J-1 Scjhedule B Prices for Supplies and Services - WTGB_DD_IDIQ.xlsx
XLSX spreadsheet 79 KB Posted
- Attached to
- WTGB 140' & 120’ BARGE DRYDOCK IDIQ FY24-29
- Solicitation number
- 70Z08524RIBCT0006
About this file
This document is a pricing schedule and details for the WTGB 140' Inland Ice Breaker Tugs & assigned 120' Barges Dry-Dock IDIQ Contract. The contract opportunity is a Request for Proposal (RFP) solicitation from the United States Coast Guard Surfaces Forces Logistics Center (SFLC) in Norfolk, VA. The contract will provide all necessary facilities, materials, equipment, personnel and services required to perform planned/unplanned dry-dock repairs on the WTGB 140' tugs and 120' barges. The pricing schedule includes unit and extended prices for various maintenance tasks across five option years, including hull plating inspection and preservation, propulsion system maintenance, tank cleaning and inspection, and other related services. The total price for definite and optional items is $0.00. The performance period is expected to last through fiscal year 2029.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
Summary of Estimate
Total Definite Per Platform
| Items | Total Optional Items per Platform | Number of Cutter Drydocks | Definite Items Total | Options Items Total | |||
| Base Year | Tug Planned | $0.00 | $0.00 | 1 | $0.00 | $0.00 | |
| Barge Planned | $0.00 | $0.00 | 1 | $0.00 | $0.00 | ||
| Option year 1 | Tug Planned | $0.00 | $0.00 | 2 | $0.00 | $0.00 | |
| Barge Planned | $0.00 | $0.00 | 1 | $0.00 | $0.00 | ||
| Option year 2 | Tug Planned | $0.00 | $0.00 | 2 | $0.00 | $0.00 | |
| Barge Planned | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Option year 3 | Tug Planned | $0.00 | $0.00 | 2 | $0.00 | $0.00 | |
| Barge Planned | $0.00 | $0.00 | 1 | $0.00 | $0.00 | ||
| Option year 4 | Tug Planned | $0.00 | $0.00 | 2 | $0.00 | $0.00 | |
| Barge Planned | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | 0 |
$0.00
Base
| PRICING SCHEDULE FOR: |
| WTGB Drydock IDIQ |
| CLIN | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 0001 | 140' WTGB Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-0001AA | Fire Prevention Requirements | NSP | NSP | NSP | NSP | |
| D-0001AB | Hull Plating, U/W Body, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-0001AC | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-0001AD | U/W Body, Preserve, 100 percent | $0.00 | EA | 1 | $0.00 | |
| O-0001AE | U/W Body, Preserve, Partial, Condition A | $0.00 | EA | 1 | $0.00 | |
| O-0001AF | U/W Body, Preserve, Partial, Condition B | $0.00 | EA | 1 | $0.00 | |
| O-0001AG | Hull and Structral Plating, General, 7.5 Lbs | $0.00 | EA | 1 | $0.00 | |
| O-0001AH | Hull Plating Freeboard, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-0001AI | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-0001AJ | Bubbler Channels, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-0001AK | Fenders, Bow, Inspect and Repair | $0.00 | EA | 1 | $0.00 | |
| D-0001AL | Appendages, U/W, Leak Test | $0.00 | EA | 1 | $0.00 | |
| O-0001AM | Propulsion Shaft Rope Guards, Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AN | Appendages, U/W, Internal, Preserve | $0.00 | EA | 1 | $0.00 | |
| D-0001AO | Chain Lockers, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AP | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AQ | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AR | Tanks, Ballast, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AS | Voids, Accessible, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001AT | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-0001AU | Masts ( Main, Fore, and Stub), Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-0001AV | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | EA | 1 | $0.00 | |
| O-0001AW | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-0001AX | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | EA | 1 | $0.00 | |
| D-0001AY | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-0001AZ | Propeller , Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-0001BA | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-0001BB | Fathometer Transducer, Renew | $0.00 | EA | 1 | $0.00 | |
| D-0001BC | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-0001BD | Sea Strainers, Simplex, All Sizes, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-0001BE | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | EA | 1 | $0.00 | |
| O-0001BF | Rudders, Preserve, 100% | $0.00 | EA | 1 | $0.00 | |
| D-0001BG | Rudder Stock Bearings Clearances, Check | $0.00 | EA | 1 | $0.00 | |
| O-0001BH | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | EA | 1 | $0.00 | |
| D-0001BI | Anchor Chain and Ground Tackle, Preserve | $0.00 | EA | 1 | $0.00 | |
| O-0001BJ | Anchors, Preserve | $0.00 | JOB | 1 | $0.00 | |
| D-0001BK | Grey Water Holding Tanks, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-0001BL | Tanks, Grey Water Holding, Preserve, Partial | $0.00 | JOB | 3 | $0.00 | |
| O-0001BM | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 4 | $0.00 | |
| O-0001BN | Chain Lockers, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-0001BO | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 2 | $0.00 | |
| O-0001BP | Accessible Void(s), Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| D-0001BQ | Tanks, Potable Water, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-0001BR | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 3 | $0.00 | |
| O-0001BS | Superstructure, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-0001BT | Exhaust Stacks (Exterior), Preserve - Partial | $0.00 | EA | 1 | $0.00 | |
| O-0001BU | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | EA | 1 | $0.00 | |
| O-0001BV | Tanks (Sewage Vacuum Collection), Preserve "100%" | $0.00 | EA | 1 | $0.00 | |
| D-0001BW | Drydock | $0.00 | JOB | 1 | $0.00 | |
| D-0001BX | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | |
| D-0001BY | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | |
| O-0001BZ | Tanks, Ballast, Preserve, 100 Percent | $0.00 | JOB | 4 | $0.00 | |
| O-0001CA | Tanks, Grey Water Holding, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-0001CB | Tanks, Potable Water, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-1001CC | Miscellaneous Repair | $0.00 | JOB | 4 | $0.00 | |
| O-1001CD | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-0001A | Composite Labor Rate | $0.00 | Hour | 520 | $0.00 | |
| D-0001B | GFP Report | NSP | EA | NSP | ||
| O-0001Z | Laydays | $0.00 | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 | |||||
| 0002 | 140' WTGB Barge Planned Dry-dock | NSP | NSP | NSP | NSP | |
| O-0002AA | Hull Plating (Side Scan), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AB | U/W Body, Preserve (100%) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AC | U/W Body, Preserve (Partial - Condition A) | $0.00 | EA | 1 | $0.00 | |
| O-0002AD | U/W Body, Preserve (Partial - Condition B) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AE | Hull Plating Freeboard, Preserve – Partial - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AF | Hull Plating Freeboard, Preserve “100%” - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AG | Accessible Void(s), Preserve "Partial" - Barge | $0.00 | JOB | 10 | $0.00 | |
| D-0002AH | Sw Heat Exchangers; Clean, Inspect And Hydro | $0.00 | EA | 1 | $0.00 | |
| D-0002AI | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-0002AJ | Fathometer Transducer, Renew – Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002AK | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | EA | 1 | $0.00 | |
| D-0002AL | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AM | Tanks (Sewage Holding), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-0002AN | Tanks (Sewage Holding), Preserve “Partial”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-0002AO | Tanks (Sewage Vacuum Collection), Preserve “Partial”- Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002AP | Tanks (MP Fuel Storage and Overflow), Preserve “Partial”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-0002AQ | Tanks (MP Fuel Storage and Overflow), Preserve “100%”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-0002AR | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | EA | 1 | $0.00 | |
| O-0002AS | Superstructure, Preserve “100%” | $0.00 | EA | 1 | $0.00 | |
| O-0002AT | Superstructure, Preserve “Partial” (Barge) | $0.00 | EA | 1 | $0.00 | |
| D-0002AU | Cathodic Protection / Zinc Anodes, Renew - Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002AV | Drydock - Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002AW | Temporary Services, Provide - Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002AX | Auxiliary Sea Water System Valves, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-0002AY | Bilge and Ballast Valves, Overhaul or Renew | $0.00 | EA | 1 | $0.00 | |
| O-0002AZ | Hull Plating (U/W Body), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002BA | Hull Plating (Freeboard), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002BB | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-0002BC | Grey Water Holding Tank(s), Clean and Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002BD | Sewage Holding Tank(s), Clean and Inspect - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-0002BE | Bilges, Preserve | $0.00 | JOB | 6 | $0.00 | |
| D-0002BF | Hull Plating (U/W Body), Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002BG | Thruster Unit, Overhaul - Barge | $0.00 | EA | 1 | $0.00 | |
| O-0002BH | Tanks (Potable Water), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-0002BI | Tanks (Potable Water), Preserve, Partial, - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-0002BJ | Tanks (Ballast), Preserve "Partial" - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-0002BK | Fenders, Bow, Inspect and Repair - Barge | $0.00 | EA | 1 | $0.00 | |
| D-0002BL | Fire Prevention Requirements | NSP | EA | 1 | NSP | |
| O-0002BM | Miscellaneous Repair | $0.00 | EA | 1 | $0.00 | |
| O-0003A | Composite Labor Rate | $0.00 | Hour | 200 | $0.00 | |
| D-0003B | GFP Report | NSP | EA | NSP | ||
| O-0003Z | Laydays | $0.00 | JOB | 5 | $0.00 | |
| Total Price of Definite Items | Day | 5 | $0.00 | |||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
OY-1
| PRICING SCHEDULE FOR: |
| WTGB Drydock IDIQ |
| CLIN | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 1001 | 140' WTGB Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-1001AA | Fire Prevention Requirements | NSP | NSP | NSP | NSP | |
| D-1001AB | Hull Plating, U/W Body, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-1001AC | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-1001AD | U/W Body, Preserve, 100 percent | $0.00 | EA | 1 | $0.00 | |
| O-1001AE | U/W Body, Preserve, Partial, Condition A | $0.00 | EA | 1 | $0.00 | |
| O-1001AF | U/W Body, Preserve, Partial, Condition B | $0.00 | EA | 1 | $0.00 | |
| O-1001AG | Hull and Structral Plating, General, 7.5 Lbs | $0.00 | EA | 1 | $0.00 | |
| O-1001AH | Hull Plating Freeboard, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-1001AI | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-1001AJ | Bubbler Channels, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-1001AK | Fenders, Bow, Inspect and Repair | $0.00 | EA | 1 | $0.00 | |
| D-1001AL | Appendages, U/W, Leak Test | $0.00 | EA | 1 | $0.00 | |
| O-1001AM | Propulsion Shaft Rope Guards, Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AN | Appendages, U/W, Internal, Preserve | $0.00 | EA | 1 | $0.00 | |
| D-1001AO | Chain Lockers, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AP | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AQ | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AR | Tanks, Ballast, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AS | Voids, Accessible, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001AT | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-1001AU | Masts ( Main, Fore, and Stub), Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-1001AV | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | EA | 1 | $0.00 | |
| O-1001AW | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-1001AX | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | EA | 1 | $0.00 | |
| D-1001AY | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-1001AZ | Propeller , Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-1001BA | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-1001BB | Fathometer Transducer, Renew | $0.00 | EA | 1 | $0.00 | |
| D-1001BC | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-1001BD | Sea Strainers, Simplex, All Sizes, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-1001BE | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | EA | 1 | $0.00 | |
| O-1001BF | Rudders, Preserve, 100% | $0.00 | EA | 1 | $0.00 | |
| D-1001BG | Rudder Stock Bearings Clearances, Check | $0.00 | EA | 1 | $0.00 | |
| O-1001BH | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | EA | 1 | $0.00 | |
| D-1001BI | Anchor Chain and Ground Tackle, Preserve | $0.00 | EA | 1 | $0.00 | |
| O-1001BJ | Anchors, Preserve | $0.00 | JOB | 1 | $0.00 | |
| D-1001BK | Grey Water Holding Tanks, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-1001BL | Tanks, Grey Water Holding, Preserve, Partial | $0.00 | JOB | 3 | $0.00 | |
| O-1001BM | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 4 | $0.00 | |
| O-1001BN | Chain Lockers, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-1001BO | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 2 | $0.00 | |
| O-1001BP | Accessible Void(s), Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| D-1001BQ | Tanks, Potable Water, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-1001BR | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 3 | $0.00 | |
| O-1001BS | Superstructure, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-1001BT | Exhaust Stacks (Exterior), Preserve - Partial | $0.00 | EA | 1 | $0.00 | |
| O-1001BU | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | EA | 1 | $0.00 | |
| O-1001BV | Tanks (Sewage Vacuum Collection), Preserve "100%" | $0.00 | EA | 1 | $0.00 | |
| D-1001BW | Drydock | $0.00 | JOB | 1 | $0.00 | |
| D-1001BX | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | |
| D-1001BY | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | |
| O-1001BZ | Tanks, Ballast, Preserve, 100 Percent | $0.00 | JOB | 4 | $0.00 | |
| O-1001CA | Tanks, Grey Water Holding, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-1001CB | Tanks, Potable Water, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-1001CC | Miscellaneous Repair | $0.00 | JOB | 4 | $0.00 | |
| O-1001CD | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-1001A | Composite Labor Rate | $0.00 | Hour | 520 | $0.00 | |
| D-1001B | GFP Report | NSP | EA | NSP | ||
| O-1001Z | Laydays | $0.00 | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 | |||||
| 1002 | 140' WTGB Barge Planned Dry-dock | NSP | NSP | NSP | NSP | |
| O-1002AA | Hull Plating (Side Scan), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AB | U/W Body, Preserve (100%) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AC | U/W Body, Preserve (Partial - Condition A) | $0.00 | EA | 1 | $0.00 | |
| O-1002AD | U/W Body, Preserve (Partial - Condition B) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AE | Hull Plating Freeboard, Preserve – Partial - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AF | Hull Plating Freeboard, Preserve “100%” - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AG | Accessible Void(s), Preserve "Partial" - Barge | $0.00 | JOB | 10 | $0.00 | |
| D-1002AH | Sw Heat Exchangers; Clean, Inspect And Hydro | $0.00 | EA | 1 | $0.00 | |
| D-1002AI | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-1002AJ | Fathometer Transducer, Renew – Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002AK | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | EA | 1 | $0.00 | |
| D-1002AL | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AM | Tanks (Sewage Holding), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-1002AN | Tanks (Sewage Holding), Preserve “Partial”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-1002AO | Tanks (Sewage Vacuum Collection), Preserve “Partial”- Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002AP | Tanks (MP Fuel Storage and Overflow), Preserve “Partial”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-1002AQ | Tanks (MP Fuel Storage and Overflow), Preserve “100%”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-1002AR | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | EA | 1 | $0.00 | |
| O-1002AS | Superstructure, Preserve “100%” | $0.00 | EA | 1 | $0.00 | |
| O-1002AT | Superstructure, Preserve “Partial” (Barge) | $0.00 | EA | 1 | $0.00 | |
| D-1002AU | Cathodic Protection / Zinc Anodes, Renew - Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002AV | Drydock - Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002AW | Temporary Services, Provide - Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002AX | Auxiliary Sea Water System Valves, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-1002AY | Bilge and Ballast Valves, Overhaul or Renew | $0.00 | EA | 1 | $0.00 | |
| O-1002AZ | Hull Plating (U/W Body), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002BA | Hull Plating (Freeboard), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002BB | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-1002BC | Grey Water Holding Tank(s), Clean and Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002BD | Sewage Holding Tank(s), Clean and Inspect - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-1002BE | Bilges, Preserve | $0.00 | JOB | 6 | $0.00 | |
| D-1002BF | Hull Plating (U/W Body), Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002BG | Thruster Unit, Overhaul - Barge | $0.00 | EA | 1 | $0.00 | |
| O-1002BH | Tanks (Potable Water), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-1002BI | Tanks (Potable Water), Preserve, Partial, - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-1002BJ | Tanks (Ballast), Preserve "Partial" - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-1002BK | Fenders, Bow, Inspect and Repair - Barge | $0.00 | EA | 1 | $0.00 | |
| D-1002BL | Fire Prevention Requirements | NSP | EA | 1 | NSP | |
| O-1002BM | Miscellaneous Repair | $0.00 | EA | 1 | $0.00 | |
| O-1002A | Composite Labor Rate | $0.00 | Hour | 200 | $0.00 | |
| D-1002B | GFP Report | NSP | EA | NSP | ||
| O-1002Z | Laydays | $0.00 | JOB | 5 | $0.00 | |
| Total Price of Definite Items | Day | 5 | $0.00 | |||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
OY-2
| PRICING SCHEDULE FOR: |
| 140 WTGB Drydock IDIQ |
| CLIN | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 2001 | 140' WTGB Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-2001AA | Fire Prevention Requirements | NSP | NSP | NSP | NSP | |
| D-2001AB | Hull Plating, U/W Body, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001AC | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-2001AD | U/W Body, Preserve, 100 percent | $0.00 | EA | 1 | $0.00 | |
| O-2001AE | U/W Body, Preserve, Partial, Condition A | $0.00 | EA | 1 | $0.00 | |
| O-2001AF | U/W Body, Preserve, Partial, Condition B | $0.00 | EA | 1 | $0.00 | |
| O-2001AG | Hull and Structral Plating, General, 7.5 Lbs | $0.00 | EA | 1 | $0.00 | |
| O-2001AH | Hull Plating Freeboard, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-2001AI | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-2001AJ | Bubbler Channels, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001AK | Fenders, Bow, Inspect and Repair | $0.00 | EA | 1 | $0.00 | |
| D-2001AL | Appendages, U/W, Leak Test | $0.00 | EA | 1 | $0.00 | |
| O-2001AM | Propulsion Shaft Rope Guards, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001AN | Appendages, U/W, Internal, Preserve | $0.00 | EA | 1 | $0.00 | |
| O-2001AO | Chain Lockers, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001AP | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001AQ | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001AR | Tanks, Ballast, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001AS | Voids, Accessible, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001AT | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001AU | Masts ( Main, Fore, and Stub), Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-2001AV | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | EA | 1 | $0.00 | |
| O-2001AW | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-2001AX | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | EA | 1 | $0.00 | |
| D-2001AY | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-2001AZ | Propeller , Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-2001BA | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-2001BB | Fathometer Transducer, Renew | $0.00 | EA | 1 | $0.00 | |
| D-2001BC | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-2001BD | Sea Strainers, Simplex, All Sizes, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-2001BE | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | EA | 1 | $0.00 | |
| O-2001BF | Rudders, Preserve, 100% | $0.00 | EA | 1 | $0.00 | |
| D-2001BG | Rudder Stock Bearings Clearances, Check | $0.00 | EA | 1 | $0.00 | |
| O-2001BH | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | EA | 1 | $0.00 | |
| D-2001BI | Anchor Chain and Ground Tackle, Preserve | $0.00 | EA | 1 | $0.00 | |
| O-2001BJ | Anchors, Preserve | $0.00 | JOB | 1 | $0.00 | |
| D-2001BK | Grey Water Holding Tanks, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001BL | Tanks, Grey Water Holding, Preserve, Partial | $0.00 | JOB | 3 | $0.00 | |
| O-2001BM | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 4 | $0.00 | |
| O-2001BN | Chain Lockers, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-2001BO | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 2 | $0.00 | |
| O-2001BP | Accessible Void(s), Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| D-2001BQ | Tanks, Potable Water, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-2001BR | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 3 | $0.00 | |
| O-2001BS | Superstructure, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-2001BT | Exhaust Stacks (Exterior), Preserve - Partial | $0.00 | EA | 1 | $0.00 | |
| O-2001BU | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | EA | 1 | $0.00 | |
| O-2001BV | Tanks (Sewage Vacuum Collection), Preserve "100%" | $0.00 | EA | 1 | $0.00 | |
| D-2001BW | Drydock | $0.00 | JOB | 1 | $0.00 | |
| D-2001BX | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | |
| D-2001BY | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | |
| O-2001BZ | Tanks, Ballast, Preserve, 100 Percent | $0.00 | JOB | 4 | $0.00 | |
| O-2001CA | Tanks, Grey Water Holding, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-2001CB | Tanks, Potable Water, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-2001CC | Miscellaneous Repair | $0.00 | JOB | 4 | $0.00 | |
| O-2001CD | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-2001A | Composite Labor Rate | $0.00 | Hour | 520 | $0.00 | |
| D-2001B | GFP Report | NSP | EA | NSP | ||
| O-2001Z | Laydays | $0.00 | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 | |||||
| 2002 | 140' WTGB Barge Planned Dry-dock | NSP | NSP | NSP | NSP | |
| O-2002AA | Hull Plating (Side Scan), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AB | U/W Body, Preserve (100%) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AC | U/W Body, Preserve (Partial - Condition A) | $0.00 | EA | 1 | $0.00 | |
| O-2002AD | U/W Body, Preserve (Partial - Condition B) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AE | Hull Plating Freeboard, Preserve – Partial - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AF | Hull Plating Freeboard, Preserve “100%” - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AG | Accessible Void(s), Preserve "Partial" - Barge | $0.00 | JOB | 10 | $0.00 | |
| D-2002AH | Sw Heat Exchangers; Clean, Inspect And Hydro | $0.00 | EA | 1 | $0.00 | |
| D-2002AI | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-2002AJ | Fathometer Transducer, Renew – Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002AK | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | EA | 1 | $0.00 | |
| D-2002AL | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AM | Tanks (Sewage Holding), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-2002AN | Tanks (Sewage Holding), Preserve “Partial”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-2002AO | Tanks (Sewage Vacuum Collection), Preserve “Partial”- Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002AP | Tanks (MP Fuel Storage and Overflow), Preserve “Partial”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-2002AQ | Tanks (MP Fuel Storage and Overflow), Preserve “100%”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-2002AR | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | EA | 1 | $0.00 | |
| O-2002AS | Superstructure, Preserve “100%” | $0.00 | EA | 1 | $0.00 | |
| O-2002AT | Superstructure, Preserve “Partial” (Barge) | $0.00 | EA | 1 | $0.00 | |
| D-2002AU | Cathodic Protection / Zinc Anodes, Renew - Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002AV | Drydock - Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002AW | Temporary Services, Provide - Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002AX | Auxiliary Sea Water System Valves, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-2002AY | Bilge and Ballast Valves, Overhaul or Renew | $0.00 | EA | 1 | $0.00 | |
| O-2002AZ | Hull Plating (U/W Body), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002BA | Hull Plating (Freeboard), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002BB | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-2002BC | Grey Water Holding Tank(s), Clean and Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002BD | Sewage Holding Tank(s), Clean and Inspect - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-2002BE | Bilges, Preserve | $0.00 | JOB | 6 | $0.00 | |
| D-2002BF | Hull Plating (U/W Body), Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002BG | Thruster Unit, Overhaul - Barge | $0.00 | EA | 1 | $0.00 | |
| O-2002BH | Tanks (Potable Water), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-2002BI | Tanks (Potable Water), Preserve, Partial, - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-2002BJ | Tanks (Ballast), Preserve "Partial" - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-2002BK | Fenders, Bow, Inspect and Repair - Barge | $0.00 | EA | 1 | $0.00 | |
| D-2002BL | Fire Prevention Requirements | NSP | EA | 1 | NSP | |
| O-2002BM | Miscellaneous Repair | $0.00 | EA | 1 | $0.00 | |
| O-2002A | Composite Labor Rate | $0.00 | Hour | 200 | $0.00 | |
| D-2002B | GFP Report | NSP | EA | NSP | ||
| O-2002Z | Laydays | $0.00 | JOB | 5 | $0.00 | |
| Total Price of Definite Items | Day | 5 | $0.00 | |||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
OY-3
| PRICING SCHEDULE FOR: |
| 140 WTGB Drydock IDIQ |
| CLIN | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 3001 | 140' WTGB Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-3001AA | Fire Prevention Requirements | NSP | NSP | NSP | NSP | |
| D-3001AB | Hull Plating, U/W Body, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-3001AC | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-3001AD | U/W Body, Preserve, 100 percent | $0.00 | EA | 1 | $0.00 | |
| O-3001AE | U/W Body, Preserve, Partial, Condition A | $0.00 | EA | 1 | $0.00 | |
| O-3001AF | U/W Body, Preserve, Partial, Condition B | $0.00 | EA | 1 | $0.00 | |
| O-3001AG | Hull and Structral Plating, General, 7.5 Lbs | $0.00 | EA | 1 | $0.00 | |
| O-3001AH | Hull Plating Freeboard, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-3001AI | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-3001AJ | Bubbler Channels, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-3001AK | Fenders, Bow, Inspect and Repair | $0.00 | EA | 1 | $0.00 | |
| D-3001AL | Appendages, U/W, Leak Test | $0.00 | EA | 1 | $0.00 | |
| O-3001AM | Propulsion Shaft Rope Guards, Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AN | Appendages, U/W, Internal, Preserve | $0.00 | EA | 1 | $0.00 | |
| D-3001AO | Chain Lockers, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AP | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AQ | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AR | Tanks, Ballast, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AS | Voids, Accessible, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001AT | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-3001AU | Masts ( Main, Fore, and Stub), Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-3001AV | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | EA | 1 | $0.00 | |
| O-3001AW | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-3001AX | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | EA | 1 | $0.00 | |
| D-3001AY | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-3001AZ | Propeller , Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-3001BA | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-3001BB | Fathometer Transducer, Renew | $0.00 | EA | 1 | $0.00 | |
| D-3001BC | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-3001BD | Sea Strainers, Simplex, All Sizes, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-3001BE | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | EA | 1 | $0.00 | |
| O-3001BF | Rudders, Preserve, 100% | $0.00 | EA | 1 | $0.00 | |
| D-3001BG | Rudder Stock Bearings Clearances, Check | $0.00 | EA | 1 | $0.00 | |
| O-3001BH | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | EA | 1 | $0.00 | |
| D-3001BI | Anchor Chain and Ground Tackle, Preserve | $0.00 | EA | 1 | $0.00 | |
| D-3001BJ | Anchors, Preserve | $0.00 | JOB | 1 | $0.00 | |
| D-3001BK | Grey Water Holding Tanks, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-3001BL | Tanks, Grey Water Holding, Preserve, Partial | $0.00 | JOB | 3 | $0.00 | |
| O-3001BM | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 4 | $0.00 | |
| O-3001BN | Chain Lockers, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-3001BO | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 2 | $0.00 | |
| O-3001BP | Accessible Void(s), Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| D-3001BQ | Tanks, Potable Water, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-3001BR | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 3 | $0.00 | |
| O-3001BS | Superstructure, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-3001BT | Exhaust Stacks (Exterior), Preserve - Partial | $0.00 | EA | 1 | $0.00 | |
| O-3001BU | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | EA | 1 | $0.00 | |
| O-3001BV | Tanks (Sewage Vacuum Collection), Preserve "100%" | $0.00 | EA | 1 | $0.00 | |
| D-3001BW | Drydock | $0.00 | JOB | 1 | $0.00 | |
| D-3001BX | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | |
| D-3001BY | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | |
| O-3001BZ | Tanks, Ballast, Preserve, 100 Percent | $0.00 | JOB | 4 | $0.00 | |
| O-3001CA | Tanks, Grey Water Holding, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-3001CB | Tanks, Potable Water, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-3001CC | Miscellaneous Repair | $0.00 | JOB | 4 | $0.00 | |
| O-3001CD | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-3001A | Composite Labor Rate | $0.00 | Hour | 520 | $0.00 | |
| D-3001B | GFP Report | NSP | EA | NSP | ||
| O-3001Z | Laydays | $0.00 | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| CLIN | Total Price of Definite and Optional Items | $0.00 | ||||
| 3003 | 140' WTGB Barge Planned Dry-dock | NSP | NSP | NSP | NSP | |
| O-3002AA | Hull Plating (Side Scan), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AB | U/W Body, Preserve (100%) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AC | U/W Body, Preserve (Partial - Condition A) | $0.00 | EA | 1 | $0.00 | |
| O-3002AD | U/W Body, Preserve (Partial - Condition B) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AE | Hull Plating Freeboard, Preserve – Partial - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AF | Hull Plating Freeboard, Preserve “100%” - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AG | Accessible Void(s), Preserve "Partial" - Barge | $0.00 | JOB | 10 | $0.00 | |
| D-3002AH | Sw Heat Exchangers; Clean, Inspect And Hydro | $0.00 | EA | 1 | $0.00 | |
| D-3002AI | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-3002AJ | Fathometer Transducer, Renew – Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002AK | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | EA | 1 | $0.00 | |
| D-3002AL | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AM | Tanks (Sewage Holding), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-3002AN | Tanks (Sewage Holding), Preserve “Partial”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-3002AO | Tanks (Sewage Vacuum Collection), Preserve “Partial”- Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002AP | Tanks (MP Fuel Storage and Overflow), Preserve “Partial”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-3002AQ | Tanks (MP Fuel Storage and Overflow), Preserve “100%”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-3002AR | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | EA | 1 | $0.00 | |
| O-3002AS | Superstructure, Preserve “100%” | $0.00 | EA | 1 | $0.00 | |
| O-3002AT | Superstructure, Preserve “Partial” (Barge) | $0.00 | EA | 1 | $0.00 | |
| D-3002AU | Cathodic Protection / Zinc Anodes, Renew - Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002AV | Drydock - Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002AW | Temporary Services, Provide - Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002AX | Auxiliary Sea Water System Valves, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-3002AY | Bilge and Ballast Valves, Overhaul or Renew | $0.00 | EA | 1 | $0.00 | |
| O-3002AZ | Hull Plating (U/W Body), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002BA | Hull Plating (Freeboard), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002BB | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-3002BC | Grey Water Holding Tank(s), Clean and Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002BD | Sewage Holding Tank(s), Clean and Inspect - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-3002BE | Bilges, Preserve | $0.00 | JOB | 6 | $0.00 | |
| D-3002BF | Hull Plating (U/W Body), Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002BG | Thruster Unit, Overhaul - Barge | $0.00 | EA | 1 | $0.00 | |
| O-3002BH | Tanks (Potable Water), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-3002BI | Tanks (Potable Water), Preserve, Partial, - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-3002BJ | Tanks (Ballast), Preserve "Partial" - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-3002BK | Fenders, Bow, Inspect and Repair - Barge | $0.00 | EA | 1 | $0.00 | |
| D-3002BL | Fire Prevention Requirements | NSP | EA | 1 | NSP | |
| O-3002BM | Miscellaneous Repair | $0.00 | EA | 1 | $0.00 | |
| O-3002A | Composite Labor Rate | $0.00 | Hour | 200 | $0.00 | |
| D-3002B | GFP Report | NSP | EA | NSP | ||
| O-3002Z | Laydays | $0.00 | JOB | 5 | $0.00 | |
| Total Price of Definite Items | Day | 5 | $0.00 | |||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
OY-4
| PRICING SCHEDULE FOR: |
| 140 WTGB Drydock IDIQ |
| CLIN | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 4001 | 140' WTGB Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-4001AA | Fire Prevention Requirements | NSP | NSP | NSP | NSP | |
| D-4001AB | Hull Plating, U/W Body, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-4001AC | Hull Plating, U/W Body, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-4001AD | U/W Body, Preserve, 100 percent | $0.00 | EA | 1 | $0.00 | |
| O-4001AE | U/W Body, Preserve, Partial, Condition A | $0.00 | EA | 1 | $0.00 | |
| O-4001AF | U/W Body, Preserve, Partial, Condition B | $0.00 | EA | 1 | $0.00 | |
| O-4001AG | Hull and Structral Plating, General, 7.5 Lbs | $0.00 | EA | 1 | $0.00 | |
| O-4001AH | Hull Plating Freeboard, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-4001AI | Hull Plating Freeboard, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-4001AJ | Bubbler Channels, Inspect | $0.00 | EA | 1 | $0.00 | |
| O-4001AK | Fenders, Bow, Inspect and Repair | $0.00 | EA | 1 | $0.00 | |
| D-4001AL | Appendages, U/W, Leak Test | $0.00 | EA | 1 | $0.00 | |
| O-4001AM | Propulsion Shaft Rope Guards, Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AN | Appendages, U/W, Internal, Preserve | $0.00 | EA | 1 | $0.00 | |
| D-4001AO | Chain Lockers, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AP | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AQ | Tanks, MP Fuel Service, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AR | Tanks, Ballast, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AS | Voids, Accessible, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001AT | Tanks, Dirty Oil and Waste, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-4001AU | Masts ( Main, Fore, and Stub), Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-4001AV | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | $0.00 | EA | 1 | $0.00 | |
| O-4001AW | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-4001AX | Propulsion Shaft Bearings, External, Check Clearances | $0.00 | EA | 1 | $0.00 | |
| D-4001AY | Stern Tube Interior Surfaces, Preserve, 100 Percent | $0.00 | EA | 1 | $0.00 | |
| D-4001AZ | Propeller , Remove, Inspect, and Reinstall | $0.00 | EA | 1 | $0.00 | |
| D-4001BA | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-4001BB | Fathometer Transducer, Renew | $0.00 | EA | 1 | $0.00 | |
| D-4001BC | Sea Valves and Waster Pieces, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-4001BD | Sea Strainers, Simplex, All Sizes, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| D-4001BE | Rudder Assembly, Remove, Inspect And Reinstall | $0.00 | EA | 1 | $0.00 | |
| O-4001BF | Rudders, Preserve, 100% | $0.00 | EA | 1 | $0.00 | |
| D-4001BG | Rudder Stock Bearings Clearances, Check | $0.00 | EA | 1 | $0.00 | |
| O-4001BH | Rudder Stock Bearings (Upper And Lower), Renew | $0.00 | EA | 1 | $0.00 | |
| D-4001BI | Anchor Chain and Ground Tackle, Preserve | $0.00 | EA | 1 | $0.00 | |
| O-4001BJ | Anchors, Preserve | $0.00 | JOB | 1 | $0.00 | |
| D-4001BK | Grey Water Holding Tanks, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-4001BL | Tanks, Grey Water Holding, Preserve, Partial | $0.00 | JOB | 3 | $0.00 | |
| O-4001BM | Tanks, Ballast, Preserve, Partial | $0.00 | JOB | 4 | $0.00 | |
| O-4001BN | Chain Lockers, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-4001BO | Tanks, Dirty Oil and Waste, Preserve, Partial, | $0.00 | JOB | 2 | $0.00 | |
| O-4001BP | Accessible Void(s), Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| D-4001BQ | Tanks, Potable Water, Clean and Inspect | $0.00 | EA | 1 | $0.00 | |
| O-4001BR | Tanks, Potable Water, Preserve, Partial, | $0.00 | JOB | 3 | $0.00 | |
| O-4001BS | Superstructure, Preserve, Partial | $0.00 | EA | 1 | $0.00 | |
| O-4001BT | Exhaust Stacks (Exterior), Preserve - Partial | $0.00 | EA | 1 | $0.00 | |
| O-4001BU | Cathodic Protection, Zinc Anodes, Renew, | $0.00 | EA | 1 | $0.00 | |
| O-4001BV | Tanks (Sewage Vacuum Collection), Preserve "100%" | $0.00 | EA | 1 | $0.00 | |
| D-4001BW | Drydock | $0.00 | JOB | 1 | $0.00 | |
| D-4001BX | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | |
| D-4001BY | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | |
| O-4001BZ | Tanks, Ballast, Preserve, 100 Percent | $0.00 | JOB | 4 | $0.00 | |
| O-4001CA | Tanks, Grey Water Holding, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-4001CB | Tanks, Potable Water, Preserve, 100 Percent | $0.00 | JOB | 3 | $0.00 | |
| O-4001CC | Miscellaneous Repair | $0.00 | JOB | 4 | $0.00 | |
| O-4001CD | Hull Plating, Side Scan, Ultrasonic Testing | $0.00 | EA | 1 | $0.00 | |
| O-4001A | Composite Labor Rate | $0.00 | Hour | 520 | $0.00 | |
| D-4001B | GFP Report | NSP | EA | NSP | ||
| O-4001Z | Laydays | $0.00 | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 | |||||
| 4003 | 140' WTGB Barge Planned Dry-dock | NSP | NSP | NSP | NSP | |
| D-4002AA | Hull Plating (Side Scan), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AB | U/W Body, Preserve (100%) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AC | U/W Body, Preserve (Partial - Condition A) | $0.00 | EA | 1 | $0.00 | |
| O-4002AD | U/W Body, Preserve (Partial - Condition B) - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AE | Hull Plating Freeboard, Preserve – Partial - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AF | Hull Plating Freeboard, Preserve “100%” - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AG | Accessible Void(s), Preserve "Partial" - Barge | $0.00 | JOB | 10 | $0.00 | |
| D-4002AH | Sw Heat Exchangers; Clean, Inspect And Hydro | $0.00 | EA | 1 | $0.00 | |
| D-4002AI | Circuit Breakers (60 Hz), Inspect and Test | $0.00 | EA | 1 | $0.00 | |
| D-4002AJ | Fathometer Transducer, Renew – Barge | $0.00 | EA | 1 | $0.00 | |
| D-4002AK | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | EA | 1 | $0.00 | |
| D-4002AL | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AM | Tanks (Sewage Holding), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-4002AN | Tanks (Sewage Holding), Preserve “Partial”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-4002AO | Tanks (Sewage Vacuum Collection), Preserve “Partial”- Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002AP | Tanks (MP Fuel Storage and Overflow), Preserve “Partial”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-4002AQ | Tanks (MP Fuel Storage and Overflow), Preserve “100%”- Barge | $0.00 | JOB | 4 | $0.00 | |
| O-4002AR | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | $0.00 | EA | 1 | $0.00 | |
| O-4002AS | Superstructure, Preserve “100%” | $0.00 | EA | 1 | $0.00 | |
| O-4002AT | Superstructure, Preserve “Partial” (Barge) | $0.00 | EA | 1 | $0.00 | |
| D-4002AU | Cathodic Protection / Zinc Anodes, Renew - Barge | $0.00 | EA | 1 | $0.00 | |
| D-4002AV | Drydock - Barge | $0.00 | EA | 1 | $0.00 | |
| D-4002AW | Temporary Services, Provide - Barge | $0.00 | EA | 1 | $0.00 | |
| D-4002AX | Auxiliary Sea Water System Valves, Overhaul Or Renew | $0.00 | EA | 1 | $0.00 | |
| D-4002AY | Bilge and Ballast Valves, Overhaul or Renew | $0.00 | EA | 1 | $0.00 | |
| O-4002AZ | Hull Plating (U/W Body), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002BA | Hull Plating (Freeboard), Ultrasonic Testing - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002BB | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-4002BC | Grey Water Holding Tank(s), Clean and Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002BD | Sewage Holding Tank(s), Clean and Inspect - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-4002BE | Bilges, Preserve | $0.00 | JOB | 6 | $0.00 | |
| D-4002BF | Hull Plating (U/W Body), Inspect - Barge | $0.00 | EA | 1 | $0.00 | |
| D-4002BG | Thruster Unit, Overhaul - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002BH | Tanks (Potable Water), Preserve “100%”- Barge | $0.00 | JOB | 3 | $0.00 | |
| O-4002BI | Tanks (Potable Water), Preserve, Partial, - Barge | $0.00 | JOB | 3 | $0.00 | |
| O-4002BJ | Tanks (Ballast), Preserve "Partial" - Barge | $0.00 | JOB | 4 | $0.00 | |
| O-4002BK | Fenders, Bow, Inspect and Repair - Barge | $0.00 | EA | 1 | $0.00 | |
| O-4002BL | Fire Prevention Requirements | NSP | EA | 1 | NSP | |
| O-4002BM | Miscellaneous Repair | $0.00 | EA | 1 | $0.00 | |
| O-4002A | Composite Labor Rate | $0.00 | Hour | 200 | $0.00 | |
| D-4002B | GFP Report | NSP | EA | NSP | ||
| O-4002Z | Laydays | $0.00 | JOB | 5 | $0.00 | |
| Total Price of Definite Items | Day | 5 | $0.00 | |||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
File details come from the government source that posted it. Updated .