J-1 J-2_Pricing_schedule.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Industrial Plan Equipment Maintenance IDIQ
Solicitation number
N3225326Q0068
Issued by

About this file

This is a pricing schedule template (Attachment J) for an Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract for Industrial Plant Equipment Maintenance at Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF). The template consists of three tabs designed to capture fully burdened labor rates, material pricing, and overall pricing calculations across a five-year ordering period.

The J-1 tab requires contractors to establish fully burdened hourly labor rates for various positions including Project Management (Key Personnel), Program Manager Engineer, Remote Call Center Field Service Engineer, Lead Onsite Field Service Engineer, Application/Development Engineer (Trainer), and Technical Representative/SME Field Service Engineer. All rates must be inclusive of wages, overhead, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The J-2 tab requires a material price list identifying parts by description, part number, manufacturer, drawing number, NSN, and OEM stock availability, with pricing for each of the five ordering years. The J-2 tab also includes sections for materials used in training demonstrations and special tools. The Pricing Template tab consolidates labor and material costs by CLIN (Contract Line Item Number) and requires contractors to input quantities, fully burdened rates, and totals for each ordering year, along with sections for Other Direct Costs (ODCs), travel expenses, and an annual Preventive Maintenance/Calibration price. Contractors may add, remove, or rename labor categories based on their proposed support structure, provided all changes are consistently reflected across all tabs.

View the file

Other files

File Type Posted
0068_QA02_Response.xlsx XLSX spreadsheet
N3225326Q00680002 SF 30.pdf PDF
N3225326Q00680002.pdf PDF
0068_QA01 Response.xlsx XLSX spreadsheet
N3225326Q00680001_SF30.pdf PDF
N3225326Q006800001.pdf PDF
Appendix_III.pdf PDF
PHNSY_IMF_OPSEC.pdf PDF
Solicitation - N3225326Q0068.pdf PDF
Appendix_II.pdf PDF
Appendix I.pdf PDF
WageDetermination_2015-5689_2026.08.12_rev29.pdf PDF
06.A04.PWS_IDIQMaintenance2026.7.31_rev4.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIONS

DIRECTIONS

Tab J-1 Fully Burdened Labor Rates

1. Contractor may add/remove/rename labor categories listed based on contractor's proposed support

2. In the blue boxes, provide a brief description of the experience, qualifications, and degree/certifcations required for an individual to hold the positions listed.

3. In the yellow boxes, insert fully burderned houly labor rate for each ordering period inclusive of all wages (e.g. straight time, overtime, shift differential, holiday time, standby time, etc.), overhead, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit.

Tab J-2 Material Price List

1. Fill-in all parts information and provide price in yellow boxes for each ordering period.

2. Fill in any material to be used to conduct training classes (i.e. parts used in demonstrating repairs, special tools, etc.,)

Tab Pricing Template

1. Ensure changes to the labor categories in tab J-1 are reflected. Fill-in fully burdened rates..

&"Calibri"&10&K737373Serco Business&1#

J-1 FB Labor Rates

Fully Burdened Hourly Labor Rate
8/19/26HRMCC410Ordering Year 1Ordering Year 2Ordering Year 3Ordering Year 4Ordering Year 5
Project Management (Key Personnel):$0.00$0.00$0.00$0.00$0.00Required for Woodward LM 2500 Fuel Control system
Key personnel for communication with maintenance work, provide service reports, coordination with service providers, production shops, TPOC/COR, and other PHNSY & IMF personnel.Program Manager
Engineer (Remote Call Center)
Field Service Engineer (Lead Onsite)
Application/Development Engineer (Trainer)
Technical Representative (Maintenance/Calibration Team) -SME/Field Service Engineer$0.00$0.00$0.00$0.00$0.00
trained and certified technicians possessing the necessary qualifications, certifications, or OEM-equivalent training required to perform maintenance and calibration analysis on the specific makes and models of equipment active on the contract.

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00

&"Calibri"&10&K737373Serco Business&1#

J-2 Material Price List

Part DescriptionPart NumberManufacturerDrawing NumberNSNIn stock with OEM (Y/N)Long Lead Time Material (Y/N) - If Y, include Lead TimeOrder Year 1Order Year 2Year Period 3Year Period 4Year Period 5
Haas Automation$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Clausing Industrial Inc$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Design Technologies International$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Herkules (Research Design)$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
ESAB$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Muratec$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00

&"Calibri"&10&K737373Serco Business&1#_x000D_&"Calibri"&11&K000000&"-,Bold"Attachment J-2, Material Price Sheet &P

Pricing Template-per Equipment

ORDERING YEAR 1ORDERING YEAR 2ORDERING YEAR 3ORDERING YEAR 4ORDERING YEAR 5
UNITQUANTITYFULLY BURDENED LABOR RATETOTALUNITQUANTITYFULLY BURDENED LABOR RATETOTALUNITQUANTITYFULLY BURDENED LABOR RATETOTALUNITQUANTITYFULLY BURDENED LABOR RATETOTALUNITQUANTITYFULLY BURDENED LABOR RATETOTAL

LABOR - CLIN 0001

Field Service - Project ManagementHR0$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0
Field service - Mechanical /Electrical (SME)HR0$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0
Field service - Mechanical /Electrical (SME)HR0$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0
HR0$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0HR$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0HR0$ - 0$ - 0
CLIN 0001$ - 0CLIN 0001$ - 0CLIN 0001$ - 0CLIN 0001$ - 0CLIN 0001$ - 0
MATERIAL - CLIN 0001
$ - 0$ - 0$ - 0$ - 0
ODCs CLIN 0001
$ - 0$ - 0$ - 0$ - 0
TRAVEL - CLIN 0001
Travel - For the purpose of setting a ceiling, the proposal for this line item will be based on the government estimate.$ - 0$ - 0$ - 0$ - 0

NSP NSP NSP NSP NSP

ANNUAL Preventive Maintenance/Calibration price $0.00 $0.00 $0.00 $0.00 $0.00

CONTRACT VALUE $0.00

&"Calibri"&10&K737373Serco Business&1#

File details come from the government source that posted it. Updated .