IVHM Secuirty Building Cleanup Appendix A.docx

DOCX document 14 KB Posted

Attached to
IVHM Security Building Clean Up
Solicitation number
19-497DVA-MANTE-B-4482
Issued by
Kane County, Manteno Village, Illinois

About this file

This document is an Appendix A for a state and local contract opportunity issued by the Illinois government to provide labor and materials to remove and treat damaged material in a security building. The scope of work includes removing approximately 1,700 square feet of ceiling, 1,500 square feet of carpet and tile, asbestos vinyl floor, baseboards, non-salvageable tile floor, and drywall. The vendor will also be responsible for applying an antimicrobial agent to the floor and walls to prevent and remove existing mold. The vendor must have appropriate licensing for asbestos removal and adhere to all federal and state guidelines for preparatory work, asbestos removal, mold treatment, and disposal of all material. The vendor will provide a report of the work completed and findings during demolition, and ensure the work area is clear of debris and garbage upon completion.

The contract will require the vendor to coordinate and schedule all work through the Chief Engineer, who will sign off on the work at the completion of the project. Pricing terms, set asides, incumbents, funding requirements and sources, and other salient information are not provided in this document.

View the file

Other files

File Type Posted
Standard Terms and Conditions~4.pdf PDF
IVHM Secuirty Building Cleanup RFQ~6.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IVHM Security Building Appendix A

· Provide Labor and Materials to remove and treat damaged material in security building to include:

· Removal approximately 1,700 square feet of ceiling

· Removal approximately 1,500 square feet of carpet and tile

· Remove asbestos vinyl floor, cover, and carpet

· Remove baseboards

· Remove non- salvageable tile floor

· Remove drywall

· Apply anti-microbial agent to floor and walls to prevent and remove existing mold

· Vendor will be responsible for the proper disposal of material removed from the security building in accordance with State and Federal regulation and guidelines.

· Vendor must have appropriate licensing for removal of asbestos.

· Vendor must adhere to all Federal and State guidelines for preparatory work and securing building.

· Vendor must adhere to all Federal and State guidelines for asbestos removal, mold treatment and disposal of all material.

· Vendor will provide the Chief Engineers Office with a report of work completed and findings during demolition.

· Vendor will ensure work area is clear of debris and garbage when work is completed.

· Vendor will coordinate and schedule all work through the Chief Engineer.

· Chief Engineer will sign off on work at the completion of the project.

File details come from the government source that posted it. Updated .