J-0200000-08 ELINS.xlsx
XLSX spreadsheet 45 KB Posted
- Solicitation number
- N4008522R2635
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-R-2635 |
| EXHIBIT A - 0001 |
| Line Item 0001 Indefinity Delivery / Indefinite Quantity - Base Period |
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A712 |
| Requirements for Sample Collection: Samples will be collected by an EPA certified technician or a certified Industrial Hygienest. All sample methods will conform to the |
| latest EPA, federal, state and local regulations. |
| The Contractor shall insure that access to confined spaces is in accordance with reguirements of the EM385-1-1. |
| Use extreme care around bridge cranes, they are electrically energized. |
| The Contractor will submit reports as per the KO approved sampling plan. |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| A700 | Sampling - Asbestos - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 250 | EA | |||
| A701 | Sampling - Asbestos - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| A702 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 150 | EA | |||
| A703 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| A704 | Sampling - PCBs - Fluorescent Light Ballasts - Routine | The Government will remove ballasts from the light fixture(s) and place them in a drum for Contractor sample collection. The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 100 | EA | |||
| A705 | Sampling - PCBs - Oil and Tar | The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 25 | EA | |||
| A706 | Laboratory Analysis - Asbestos. Routine | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 14 working days of order. | 7500 | EA | |||
| A707 | Laboratory Analysis - Asbestos. Urgent | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 6 working days of order. | 3000 | EA | |||
| A708 | Laboratory Analysis - Lead. Routine | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 14 working days of order. | 3375 | EA | |||
| A709 | Laboratory Analysis - Lead. Urgent | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 6 working days of order. | 2250 | EA | |||
| A710 | Laboratory Analysis - TCLP - Metals (8). Routine | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 14 working day of order. | 1125 | EA | |||
| A711 | Laboratory Analysis - TCLP. Urgent | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 6 working day of order. | 750 | EA | |||
| A712 | Laboratory Analysis - PCB. | The Contractor's certified laboratory will analyze samples for PCBs. Analysis results package submitted to the KO within 12 working days of order. | 125 | EA | |||
| TOTAL INDEFINITE QUANTITY PRICE BASE YEAR |
1st Option Year
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-XX-X-XXXX |
| EXHIBIT B - CLIN 0002 |
| Line Item 0001 Indefinity Delivery / Indefinite Quantity - Base Period |
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B712 |
| Requirements for Sample Collection: Samples will be collected by an EPA certified technician or a certified Industrial Hygienest. All sample methods will conform to the |
| latest EPA, federal, state and local regulations. |
| The Contractor shall insure that access to confined spaces is in accordance with reguirements of the EM385-1-1. |
| Use extreme care around bridge cranes, they are electrically energized. |
| The Contractor will submit reports as per the KO approved sampling plan. |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| B700 | Sampling - Asbestos - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 250 | EA | |||
| B701 | Sampling - Asbestos - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| B702 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 150 | EA | |||
| B703 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| B704 | Sampling - PCBs - Fluorescent Light Ballasts - Routine | The Government will remove ballasts from the light fixture(s) and place them in a drum for Contractor sample collection. The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 100 | EA | |||
| B705 | Sampling - PCBs - Oil and Tar | The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 25 | EA | |||
| B706 | Laboratory Analysis - Asbestos. Routine | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 14 working days of order. | 7500 | EA | |||
| B707 | Laboratory Analysis - Asbestos. Urgent | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 6 working days of order. | 3000 | EA | |||
| B708 | Laboratory Analysis - Lead. Routine | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 14 working days of order. | 3375 | EA | |||
| B709 | Laboratory Analysis - Lead. Urgent | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 6 working days of order. | 2250 | EA | |||
| B710 | Laboratory Analysis - TCLP - Metals (8). Routine | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 14 working day of order. | 1125 | EA | |||
| B711 | Laboratory Analysis - TCLP. Urgent | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 6 working day of order. | 750 | EA | |||
| B712 | Laboratory Analysis - PCB. | The Contractor's certified laboratory will analyze samples for PCBs. Analysis results package submitted to the KO within 12 working days of order. | 125 | EA | |||
| TOTAL INDEFINITE QUANTITY PRICE Option Year 1 |
2nd Option Year
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-R-2635 |
| EXHIBIT C - CLIN 0003 |
| Line Item 0001 Indefinity Delivery / Indefinite Quantity - Base Period |
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C712 |
| Requirements for Sample Collection: Samples will be collected by an EPA certified technician or a certified Industrial Hygienest. All sample methods will conform to the |
| latest EPA, federal, state and local regulations. |
| The Contractor shall insure that access to confined spaces is in accordance with reguirements of the EM385-1-1. |
| Use extreme care around bridge cranes, they are electrically energized. |
| The Contractor will submit reports as per the KO approved sampling plan. |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| C700 | Sampling - Asbestos - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 250 | EA | |||
| C701 | Sampling - Asbestos - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| C702 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 150 | EA | |||
| C703 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| C704 | Sampling - PCBs - Fluorescent Light Ballasts - Routine | The Government will remove ballasts from the light fixture(s) and place them in a drum for Contractor sample collection. The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 100 | EA | |||
| C705 | Sampling - PCBs - Oil and Tar | The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 25 | EA | |||
| C706 | Laboratory Analysis - Asbestos. Routine | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 14 working days of order. | 7500 | EA | |||
| C707 | Laboratory Analysis - Asbestos. Urgent | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 6 working days of order. | 3000 | EA | |||
| C708 | Laboratory Analysis - Lead. Routine | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 14 working days of order. | 3375 | EA | |||
| C709 | Laboratory Analysis - Lead. Urgent | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 6 working days of order. | 2250 | EA | |||
| C710 | Laboratory Analysis - TCLP - Metals (8). Routine | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 14 working day of order. | 1125 | EA | |||
| C711 | Laboratory Analysis - TCLP. Urgent | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 6 working day of order. | 750 | EA | |||
| C712 | Laboratory Analysis - PCB. | The Contractor's certified laboratory will analyze samples for PCBs. Analysis results package submitted to the KO within 12 working days of order. | 125 | EA | |||
| TOTAL INDEFINITE QUANTITY PRICE OPTION YEAR 2 |
3rd Option Year
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-R-2635 |
| EXHIBIT D - CLIN 0004 |
| Line Item 0001 Indefinity Delivery / Indefinite Quantity - Base Period |
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D712 |
| Requirements for Sample Collection: Samples will be collected by an EPA certified technician or a certified Industrial Hygienest. All sample methods will conform to the |
| latest EPA, federal, state and local regulations. |
| The Contractor shall insure that access to confined spaces is in accordance with reguirements of the EM385-1-1. |
| Use extreme care around bridge cranes, they are electrically energized. |
| The Contractor will submit reports as per the KO approved sampling plan. |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| D700 | Sampling - Asbestos - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 250 | EA | |||
| D701 | Sampling - Asbestos - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| D702 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 150 | EA | |||
| D703 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| D704 | Sampling - PCBs - Fluorescent Light Ballasts - Routine | The Government will remove ballasts from the light fixture(s) and place them in a drum for Contractor sample collection. The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 100 | EA | |||
| D705 | Sampling - PCBs - Oil and Tar | The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 25 | EA | |||
| D706 | Laboratory Analysis - Asbestos. Routine | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 14 working days of order. | 7500 | EA | |||
| D707 | Laboratory Analysis - Asbestos. Urgent | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 6 working days of order. | 3000 | EA | |||
| D708 | Laboratory Analysis - Lead. Routine | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 14 working days of order. | 3375 | EA | |||
| D709 | Laboratory Analysis - Lead. Urgent | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 6 working days of order. | 2250 | EA | |||
| D710 | Laboratory Analysis - TCLP - Metals (8). Routine | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 14 working day of order. | 1125 | EA | |||
| D711 | Laboratory Analysis - TCLP. Urgent | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 6 working day of order. | 750 | EA | |||
| D712 | Laboratory Analysis - PCB. | The Contractor's certified laboratory will analyze samples for PCBs. Analysis results package submitted to the KO within 12 working days of order. | 125 | EA | |||
| TOTAL INDEFINITE QUANTITY PRICE OPTION YEAR 3 |
4th Option Year
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-22-R-2635 |
| EXHIBIT E - CLIN 0005 |
| Line Item 0001 Indefinity Delivery / Indefinite Quantity - Base Period |
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E712 |
| Requirements for Sample Collection: Samples will be collected by an EPA certified technician or a certified Industrial Hygienest. All sample methods will conform to the |
| latest EPA, federal, state and local regulations. |
| The Contractor shall insure that access to confined spaces is in accordance with reguirements of the EM385-1-1. |
| Use extreme care around bridge cranes, they are electrically energized. |
| The Contractor will submit reports as per the KO approved sampling plan. |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of issue | Unit Price | Extended Price | IMAP CAC(s) |
| E700 | Sampling - Asbestos - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 250 | EA | |||
| E701 | Sampling - Asbestos - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| E702 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Routine (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 7 working days of order. | 150 | EA | |||
| E703 | Sampling - Lead, and/or TCLP- Paint, Soil, Dust - Urgent (one unit is up to 30 field samples) | The Contractor shall collect and transport samples to Contractor provided certified laboratory for analysis. Prepare a written report to the Government indicating the number of samples taken and the location from which the sample was taken. Samples submitted to the Laboratory and the written report submitted to the KO within 3 working days of order. | 100 | EA | |||
| E704 | Sampling - PCBs - Fluorescent Light Ballasts - Routine | The Government will remove ballasts from the light fixture(s) and place them in a drum for Contractor sample collection. The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 100 | EA | |||
| E705 | Sampling - PCBs - Oil and Tar | The Contractor shall collect and transport samples to Contractor provided certified laboratory within 5 working days of order. | 25 | EA | |||
| E706 | Laboratory Analysis - Asbestos. Routine | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 14 working days of order. | 7500 | EA | |||
| E707 | Laboratory Analysis - Asbestos. Urgent | The Contractor's certified laboratroy will analyze samples for Asbestos. Analysis results package submitted to the KO within 6 working days of order. | 3000 | EA | |||
| E708 | Laboratory Analysis - Lead. Routine | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 14 working days of order. | 3375 | EA | |||
| E709 | Laboratory Analysis - Lead. Urgent | The Contractor's certified laboratroy will analyze samples for Lead. Analysis results package submitted to the KO within 6 working days of order. | 2250 | EA | |||
| E710 | Laboratory Analysis - TCLP - Metals (8). Routine | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 14 working day of order. | 1125 | EA | |||
| E711 | Laboratory Analysis - TCLP. Urgent | The Contractor's certified laboratory will analyze samples for Toxic Characteristic Leachng Procedures (TCLP) - Metals (8) Arsenic (As), Barium (Ba), Cadmium (Cd), Chromium (Cr), Lead (Pb), Mercury (Hg), Selenium (Se), Silver (Ag). Analysis results package submitted to the KO within 6 working day of order. | 750 | EA | |||
| E712 | Laboratory Analysis - PCB. | The Contractor's certified laboratory will analyze samples for PCBs. Analysis results package submitted to the KO within 12 working days of order. | 125 | EA | |||
| TOTAL INDEFINITE QUANTITY PRICE OPTION YEAR 4 |
File details come from the government source that posted it. Updated .