J-0200000-08 ELINS.xlsx
XLSX spreadsheet 109 KB Posted
- Solicitation number
- N4008521R0117
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Corporate Experience Form.docx | DOCX document | |
| J-0200000-07 Base Access.pdf | ||
| J-1503030-03 Transfer Station SOP 2016.pdf | ||
| J-0200000-05 Spill Plan.pdf | ||
| RFP 21R0117.pdf | ||
| PPQ Form.docx | DOCX document | |
| Limit Subcontracting Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| EXHIBIT SUMMARY | |||
| OPTION | RECURRING | NON-RECURRING | OPTION TOTAL |
| BASE | |||
| ONE | |||
| TWO | |||
| THREE | |||
| FOUR | |||
| CONTRACT |
TOTAL
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring Services (FFP) - Base Period | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A005 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| A001 - FMD 1503030 Integrated Solid Waste Management | ||||||
| A001AA | Operation of Transfer Station (Excluding Disposal Fees) | 1 | 12 | MO | $ - 0 | |
| A001AB | Collection/Disposal of Treated/Painted Wood Debris Transfer Station | 1 | 104 | EA | $ - 0 | |
| A001AC | Collection/Disposal of Treated/Painted Wood - B-85 | 1 | 26 | EA | $ - 0 | |
| A001AD | Collection/Disposal of Treated/Painted Wood - Bogue Field | 1 | 12 | EA | $ - 0 | |
| A001AE | Refuse and Treated/Painted Wood Disposal Fee (All Dumpsters) | 4,800 | 1 | TON | $ - 0 |
| FMD Subtotal | |||||
| A002 - FRC East - 1503030 Integrated Solid Waste Management | |||||
| A002AA | Collection/Disposal of Treated/Painted Wood Debris | 2 | 26 | EA | $ - 0 |
| A002AB | Recycling 8 cubic yard containers (Co-Mingled) | 27 | 52 | EA | $ - 0 |
| A002AC | Recycling 8 cubic yard containers (Cardboard) | 27 | 52 | EA | $ - 0 |
| FRC East Subtotal | |||||
| A003 - DLA - 1503030 Intergrated Solid Waste Management | |||||
| A003AA | Collection/Disposal of Treated/Painted Wood Debris | 1 | 12 | EA | $ - 0 |
| A003AB | Recycling 95 Gallon Container (Co-Mingled) | 2 | 26 | EA | $ - 0 |
| A003AC | Recycling 30 Cubic Yard Container (Cardboard) | 2 | 12 | EA | $ - 0 |
| DLA Subtotal | |||||
| A004-Naval Health Clinic-1503030 | |||||
| A004AA | Recycling 40 Cubic Yard (Cardboard) | 1 | 6 | EA | $ - 0 |
| NHC Subtotal | |||||
| A005-Environmental Affairs Department-1503030 | |||||
| A005AA | Recycling 65 Gallon (Co-Mingled) | 3 | 104 | EA | $ - 0 |
| A005AB | Recycling 65 Gallon (Aluminum) | 2 | 104 | EA | $ - 0 |
| A005AC | Recycling 65 Gallon (Aluminum) | 1 | 52 | EA | $ - 0 |
| A005AD | Recycling 30 Cubic Yard (Co-Mingled) | 2 | 52 | EA | $ - 0 |
| A005AE | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
EAD Subtotal
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period-Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non Recurring Services (IDIQ) - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES -NON RECURRING SERVICES (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs A700 through A709 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Collection/Disposal of Treated/Painted Wood Debris Various Locations | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCAS Cherry Point. | 24 | EA | $ - 0 | |
| A701 | Collection/Disposal of Treated/Painted Wood Debris Bogue Field | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCOLF Bogue Field. | 4 | EA | $ - 0 | |
| A702 | Operate Transfer Station | Operation of Transfer Station After Working Hours to include Weekends | 8 | HRS | $ - 0 | |
| A703 | Recyclable Waste Pickup and Disposal 8 yd Can | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 10 | EA | $ - 0 | |
| A704 | Recyclable Waste Disposal 95 GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| A705 | Recyclable Waste Disposal 40 yd Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| A706 | Recyclable Waste Disposal 65GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| A707 | Recyclable Waste Disposal 30 YD Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| A708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||
| 10 | HR | $ - 0 | ||||
| A709 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A708. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 5,000 | EA | $ - 0 | |
| TOTAL NON-RECURRING PRICE BASE YEAR |
ELINs -Option Year 1-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0003 Recurring Services (FFP) - Option Year 1 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 through B005 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| B001 - FMD 1503030 Integrated Solid Waste Management | ||||||
| B001AA | Operation of Transfer Station (Excluding Disposal Fees) | 1 | 12 | MO | $ - 0 | |
| B001AB | Collection/Disposal of Treated/Painted Wood Debris Transfer Station | 1 | 104 | EA | $ - 0 | |
| B001AC | Collection/Disposal of Treated/Painted Wood - B-85 | 1 | 26 | EA | $ - 0 | |
| B001AD | Collection/Disposal of Treated/Painted Wood - Bogue Field | 1 | 12 | EA | $ - 0 | |
| B001AE | Refuse and Treated/Painted Wood Disposal Fee (All Dumpsters) | 5,000 | 1 | TON | $ - 0 |
| FMD Subtotal | |||||
| B002 - FRC East - 1503030 Integrated Solid Waste Management | |||||
| B002AA | Collection/Disposal of Treated/Painted Wood Debris | 2 | 26 | EA | $ - 0 |
| B002AB | Recycling 8 cubic yard containers (Co-Mingled) | 27 | 52 | EA | $ - 0 |
| B002AC | Recycling 8 cubic yard containers (Cardboard) | 27 | 52 | EA | $ - 0 |
| FRC East Subtotal | |||||
| B003 - DLA - 1503030 Intergrated Solid Waste Management | |||||
| B003AA | Collection/Disposal of Treated/Painted Wood Debris | 1 | 12 | EA | $ - 0 |
| B003AB | Recycling 95 Gallon Container (Co-Mingled) | 2 | 26 | EA | $ - 0 |
| B003AC | Recycling 30 Cubic Yard Container (Cardboard) | 2 | 12 | EA | $ - 0 |
| DLA Subtotal | |||||
| B004-Naval Health Clinic-1503030 | |||||
| B004AA | Recycling 40 Cubic Yard (Cardboard) | 1 | 6 | EA | $ - 0 |
| NHC Subtotal | |||||
| B005-Environmental Affairs Department-1503030 | |||||
| B005AA | Recycling 65 Gallon (Co-Mingled) | 3 | 104 | EA | $ - 0 |
| B005AB | Recycling 65 Gallon (Aluminum) | 2 | 104 | EA | $ - 0 |
| B005AC | Recycling 65 Gallon (Aluminum) | 1 | 52 | EA | $ - 0 |
| B005AD | Recycling 30 Cubic Yard (Co-Mingled) | 2 | 52 | EA | $ - 0 |
| B005AE | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
EAD Subtotal
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-OY 1-Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0004 Non Recurring Services (IDIQ) - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES -NON RECURRING SERVICES (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs B700 through B709 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Collection/Disposal of Treated/Painted Wood Debris Various Locations | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCAS Cherry Point. | 24 | EA | $ - 0 | |
| B701 | Collection/Disposal of Treated/Painted Wood Debris Bogue Field | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCOLF Bogue Field. | 4 | EA | $ - 0 | |
| B702 | Operate Transfer Station | Operation of Transfer Station After Working Hours to include Weekends | 8 | HRS | $ - 0 | |
| B703 | Recyclable Waste Pickup and Disposal 8 yd Can | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 10 | EA | $ - 0 | |
| B704 | Recyclable Waste Disposal 95 GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| B705 | Recyclable Waste Disposal 40 yd Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| B706 | Recyclable Waste Disposal 65GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| B707 | Recyclable Waste Disposal 30 YD Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| B708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||
| 10 | HR | $ - 0 | ||||
| B709 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B708. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 5,000 | EA | $ - 0 | |
| TOTAL NON-RECURRING PRICE OPTION YEAR 1 |
ELINs -Option Year 2-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0005 Recurring Services (FFP) - Option Year 2 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs C001 through C005 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| C001 - FMD 1503030 Integrated Solid Waste Management | ||||||
| C001AA | Operation of Transfer Station (Excluding Disposal Fees) | 1 | 12 | MO | $ - 0 | |
| C001AB | Collection/Disposal of Treated/Painted Wood Debris Transfer Station | 1 | 104 | EA | $ - 0 | |
| C001AC | Collection/Disposal of Treated/Painted Wood - B-85 | 1 | 26 | EA | $ - 0 | |
| C001AD | Collection/Disposal of Treated/Painted Wood - Bogue Field | 1 | 12 | EA | $ - 0 | |
| C001AE | Refuse and Treated/Painted Wood Disposal Fee (All Dumpsters) | 5,000 | 1 | TON | $ - 0 |
| FMD Subtotal | |||||
| C002 - FRC East - 1503030 Integrated Solid Waste Management | |||||
| C002AA | Collection/Disposal of Treated/Painted Wood Debris | 2 | 26 | EA | $ - 0 |
| C002AB | Recycling 8 cubic yard containers (Co-Mingled) | 27 | 52 | EA | $ - 0 |
| C002AC | Recycling 8 cubic yard containers (Cardboard) | 27 | 52 | EA | $ - 0 |
| FRC East Subtotal | |||||
| C003 - DLA - 1503030 Intergrated Solid Waste Management | |||||
| C003AA | Collection/Disposal of Treated/Painted Wood Debris | 1 | 12 | EA | $ - 0 |
| C003AB | Recycling 95 Gallon Container (Co-Mingled) | 2 | 26 | EA | $ - 0 |
| C003AC | Recycling 30 Cubic Yard Container (Cardboard) | 2 | 12 | EA | $ - 0 |
| DLA Subtotal | |||||
| C004-Naval Health Clinic-1503030 | |||||
| C004AA | Recycling 40 Cubic Yard (Cardboard) | 1 | 6 | EA | $ - 0 |
| NHC Subtotal | |||||
| C005-Environmental Affairs Department-1503030 | |||||
| C005AA | Recycling 65 Gallon (Co-Mingled) | 3 | 104 | EA | $ - 0 |
| C005AB | Recycling 65 Gallon (Aluminum) | 2 | 104 | EA | $ - 0 |
| C005AC | Recycling 65 Gallon (Aluminum) | 1 | 52 | EA | $ - 0 |
| C005AD | Recycling 30 Cubic Yard (Co-Mingled) | 2 | 52 | EA | $ - 0 |
| C005AE | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
EAD Subtotal
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-OY 2-Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0006 Non Recurring Services (IDIQ) - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES -NON RECURRING SERVICES (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs C700 through C709 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Collection/Disposal of Treated/Painted Wood Debris Various Locations | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCAS Cherry Point. | 24 | EA | $ - 0 | |
| C701 | Collection/Disposal of Treated/Painted Wood Debris Bogue Field | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCOLF Bogue Field. | 4 | EA | $ - 0 | |
| C702 | Operate Transfer Station | Operation of Transfer Station After Working Hours to include Weekends | 8 | HRS | $ - 0 | |
| C703 | Recyclable Waste Pickup and Disposal 8 yd Can | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 10 | EA | $ - 0 | |
| C704 | Recyclable Waste Disposal 95 GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| C705 | Recyclable Waste Disposal 40 yd Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| C706 | Recyclable Waste Disposal 65GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| C707 | Recyclable Waste Disposal 30 YD Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| C708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||
| 10 | HR | $ - 0 | ||||
| C709 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C708. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 5,000 | EA | $ - 0 | |
| TOTAL NON-RECURRING PRICE OPTION YEAR 2 |
ELINs -Option Year 3-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0007 Recurring Services (FFP) - Option Year 3 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs D001 through D005 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| D001 - FMD 1503030 Integrated Solid Waste Management | ||||||
| D001AA | Operation of Transfer Station (Excluding Disposal Fees) | 1 | 12 | MO | $ - 0 | |
| D001AB | Collection/Disposal of Treated/Painted Wood Debris Transfer Station | 1 | 104 | EA | $ - 0 | |
| D001AC | Collection/Disposal of Treated/Painted Wood - B-85 | 1 | 26 | EA | $ - 0 | |
| D001AD | Collection/Disposal of Treated/Painted Wood - Bogue Field | 1 | 12 | EA | $ - 0 | |
| D001AE | Refuse and Treated/Painted Wood Disposal Fee (All Dumpsters) | 5,000 | 1 | TON | $ - 0 |
| FMD Subtotal | |||||
| D002 - FRC East - 1503030 Integrated Solid Waste Management | |||||
| D002AA | Collection/Disposal of Treated/Painted Wood Debris | 2 | 26 | EA | $ - 0 |
| D002AB | Recycling 8 cubic yard containers (Co-Mingled) | 27 | 52 | EA | $ - 0 |
| D002AC | Recycling 8 cubic yard containers (Cardboard) | 27 | 52 | EA | $ - 0 |
| FRC East Subtotal | |||||
| D003 - DLA - 1503030 Intergrated Solid Waste Management | |||||
| D003AA | Collection/Disposal of Treated/Painted Wood Debris | 1 | 12 | EA | $ - 0 |
| D003AB | Recycling 95 Gallon Container (Co-Mingled) | 2 | 26 | EA | $ - 0 |
| D003AC | Recycling 30 Cubic Yard Container (Cardboard) | 2 | 12 | EA | $ - 0 |
| DLA Subtotal | |||||
| D004-Naval Health Clinic-1503030 | |||||
| D004AA | Recycling 40 Cubic Yard (Cardboard) | 1 | 6 | EA | $ - 0 |
| NHC Subtotal | |||||
| D005-Environmental Affairs Department-1503030 | |||||
| D005AA | Recycling 65 Gallon (Co-Mingled) | 3 | 104 | EA | $ - 0 |
| D005AB | Recycling 65 Gallon (Aluminum) | 2 | 104 | EA | $ - 0 |
| D005AC | Recycling 65 Gallon (Aluminum) | 1 | 52 | EA | $ - 0 |
| D005AD | Recycling 30 Cubic Yard (Co-Mingled) | 2 | 52 | EA | $ - 0 |
| D005AE | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
EAD Subtotal
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-OY 3-Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0008 Non Recurring Services (IDIQ) - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES -NON RECURRING SERVICES (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs D700 through D709 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Collection/Disposal of Treated/Painted Wood Debris Various Locations | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCAS Cherry Point. | 24 | EA | $ - 0 | |
| D701 | Collection/Disposal of Treated/Painted Wood Debris Bogue Field | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCOLF Bogue Field. | 4 | EA | $ - 0 | |
| D702 | Operate Transfer Station | Operation of Transfer Station After Working Hours to include Weekends | 8 | HRS | $ - 0 | |
| D703 | Recyclable Waste Pickup and Disposal 8 yd Can | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 10 | EA | $ - 0 | |
| D704 | Recyclable Waste Disposal 95 GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| D705 | Recyclable Waste Disposal 40 yd Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| D706 | Recyclable Waste Disposal 65GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| D707 | Recyclable Waste Disposal 30 YD Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| D708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||
| 10 | HR | $ - 0 | ||||
| D709 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D708. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 5,000 | EA | $ - 0 | |
| TOTAL NON-RECURRING PRICE OPTION YEAR 3 |
ELINs -Option Year 4-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0009 Recurring Services (FFP) - Option Year 4 | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs E001 through E005 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Frequency | Unit of Issue | Unit Price | Total |
| E001 - FMD 1503030 Integrated Solid Waste Management | ||||||
| E001AA | Operation of Transfer Station (Excluding Disposal Fees) | 1 | 12 | MO | $ - 0 | |
| E001AB | Collection/Disposal of Treated/Painted Wood Debris Transfer Station | 1 | 104 | EA | $ - 0 | |
| E001AC | Collection/Disposal of Treated/Painted Wood - B-85 | 1 | 26 | EA | $ - 0 | |
| E001AD | Collection/Disposal of Treated/Painted Wood - Bogue Field | 1 | 12 | EA | $ - 0 | |
| E001AE | Refuse and Treated/Painted Wood Disposal Fee (All Dumpsters) | 5,000 | 1 | TON | $ - 0 |
| FMD Subtotal | |||||
| E002 - FRC East - 1503030 Integrated Solid Waste Management | |||||
| E002AA | Collection/Disposal of Treated/Painted Wood Debris | 2 | 26 | EA | $ - 0 |
| E002AB | Recycling 8 cubic yard containers (Co-Mingled) | 27 | 52 | EA | $ - 0 |
| E002AC | Recycling 8 cubic yard containers (Cardboard) | 27 | 52 | EA | $ - 0 |
| FRC East Subtotal | |||||
| E003 - DLA - 1503030 Intergrated Solid Waste Management | |||||
| E003AA | Collection/Disposal of Treated/Painted Wood Debris | 1 | 12 | EA | $ - 0 |
| E003AB | Recycling 95 Gallon Container (Co-Mingled) | 2 | 26 | EA | $ - 0 |
| E003AC | Recycling 30 Cubic Yard Container (Cardboard) | 2 | 12 | EA | $ - 0 |
| DLA Subtotal | |||||
| E004-Naval Health Clinic-1503030 | |||||
| E004AA | Recycling 40 Cubic Yard (Cardboard) | 1 | 6 | EA | $ - 0 |
| NHC Subtotal | |||||
| E005-Environmental Affairs Department-1503030 | |||||
| E005AA | Recycling 65 Gallon (Co-Mingled) | 3 | 104 | EA | $ - 0 |
| E005AB | Recycling 65 Gallon (Aluminum) | 2 | 104 | EA | $ - 0 |
| E005AC | Recycling 30 Cubic Yard (Co-Mingled) | 1 | 52 | EA | $ - 0 |
| E005AD | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
| E005AE | Recycling 40 Cubic Yard (Cardboard) | 2 | 52 | EA | $ - 0 |
EAD Subtotal
TOTAL RECURRING WORK
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-OY 4-Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40085-21-R-0117 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0010 Non Recurring Services (IDIQ) - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES -NON RECURRING SERVICES (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs E700 through E709 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Collection/Disposal of Treated/Painted Wood Debris Various Locations | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCAS Cherry Point. | 24 | EA | $ - 0 | |
| E701 | Collection/Disposal of Treated/Painted Wood Debris Bogue Field | Collection/Disposal of Treated/Painted Wood Debris at various locations on board MCOLF Bogue Field. | 4 | EA | $ - 0 | |
| E702 | Operate Transfer Station | Operation of Transfer Station After Working Hours to include Weekends | 8 | HRS | $ - 0 | |
| E703 | Recyclable Waste Pickup and Disposal 8 yd Can | The Contractor shall remove general waste from containers to ensure refuse is properly collected. | 10 | EA | $ - 0 | |
| E704 | Recyclable Waste Disposal 95 GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| E705 | Recyclable Waste Disposal 40 yd Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| E706 | Recyclable Waste Disposal 65GL Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| E707 | Recyclable Waste Disposal 30 YD Can | The Contractor shall remove recyclable waste from containers to ensure it is properly collected. | 10 | EA | $ - 0 | |
| E708 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO USING ETO PROCESS. | ||||
| 10 | HR | $ - 0 | ||||
| E709 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E708. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. | 5,000 | EA | $ - 0 | |
| TOTAL NON-RECURRING PRICE OPTION YEAR 4 |
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .