IVHM Boiler Exhaust Appendices~1.docx

DOCX document 1001 KB Posted

Attached to
IVHM Boiler Exhaust Replacement
Solicitation number
20-497DVA-MANTE-B-10801
Issued by
Kane County, Illinois

About this file

This document is an appendix to a state and local contract opportunity for the IVHM Boiler Exhaust Replacement project. The scope of work includes the removal of the existing boiler exhaust stack, fabrication of approximately 30 lineal feet of new boiler exhaust stack, and installation of the new stack. The new stack must be fabricated from welded carbon steel pipe with a minimum thickness of 16 gauge and have a diameter of 16 inches. The vendor must also wrap the new stack with mineral wool and aluminum jacket. All work must be completed during normal business hours Monday-Friday, excluding holidays, and the Chief Engineer must sign off that the work is satisfactory.

The pricing terms, funding, and other commercial details are not provided in this appendix. The document focuses on the technical specifications and requirements for the boiler exhaust stack replacement work. No information is given about any set-asides, incumbents, or the current contracting environment.

View the file

Other files

File Type Posted
IVHM Boiler Exhaust RFQ~3.doc DOC document
Standard Certifications V.18.1~37.docx DOCX document
Forms B Section V.18.1~19.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IVHM Boiler Exhaust Replacement Appendix A Provide labor and materials for the removal of existing boiler exhaust stack, fabrication of a new exhaust stacks, and installation of new exhaust stacks. There are 3 separate exhaust stacks that will need to be removed and replaced with new.

General Specifications

· Vendor will remove the entire existing boiler exhaust stack this includes everything from the boiler and through the roof approximately 30 lineal feet.

· Vendor will fabricate approximately 30 lineal feet of boiler exhaust stack to include:

· Metal utilized must be welded carbon steel pipe and must have a minimum thickness of 16 gauge.

· Boiler exhaust stack to be fitted with a rain cap, pipe flanges, and feature a square to round fitting above the roof.

· Boiler exhaust stack to be a diameter of 16 inches

· Boiler exhaust stack will need to bolt into existing mounting plate located on boiler.

· Vendor will install new boiler exhaust stack starting at boiler and exiting through the roof.

· Vendor will utilize existing penetrations for new boiler exhaust stack through any walls, ceilings, or roofs.

· Vendor will wrap new boiler exhaust stack with 2 1/2" thick mineral wool and finish with aluminum jacket.

· The boiler exhaust stack will be wrapped from the boiler to the roof penetration.

· Vendor will ensure that penetration from the attic to the roof is sealed.

· Must be a water tight seal to ensure no water leaks into attic.

· All parts and labor must carry a minimum of a 1 year warranty

· Vendor will be responsible for the proper removal and disposal of any waste created during job from facility grounds.

· Vendor will ensure work area is clear of debris and garbage when work is completed.

· Vendor will coordinate and schedule all work through the Chief Engineer.

· All work to be completed during normal business hours Monday-Friday 08:00 AM – 05:00 PM excluding State and Federal holidays.

· Chief engineer will sign off that work is satisfactory at the completion of the project.

· Vendor must bring all materials and tools to job site. The facility will not be responsible for the storage or transportation of any tools and/or materials.

IVHM Boiler Exhaust Replacement Appendix B Boiler Room to Attic

Attic to Roof

Roof image1.jpeg image2.jpeg image3.jpeg

File details come from the government source that posted it. Updated .