J - 11 Dry Dock Evaluation Form.docx

DOCX document 35 KB Posted

Attached to
USNS MEDGAR EVERS ROH/DD Federal contract opportunity
Solicitation number
N3220521R4212
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a drydock evaluation form for the USNS MEDGAR EVERS, along with details of a related federal contract opportunity from the Department of the Navy Military Sealift Command. The drydock evaluation form provides specifications for the ship such as its length, draft, displacement and drydock requirements including minimum clearances, loading pressures, and available utilities. It also lists safety response plans that are both required and available. The associated federal contract opportunity is solicitation number N3220521R4212 for repair, overhaul and drydocking of the USNS MEDGAR EVERS.

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS ROH/DD, newest first.
File Type Posted
N3220521R4212 Amendment 0006.pdf PDF
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
J - 3 Category B Items EVERS.xls XLS spreadsheet
USNS MEDGAR EVERS JA Redacted.docx DOCX document
N3220521R4212 Amendment 0005.docx DOCX document
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
N3220521R4212 Amendment 0004.docx DOCX document
N3220521R4212 Amendment 0003.docx DOCX document
GFP J-4 MEDGAR EVERS MARCH FY22 DD.xlsx XLSX spreadsheet
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
N3220521R4212 00002.docx DOCX document
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
MEDGAR EVERS AMENDMENT 1.docx DOCX document
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
J - 2 Category A Items USNS EVERS.xls XLS spreadsheet
J - 14 Technical Data Non-Disclosure EVERS ROHDD R4212.docx DOCX document
J - 10 Interport Differential.docx DOCX document
J - 3 Category B Items EVERS.xls XLS spreadsheet
J - 13 PAST PERFORMANCE QUESTIONNAIRE EVERS ROH DD.docx DOCX document
J - 8 Request for Spec Clarification.doc DOC document
J - 7 MSC Ship Repair Facility Survey.doc DOC document
J - 12 Past Performance Data.doc DOC document
J - 9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
GFP J-4 MEDGAR EVERS MARCH FY22 DD.xlsx XLSX spreadsheet
EVERS SOLICITATION.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSC DRYDOCK EVALUATION FORM

Ship name:
USNS MEDGAR EVERS
Hull No:
T-AKE 13

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Drydock Certification / Classification Info

Certified? Yes |_| No |_|

Certifying / Classifying Agency

Certificate No.

Date of expiration

Ship Characteristics
English measure
Metric measure

Provide date in English and Metric Units:

Length, overall
689
ft -
0
in
210.0 m

Dry-dock Characteristics

Breadth, molded
105
ft -
7
in
32.2 m

Length, overall ft-in m

Draft, light load line
23
ft -
4
in
7.2 m

Breadth ft-in m

Gross Tonnage (U. S.)
43758
Tons

MT

Displacement, Full Load
44071
LT

44778MT

Maximum dry-dock lift capability

LT

MT

Minimum Displacement/Draft

Displacement
29,650
LT
Draft - forward
20
ft -
4
in
6.2 m

Maximum entry draft rating:

LT

MT

Draft – aft
20
ft -
4
in
6.2 m

Max stern trim for graving dock ft -

in
m

Water depths around dock ft-in m area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/

Draft - forward
24
ft -
2
in
7.3 m

Leaving the dry-dock

Draft - aft
26
ft -
2
in
8.1m

Depth Over Floor ft-in m

Positioning Clearances

Depth Over Blocks ft-in m

Bottom: keel to dry-dock floor
5
ft -
0
in
1.5 m

Depth Over Sill ft-in m

Side: hull to dry-dock wall
5
ft -
0
in
1.5m

Depth Over KEEL ft-in m

Loading Pressures

Max block loading
17.65
Tons Per square ft.
193.0 per sq meter

Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.

Max Block Loading Capability

Blocking Requirements

Block Capability

LT/ft2

LT/m2

Construction
Hardwood

Keel & Side Block Information

Cap material
Soft Wood

Construction

Cap thickness (min)
2

Cap Material

Side blocks (e.g., shaped, wedged, etc.)
Shaped

Cap Thickness in cm

Block Age

Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in m

Blue Gum, American Rock Elm or Preserved Red Oak.

Width ft-in m

Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock

Length ft-in m

MSC DRYDOCK EVALUATION FORM (cont’d)

PART A (to be completed by MSC)

PART B (to be completed by ALL shipyards)

Provide data in English and Metric units

Minimum Required Services

Electrical power

Minimum Available Services

AC volts
505
VAC

Electrical power

number of phases
3

AC volts

VAC

amperage (total)
8000
Amps

number of phases

frequency
60
Hz

amperage (total) amps

number of lines
20

frequency

Hz number of lines

Ground connections

number
2

Ground connections

cable size, each
500,000
cir mils

number cable size, each cir mils

Sewage connections

number
1

Sewage connections

pipe size
2 1/2
inch ips

number

capacity
1,000
gals per day

pipe size inch ips cm capacity gal/day ltr/day

Fire Main

number of connections
5

Fire Main

connection size
2 1/2
inch ips

number of connections

pressure
150
Psig

connection size inch ips cm

capacity
1,000
gals per min

pressure psig kg/m2 capacity gpm ltr/min

Aux Seawater

pressure
100
Psig

Aux Seawater

capacity
600
gals per min

pressure psig kg/m2 capacity gpm ltr/min

Fresh Water

pressure
60
Psig

Fresh Water

capacity
100
gals per min

pressure psig kg/m2 capacity gpm ltr/min

Compressed Air

pressure
125
Psig

Compressed Air

capacity
300
cu ft per min

pressure psig kg/m2 capacity cfm ltr/min

Shore Steam pressure psig

Shore Steam capacity lbs per hour pressure psig kg/m2 capacity lb/hr kg/hr

High Pressure Water Wash pressure
6,000
psig

High Pressure Water Wash pressure psig kg per sq cm

Safety Response Plans Required

Safety Response Plans Available (circle correct answer)

Firefighting
YesX
No|_|
Firefighting
Yes
No
Flooding (accidental)
YesX
No|_|
Flooding (accidental)
Yes
No
Earthquake
Yes|_|
NoX
Earthquake
Yes
No
Typhoon
Yes|_|
NoX
Typhoon
Yes
No

MSC DRYDOCK EVALUATION FORM (cont’d)

PART C (to be completed by Shipyard if dry-dock is not certified by IACS or under MIL STD 1625C)

Dock master info

Contractor name

Dock master name

Certifying Agency

Certificate No.

Years experience

Drydock Insurance Info

Is Drydock insured?
Yes |_|No |_|

Insurer

Policy No.

Amount Insured

Date of expiration

Attachment J – 11

ATTACHMENT J - 11

File details come from the government source that posted it. Updated .