION
OF WORK TO BE PERFORMED. THE CONTRACTOR SHALL PERFORM AN ASSESSMENT OF THE
3. REFER TO SCOPE OF WORK IN THE TECHNICAL SPECIFICATIONS FOR COMPLETE DESCRIPTION
RESPONSIBLE TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START OF WORK.
2. LOCATIONS SHOWN FOR EXISTING CONSTRUCTION ARE APPROXIMATE. THE CONTRACTOR IS
APPROPRIATELY.
OF ALL WALLS AS SHOWN. NEW PENETRATIONS THROUGH RATED WALLS SHALL BE FIRESTOPPED
AT THE CONTRACTOR'S EXPENSE. CONTRACTOR IS RESPONSIBLE TO MAINTAIN FIRE RATING
IS DAMAGED OR ALTERED BY THE CONTRACTOR SHALL BE RESTORED TO ORIGINAL CONDITION
1. ALL INTERIOR WALLS, CEILINGS, FLOORS, DOORS OR OTHER FINISHED CONSTRUCTION THAT
14 GA. @ 16" O.C.
2 1/2" METAL STUDS
ONE SIDE ON
ONE LAYER 5/8" GWB
OMIT @ SIM.
RIGID INSUL
2 1/2" SEMI-RIGID
BATT. INSUL
INSUL R=11
3 5/8" METAL
STUDS @ SIM.
2 HR FIRE RATED ASSEMBLY
PARTITION TYPE C
NON-RATED
R=11 @ SIM.
PARTITION TYPE D
F.R. GWB
W/ 2 LAYERS 5/8"
ON 2 1/2" C-H STUDS
1" SHAFTWALL LINER
@ SIM.
'x' GWB
5/8" TYPE
METAL STUDS
SIDE ON 3 5/8"
F.R. GWB EACH
2 LAYER 5/8"
3 5/8" METAL STUDS
EACH SIDE ON
ONE LAYER 5/8" GWB
OCCURS
BLANKET WHERE
SOUND ATTENUATION
WHERE OCCURS
CERAMIC TILE
CLR
-8'-0"
-9'-0"
D2HR SIM
2HR
bgr-22003895-a001
2022-06-06T09:51:03-0400
PAUL T KIRBY
2022-06-06T09:39:27-0400
ELISE M DAUDIER
TOWER ELEVATION
BGR-22003895-A002 A
r-
GROUND LEVEL
EL. 0'-0"
EL. 16'-0"
LEVEL I-1
EL. 32'-0"
EL. 48'-0"
LEVEL I-3
EL. 64'-0"
LEVEL I-4
LEVEL I-2
SUB-JUNCTION LEVEL
EL. 96'-0"
CAB LEVEL
EL. 111'-0"
JUNCTION LEVEL
EL. 80'-0"
I06I01I04
G07
G02 G01
B01B04
I06
I06I01I04
I04 I01
I04 I01 I06
S01S04
C01
J04 J01
08' 8'
SCALE: 1/8" = 1'-0"
16'
A002 SCALE: 1/8"=1'-0"
TOWER ELEVATION - SOUTH
CONDITIONS PRIOR TO THE START OF WORK.
THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL EXISTING
2. LOCATIONS SHOWN FOR EXISTING CONSTRUCTION ARE APPROXIMATE.
DN
A002 SCALE: 1/4"=1'-0"
TYPICAL STAIR LANDING PLAN
CHASE
CABLE
VESTIBULE LOBBY
D00R (TYP 6)
LANDING
BOTTOM
LANDING
TOP
r-lo tt e bgr-22003895-a002
2022-06-06T09:51:26-0400
PAUL T KIRBY
2022-06-06T09:39:43-0400
ELISE M DAUDIER
BASEMENT LEVEL POWER FLOOR PLAN
BGR-22003895-E001 A
04/06/202222003895CONSTRUCTION, WR #1980205/06/2022A
r-
ENCLOSURE TO BE REPLACED
CIRCUIT BREAKER, NEMA 1
60A, 3PH, ENCLOSED
REPLACE WITH NEW ATS
UP TO MTS-1IN RM G04 ABOVE;
GFI
2,+48"
SP
ELPTA-7
+48"
NLPTA-2 UP TO GND LEVEL
ELPTA-1
SUMP PUMP
TO NEW ELEVATOR
SHUNT TRIP
ELEVATOR POWER
CB
r-lo tt e
100A 3P 3P
60A
TOWER
70A
3P
400A
SWITCH
TRANSFER
MANUAL
150A 100A
225A
700A
70A 40A
125A
800A BUS 30,4W
E6
175A
200A
N4 E10
1 2 3 4 5 6 7 8 9 10 12
3P3P
SPARE SPARE
ENCLOSED CIRCUIT
BREAKER W/SHUNT TRIP
MTS-1
1 2 3 4 5
3P 3P
SPARESPARE
11.592KVA
36.106
KVA
10,000 AIC MIN
10,000 AIC MIN
MDPE, E/G BLDG
PANEL NTMD, TOWER
400A,208/120V,30,4W
SINGLE LINE DIAGRAM
ELEVATOR FEED
EXISTING ELEVATOR FEEDER SCHEDULE
PARALLEL
FEEDER
WIRE QTY
& SIZE
NEUTRAL
SIZE SIZE
GROUND CONDUIT
SIZE LENGTH
1 1/4"#83#41PNL NTMDN4
#4#4/03#4/01PNL ELPTAPNL MDPEE6
1 1/4"1E10
55'1 1/4"1ELEV CKT BKRE11
TO
LOAD
FROMNUMBER
3#4
3#4
#8
#8
2 1/2"
ELEV MTS-1
85'
283'
64'PNL ELPTA
E11
E001 SCALE: 1/2"=1'-0"
BASEMENT LEVEL POWER PLAN
4. NEW ELEVATOR CONTROLLER SHALL INCLUDE VVVF DRIVE PER SPECIFICATIONS.
REQUIRED IN ACCORDANCE WITH ASME A17.1 AND FAA 1217G.
TRANSFER SWITCH WITH A NEW AUTOMATIC TRANSFER SWITCH IS
LEVEL 1 (2ND FLOOR) OF THE ATCT. REPLACEMENT OF THIS MANUAL
TO THE SWITCH IS FED FROM PANEL ELPTA LOCATED ON INTERMEDIATE
ON INTERMEDIATE LEVEL 3 (4TH FLOOR) OF THE ATCT. EMERGENCY POWER
NORMAL POWER TO THE SWITCH IS FED FROM PANEL NTMD-4 LOCATED
MANUAL TRANSFER SWITCH (MTS) LOCATED ON LEVEL 1 OF THE TOWER.
3. THE ELEVATOR CONTROLLER IS CURRENTLY FED FROM A 60A, 3 PHASE
CIRCUIT LABELS.
REMAIN. CONTRACTOR TO FIELD VERIFY ACCURACY OF POWER FEED
THE EXTENT PRACTICABLE. EXISTING RECEPTACLES SHOWN ARE TO
ELECTRICAL CIRCUITS SHOWN ARE EXISTING AND SHALL BE REUSED TO
2. LOCATIONS SHOWN FOR EXISTING CONSTRUCTION ARE APPROXIMATE. ALL
bgr-22003895-e001
2022-06-06T09:51:49-0400
PAUL T KIRBY
2022-06-06T09:39:58-0400
ELISE M DAUDIER
File details come from the government source that posted it. Updated .