IVHM BAS System Appendix A~3.docx

DOCX document 19 KB Posted

Attached to
IVHM FY26 BAS System Preventative Maintenance
Solicitation number
26-497DVA-MANTE-B-47775
Issued by
Illinois

About this file

This document is a Scope of Work (SOW) for an Integrated Vehicle Health Management (IVHM) Building Automation System (BAS) maintenance contract covering two buildings with extensive technological infrastructure. The contract includes preventative maintenance services for Fiscal Years 2024 and 2025, specifically one quarterly preventative maintenance service in FY 2024 and four quarterly services in FY 2025. The scope encompasses comprehensive system monitoring, testing, and support for multiple building wings, including remote support for building engineers and service vendors, with detailed specifications for TCP controls, software licensing, and system components.

The maintenance contract involves a Tridium N4 software subscription and requires keeping supervisor software updated to the newest available revision. The system covers multiple controllers, including MACH Pro-Sys, Pro-Com, Pro-Air, and Pro-Zone88 controllers across Building 1 (East and West Wings) and Building 2 (East and West Wings). The vendor is responsible for replacing any broken or defective parts with manufacturer-recommended replacements, and all maintenance will be coordinated through the Chief Engineer's Office. The current software license from Tridium is noted as having no expiration, with version 4.10 generated on 2021-11-18, and includes extensive monitoring capabilities for air handling units, variable air volume systems, fan filter units, and room pressure monitors across multiple zones and rooms.

View the file

Other files

File Type Posted
IVHM BAS System RFQ~4.docx DOCX document
BB.Standard Terms and Conditions v.23_98~39.pdf PDF
TIN Page~3.pdf PDF
standard-illinois-certifications-v.23.1~16.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IVHM BAS System Appendix A

· Scope of Work

· PM work shall be performed at one (1) work site.

· Shall perform a series of tests and verifications for all valves or actuators, shall perform stroke tests.

· View any active points to ensure that information is being received.

· Check of sub-level controllers for communication

· Review of alarm histories

· Backup all controllers to Server, Workstation, and Technician laptop Schedules and settings are tailored over time.

· Include in maintenance cost the Lynxspring/Tridium N4 software subscription and keep Supervisor software upgraded at the newest available revision.

· Fiscal Year 2024 Service – QTY (1) Quarterly Preventative Maintenance

· Fiscal Year 2025 Service – QTY (4) Quarterly Preventative Maintenance

· Vendor to replace any broken or defective parts with manufacturer recommend replacement parts.

· The Chief Engineer has detailed blueprints of BAS System that will be available to awarded bidder onsite in the Engineering Officer.

· Mechanical service repairs for the building are handled by the engineering staff. Any coordination between the BAS and mechanical systems will be coordinated with the Chief Engineers Office.

· Remote Support

· Shall provide remote support for building engineers, service vendors/ other contractors, and any applicable staff.

· Preventative Maintenance:

· All installed TCP controls.

· Current Software

· License Vendor=”Tridium”

· Expiration=”Never”

· HostID=”Win-CABB-4A58-1EAB-F6D3”

· Version=”4.10”

· Generated=”2021-11-18”

· Maintenance Expiration=”2021-10-21” Building 1 East Wing:

Supervisor Workstation (Engineer’s Office) TCP-AHU-NE (Northeastern Basement)

0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SE (Southeast Basement)

0. (1) MACH Pro-Sys Controller AHU-SE

0. TCP- R1E (Southeast Basement)

(1) MACH ProCom Controller VAVs, SRPMs, FFUs

(32) MACH Pro-Air Controllers VAV-111, 112-12, 114-15, 116, 117, 118-19, 120

VAV-SE-COR1, SE-COR2, SE-COR3, SE-ANTE

VAV-E5, E6, E7, E8, SE-REC

VAV-101, 102-03, 104-05, 106, 107, 108-09, 110

VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE

VAV-E1, E2, E3, E4, NE-REC

(4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SE Wing North Alcove) FFUs, EF-TLT (SE Wing South Alcove) FFUs, EF-TLT (NE Wing North Alcove) FFUs, EF-TLT (NE Wing South Alcove)

(1) BACnet Router SRPMs, FFUs

(22) SRPM Room Pressure Monitors FFU Rm 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, SE Anteroom FFU RM 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, NE Anteroom

(20) BACnet Flow Controllers for FFUs Rm 111, 112, 113, 114, 115, 116, 117, 118, 119, 120 Rm 101, 102, 103, 104, 105, 106, 107, 108, 109, 110 Building 1 West Wing:

TCP-AHU-NW

0. (1) MACH Pro-Sys Controller AHU-NW

TCP-AHU-SW

0. (1) MACH Pro-Sys Controller AHU-SW

TCP-R1W

(1) MACH Pro-Com Controller VAVs, SRPMs, FFUs

(32) MACH Pro-Air Controllers VAV-131, 132-33, 134-35, 136, 137, 138-39, 140 VAV-SW-COR1, COR2, COR3, ANTE Rm

VAV-W5, W6, W7, W8, SW-REC

VAV-121, 122-33, 124-25, 126, 127, 128-29, 130

0. VAV-NE-COR1, COR2, COR3, ANTE Rm

0. VAV-W1, W2, W3, W4, REC

0. FFUs, EF-TLT (SW Wing North Alcove)

0. FFUs, EF-TLT (SW Wing South Alcove)

0. FFUs, EF-TLT (NW Wing North Alcove)

0. FFUs, EF-TLT (NW Wing South Alcove)

0. SRPMs, FFUs

0. FFU Rm 131, 132, 133, 134,135, 136, 137, 138, 139, 140, SE Anteroom

0. FFU Rm 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, NE Anteroom

0. Rm 131, 132, 133, 134,135, 136, 137, 138, 139, 140

0. Rm 121, 122, 123, 124, 125, 126, 127, 128, 129, 130

(4) MACH Pro-Zone88 Controllers, (1) BACnet Router, (22) SRPM Room Pressure, (20) BACnet Flow Controllers for FFUs

Building 2 East Wing:

Supervisor Workstation (Engineer’s Office) TCP-AHU-NE (Northeastern Basement)

0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SE (Southeast Basement)

0. (1) MACH Pro-Sys Controller AHU-SE TCP- R2E (Southeast Basement)

0. (1) MACH ProCom Controller VAVs, SRPMs, FFUs

- (32) MACH Pro-Air Controllers VAV-211, 212-12, 214-15, 216, 217, 218-19, 220

VAV-SE-COR1, SE-COR2, SE-COR3, SE-ANTE

VAV-E5, E6, E7, E8, SE-REC

VAV-201, 202-03, 204-05, 206, 207, 208-09, 210

VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE

VAV-E1, E2, E3, E4, NE-REC

- (4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SE Wing North Alcove) FFUs, EF-TLT (SE Wing South Alcove) FFUs, EF-TLT (NE Wing North Alcove) FFUs, EF-TLT (NE Wing South Alcove)

0. TCP- R1E (Basement)

(1) BACnet Router SRPMs, FFUs

(22) SRPM Room Pressure Monitors FFU Rm 211, 212, 213, 214, 215, 216, 217, 218, 219, 220, SE Anteroom FFU RM 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, NE Anteroom

(20) BACnet Flow Controllers for FFUs Rm 211, 212, 213, 214, 215, 216, 217, 218, 219, 220 Rm 201, 202, 203, 204, 205, 206, 207, 208, 209, 210

Building 2 West Wing:

TCP-AHU-NW (Northwestern Basement)

0. (1) MACH Pro-Sys Controller AHU-NE TCP-AHU-SW (Southwest Basement)

0. (1) MACH Pro-Sys Controller AHU-SE TCP- R2W (Southwest Basement)

(1) MACH ProCom Controller VAVs, SRPMs, FFUs

(32) MACH Pro-Air Controllers VAV-231, 232-32, 234-35, 236, 237, 238-39, 230

VAV-SW-COR1, SW-COR2, SW-COR3, SW-ANTE

VAV-W5, W6, W7, W8, SW-REC

VAV-221, 222-23, 224-25, 226, 227, 228-29, 230

VAV-NE-COR1, NE-COR2, NE-COR3, NE-ANTE

VAV-W1, W2, W3, W4, WE-REC

0. (4) MACH Pro-Zone88 Controllers FFUs, EF-TLT (SW Wing North Alcove)

0. FFUs, EF-TLT (SW Wing South Alcove)

0. FFUs, EF-TLT (NW Wing North Alcove)

0. FFUs, EF-TLT (NW Wing South Alcove) TCP- R1W (Basement)

(1) BACnet Router SRPMs, FFUs

(22) SRPM Room Pressure Monitors FFU Rm 231, 232, 233, 234, 235, 236, 237, 238, 239, 240, SE Anteroom FFU RM 221, 222, 223, 224, 225, 226, 227, 228, 229, 230, NE Anteroom

(20) BACnet Flow Controllers for FFUs Rm 231, 232, 233, 234, 235, 236, 237, 238, 239, 240 Rm 221, 222, 223, 224, 225, 226, 227, 228, 229, 230

File details come from the government source that posted it. Updated .