Item 3 - W519TC-26-R-A061 Supplier_Table_DRAFT.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- 120mm Tank Training Ammunition - FY27-FY32
- Solicitation number
- W519TC-26-R-A061
About this file
This is a supplier table template and instructions document for the 120mm Tank Training Ammunition contract (W519TC-26-R-A061) covering Fiscal Years 2027-2032. Offerors are required to complete tiered supplier documentation identifying their supply base across four levels: Tier 1 (primary suppliers to the prime), Tier 2 (suppliers to Tier 1 providing major sub-assemblies), Tier 3 (suppliers to Tier 2 providing next-level components), and Tier 4 (suppliers to Tier 3 providing component assemblies or raw materials). For each supplier identified at any tier level, offerors must provide: supplier name and facility location, relationship to prime (parent, child, or independent), ISO 9001 certification status, specific component or sub-assembly identification, available production capacity, program criticality rating (High/Medium/Low), identified technical and schedule risks, risk mitigation strategies, single/sole source designation, alternative source qualification status, and additional notes. If suppliers have not yet been identified, offerors must provide a brief explanation of their progress in identifying sources. The template emphasizes that offerors should expand tables as necessary to clearly document their complete supply chain and that lower-tier suppliers not provided should be identified as such in the Additional Notes section. This supplier documentation is intended to support government evaluation of each offeror's supply base capability and risk posture for meeting the multi-year training ammunition production requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Item 7 - Tank Ammo Industry Day Registration Form 22-23SEP26 Rev2.docx | DOCX document | |
| Item 8 - 120mm Tank Training Ammo Industry Day Agenda.docx | DOCX document | |
| Item 7 - Tank Ammo Industry Day Registration Form 22-23SEP26 Rev1.docx | DOCX document | |
| Item 4 120MM Sections LM 28 August 2026_DRAFT.docx | DOCX document | |
| Item 6 - PIEE Solicitation Module Vendor Access Instructions.pdf | ||
| Item 7 - Tank Ammo Industry Day Registration Form 22-23SEP26.docx | DOCX document | |
| Item 5 - W519TC-26-R-A061 120mm Tank Training Price Matrix_DRAFT.xlsx | XLSX spreadsheet | |
| Item 2 - Section C Narrative SOW_V15JUN26_DRAFT.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Directions
| Supplier Tier Table Directions | Tier Definitions | V.20JUL2026 |
| Offeror shall fill out the Tier 1-x tabs to the best of its ability to support evaluation of its specific supply base for the Tank Training Contract. |
If no supplier has been identified it shall provide a brief explaination of where the offeror is in the process to identify a source.
| Offeror shall expand table as required to provide required information clearly | (Tier 1) - Primary supplier to the Prime - To include end item test site | |
| (Tier 2) - Supplier to Tier 1 - Typically major sub-assembly component | ||
| (Tier 3) - Supplier to Tier 2 - Typically next level components supporting a major sub-assembly | ||
| (Tier 4) - Supplier to Tier 3 - Typically next level compoent supporting component assembly or raw materials |
| Example for Guidance Only |
| (Tier 1) - LAP Facility |
| (Tier 2) - Combustible Cartridge Case Manufacturer |
| (Tier 3) - Nitrocellulose (NC) Manufacturer, Kraft Paper Supplier (Raw Material) |
| (Tier 4) - Wood Pulp suppler for NC (RM) |
| Information Categories (for Guidance Only) |
| Component / Sub-Assembly / Raw Material |
| Sub-components or specialized services |
| Specialized materials or hardware |
| Raw materials (e.g., chemical precursors, steel) |
Definations for Tier Spreadsheets
| Supplier Name & Facilty Location |
| Name of supplier and City, State; If supplier is outside US - City, Country |
| Relationship to Prime |
| Parent, child, or 3rd party independing company |
| ISO 9001 Certification |
| ISO Certified (Year), Compliant (Year), or Non-compliant/certified |
| Higher Level Assembly (Tiers 2-4 Spreadsheets) |
| Identify the next level up assembly for linkage of higher level assembly to lower level components. Lowest level should be "raw material"; If assembly has lower than 4th tier please ID that "lower levels not provided" in the "Additional Notes" Section |
| Compoent / Sub-Assembly / Raw Material |
| Provide the specific component, major sub-assembly or if item is lowest level raw material |
| Available Capacity |
| Provide known maximium capacity, if maximum capacity unknown, provide quoted available |
| Identification of Program Criticality (High/Med/Low) |
| Impact of failure on the program - Cost / Schedule / Technical Achievement |
| Identified Technical & Schedule Risks |
| Identify major (medium/high) risks associated with supplier or component supply base |
| Risk Mitigation Strategy |
| Short synopsis of intended mitigation approach |
Single/Sole Source? (Yes/No)
| Alternative Source Status |
| Qualified / Needs Qual / Not Applicable (Q/NQ/NA) / If there is Alternate Srouce - provide Company name |
| Additional Notes |
| Additional information supporting supply base input - limitations, low but likely risks, health of supplier, additional assessment, etc |
DRAFT
Tier 1 Suppliers
| Supplier Name & Facility Location | Relationship to Prime | ISO Certification | Component / Sub-Assembly / Raw Material | Available Capacity | Criticality (High/Med/Low) | Identified Technical & Schedule Risks | Risk Mitigation Strategy | Single/Sole Source? (Yes/No) | Alternative Source Status | Additional Notes | |
| Example | Widget, Inc - Far Far Away, Antarctica | Parent Organization | ISO 9001 Compliant | Final Widget Assembly | 6,000 units annually | Medium | Schedule - Penguins only work during sunlight hours | Increase training for more efficient output during daylight | Yes | NQ / Smash Plate, LLC | Considering qualifying new source closer to equator |
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 | |||||||||||
| 9 | |||||||||||
| 10 | |||||||||||
| 11 | |||||||||||
| 12 | |||||||||||
| 13 | |||||||||||
| 14 | |||||||||||
| 15 | |||||||||||
| 16 | |||||||||||
| 17 | |||||||||||
| 18 | |||||||||||
| 19 | |||||||||||
| 20 | |||||||||||
| 21 | |||||||||||
| 22 | |||||||||||
| 23 | |||||||||||
| 24 | |||||||||||
| 25 | |||||||||||
| 26 | |||||||||||
| 27 | |||||||||||
| 28 | |||||||||||
| 29 | |||||||||||
| 30 | |||||||||||
| …n |
DRAFT
DRAFT
DRAFT
Tier 2 Suppliers
| Supplier Name & Facility Location | Relationship to Prime | ISO Certification | Component / Sub-Assembly / Raw Material | Available Capacity | Criticality (High/Med/Low) | Identified Technical & Schedule Risks | Risk Mitigation Strategy | Single/Sole Source? (Yes/No) | Alternative Source Status | Additional Notes | |
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 | |||||||||||
| 9 | |||||||||||
| 10 | |||||||||||
| 11 | |||||||||||
| 12 | |||||||||||
| 13 | |||||||||||
| 14 | |||||||||||
| 15 | |||||||||||
| 16 | |||||||||||
| 17 | |||||||||||
| 18 | |||||||||||
| 19 | |||||||||||
| 20 | |||||||||||
| 21 | |||||||||||
| 22 | |||||||||||
| 23 | |||||||||||
| 24 | |||||||||||
| 25 | |||||||||||
| 26 | |||||||||||
| 27 | |||||||||||
| 28 | |||||||||||
| 29 | |||||||||||
| 30 | |||||||||||
| …n |
DRAFT
DRAFT
DRAFT
Tier 3 Suppliers
| Supplier Name & Facility Location | Relationship to Prime | ISO Certification | Component / Sub-Assembly / Raw Material | Available Capacity | Criticality (High/Med/Low) | Identified Technical & Schedule Risks | Risk Mitigation Strategy | Single/Sole Source? (Yes/No) | Alternative Source Status | Additional Notes | |
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 | |||||||||||
| 9 | |||||||||||
| 10 | |||||||||||
| 11 | |||||||||||
| 12 | |||||||||||
| 13 | |||||||||||
| 14 | |||||||||||
| 15 | |||||||||||
| 16 | |||||||||||
| 17 | |||||||||||
| 18 | |||||||||||
| 19 | |||||||||||
| 20 | |||||||||||
| 21 | |||||||||||
| 22 | |||||||||||
| 23 | |||||||||||
| 24 | |||||||||||
| 25 | |||||||||||
| 26 | |||||||||||
| 27 | |||||||||||
| 28 | |||||||||||
| 29 | |||||||||||
| 30 | |||||||||||
| …n |
DRAFT
DRAFT
DRAFT
Tier 4 Suppliers
| Supplier Name & Facility Location | Relationship to Prime | ISO Certification | Component / Sub-Assembly / Raw Material | Available Capacity | Criticality (High/Med/Low) | Identified Technical & Schedule Risks | Risk Mitigation Strategy | Single/Sole Source? (Yes/No) | Alternative Source Status | Additional Notes | |
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 | |||||||||||
| 9 | |||||||||||
| 10 | |||||||||||
| 11 | |||||||||||
| 12 | |||||||||||
| 13 | |||||||||||
| 14 | |||||||||||
| 15 | |||||||||||
| 16 | |||||||||||
| 17 | |||||||||||
| 18 | |||||||||||
| 19 | |||||||||||
| 20 | |||||||||||
| 21 | |||||||||||
| 22 | |||||||||||
| 23 | |||||||||||
| 24 | |||||||||||
| 25 | |||||||||||
| 26 | |||||||||||
| 27 | |||||||||||
| 28 | |||||||||||
| 29 | |||||||||||
| 30 | |||||||||||
| …n |
&"Arial Black,Bold"&K02-023DRAFT
&"Arial Black,Bold"&K02-024DRAFT
DRAFT
DRAFT
DRAFT
File details come from the government source that posted it. Updated .