J-0200000-14 ELINs.xlsx
XLSX spreadsheet 166 KB Posted
- Solicitation number
- N40085-23-R-2517
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Summary
| Year | Recurring | Non-Recurring | Total |
| BASE | $0.00 | $225,000.00 | $225,000.00 |
| OPTION 1 | $0.00 | $225,000.00 | $225,000.00 |
| OPTION 2 | $0.00 | $225,000.00 | $225,000.00 |
| OPTION 3 | $0.00 | $225,000.00 | $225,000.00 |
| OPTION 4 | $0.00 | $225,000.00 | $225,000.00 |
| Total | $0.00 | $1,125,000.00 | |
| Contract Total | $1,125,000.00 |
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #TBD |
| EXHIBIT A |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A015 |
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Fort Pickett and Fort AP Hill | ||||||
| A001 | 1502000 - Facility Investment - Fort Pickett EOD CNRMA/Region | |||||
| Service Orders, Spec Item 3.1 | ||||||
| A001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | EA | $0.00 | ||
| A001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | EA | $0.00 | ||
| A001AC | Routine Service Orders Spec Item 3.1.3 | 36 | EA | $0.00 | ||
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| A001AD | Air Handling Unit (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AE | Condenser, DX, Air Cooled (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AF | Drinking Fountain (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AG | Fan Coil Unit (38 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AH | Freezer (4 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AJ | Gas Heater Wall Mounted (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AK | HVAC System (4 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AL | Unit Heater, Gas Fired (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AM | Ice Maker (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AN | Multi City, Condenser, Air Cooled (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AP | Packaged Terminal Air Conditioner (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AQ | Split Ductless System, Outdoor Unit (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AR | Split System Heat Pump, Indoor Unit (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| A001AS | Fire Alarm Control Panel & Alarm (4 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A001AT | Wet Pipe Sprinkler System (3 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A001AU | Zone Panel (2 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A001AV | H2O Water Tank (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| A001AW | Electric Water Heater (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| A001AX | Natural Gas Storage Water Tank (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Domestic Water Systems, Spec Item 3.2.5 | ||||
| A001AY | Hot Water Circulating Pump (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A001AZ | H2O Storage Tank (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| A001BA | 50 Gallon Water Tank (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| A001BB | Storage Tank Domestic Water (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| A001BC | Range Hood (4 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A001BD | Fan, Wall Exhauster, Direct Drive (2 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
TOTAL FORT PICKETT EOD FACILITY INVESTMENT $0.00
| A002 | 1502000 - Facility Investment - Fort Pickett NSWCEN CNRMA/Region | |||
| Service Orders, Spec Item 3.1 | ||||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | EA | $0.00 |
| A002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | EA | $0.00 |
| A002AC | Routine Service Orders Spec Item 3.1.3 | 36 | EA | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| A002AD | Air Handling Unit (7 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AE | Drinking Fountain (5 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AF | Freezer (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AG | HVAC Gas Pack (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AH | Ice Maker (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AJ | Refrigerator (6 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AK | Split Ductless Heat Pump, Outdoor Unit (5 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AL | A/C Coil (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AM | Condenser (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AN | Energy Recover System (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A002AP | Unit Heater (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| A002AQ | Dry Pipe Sprinkler System (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A002AR | Fire Alarm Control Panel & Alarm (5 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A002AS | Wet Pipe Sprinkler System (3 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Compressed Air Systems, Spec Item 3.2.3 | ||||
| A002AT | Air Compressor (3 EA), Spec Item 3.2.3 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| A002AU | Electric Water Heater (3 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| A002AV | Natural Gas Storage Water Tank (6 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| A002AW | Water Heater (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Domestic Water Systems, Spec Item 3.2.5 | ||||
| A002AX | Pump, Circulating (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| A002AY | Expansion Tank, (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| A002AZ | Mixing Valve (2 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| A002BA | Back Flow Preventer (1 EA) | 12 | MO | $0.00 |
| Electrical Systems, Spec Item 3.2.6 | ||||
| A002BB | Emergency Lighting Inverter (2 EA), Spec Item 3.2.6 | 12 | MO | $0.00 |
| A002BC | Electical Panel (2 EA), Spec Item 3.2.6 | 12 | MO | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| A002BD | Exhaust Hood (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A002BE | Range Hood (5 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A002BF | Fan, Wall Exhauster, Direct Drive (6 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A002BG | Ceiling Exhaust Fan (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
TOTAL FORT PICKETT NSWCEN FACILITY INVESTMENT $0.00
| A003 | 1502000 - Facility Investment - Fort AP Hill NSWCEN CNRMA/Region | |||
| Service Orders, Spec Item 3.1 | ||||
| A003AA | Emergency Service Orders, Spec Item 3.1.1 | 18 | EA | $0.00 |
| A003AB | Urgent Service Orders, Spec Item 3.1.2 | 18 | EA | $0.00 |
| A003AC | Routine Service Orders Spec Item 3.1.3 | 54 | EA | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| A003AD | Heat Pump (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A003AE | Condensing Unit (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A003AF | Air Handler (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| A003AG | Freezer (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A003AH | Ice Machine (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| A003AJ | Fire Alarm Control Panel & Alarm (9 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| A003AK | Wet Pipe Sprinkler System (9 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Compressed Air Systems, Spec Item 3.2.3 | ||||
| A003AL | Air Compressor (1 EA), Spec Item 3.2.3 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| A003AM | Electric Water Heater (10 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| A003AN | Exhaust Fan (8 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A003AP | Wall Mounted Fan (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A003AQ | Heavy Duty Exhaust Blower (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| A003AR | Roof Mounted Exhaust System (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
TOTAL FORT AP HILL NSWCEN FACILITY INVESTMENT $0.00
| A004 | 1503010 - Custodial Services - Fort Pickett EOD CNRMA/Region | |||
| A004AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| A004AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| A004AC | COL 3 | 30,076 | SF | $0.00 |
| A004AD | COL 4 | 0 | SF | $0.00 |
| A004AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| A004AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT PICKETT EOD CUSTODIAL SERVICES $0.00
| A005 | 1503010 - Custodial Services - Fort Pickett NSWCEN CNRMA/Region | |||
| A005AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| A005AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| A005AC | COL 3 | 18,105 | SF | $0.00 |
| A005AD | COL 4 | 0 | SF | $0.00 |
| A005AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| A005AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT PICKETT NSWCEN CUSTODIAL SERVICES $0.00
| A006 | 1503010 - Custodial Services - Fort AP Hill NSWCEN CNRMA/Region | |||
| A006AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| A006AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| A006AC | COL 3 | 14,487 | SF | $0.00 |
| A006AD | COL 4 | 0 | SF | $0.00 |
| A006AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| A006AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT AP HILL NSWCEN CUSTODIAL SERVICES $0.00
| A007 | 1503020 - Pest Control - Fort Pickett EOD CNRMA/Region | |||
| A007AA | COL 3 | 39,945 | SF | $0.00 |
| A007AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT PICKETT EOD PEST CONTROL $0.00
| A008 | 1503020 - Pest Control - Fort Pickett NSWCEN CNRMA/Region | |||
| A008AA | COL 3 | 21,604 | SF | $0.00 |
| A008AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT PICKETT NSWCEN PEST CONTROL $0.00
| A009 | 1503020 - Pest Control - Fort AP Hill NSWCEN CNRMA/Region | |||
| A009AA | COL 3 | 20,681 | SF | $0.00 |
| A009AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT AP HILL NSWCEN PEST CONTROL $0.00
| A010 | 1503030 - Solid Waste Management - Fort Pickett EOD CNRMA/Region | |||
| A010AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 3 | EA | $0.00 |
TOTAL FORT PICKETT EOD SOLID WASTE $0.00
| A011 | 1503030 - Solid Waste Management - Fort Pickett NSWCEN CNRMA/Region | |||
| A011AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 2 | EA | $0.00 |
TOTAL FORT PICKETT NSWCEN SOLID WASTE $0.00
| A012 | 1503030 - Solid Waste Management - Fort AP Hill NSWCEN CNRMA/Region | |||
| A012AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 2 | EA | $0.00 |
TOTAL FORT AP HILL NSWCEN SOLID WASTE $0.00
| A013 | 1503050 - Grounds Maintenance - Fort Pickett EOD CNRMA/Region | |||
| A013AA | COL 1 | 0 | AC | $0.00 |
| A013AB | COL 2 | 0 | AC | $0.00 |
| A013AC | COL 3 | 8.67 | AC | $0.00 |
| A013AD | COL 4 | 0 | AC | $0.00 |
| A013AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| A013AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT PICKETT EOD GROUNDS MAINTENANCE $0.00
| A014 | 1503050 - Grounds Maintenance - Fort Pickett NSWCEN CNRMA/Region | |||
| A014AA | COL 1 | 0 | AC | $0.00 |
| A014AB | COL 2 | 0 | AC | $0.00 |
| A014AC | COL 3 | 11.55 | AC | $0.00 |
| A014AD | COL 4 | 0 | AC | $0.00 |
| A014AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| A014AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT PICKETT NSWCEN GROUNDS MAINTENANCE $0.00
| A015 | 1503050 - Grounds Maintenance - Fort AP Hill NSWCEN CNRMA/Region | |||
| A015AA | COL 1 | 0 | AC | $0.00 |
| A015AB | COL 2 | 0 | AC | $0.00 |
| A015AC | COL 3 | 29.93 | AC | $0.00 |
| A015AD | COL 4 | 0 | AC | $0.00 |
| A015AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| A015AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT AP HILL NSWCEN GROUNDS MAINTENANCE $0.00
| TOTAL ST FUNDS (A001-A003 & A007-A009) | $0.00 |
| TOTAL FX FUNDS (A004-A006 & A010-A015) | $0.00 |
TOTAL RECURRING WORK PRICE - BASE PERIOD $0.00
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period-Non Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #TBD |
| EXHIBIT A |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A757 |
PROVIDE PRICES TO PERFORM FACILITY INVESTMENT SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 100 | HR | $0 | |
| A701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700. | 1 | LS | $50,000 | $50,000 |
| A703 | Emergency Service Orders | Develop and Implement Emergency Service Orders per respective requirements in Annex 1502000, Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | $0 | |
| A704 | Urgent Service Orders | Develop and Implement Urgent Service Orders per respective requirements in Annex 1502000, Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | $0 | |
| A705 | Routine Service Orders | Develop and Implement Routine Service Orders per respective requirements in Annex 1502000, Routine Service Orders, Spec Item 3.1.3 | 30 | EA | $0 |
TOTAL NON-RECURRING WORK PRICE FOR FACILITY INVESTMENT SERVICES $50,000
PROVIDE PRICES TO PERFORM CUSTODIAL SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A706 | Stripping/Rewaxing | The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear. | 20000 | SF | $0 | |
| A707 | Carpet and Rug Deep Cleaning | The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Shampooed carpets are fr | 4000 | SF | $0 | |
| A708 | Cleaning Light Fixtures | Globes, reflectors, covers, diffusers and plastic side panels shall be removed and washed. After cleaning and reassembling, light fixture shall be free of bugs, dirt,dust,streaks,grease and other foreign matter. | 50 | EA | $0 | |
| A709 | Interior Window Cleaning | The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. | 1200 | SF | $0 | |
| A710 | Exterior Window Cleaning | The Contractor shall clean window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. | 1200 | SF | $0 | |
| A711 | Window Blind Cleaning | Blinds shall cleaned. If removed for cleaning, blinds are returned to their original location within two working days. | 40 | EA | $0 | |
| A712 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 100 | HR | $0 | |
| A713 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A712. | 1 | LS | $50,000 | $50,000 |
TOTAL NON-RECURRING WORK PRICE FOR CUSTODIAL SERVICES $50,000
PROVIDE PRICES TO PERFORM PEST CONTROL SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A714 | Bat Control in Buildings | Provide labor and materials to control/exclude bats from buildings in accordance with state regulations. Time Period to Respond: Same day as ordered. Complete work per time periods specified in J-1503020-06. | 12 | EA | $0 | ||
| A715 | Infestation Bee, Wasp, Hornet, and Stinging Arthropod Control | Provide labor and materials to control stinging arthropod infestations in and around buildings, structures, and areas. Pests include, but are not limited to, bees, wasps, hornets, carpenter bees, cicada killers, yellow jackets, and solitary wasps (mud daubers, umbrella wasps). European honeybee swarms/nests: Contractor shall contact state or local authorities to determine if local beekeepers can remove honeybee swarms/nests. Time Period to Respond: 4 hours. If swarm, respond immediately at discretion of KO. Complete work per time periods specified in J-1503020-06. | 10 | EA Infestation | $0 | ||
| A716 | Pest Bird Control (including Bird Aircraft Strike Hazard Reduction Activities) | Provide labor and materials to prevent and control birds inside and outside buildings/structures, and prevent and control birds roosting/nesting on aircraft operation areas. Time Period to Respond: General Bird Control: 3 working days, one day in occupied spaces. BASH: 24 hours BASH Emergency Call: (Mission affected) Immediately. Complete work per time periods specified in J-1503020-06. | 20 | EA Infestation | $0 | ||
| A717 | Filth Fly Control | Provide labor and materials to prevent and control filth flies including house flies, flesh flies, bottle flies, blow flies, fruit flies, and other related insects that breed or are attracted to garbage and trash in area designated by the KO. Identify source, if applicable. Time Period to Respond: 2 working days. Complete work per time periods specified in J-1503020-06. | 10 | EA Infestation | $0 | ||
| A718 | Fire Ant Control | Provide labor and materials to prevent and control fire ants indoors and outdoors. Sites include all developed and semi-developed areas and other designated sites. Time Period to Respond: Indoors: Immediately. Outdoors: 1 day. Complete work per time periods specified in J-1503020-06. | 10 | Indoors: 1,000 SF | |||
| Outdoors: 0.25 acre | $0 | ||||||
| A719 | Flea Control In and Around Buildings and Structures | Provide labor and materials to control flea infestations in and around buildings and structures. Time Period to Respond: 2 working days. Complete work per time periods specified in J-1503020-06. | 10 | 1,000 SF | $0 | ||
| A720 | Larval and Pupal Mosquito Control | Provide labor and materials to control of larval and pupal mosquitoes in designated area(s) when directed by KO (medical personnel determine when to control). Time Period to Respond: 1 day. Complete work per time periods specified in J-1503020-06. | 50 | 1,000 SF | $0 | ||
| A721 | Adult Mosquito Control | Provide labor and materials to apply a mosquito adulticide (ULV Formulation) at designated sites when directed by KO. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-06. | 10 | Road Mile | $0 | ||
| A722 | Commensal Rodents In and Around Buildings and Structures | Provide labor and materials to prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Rodent pests include, but are not limited to Norway rats, roof rats, house mice, and field mice. Service requires removal of dead animals. Time Period to Respond: Indoors: 1 day. Outdoors: 3 working days. Complete work per time periods specified in J-1503020-06. | 20 | 1,000 SF | $0 | ||
| A723 | Industrial, Sidewalk, Substation, Vault, and Right-Of-Way Weed Control | Provide labor and materials to provide bare ground weed control in cracks in sidewalks, and paved surfaces, at fenceline locations, and in transformer vaults, around fire hydrants, and other locations as designated by the KO. Time Period to Respond: 5 working days. Complete work per time periods specified in J-1503020-06. | 100 | 1,000 SF | $0 | ||
| A724 | Stored Product Pest Control (Arthropods) | Provide labor and materials to control and prevent stored product pests at designated sites. Time Period to Respond: 3 working days. Complete work per time periods specified in J-1503020-06. | 21 | 1,000 SF | $0 | ||
| A725 | Survey for Termite and Wood Destroying Organisms | Provide labor and materials to survey for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles. Time Period to Respond: If swarm, immediately. Otherwise, 1 week. Complete work per time periods specified in J-1503020-08. | 25 | 1,000 SF | $0 | ||
| A726 | Subterranean Termite Control | Provide labor and materials to control infestations of subterranean termites in accordance with J-1503020-08 (Termite Control Specifications). Time Period to Respond: complete work per time periods specified in J-1503020-08. | 25 | 100 LF | $0 | ||
| A727 | Drywood Termite Control | Provide labor and materials to prevent, manage, and control Drywood Termites in accordance with J-1503020-08 (Termite Control Specifications). Time Period to Respond: Complete work per time periods specified in J-1503020-08. | 25 | 1000 CF | $0 | ||
| A728 | Other Wood Destroying Organism Control | Provide labor and materials to prevent, manage, and control non-termite wood destroying organisms including, but not limited to powder post beetles (Lyctids and Bostrichids), Anobiids (furniture and deathwatch beetles), old house borer, carpenter ants, and carpenter bees. Time Period to Respond: 10 working days. Complete work per time periods specified in J-1503020-08. | 10 | 1000 SF | $0 | ||
| A729 | Tick Survey and Control Outdoors | Provide labor and materials to survey for and control of ticks outdoors. Time Period to Respond: 3 calendar days. Complete work per time periods specified in J-1503020-07. | 100 | 5,000 SF | $0 | ||
| A730 | Pest Vertebrate Control | Provide labor and materials to control pest vertebrate animals including, but not limited to, feral dogs and cats, squirrels, skunks, snakes, opossums, raccoons, and mongoose. Comply with local laws and regulations. Time Period to Respond: Within 24 hours. Emergency (animal possibly rabid) or indoors, immediately. Complete work per time periods specified in J-1503020-06. | 20 | EA | $0 | ||
| A731 | Ant Control | Provide labor and materials to prevent and control ants in and around buildings and structures. Time Period to Respond: 10 working days Complete work per time periods specified in J-1503020-06. | 100 | 1,000 SF | $0 | ||
| A732 | Turf and Ornamental Bed Weed Control | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. ime Period to Respond: 1 week. Complete work per time periods specified in J-1503020-06. | 50 | 1,000 SF | $0 | ||
| A733 | Turf and Ornamental Pest Control | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Time Period to Respond: 5 days. Complete work per time periods specified in J-1503020-06. | 50 | 1,000 SF | $0 | ||
| A734 | Aerial Spray Support | Provide labor and materials to provide ground support services for the U.S. Air Force for aerial spray operations. Time Period to Respond: 24 hours. Complete work per time periods specified in J-1503020-06. | 2 | EA | $0 | ||
| A735 | Aerial Spray Operations | Provide labor and materials to perform aerial spray operations when requested by the KO or his duly authorized representative. Aerial applications shall begin within 48 hours after receipt of a task order, weather permitting. Complete work per time periods specified in J-1503020-06. | 2 | EA | $0 | ||
| A736 | Cockroach Control | Provide labor and materials to prevent and control all cockroaches. Time Period to Respond: 3 days. Complete work per time periods specified in J-1503020-06. | 100 | 1,000 SF | $0 | ||
| A737 | Mole Cricket Control | Provide labor and materials to control mole crickets in lawns. Time Period to Respond: 7 calendar days. Complete work per time periods specified in J-1503020-06. | 100 | 1,000 SF | $0 | ||
| A738 | Miscellaneous Arthropod Pest Control | Provide labor and materials to prevent and control nuisance arthropod pests in and around buildings and structures. Excludes but is not limited to spiders, silverfish, scorpions, crickets, centipedes, millipedes, boxelder bugs, mites, beetles, etc. (Excludes ants, cockroaches, filth flies, and bees/wasps/hornets covered in separate sections.) Time Period to Respond: 7 days. Complete work per time periods specified in J-1503020-06. | 99 | 1,000 SF | $0 | ||
| A739 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 160 | HR | $0 | ||
| A740 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A739. | 1 | LS | $25,000 | $25,000 |
TOTAL NON-RECURRING WORK PRICE FOR PEST CONTROL SERVICES $25,000
PROVIDE PRICES TO PERFORM SOLID WASTE SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A741 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 100 | HR | $0 | |
| A742 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A741. | 1 | LS | $50,000 | $50,000 |
TOTAL NON-RECURRING WORK PRICE FOR SOLID WASTE $50,000
PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A743 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 10 | AC | $0 | |
| A744 | Special Event Grass Cutting | Grass shall be mowed and trimmed to a uniform height of 3 inches. Clippings and debris shall be removed. Complete all work within 3 calendar days. | 10 | AC | $0 | |
| A745 | Special Event Edging | Edging to provide a uniform edged cut. All clippings shall be removed. Complete all work within 3 calendar days. | 3,125 | LF | $0 | |
| A746 | Tree Removal (Up to 6" Caliper) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 4 working days. | 20 | EA | $0 | |||
| A747 | Tree Removal ( 6 1/8" to 12" Caliper ) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 4 working days. | 20 | EA | $0 | |||
| A748 | Tree Removal (12 1/8" to 24" Caliper ) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 4 working days. | 20 | EA | $0 | |||
| A749 | Tree Removal (24 1/8" to 36" Caliper ) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 4 working days. | 20 | EA | $0 | |||
| A750 | Tree Removal (36 1/8" to 48" Caliper ) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 4 working days. | 20 | EA | $0 | |||
| A751 | Tree Removal (48 1/8" and Above Caliper ) | |||||
| Cut down and remove trees using standard trade practices and safety procedures. Remove all debris from Government property daily and rake area clean. Work will be completed 6 working days. | 10 | EA | $0 | |||
| A752 | Stump Removal (Large) | |||||
| Remove large stumps (4" diameter and up, measuring across the stump) to a depth of 18" below grade. Remove all debris from the process and fill void where stump was removed with earth similar to existing earth. Rake and grade new soil and seed area to match existing grass. Remove all debris from Government property daily. Work will be completed within 4 working days of receiving a digging permit. | 1,000 | IN | $0 | |||
| A753 | Stump Removal (Small) | |||||
| Remove small stumps (up to 4" diameter, measuring across the stump) to a depth of 18" below grade. Remove all debris from the process and fill void where stump was removed with earth similar to existing earth. Rake and grade new soil and seed area to match existing grass. Remove all debris from Government property daily. Work will be completed within 2 working days of receiving a digging permit. | 30 | EA | $0 | |||
| A754 | Surface Ground Root Removal | |||||
| Remove surface roots to a depth of 6" below grade. Remove all debris from the process and fill void where roots were removed with earth similar to existing earth. Rake and grade new soil and see area to match existing grass. Remove all debris from Government property daily. Work will be completed within 4 working days of receiving a digging permit. | 500 | IN | $0 | |||
| A755 | Vegetation Herbicide | Apply herbicide on undesirable vegetation per manufacturer's recommendations. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). Work will be completed in 2 working day. | 10,000 | SF | $0 | |
| A756 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 100 | HR | $0 | |
| A757 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A756. | 1 | LS | $50,000 | $50,000 |
TOTAL NON-RECURRING WORK PRICE FOR GROUNDS MAINTENANCE SERVICES $50,000
TOTAL NON-RECURRING WORK LINE ITEM BASE PERIOD (A700 THRU A757) $225,000
ELINs-1st Opt Period-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #TBD |
| EXHIBIT B |
| Line Item 0003 Recurring Work - First Option Period |
| PROVIDE PRICES FOR - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B015 |
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | CAC |
| Fort Pickett and Fort AP Hill | ||||||
| B001 | 1502000 - Facility Investment - Fort Pickett EOD CNRMA/Region | |||||
| Service Orders, Spec Item 3.1 | ||||||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | EA | $0.00 | ||
| B001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | EA | $0.00 | ||
| B001AC | Routine Service Orders Spec Item 3.1.3 | 36 | EA | $0.00 | ||
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| B001AD | Air Handling Unit (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AE | Condenser, DX, Air Cooled (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AF | Drinking Fountain (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AG | Fan Coil Unit (38 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AH | Freezer (4 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AJ | Gas Heater Wall Mounted (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AK | HVAC System (4 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AL | Unit Heater, Gas Fired (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AM | Ice Maker (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AN | Multi City, Condenser, Air Cooled (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AP | Packaged Terminal Air Conditioner (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AQ | Split Ductless System, Outdoor Unit (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AR | Split System Heat Pump, Indoor Unit (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| B001AS | Fire Alarm Control Panel & Alarm (4 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B001AT | Wet Pipe Sprinkler System (3 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B001AU | Zone Panel (2 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B001AV | H2O Water Tank (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| B001AW | Electric Water Heater (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| B001AX | Natural Gas Storage Water Tank (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Domestic Water Systems, Spec Item 3.2.5 | ||||
| B001AY | Hot Water Circulating Pump (3 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B001AZ | H2O Storage Tank (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| B001BA | 50 Gallon Water Tank (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| B001BB | Storage Tank Domestic Water (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| B001BC | Range Hood (4 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B001BD | Fan, Wall Exhauster, Direct Drive (2 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort Pickett EOD CNRMA/Region | $0.00 |
TOTAL FORT PICKETT EOD FACILITY INVESTMENT $0.00
| B002 | 1502000 - Facility Investment - Fort Pickett NSWCEN CNRMA/Region | |||
| Service Orders, Spec Item 3.1 | ||||
| B002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | EA | $0.00 |
| B002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | EA | $0.00 |
| B002AC | Routine Service Orders Spec Item 3.1.3 | 36 | EA | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| B002AD | Air Handling Unit (7 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AE | Drinking Fountain (5 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AF | Freezer (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AG | HVAC Gas Pack (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AH | Ice Maker (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AJ | Refrigerator (6 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AK | Split Ductless Heat Pump, Outdoor Unit (5 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AL | A/C Coil (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AM | Condenser (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AN | Energy Recover System (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B002AP | Unit Heater (1 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| B002AQ | Dry Pipe Sprinkler System (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B002AR | Fire Alarm Control Panel & Alarm (5 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B002AS | Wet Pipe Sprinkler System (3 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Compressed Air Systems, Spec Item 3.2.3 | ||||
| B002AT | Air Compressor (3 EA), Spec Item 3.2.3 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| B002AU | Electric Water Heater (3 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| B002AV | Natural Gas Storage Water Tank (6 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| B002AW | Water Heater (5 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Domestic Water Systems, Spec Item 3.2.5 | ||||
| B002AX | Pump, Circulating (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| B002AY | Expansion Tank, (1 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| B002AZ | Mixing Valve (2 EA), Spec Item 3.2.5 | 12 | MO | $0.00 |
| B002BA | Back Flow Preventer (1 EA) | 12 | MO | $0.00 |
| Electrical Systems, Spec Item 3.2.6 | ||||
| B002BB | Emergency Lighting Inverter (2 EA), Spec Item 3.2.6 | 12 | MO | $0.00 |
| B002BC | Electical Panel (2 EA), Spec Item 3.2.6 | 12 | MO | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| B002BD | Exhaust Hood (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B002BE | Range Hood (5 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B002BF | Fan, Wall Exhauster, Direct Drive (6 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B002BG | Ceiling Exhaust Fan (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort Pickett NSWCEN CNRMA/Region | $0.00 |
TOTAL FORT PICKETT NSWCEN FACILITY INVESTMENT $0.00
| B003 | 1502000 - Facility Investment - Fort AP Hill NSWCEN CNRMA/Region | |||
| Service Orders, Spec Item 3.1 | ||||
| B003AA | Emergency Service Orders, Spec Item 3.1.1 | 18 | EA | $0.00 |
| B003AB | Urgent Service Orders, Spec Item 3.1.2 | 18 | EA | $0.00 |
| B003AC | Routine Service Orders Spec Item 3.1.3 | 54 | EA | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
| Preventive Maintenance (PM) Program, Spec Item 3.2 | ||||
| HVAC and Refrigeration Systems, Spec Item 3.2.1 | ||||
| B003AD | Heat Pump (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B003AE | Condensing Unit (2 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B003AF | Air Handler (10 EA), Spec Item 3.2.1 | 12 | MO | $0.00 |
| B003AG | Freezer (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B003AH | Ice Machine (1 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Fire Protection Systems, Spec Item 3.2.2 | ||||
| B003AJ | Fire Alarm Control Panel & Alarm (9 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| B003AK | Wet Pipe Sprinkler System (9 EA), Spec Item 3.2.2 | 12 | MO | $0.00 |
| Compressed Air Systems, Spec Item 3.2.3 | ||||
| B003AL | Air Compressor (1 EA), Spec Item 3.2.3 | 12 | MO | $0.00 |
| Heat Exchangers, Spec Item 3.2.4 | ||||
| B003AM | Electric Water Heater (10 EA), Spec Item 3.2.4 | 12 | MO | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
| Other Recurring Services Program, Spec Item 3.3 | ||||
| Exhaust Hoods and Ducts, Spec Item 3.3.1 | ||||
| B003AN | Exhaust Fan (8 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B003AP | Wall Mounted Fan (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B003AQ | Heavy Duty Exhaust Blower (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| B003AR | Roof Mounted Exhaust System (1 EA), Spec Item 3.3.1 | 12 | MO | $0.00 |
| Subtotal Fort AP Hill NSWCEN CNRMA/Region | $0.00 |
TOTAL FORT AP HILL NSWCEN FACILITY INVESTMENT $0.00
| B004 | 1503010 - Custodial Services - Fort Pickett EOD CNRMA/Region | |||
| B004AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| B004AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| B004AC | COL 3 | 30,076 | SF | $0.00 |
| B004AD | COL 4 | 0 | SF | $0.00 |
| B004AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| B004AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT PICKETT EOD CUSTODIAL SERVICES $0.00
| B005 | 1503010 - Custodial Services - Fort Pickett NSWCEN CNRMA/Region | |||
| B005AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| B005AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| B005AC | COL 3 | 18,105 | SF | $0.00 |
| B005AD | COL 4 | 0 | SF | $0.00 |
| B005AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| B005AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT PICKETT NSWCEN CUSTODIAL SERVICES $0.00
| B006 | 1503010 - Custodial Services - Fort AP Hill NSWCEN CNRMA/Region | |||
| B006AA | COL 1 Prestige (HQ Approval) | 0 | SF | $0.00 |
| B006AB | COL 2 Prestige (REGOM Approved) | 0 | SF | $0.00 |
| B006AC | COL 3 | 14,487 | SF | $0.00 |
| B006AD | COL 4 | 0 | SF | $0.00 |
| B006AE | Mandated services for hospitals and clinics | 0 | SF | $0.00 |
| B006AF | Mandated services for child youth program facilities | 0 | SF | $0.00 |
TOTAL FORT AP HILL NSWCEN CUSTODIAL SERVICES $0.00
| B007 | 1503020 - Pest Control - Fort Pickett EOD CNRMA/Region | |||
| B007AA | COL 3 | 39,945 | SF | $0.00 |
| B007AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT PICKETT EOD PEST CONTROL $0.00
| B008 | 1503020 - Pest Control - Fort Pickett NSWCEN CNRMA/Region | |||
| B008AA | COL 3 | 21,604 | SF | $0.00 |
| B008AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT PICKETT NSWCEN PEST CONTROL $0.00
| B009 | 1503020 - Pest Control - Fort AP Hill NSWCEN CNRMA/Region | |||
| B009AA | COL 3 | 20,681 | SF | $0.00 |
| B009AB | COL 4 | 0 | SF | $0.00 |
TOTAL FORT AP HILL NSWCEN PEST CONTROL $0.00
| B010 | 1503030 - Solid Waste Management - Fort Pickett EOD CNRMA/Region | |||
| B010AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 3 | EA | $0.00 |
TOTAL FORT PICKETT EOD SOLID WASTE $0.00
| B011 | 1503030 - Solid Waste Management - Fort Pickett NSWCEN CNRMA/Region | |||
| B011AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 2 | EA | $0.00 |
TOTAL FORT PICKETT NSWCEN SOLID WASTE $0.00
| B012 | 1503030 - Solid Waste Management - Fort AP Hill NSWCEN CNRMA/Region | |||
| B012AA | Provide Recurring Waste Collection, Disposal, and Recycle Services for Small 3, 6, & 8 CY Waste Containers | 2 | EA | $0.00 |
TOTAL FORT AP HILL NSWCEN SOLID WASTE $0.00
| B013 | 1503050 - Grounds Maintenance - Fort Pickett EOD CNRMA/Region | |||
| B013AA | COL 1 | 0 | AC | $0.00 |
| B013AB | COL 2 | 0 | AC | $0.00 |
| B013AC | COL 3 | 8.67 | AC | $0.00 |
| B013AD | COL 4 | 0 | AC | $0.00 |
| B013AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| B013AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT PICKETT EOD GROUNDS MAINTENANCE $0.00
| B014 | 1503050 - Grounds Maintenance - Fort Pickett NSWCEN CNRMA/Region | |||
| B014AA | COL 1 | 0 | AC | $0.00 |
| B014AB | COL 2 | 0 | AC | $0.00 |
| B014AC | COL 3 | 11.55 | AC | $0.00 |
| B014AD | COL 4 | 0 | AC | $0.00 |
| B014AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| B014AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT PICKETT NSWCEN GROUNDS MAINTENANCE $0.00
| B015 | 1503050 - Grounds Maintenance - Fort AP Hill NSWCEN CNRMA/Region | |||
| B015AA | COL 1 | 0 | AC | $0.00 |
| B015AB | COL 2 | 0 | AC | $0.00 |
| B015AC | COL 3 | 29.93 | AC | $0.00 |
| B015AD | COL 4 | 0 | AC | $0.00 |
| B015AE | Semi-Improved Grounds | 0 | AC | $0.00 |
| B015AF | Un-Improved Grounds | 0 | AC | $0.00 |
TOTAL FORT AP HILL NSWCEN GROUNDS MAINTENANCE $0.00
| TOTAL ST FUNDS (B001-B003 & B007-B009) | $0.00 |
| TOTAL FX FUNDS (B004-B006 & B010-B015) | $0.00 |
TOTAL RECURRING WORK PRICE - FIRST OPTION PERIOD $0.00
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-1st Opt-Non-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #TBD |
| EXHIBIT B |
| Line Item 0004 Non-Recurring Work - First Option Period |
| PROVIDE PRICES FOR NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B757 |
PROVIDE PRICES TO PERFORM FACILITY INVESTMENT SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 100 | HR | $0 | |
| B701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700. | 1 | LS | $50,000 | $50,000 |
| B703 | Emergency Service Orders | Develop and Implement Emergency Service Orders per respective requirements in Annex 1502000, Emergency Service Orders, Spec Item 3.1.1 | 20 | EA | $0 | |
| B704 | Urgent Service Orders | Develop and Implement Urgent Service Orders per respective requirements in Annex 1502000, Urgent Service Orders, Spec Item 3.1.2 | 20 | EA | $0 | |
| B705 | Routine Service Orders | Develop and Implement Routine Service Orders per respective requirements in Annex 1502000, Routine Service Orders, Spec Item 3.1.3 | 30 | EA | $0 |
TOTAL NON-RECURRING WORK PRICE FOR FACILITY INVESTMENT SERVICES $50,000
PROVIDE PRICES TO PERFORM CUSTODIAL SERVICES
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B706 | Stripping/Rewaxing | The Contractor shall strip and rewax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear. | 20000 | SF | $0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .